Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “transmissive”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 973 records · Page 54

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2021 [Slides]

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While most projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2021, as well as data on "operational" and "withdrawn" projects where those data are available. We find that the amount of new electric capacity in these queues is growing dramatically, with over 1,400 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 90% of which is for zero-carbon resources like solar, wind, and battery storage). Solar (676 GW) and battery storage (~420 GW) are – by far – the fastest growing resources in the queues; combined they accounted for nearly 85% of new capacity entering the queues in 2021. Substantial wind (247 GW) capacity is also seeking interconnection, 31% of which is for offshore projects (77 GW). In total, about 930 GW of zero-carbon generating capacity is currently seeking transmission access, as is 74 GW of natural gas capacity. Hybrids now comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 286 GW of solar hybrids (primarily solar+battery) and 19 GW of wind hybrids are currently active in the queues; nearly half of battery storage in the queues is paired with generation. However, much of this proposed capacity will be withdrawn from the queues and not built. Among a subset of queues for which data are available, only 23% of the projects seeking connection from 2000 to 2016 have subsequently been built. Completion percentages appear to be declining and are even lower for wind and solar than other resources. Additionally, wait times are on the rise: for the regions with available data, the typical duration from connection request to commercial operation increased from ~2.1 years for projects built in 2000-2010 to ~3.7 years for those built in 2011-2021.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cyber Resilient Flexible Alternating Current Transmission Systems (XFACTS)

This report summarizes the activities conducted under the DOE-OE funded project DEOE0000897, Cyber Attack Resilient Flexible AC Systems – XFACTS. Hitachi Energy (HE), in collaboration with ABB Inc. (ABB), Bonneville Power Administration (BPA), University of Illinois at Urbana-Champaign (UIUC), Iowa State University (ISU), and University of Idaho (UI) pursued the development of a system of defense for Flexible Alternating current Transmission Systems against cyber-attacks (XFACTS). A FACTS substation enhanced with XFACTS defense mechanisms will be capable of mitigating cyberattacks especially those that seek to control electrical parameters like voltage or current and interrupt the power flow in AC lines. It empowers existing FACTS controllers and associated intelligent electronic devices to detect and mitigate malicious intents to depress system voltages, destabilize power flows, trip AC circuit breakers, corrupt currents, and voltages, even if the malicious commands and the measurements have correct syntax. The XFACTS functions utilize the physics of active power electronic systems, control and protection, electric power engineering principles, and state estimation to bring more in-depth cyber defense closer to the protected FACTS substation devices.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Real-Time Operations Manual for the IEEE 118 Bus Transmission Model

This document presents a sample operations manual for the IEEE 118 Bus Model, which is a synthetic test case developed in 1962 from a section of the transmission grid operated by American Electric Power (AEP). The model is one of the most used synthetic test cases for development of power system applications and is referenced by over 9000 papers. However, the model lacks any context for use with real-time energy management system (EMS) applications, including common considerations, such as generator ramp rates, reactive capabilities, operating limits, and other information typically used by power system operators for real-time decision making. This manual divides the IEEE 118 Bus Model into three operating areas, defines various operating limits, and sets recommended operating procedures for responding to a few types of emergency operating conditions. The manual can be used in support of a wide variety of human-in-the-loop evaluation methodologies for new advanced power applications.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2022 [Slides]

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While most projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2022, as well as data on "operational" and "withdrawn" projects where those data are available. We find that the amount of new electric capacity in these queues is growing dramatically, with over 2,000 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 95% of which is for zero-carbon resources like solar, wind, and battery storage). Solar (947 GW) and battery storage (~680 GW) are – by far – the fastest growing resources in the queues; combined they accounted for over 80% of new capacity entering the queues in 2022. Substantial wind (300 GW) capacity is also seeking interconnection, 38% of which is for offshore projects (113 GW). In total, about 1,250 GW of zero-carbon generating capacity is currently seeking transmission access, as is 82 GW of natural gas capacity. Hybrids projects (co-locating multiple generation and/or storage types) comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 457 GW of solar hybrids (primarily solar+battery) and 24 GW of wind hybrids are currently active in the queues; over half of battery storage in the queues is paired with generation. However, much of this proposed capacity will be withdrawn from the queues and not built. Among a subset of queues for which data are available, only 21% of the projects (and 14% of capacity) seeking connection from 2000 to 2017 have been built as of the end of 2022. Additionally, interconnection wait times are on the rise: The typical duration from connection request to commercial operation increased from <2 years for projects built in 2000-2007 to nearly 4 years for those built in 2018-2022 (with a median of 5 years for projects built in 2022).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Packetized Energy Management: Coordinating Transmission and Distribution (Final Report)

The project Packetized Energy Management (PEM): Coordinating Transmission and Distribution was part of the ARPA-E NODES program from 2015 to 2023. The high-level goal of the project was to develop and demonstrate novel, scalable, and impactful technologies related to the coordination of networked distributed energy resources (DERs). By demonstrating responsive means by which fleets of DERs could be coordinated to enhance grid operation and reliability, the U.S. could accelerate renewable integration and electrification efforts and meet decarbonization goals.

25 ENERGY STORAGE↗

Transmission Operator Workflows for Real-Time Reliability Studies: A Review of Control Room Practices and Naturalistic Decision Making

This report provides an overview of real-time reliability study tools and their use by power system operators in the control room environment. After introducing some of the nuances of the control room environment and the differences in perspectives between power system engineers and operators, the roles and responsibilities of key entities involved in RTCA workflows are introduced. These are specifically the transmission system operator (TOP) and reliability coordinator (RC), which are required to run tools such as real-time contingency analysis (RTCA) as part of a real-time reliability assessment every 30 minutes, as dictated by a series of standards issued by the North American Electric Reliability Corporation (NERC). The process by which power systems operators operate the grid is discussed in terms of naturalistic decision making (NDM) and the recognition-primed decision-making (RPD) model. This cognitive model describe how experts working in high-risk, high-stress environments make safety-critical decisions under uncertainty and time pressure. For power system operators, the mental simulations involved in the traditional RPD model are supplemented by physics-based simulations using numerical tools, such as RTCA, to improve situational awareness and effectiveness of control actions. Next, a generic workflow is introduced to describe operator decision making for running RTCA tools and responding to system violations on a pre-contingent basis. The types of analysis performed and control actions chosen by power system operators are described in detail. The overall high-level workflow is then expanded in subsequent sections, with special attention given to high-voltage violations, low-voltage violations, and thermal overloads. Each type of violation is described in detail, with explanations of common causes, impacts on equipment and customers, and mitigation strategies. An additional workflow diagram is provided for each type of violation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Utility Experience with Inverter-Based Resource Impacts on Transmission Protection

High penetration of inverter-based resources (IBR) can adversely affect the transmission protection schemes in the area. With the proliferation of IBRs, utilities are finding out that conventional protection schemes are not adequately equipped to protect the electric systems because the existing system has been designed based on the fault current response of conventional rotating-machine-based generators. This report identifies various protection challenges due to IBRs that industry is facing.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A review on protection challenges of Transmission Lines connected to Inverter Based Resources

The increased penetration of inverter-based resources (IBRs) connected to transmission grids is challenging how traditional electric power systems operate. Such systems were originally designed based on the dominant presence of synchronous generators. Some main challenges include the increased concerns about system stability due to the reduced system inertia caused by IBRs and the reduced protection reliability caused by the non-deterministic fault current response of IBRs. The protection relays’ algorithms have been designed and validated based on well-known fault current characteristics of synchronous generations, while the short-circuit responses of IBRs heavily depend on their vendor-specific control schemes, which are mainly set to protect inverter semiconductor switches and DC components. The magnitude of short current that IBRs contribute is typically between 1.1–1.5 times the rated current that may behave unstably and incoherently with the voltages. The control scheme of the IBRs also controls the active (P) and reactive (Q) support during system voltage sag and swell conditions. These characteristics challenge not only protective relay schemes but also existing short-circuit software tools to correctly model IBRs for fault studies and protection coordination analyses.

14 SOLAR ENERGY↗

Remote Sensing Approach for Monitoring Tree Health Adjacent to Transmission Corridors

This study presents an initial proof-of-concept for a satellite-based remote sensing approach to identify and monitor potential areas of poor tree health across the entire BPA service territory on an annual basis. We tested three variants of “delta peak NDVI” ( ΔPN ) change detection metrics that express interannual variation in primary productivity relative to a baseline by comparing ΔPN values for known insect/disease disturbances and nearby reference locations. All three metrics showed promise for detecting poor tree health in the year during disturbance, but the metric based on the difference from the long-term (2016-2024) median ( Δ Med PN ) was preferred due to its responsiveness to change in the years during and after disturbance, resilience to interannual variation, and ease of interpretation as being above or below normal. Comparison of Δ Med PN grouped by relative severity of disturbance indicated it was not sensitive enough to detect “low” severity disturbances, as mapped by USGS’s LANDFIRE program, but could distinguish “moderate” and “high” severity disturbances from reference locations. These findings informed selection of a threshold for Δ Med PN , which was combined with areas exhibiting negative NDVI to map potential areas of concern. Visual inspection of before/after high-resolution imagery and NDVI time series showed that many areas of concern aligned with visible signs of defoliation and die-off as well as other types of disturbance (e.g., landslides, logging, road grading, flooding). Some areas of concern are thought to be false detections caused by persistent shadow, and some could not be explained with visual inspection due to spatiotemporal limitations of before/after imagery. In summary, our approach shows promise for large-scale monitoring of tree health adjacent to BPA transmission lines, but additional work is recommended to improve model sophistication and remove noise.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evaluating Variable-Impedance Magnetically-Insulated Transmission Lines as a Risk-Mitigation Measure for Next-Generation Pulsed Power

This project has produced the first detailed characterizations of power flow resulting from applying the “variable-impedance MITL” concept to real-life systems in Sandia’s pulsed power program (Z and next-generation pulsed power (NGPP)). We present simulation results and analyses for constant-impedance versions of both Z and NGPP and survey the operational viability of several variable-impedance re-designs in the parameter space of linear tapers. Circuit modeling (SCREAMER/Bertha) was used to pinpoint promising candidate designs, and EM-PIC (Empire) simulations were used to evaluate these candidates more rigorously. This approach was particularly successful in the Z regime which resulted in the identification of several viable variable-impedance MITL designs for each level. The approach was more challenged in the operating space NGPP occupies, producing data points that speak to a more restrictive design space due to anode plasma turn-on. In the end, we were able to converge on one viable variable-impedance design for the highest inductance line (level “F”) and one for the highest current line (level “A”). Altogether, the body of simulation evidence presented in this report suggest there does exist flexibility in operating space for magnetically-insulated transmission lines (MITLs) having variable geometric impedance to be a potential enabling technology for safely increasing current delivery (and potentially lowering stack voltage) in pulsed-power drivers by manipulating electron losses; however, operating points for a particular design must be carefully screened. Circuit and EM-PIC modeling provided consistent verdicts in safe operating regimes for operational viability, but additional physics such as anode plasma turn-on which is included in Empire but not in SCREAMER/Bertha was found to be a critical factor affecting power flow that lead to different assessments between the codes. It is not always the case that the occurrence of anode plasma caused a design to fail (some designs turned on anode plasma yet still delivered load currents meeting design targets); the details matter such as how early in the pulse anode surfaces break down (and how large a region). However, in every case that it did fail it was found that the feedback from anode plasma was the cause (i.e., turning off the anode plasma model in Empire restored agreement with the circuit model prediction). As circuit simulations represent an efficient and practical means of surveying design space compared to more computationally-expensive approaches such as EM-PIC, it could be prudent to invest in the research and development of models to include the effects of anode plasma such as ion emission in circuit codes. The variable-impedance MITL design is a new concept that enables controlled manipulation of the initial electron losses in the outer MITL and can be tested on Z today. We encourage follow-on work to explore further optimization (including alternative variable-impedance profiles, e.g., having constant dZ/dR), and to confirm the major findings presented in this report by fielding test hardware on actual Z shots.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Transmission Cost Allocation Practices

This technical brief summarizes approaches to allocating costs of transmission facilities between generators and loads, jurisdictions, and customer classes, and based on project drivers. The brief also discusses planning approaches, stakeholder engagement, considerations for using counterfactuals for cost allocation, and Federal Energy Regulatory Commission and court decisions on cost allocation proposals.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Field Verification of Grid-Forming Inverter-Based Power Plant Performance for Transmission System Reliability

This report describes some examples of the operation of two grid-forming (GFM) inverter-based photovoltaic-battery hybrid power plants connected to the electric system of the island of Kauai in Hawaii. Both plants are photovoltaic power plants with battery energy storage and are connected to the networked transmission system operated by Kauai Island Utility Cooperative (KIUC), along with several other power plants including an oil-fired plant, diesel generators, small hydroelectric plants, a biofuel plant, and several other photovoltaic plants.

14 SOLAR ENERGY↗

Wetlands Delineation Report: Big Eddy-Ostrander Transmission Line

Pacific Northwest National Labs (PNNL) was contracted by BPA to prepare a Wetland Delineation Report to support project planning and compliance with state and federal wetland and waterway removal/fill regulations. This report documents the wetlands and waterways of the U.S./State located along the 66.5 miles of existing transmission line, the access road network, and in areas where hazard trees would be removed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

West Coast Offshore Wind Transmission Literature Review and Gaps Analysis

This review of the state of west coast OSW transmission research organizes the body of literature to date and describes the most impactful grid integration analysis and convening opportunities. It is intended as a scan of the landscape to ground impactful investments, which will guide state and federal entities and private developers to maximize net value of west coast OSW to the Nation.

17 WIND ENERGY↗

Alaska Meteorology, Energy, and Transmission (MET) Toolkit

The Alaska MET (Meteorology, Energy, and Transmission) Toolkit is the National Laboratory of the Rockies' (NLR) new flagship atmospheric dataset, designed to support comprehensive long-term planning and operations across the entire power sector. Serving as the regional counterpart to CONUS-wide HRRR MET Toolkit, this dataset provides a comprehensive, high-fidelity meteorological record covering Alaska.The Alaska MET Toolkit is delivered at an hourly resolution on a standardized 2-km horizontal grid. This dataset is repackaged from the National Oceanic and Atmospheric Administration's (NOAA) operational High-Resolution Rapid Refresh for Alaska (HRRR-AK) forecasts. Spanning from 2019 to 2025, it overcomes the technical barriers of native weather models by providing spatial regridding from the native 3-km HRRR-AK horizontal resolution to a 2-km grid, temporal gap-filling, and vertical interpolation at key energy-relevant heights. By delivering highly accurate, validation-backed data across a comprehensive suite of atmospheric variables - including temperature, pressure, humidity, and wind characteristics - the Alaska MET Toolkit provides a highly accessible and strictly standardized foundation for modern power system modeling.

17 WIND ENERGY↗

Investigation of the thermal decomposition of Pu(IV) oxalate: a transmission electron microscopy study

The degradation of the internal structure of plutonium (IV) oxalate during calcination was investigated with Transmission Electron Microscopy (TEM), electron diffraction, Electron Energy-Loss Spectroscopy (EELS), and 4D Scanning TEM (STEM). TEM lift-outs were prepared from samples that had been calcined at 300°C, 450°C, 650°C and 950°C. The resulting phase at all calcination temperatures was identified as PuO 2 with electron diffraction. The grain size range was obtained with high-resolution TEM. In addition, 4D STEM images were analyzed to provide grain size distributions. In the 300°C calcined sample, the grains were <10 nm in diameter, at 650°C, the grains ranged from 10 to 20 nm, and by 950°C, the grains were 95–175 nm across. Using the Kolmogorov-Smirnov (K-S) two sample test, it was shown that morphological measurements obtained from 4D-STEM provided statistically significant distributions to distinguish samples at the different calcination conditions. Using STEM-EELS, carbon was shown to be present in the low temperature calcined samples associated with oxalate but had formed carbon (possibly graphite) deposits in the 950°C calcined sample. This work highlights the new methods of STEM-EELS and 4D-STEM for studying the internal structure of special nuclear materials (SNM).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Integrated Transmission and Distribution Co-Simulation Platform for Demonstration of Bulk Grid Services Using Distributed Energy Resources

In September 2020, the Federal Energy Regulatory Commission (FERC) released Order 2222, which opens wholesale markets to small-capacity distributed energy resources (DERs), recognizing their potential in improving operational efficiency by providing bulk grid services. Therefore, a co-simulation capability that can connect transmission and distribution (T&D) simulations and evaluate the impacts of DER provision of bulk grid services is needed. In this paper, we present a new integrated T&D co-simulation platform that incorporates T&D system simulators, DER aggregator/group strategies, and a co-simulation coordinator. Industry-standard communication protocols are employed to mimic real-world conditions. Secondary frequency regulation is selected as the representative bulk grid service, and we simulate the responses of DERs to the frequency regulation signals. The simulation results for a solar-rich distribution feeder in Colorado, USA, demonstrate how the T&D co-simulation setup is used to evaluate the contributions of DERs to minimize the bulk grid frequency deviation.

24 POWER TRANSMISSION AND DISTRIBUTION↗