Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “storing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 973 records · Page 54

NSUF Irradiated Materials Library

The Nuclear Science User Facilities has been in the process of establishing an innovative Irradiated Materials Library concept for maximizing the value of previous and on-going materials and nuclear fuels irradiation test campaigns, including utilization of real-world components retrieved from current and decommissioned reactors. When the ATR national scientific user facility was established in 2007 one of the goals of the program was to establish a library of irradiated samples for users to access and conduct research through competitively reviewed proposal process. As part of the initial effort, staff at the user facility identified legacy materials from previous programs that are still being stored in laboratories and hot-cell facilities at the INL. In addition other materials of interest were identified that are being stored outside the INL that the current owners have volunteered to enter into the library. Finally, over the course of the last several years, the ATR NSUF has irradiated more than 3500 specimens as part of NSUF competitively awarded research projects. The Logistics of managing this large inventory of highly radioactive poses unique challenges. This document will describe materials in the library, outline the policy for accessing these materials and put forth a strategy for making new additions to the library as well as establishing guidelines for minimum pedigree needed to be included in the library to limit the amount of material stored indefinitely without identified value.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A close look at beam aborts with rise times less than 40 ms from the years 2014-2016. Case studies.

In an effort to understand the risks of operating RHIC with an additional delay of 40 ms in the abort system, all beam aborts triggered by loss monitors at store from the years 2014, 2015 and 2016 were analyzed; and particularly fast cases, selected. The results were presented at the RHIC retreat on Jul 29, 2016. All beam aborts at injection, during the ramp and at flattop but before the “ev-lumi” event were ignored since the additional delay of 40 ms is proposed for operation at store only. Many (but not all) of the 15 studied cases are of no concern. Cases with high damage potential are rare - but not rare enough. In order to make an added 40 ms during physics store conditions as safe as reasonably possible, additional permit inputs such as 10 Hz BF power supplies, RF storage cavities, power supply error states or BPMs, in addition to significantly reduced loss monitors (LM) thresholds for selected LM should be commissioned.

43 PARTICLE ACCELERATORS↗

Summary of Documentation for DYNA3D-ParaDyn's Software Quality Assurance Regression Test Problems

The Software Quality Assurance (SQA) regression test suite for DYNA3D (Zywicz and Lin, 2015) and ParaDyn (DeGroot, et al., 2015) currently contains approximately 600 problems divided into 21 suites, and is a required component of ParaDyn’s SQA plan (Ferencz and Oliver, 2013). The regression suite allows developers to ensure that software modifications do not unintentionally alter the code response. The entire regression suite is run prior to permanently incorporating any software modification or addition. When code modifications alter test problem results, the specific cause must be determined and fully understood before the software changes and revised test answers can be incorporated. The regression suite is executed on LLNL platforms using a Python script and an associated data file. The user specifies the DYNA3D or ParaDyn executable, number of processors to use, test problems to run, and other options to the script. The data file details how each problem and its answer extraction scripts are executed. For each problem in the regression suite there exists an input deck, an eight-processor partition file, an answer file, and various extraction scripts. These scripts assemble a temporary answer file in a specific format from the simulation results. The temporary and stored answer files are compared to a specific level of numerical precision, and when differences are detected the test problem is flagged as failed. Presently, numerical results are stored and compared to 16 digits. At this accuracy level different processor types, compilers, number of partitions, etc. impact the results to various degrees. Thus, for consistency purposes the regression suite is run with ParaDyn using 8 processors on machines with a specific processor type (currently the Intel Xeon E5530 processor). For non-parallel regression problems, i.e., the two XFEM problems, DYNA3D is used instead. When environments or platforms change, executables using the current source code and the new resource are created and the regression suite is run. If differences in answers arise, the new answers are retained provided that the differences are inconsequential. This bootstrap approach allows the test suite answers to evolve in a controlled manner with a high level of confidence. Developers also run the entire regression suite with (serial) DYNA3D. While these results normally differ from the stored (parallel) answers, abnormal termination or wildly different values are strong indicators of potential issues.

42 ENGINEERING↗

Choosing the best partition of the output from a large-scale simulation

Data partitioning becomes necessary when a large-scale simulation produces more data than can be feasibly stored. The goal is to partition the data, typically so that every element belongs to one and only one partition, and store summary information about the partition, either a representative value plus an estimate of the error or a distribution. Once the partitions are determined and the summary information stored, the raw data is discarded. This process can be performed in-situ; meaning while the simulation is running. When creating the partitions there are many decisions that researchers must make. For instance, how to determine once an adequate number of partitions have been created, how are the partitions created with respect to dividing the data, or how many variables should be considered simultaneously. In addition, decisions must be made for how to summarize the information within each partition. Because of the combinatorial number of possible ways to partition and summarize the data, a method of comparing the different possibilities will help guide researchers into choosing a good partitioning and summarization scheme for their application.

97 MATHEMATICS AND COMPUTING↗

Factors influencing moisture analysis in the 3013 destructive examination surveillance program

Thermogravimetric analysis of a solid sample with mass spectrometry (TGA-MS) of the evolved gas is used in the destructive examination (DE) portion of the Integrated Surveillance Program to quantify the moisture content of the material stored in a 3013 container. As with any measurement determined from a small sample, the collection, storage, transportation, and handling of the sample can affect its ability to represent the properties of the bulk material. During the course of the DE program, questions have periodically arisen concerning the ability of the moisture sample to reflect reliably the actual moisture content of the entire material stored in the 3013 container. Most concerns are related to the ability to collect a representative sample and to preserve the moisture content of the sample between collection and analysis. Recent delays in analysis caused by maintenance issues with the TGA-MS instrument presented a unique opportunity to document and quantify the effects various factors have on the TGA-MS moisture measurement. This report will use recent data to document the effects that current sample collection and handling practices have on the TGA-MS moisture measurement. Some suggestions will be made which could improve the current sample collection and handling practices for the TGA-MS moisture measurement so that the analytical results more accurately reflect the moisture content of the material stored in the 3013 container.

3013↗

Final Report UCLA-Thermochemical Storage with Anhydrous Ammonia

In ammonia-based thermochemical energy storage (TCES), ammonia is dissociated endothermically as it absorbs solar energy during the daytime. When energy is required, the reverse reaction releases energy to heat a working fluid such as steam, to produce electricity. Ammonia-based TCES has great advantages of simplicity, low cost reactants, and a strong industrial base in the conventional ammonia industry. The concept has been demonstrated over three decades of research at Australian National University, achieving a 24-hour demonstration of a complete system. At the start of this project, three challenges were identified that would have to be addressed to show that the system is technically and economically viable for incorporation into a CSP plant with an advanced, high temperature power block. All three of these challenges have now been addressed: 1. The ammonia synthesis reaction had not, to our knowledge, been carried out at temperatures consistent with modern power blocks (i.e., ~650°C). The technical feasibility of operating a reactor under high-temperature, near-equilibrium conditions was an unknown, and was therefore a technical risk. The project has successfully demonstrated steam heating to 650°C and energy recovery to steam at the 5 kWt level. 2. The ammonia system has a relatively low enthalpy of reaction combined with gas phase reactants. This is not a direct disadvantage since the reactants themselves are low cost. The challenge lies in storing the required volume of reactants cost effectively. Therefore, a second key goal was to show, through techno-economic analysis, that underground storage technologies can be used to store the energy-rich gas at a cost that is consistent with the SunShot cost goal. We have identified two promising technologies for gas storage: storage in salt caverns has an estimated cost of 1(USD)/kWht and storage in drilled shafts could be on the order of 7(USD)/kWht. Together these two options answer the technical challenge associated with storage of gas phase components. 3. While this project is primarily concerned with high-temperature heat recovery and methods to store the gaseous components, it is also important to consider the feasibility of the entire system. Consequently, an additional goal was to perform analysis to show the feasibility of integrating endothermic reactors within a tower receiver. A conceptual design of an ammonia dissociation receiver/reactor has been developed that fits into the same size cylindrical envelope as the molten salt receiver in SAM, and has the same design thermal capacity. The calculated thermal efficiency of this receiver is 94.6%. Thus, this investigation has established the technical feasibility of a surround field tower system using ammonia dissociation. With these challenges addressed, we proceeded to design a full-scale synthesis and heat recovery system. A model was developed and validated by comparison with our experimental data. A parametric study showed, among other things, the importance of using small tube diameters and spacing to enhance heat transfer. Multi-parameter optimization was used to find a design that minimizes the wall material volume. Finally, cost estimation shows that the ammonia system has good prospects of meeting the Sunshot 15(USD)/kWht target: estimated costs of the entire synthesis system for the 220 MWt plant with 6 hours of storage are 13(USD)/kWht using salt cavern storage and 18(USD)/kWht using shaft drilling. Costs per kWht are even lower with more hours of storage. With the established technology of ammonia synthesis as a starting point, the successes of the project have mitigated technical risks associated with high-temperature synthesis reaction, underground storage, and tower receiver design. Estimated costs are less than 15(USD)/kWht with salt cavern storage. It is now possible to map a time line to commercial deployment that is likely to be shorter and less risky than other thermochemical cycles under active investigation. UCLA has filed a patent that protects the new ideas developed during this project. Discussions are ongoing with potential investors with the aim of partnering for further work. As well as immediate improvements and extra work with the existing experimental system, a key goal is to extend it to a small solar-driven project at an early opportunity.

14 SOLAR ENERGY↗

SunShot Innovator in Residence Final Report.

This report describes the development of Radical-Ion Flow Battery (RIFB) technology for electrochemical grid storage, and solar thermochemical cycles for conversion of concentrated solar energy to stored chemical energy. The Radical-Ion Flow Battery stores energy via electrolysis of a molten salt electrolyte such as NaNO2 into an alkali metal and nitrogen dioxide, both of which can be stored as liquids in non-pressurized tanks. The use of extremely facile ion-radical single electron transfer reactions at both electrodes that entail no breaking of covalent bonds is directed towards minimizing thermodynamic irreversibility in the charge/discharge cycle, and eliminating the need for catalytically active electrode materials. Both kinetics and mass transport are also facilitated by the absence of diluent species; the battery electrolyte and active chemical ingredient are one and the same. Our underlying strategy for low-cost scalability is the use of only earth abundant starting materials (NaCl, N2, O2, and steel). The underlying strategy for avoiding the problem of capacity fade over 10,000 charge/discharge cycles is the use of extremely simple chemistry. It is argued that operation at elevated temperature is highly advantageous for very large-scale batteries from the standpoint of battery heat-sinking, access to ultrahigh conductivity electrolytes, and increased electrochemical kinetic rate constants. Numerous practical considerations, such as seals, insulators, and electrical feedthroughs are examined in detail, as are questions related to low-cost mass production and battery techno-economic analysis.

25 ENERGY STORAGE↗

Phenolic compounds and black carbon feedback controls on peat decomposition and carbon accumulation in southeastern peatlands under regimes of seasonal drought, drainage and frequent fire

Peatlands store one-third of soil C in terrestrial ecosystems and have persisted through changing climate over millennia from the arctic to the tropics. Approximately one-third of peat stores are found in subtropical and tropical peatlands (STPs) formed from high-lignin woody biomass. In this project, our questions are: 1) why do these non-sphagnum peatlands (STPs) accumulate C under warmer-drier climates and 2) how might insights coming from studying control mechanisms in STPs improve the management and conservation of the vast C stores in boreal peatlands subject to increasing climate forcing. We hypothesized that a dual control or “latch mechanism” reduces decomposition in shrub/tree communities in STPs due to both (1) higher production of polyphenol and aromatic compounds in STPs than found in northern Sphagnum/Carex communities and (2) the buildup of recalcitrant organic matter produced by light fire-drought-warming-adapted communities, together leading to a reduction in the microbial decay rate of peat. After three-years of intensive biological and chemical analysis in a series of field and microcosm experiments along our north to south bog gradient from Minnesota to Peru, we show how previously unrecognized biotic factors, particularly dynamic interlinked above- and belowground attributes control C sequestration in peatlands. Our key findings include (1) phenolics-bridged plant-microbe symbioses, principally slow-growing microbes dominated in higher phenolic wooded STPs, preserving C in peatlands under climate change, 2) phenolics are the overarching factor controlling the relative abundance of slow-and fast-growing microbes, the slow-growing microbes in STPs metabolize C slowly and are inherently resistant to disturbance, 3) global data analysis shows that soil respiration does not increase exponentially from boreal to tropical peatlands, suggesting that slow-growing microbes may have become dominant in most non-boreal peatlands, 4) peat chemistry analysis from over 2000 samples show that across peatlands both from the arctic to tropics and from high to low elevation peatlands recalcitrance increases as aromatic content increases, and 5) peat affected by low-severity wildfires displays a similar pattern of higher aromatic content. Our findings all demonstrate links between peat recalcitrance and increased content of phenolics and other aromatic compounds in plants. Thus, linked plant–microbe symbiotic traits are a key to understanding ecological resilience and resistance developed in peatlands under disturbance. New trait-based approaches that can better link above-and below ground processes are needed to advance both the accuracy and precision of current abiotic-factor-based Earth system models in predicting future soil C responses to climate-change feedbacks.

54 ENVIRONMENTAL SCIENCES↗

Thermal evaluations for mixed organic and nitrate salt drums in interim storage at the WCS Federal Waste Facility

Waste Control Specialists LLC (WCS) operates the Federal Waste Facility (FWF) in Texas that is licensed to process and store certain types of mixed low-level radioactive waste packages. The specific waste currently housed at WCS includes some of the transuranic (TRU) waste that originated at the DOE Los Alamos National Laboratory (LANL) and are destined for disposal at the DOE Waste Isolation Pilot Plant (WIPP) facility. The TRU waste within each Standard Waste Box (SWB) was packaged in 55-gallon drums at LANL. Some of the drums contain mixed organic and nitrate salt contents suspected of experiencing a chemical reaction. The drums (up to four drums in a SWB) were then overpacked in a SWB prior to shipment to WCS. In the most common configuration, WCS placed the SWB containing the drums on metal pallets and stored two SWBs into Modular Concrete Canisters (MCCs) in a double stacked array. The MCCs were placed in a staggered array at a segregated area of the FWF and covered with sand to mitigate the heating that occurred when stored above ground on waste pads. The temporary interment is also intended to provide additional containment of the suspect reactive waste to mitigate release of radioactivity in an incident such as that which occurred at WIPP for one such drum. Void space of each MCC was filled with 1-inch pea gravel to facilitate retrievability. Thermocouple probes were placed within each MCC to monitor heat generation from the SWBs and the MCC lids were closed. The primary objective of this analysis was to estimate the heat generation of the SWB drum contents when the SWB package temperature inside the MCC and the FWF ambient temperature were monitored.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Single-Fuel Reactivity Controlled Compression Ignition Combustion Enabled by Onboard Fuel Reformation (Final Report)

Reactivity-Controlled Compression Ignition (RCCI) is a promising new advanced, low temperature combustion mode that offers efficiencies equal to or greater than conventional diesel combustion, but significantly lower soot and NOx emissions. Additionally, RCCI has enhanced controllability over the combustion process compared to some of the other advanced combustion modes. Therefore, RCCI combustion has the potential to be of great benefit to the public by increasing the efficiency and reducing the harmful pollutant emissions from transportation. However, RCCI combustion achieves this favorable level of performance through the use of two distinct fuels (e.g., diesel and gasoline, diesel and natural gas, or diesel and ethanol). In a vehicle application, RCCI therefore requires two different fuel tanks and fuel injection systems, which presents a significant drawback to the commercialization RCCI. This project proposed a new concept to enable RCCI combustion from a single parent fuel stored onboard the vehicle in a single fuel tank. Specifically, the parent fuel would be stored in the fuel tank and one branch of the fuel system would deliver the parent fuel, unaltered, to the cylinder, while a second branch of the fuel system would route the parent fuel through a fuel reformer to chemically react the fuel into a gaseous fuel mixture, called “reformate”, that has different properties from the original parent fuel. In this way, there can be two fuels at the engine that have different properties, but only one parent fuel needs to be stored and refilled in the vehicle. This initial, exploratory investigation into the feasibility of this promising new concept included reacting three potential parent fuels (diesel, gasoline, and natural gas) in a fuel reformer and determining the composition of the gaseous reformate fuel that exited the fuel reformer. There are different types of reformation processes, but since this project was a proof-of-concept investigation into the potential of Single-Fuel RCCI and the combustion process in the cylinder, a catalytic partial oxidation (CPOX) reformation process was selected, which is more straightforward to perform and control, and would potentially be easier to implement in a vehicle application compared to other reformation processes. Once the three parent fuels were reformed to varying degrees and their reformate compositions were determined, their autoignition tendencies were experimentally determined by comparing advanced combustion results of the reformate mixtures with known reference fuels. This showed that diesel fuel and its reformate fuel mixture exhibited the largest reactivity separation, which is necessary to enable RCCI combustion in the cylinder. Using diesel fuel as the parent fuel, experimental testing was conducted to provide a better understanding of the operational considerations, benefits, and drawbacks of Single-Fuel RCCI with onboard fuel reformation. The experimental testing was accompanied by computational fluid dynamics and system-level modeling to help complement the experiments and further expand the understanding. The main conclusions are that Single-Fuel RCCI using diesel fuel as the direct injected, high reactivity fuel and diesel’s gaseous reformate mixture as the premixed, low reactivity fuel is viable. The efficiencies were equal to, or sometimes greater than, RCCI with conventional fuel pairs, and the emissions were comparable as well. A key consideration is that gaseous reformate fuel contains a large amount of diluents in the fuel which displace air entering the cylinder and act as EGR inside the cylinder. Additionally, the reactivity separation between diesel and its reformate fuel mixture is larger than diesel-gasoline, but less than diesel-natural gas, and the combustion process therefore responded in a manner that was between the two conventional fuel pairs. Finally, although achievable in the cylinder, there are practical drawbacks or other disadvantages of Single-Fuel RCCI with onboard fuel reformation. First, this project used a CPOX reformation process which is exothermic, meaning that a portion of the fuel’s energy was released in the reformer where it could not be converted into useful work. This constituted an efficiency penalty of the system of on the order of 10% or 4 percentage points. Future research should therefore focus on alternate reforming processes including steam-methane reforming or autothermal reforming where there might not be any energy released in the reformer, or there could even be an energy gain in the reformer (through an endothermic process with waste heat recovery). Practical drawbacks that exist, but were beyond the scope of this preliminary proof-of-concept research project, are the added cost of the fuel reformer, which is a catalyst made of precious metals, transient response of the system, and the lifetime of the fuel reformer.

33 ADVANCED PROPULSION SYSTEMS↗

NSLS-II Storage Ring Injection Using a Nonlinear Injection Kicker

The NSLS-II has been operating successfully with top off injection since September 2015. Measurements of the stored beam show a transient of 200 μm in the long straight sections during top off injections. This transient is not desirable for some users, particularly those who specialized in imaging or are otherwise sensitive to beam motion. Users are provided with a signal with which they can gate their detectors, but it is desirable to reduce or eliminate this motion all together. Studies have been performed to reduce the transients, and it is clear that the power supplies require more tunability in the pulse shape in order to reduce the transient across the entire bunch train. Other light sources have explored the possibility of using pulsed quadrupoles and sextupoles as the injection magnet. The stored beam receives no kick as the on-axis fields in these magnets is zero, but the injected beam would see a kick as it is off-center. One drawback of the pulsed quadrupole is that the stored beam experiences a size oscillation. Another issue with a nonlinear kicker is the gradient seen by the injected beam. The transport line needs to be tuned for this gradient, and depending on the strength of the nonlinearity, this gradient may change greatly with injected beam position. Therefore, other facilities have explored other magnet configurations that are nonlinear but have a gradient with less positional dependence. The prospect of using a sextupole kicker was investigated during the design phase of the NSLS-II. It was decided that the idea would not be pursued for several reasons. In particular, the design that was studied the most in depth was not compatible with the standard four bump injection design and the tolerances required were deemed too tight at the time. Other ideas were discussed as well and ultimately none were accepted into the design. In this report we discuss the possibility of placing a nonlinear kicker in the first straight section after the injection straight instead of using the injection bumps. The design of the kicker is based on a design that has been used successfully at BESSY and MAX IV. Our conceptual kicker design is compatible with the existing ring optics and power supply requirements. We show that the transport line is capable of being matched to the required optics. The design does not have restrictive tolerances and is a viable option for a facility upgrade.

36 MATERIALS SCIENCE↗

NSLS-II SR Commissioning Report

The NSLS-II storage ring (SR) phase I commissioning has been successfully completed in May 12, 2014. In accordance to the project milestone, 25 mA average current was achieved in the storage ring with PETRA III 500 MHz 7-cell PETRA-III RF cavity but w/o ID’s and Landau cavities. In about 5 weeks we delivered a 3 GeV beam to the ring injection straight section, made the 1st turn around the ring, achieved hundreds of turns optimizing injection, stored beam having sextupoles and RF turned ON. Injection efficiency was achieved 95%, close orbit rms value is ~100 um, tune and chromaticity were measured and adjusted as desired, and beam lifetime was a few hours depending on the stored beam current. This report consists of a summary, a chronological part, the injector system performance in Ch3, SR commissioning experience in Ch4 and the outlook of remaining work in Ch5. The SR commissioning experience includes the software experience, hardware (timing, diagnostics, RF, vacuum, PS) operation experience, the strategy for initial injection beam to the stored beam, measurement of the linear optics and control to the desired value, nonlinear beam dynamics study, beam instability study, the subsystem reliability and fault study at different scenarios.

36 MATERIALS SCIENCE↗

Integrated Commercial Carbon Capture and Storage (CCS) Prefeasibility Study at Rock Springs Uplift, Wyoming (Final Report)

To establish the potential of safe, long-term commercial-scale carbon capture & storage (CCS) in southwestern Wyoming, the University of Wyoming formed a CCS coordination team (CCT) to complete a Phase I CarbonSAFE pre-feasibility study adjacent to the region’s largest coal-fired power plant, the Jim Bridger Plant (JBP). The study’s primary objective was to evaluate the potential of storing 50+ million metric tons of anthropogenic carbon dioxide (CO 2 ) in stacked reservoirs over a period of 25 years. In addition, this integrated study evaluated related aspects of carbon capture utilization & storage (CCUS) at the study site, including: (1) the CO 2 character of post-combustion flue gas from JBP and the technical capacity for retrofitting proven commercial-scale CO 2 capture technology relative to CO 2 source character and technological constraints; (2) utilization of the existing CO 2 pipeline network in the immediate vicinity of JBP for enhanced oil recovery (CO 2 -EOR) and utilizing that network as part of a regional hub for CO 2 storage from other anthropogenic sources; (3) assessment of the challenges and benefits of meeting all of CarbonSAFE programmatic Phase I goals relative to Wyoming’s carbon management regulatory framework; and (4) assessment of the community and environmental factors that may impact CCS at JBP. With respect to storage, we analyzed the potential of stacked Mesozoic reservoirs at the study site, focusing on the Entrada and Nugget sandstones. The reservoir response to injection simulations varied greatly between formations, though they both were capable of CO 2 storage. The Entrada Sandstone is relative thin (~40’) and heterogeneous; storage using one injection and production well was limited to 1.2 Mt over 25 years at the study site. The Nugget Sandstone is much thicker (> 400’) and generally homogeneous; storage using one injection and production well approached 15.0 Mt over 25 years; this scenario suggests that the storage potential in the Nugget Sandstone is close to the estimated P90 calculation of 9.6 Mt/mi 2 as models indicate a storage potential of 8.3 Mt/mi 2 at saturation. Both reservoirs’ storage capacity benefited greatly from coupling an injection well with an offset production well; total storage capacity increased and reservoir pressure stayed below critical thresholds. This indicates that implementing a pressure management strategy at the study site would optimize storage and decrease risk. Seals associated with the targeted reservoirs were shown to be capable of retaining the potential storage volumes, and the site benefits from multiple seal redundancies (i.e. > 7,000’ of seal formations). Furthermore, assessment of different reservoir variables (e.g., fluid composition, pressure, etc.) indicates all reservoirs at the study site are isolated. Storage assessments from Mesozoic reservoirs were coupled with simulations from the site’s Paleozoic reservoirs (the Weber Sandstone and Madison Limestone), which were the focus of previous study. The fully integrated stacked reservoir pre-feasibility studies suggest that the Nugget and Madison formations alone could safely store 50 million metric tons of CO 2 within the study site. Furthermore, both formations are true saline reservoirs near JBP, making them ideal target reservoirs for CO 2 sequestration. Analysis of Wyoming’s laws and regulations confirm that the State has a favorable policy environment for CCS/CCUS. The project’s economic models estimated that the following revenues collectively are sufficient to finance the project over its lifespan if CO 2 utilization is coupled with CCS via the following strategies: (1) sales of CO 2 for EOR (approximately $69 million/year); (2) use of CO 2 tax credits such as amended §45Q and §48A (approximately $484 million total); and (3) sales of low-carbon electricity and marketable carbon offset/credits into carbon-constrained markets (approximately $11-$17 million/year) to West Coast consumers. These revenue estimates are broadly consistent with other studies that concluded arbitrage in JBP retail electricity sales between California and Wyoming could help to support the cost of deploying CCS at JBP. The models also indicate that maintaining a successful business case for long-term CCS -- wherein associated capture, transportation and operational costs are fully addressed at JBP -- is reliant on numerous external factors that complicate predictions. This study suggests that this site meets the CarbonSAFE program’s requirements of being able to feasibly store 50+ million metric tons of CO 2 over 25 years within the site’s stacked reservoirs, especially if coupled with pressure management strategies. This study suggests that the Nugget Sandstone and the Madison Limestone are two of the best reservoirs in the State with respect to overall storage capacity. In addition, the site’s proximity to existing CO 2 transportation networks, CO 2 -EOR opportunities, ability to sell to markets that value low-carbon electricity, Wyoming’s existing carbon regulatory framework, and a public that is well-educated with respect to energy markets and issues collectively increase the potential for implementing commercial-scale CCS adjacent to the JBP. With respect to the available technical and non-technical site data, and the reservoir quality at the study site, we suggest that this site is capable of moving directly into Phase III of the CarbonSAFE program.

01 COAL, LIGNITE, AND PEAT↗

Sparse Data Acquisition on Emerging Memory Architectures

Emerging memory devices, such as resistive crossbars, have the capacity to store large amounts of data in a single array. Acquiring the data stored in large-capacity crossbars in a sequential fashion can become a bottleneck. We present practical methods, based on sparse sampling, to quickly acquire sparse data stored on emerging memory devices that support the basic summation kernel, reducing the acquisition time from linear to sub-linear. Experimental results show that at least an order of magnitude improvement in acquisition time can be achieved when the data is sparse.

97 MATHEMATICS AND COMPUTING↗

Helium pressure increase inside GPHS clads: implications for formation of distended clads

Distension of GPHS clads has generally been attributed to gas buildup inside the clad. The bulging vent frit cover can be caused only by gas pressure, since the vent cover is isolated from the fuel by the vent frit. Gas generation is the only change expected as the oxide fuel ages. However, several data suggest that gas pressure is not the origin of the distension of the clad body. Gas pressure sufficient to distend the iridium body of the clad would be on the order of 1500 psi. This high pressure is very unlikely to be reached inside a GPHS clad, because the vent frit cover weld cannot sustain high pressures. Every distended clad that has been examined has an open vent frit, suggesting that the vent frit cover eventually opens on all distended GPHS clads. No gas pressure has been observed in any distended clad. In addition, the vent frit cover is sufficiently thin, about 2 grains thick, that diffusion of helium through the intact cover is possible and almost certainly occurs. Conversely, no clad has ever been definitively observed to distend after venting. Removal of the vent cover allows free escape of any radiolytically generated helium. However, there is little data on the behavior of vented GPHS. The vent cover is seldom removed at LANL, and vent covers are not removed on clads that will be stored. The vent covers are known to have been removed from the four clads residing in a module which was stored for 8 years. Expansion of the fuel is more likely to provide sufficient force on the iridium clad to distort the iridium metal. Radiographs indicate that the fuel inside a distended GPHS clad is also distended, filling all or most of the interior volume of the GPHS. No radiograph shows the fuel expanded and in contact with the weld shield and the distorted side of the GPHS clad without distension. However, radiography is infrequently done on stored clads unless they exhibit distension, so the dimensions of fuel in normal clads are not generally known.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

North Dakota Integrated Carbon Storage Complex Feasibility Study. Final report

In spring 2017, the Energy & Environmental Research Center (EERC) initiated an effort to determine the feasibility of developing a commercial-scale CO 2 geologic storage complex able to store 50+ million tonnes (Mt) of CO 2 in central North Dakota safely, permanently, and economically. The objective was to fulfill the goals of the U.S. Department of Energy (DOE) Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative and address technical and nontechnical challenges specific to commercial-scale deployment of a CO2 storage project. The findings clearly show that the concept of capturing CO 2 from a lignite-fired electrical generation facility in central North Dakota and safely and permanently storing the CO 2 in the deep subsurface is indeed technically, economically, and socially feasible. This project evaluated two study areas and their respective geologic storage complexes located adjacent to separate coal-fired facilities in North Dakota: the Basin Electric Power Cooperative (BEPC)-owned Great Plains Synfuels Plant (GPSP) and the Minnkota Power Cooperative (Minnkota)-owned Milton R. Young Station (MRYS). These locations, one with CO 2 capture in place and an existing CO 2 pipeline, are bolstered by progressive North Dakota pore space ownership and long-term liability laws. These elements and a motivated team created an ideal synergistic scenario for ensuring success of the CarbonSAFE Initiative and promoting North Dakota’s statewide vision for carbon management. The project included drilling two new geologic characterization wells, integrating an existing 3-D seismic survey, creating a geologic model subsequently used for injection simulation, a risk assessment, public outreach, and generating a site development plan based on results. In addition, the performance of select National Risk Assessment Partnership tools was evaluated. The geologic characterization wells were drilled ~5600 feet deep to the Broom Creek Formation; ~350 feet of core was retrieved from each well. The core included the Broom Creek (targeted injection zone) and a portion of the overlying Opeche Shale (seal). The Flemmer-1 well, west of Beulah, North Dakota, yielded 169 feet of sandstone. The BNI-1 well located south of Center, North Dakota, yielded 124 feet of sandstone. In each case, laboratory analysis of the sandstone showed permeability in the 300–1000-mD range, with porosity of 20%–30%. The Flemmer-1 well was sited within the boundaries of an existing 3-D seismic survey. Colocating the well with the seismic survey maximized the relationship between new and legacy data and developed a first-of-its-kind interpretation of the geologic fabric of the Broom Creek. Geologic characterization data were integrated into a 5544-mi 2 geocellular model that encompassed both new wells and stratigraphy from the surface to the Amsden Formation (underlying the Broom Creek). The model was later expanded vertically to include the deeper Black Island–Deadwood interval to examine its potential viability as a storage target. The geocellular model provided the foundation for dynamic simulation of CO 2 into the Broom Creek. Results of the simulation suggest that the Broom Creek could accept the DOE target rate of 2 Mt/yr of CO 2 into as few as two wells. To bracket the expected capture from MRYS, simulations were also investigated for a 4-Mt/yr rate near MRYS. Although more wells are needed (two additional), the Broom Creek still has the storage resource to accept the CO 2 at the increased rate. A risk assessment exercise was conducted to identify and assess technical and nontechnical risks that could prevent potential candidate storage complexes within the study area from serving as commercial storage sites. The assessment identified and evaluated six technical risk categories: 1) CO 2 injectivity, 2) storage capacity, 3) lateral migration of CO 2 , 4) lateral pressure propagation, 5) vertical migration of CO 2 or formation brine, and 6) induced seismicity. Following two rounds of analysis and scoring, no risks were determined to preclude continued efforts to develop carbon capture, utilization, and storage (CCUS) in central North Dakota. The risk assessment results will be used to guide future site characterization, modeling and simulation, and monitoring activities. A specific nontechnical strategic risk based on challenges that may be realized in amalgamation of pore space resulted in vertically expanding the geologic model to incorporate the potential for stacked storage in multiple saline reservoirs. By including the Black Island–Deadwood interval (the basal sedimentary reservoir in this region), the amalgamated areal extent could be reduced by as much as 45%. Working with a smaller geographic area reduces risks and costs associated with monitoring and pore space leasing. An economic evaluation incorporating capture; transport (<5 mi); Class VI wells; permitting; and monitoring, verification, and accounting suggests implementing commercial-scale CCUS is economically attractive if the federal tax benefits of 45Q are included. This is validated by Minnkota’s continued pursuit of CO 2 capture and geologic storage at MRYS through its Project Tundra initiative, indicating that there is a business case for CCUS in central North Dakota. Currently, North Dakota is the only state with underground injection control (UIC) Class VI primacy. Built into the North Dakota Century Code is a series of regulatory requirements that guide the process to obtain a Class VI CO 2 storage facility permit. As part of this project, a site development plan was compiled to assure compliance with North Dakota’s requirements to permit a commercial-scale CO 2 storage operation and includes a prospective time line encompassing a general breakdown of activities. In total, an estimated 30 months would be needed to execute the necessary steps to attain a North Dakota CO 2 storage facility permit. Outreach was an integral part of the project and encompassed any project-related activity that had contact or exposure beyond the project team. The goals of outreach were to foster an environment from which stakeholders could make informed decisions about the project and gauge community receptiveness to a CCUS project. A consistent set of messages and outreach products were developed in conjunction with an outreach advisory board that integrated project partners and team members. To gauge public acceptability of geologically storing CO 2 , 5611 households in the project area were invited to participate in an online survey. The survey results indicate that the public attitude regarding CCUS is neutral to positive, with strong sentiment that CO 2 capture and storage may be an approach to maintain the economic vitality of the region. To achieve project objectives, critical support in the form of financial backing, engineering evaluations, site access, outreach collaboration, operations data, risk assessment/evaluation, and software access was provided by BEPC, the North Dakota Industrial Commission Lignite Research Council, ALLETE Clean Energy, BNI Energy, North American Coal Corporation, Minnkota, Prairie Public Broadcasting, Computer Modelling Group Ltd., and Schlumberger.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Southeast Offshore Storage Resource Assessment (SOSRA) (Final Technical Report)

Subsurface geologic storage of CO 2 can play a major role in offsetting greenhouse gas emissions in a manner that is safe, economical, and acceptable to the public. Due to legal advantages and potential vast resource capacity, offshore storage offers an attractive alternative to onshore storage. Indeed, the success of the Sleipner project in the North Sea demonstrates the technical feasibility of offshore storage as not only a viable option, but as an early opportunity for commercial deployment. Although the storage capacity of offshore reservoirs is expected to be vast, no comprehensive assessment of the offshore storage resource in the southeastern United States had been performed. In a preliminary analysis of a 10,000 mi 2 area of offshore Alabama and the western Florida Panhandle, Hills and Pashin (2010) suggested that about 170 Gt of CO 2 could be stored in Miocene sandstone and that at least 30 Gt could be stored in deeper Cretaceous formations. A task force convened by the Southern States Energy Board (SSEB) and the Interstate Oil and Gas Compact Commission (IOGCC) found that no assessment had been made of the offshore storage resource potential in the shelf areas of the Atlantic seaboard and the eastern Gulf of Mexico in the southeastern US. Considering that the U.S. Environmental Protection Agency estimates that about 40% of anthropogenic CO 2 emissions in the US are generated in the southeast, the lack of an offshore CO 2 assessment constitutes a major gap in understanding of the regional storage resource. In order to address this significant gap in knowledge of the regional storage resources and geologic capacity the Southern States Energy Board (SSEB) led a coalition of southern universities and technical experts to assess prospective geologic storage resources for carbon dioxide (CO 2 ) in the State and Federal waters of three planning areas: The Mid-Atlantic; The South Atlantic; and The eastern Gulf of Mexico. The Southeast Offshore Storage Resource Assessment (SOSRA) project developed a high-level approximation of the amount of CO 2 that might be stored utilizing key geologic and environmental factors which influence the storage potential. The research included significant advances in knowledge and technology that will facilitate assessment and quantification of offshore CO 2 storage resources in the SOSRA region and provide a pathway toward commercialization.

54 ENVIRONMENTAL SCIENCES↗

An Eight-County Appraisal of the San Andres Residual Oil Zone (ROZ) 'Fairway' of the Permian Basin

This document assesses the size and distribution of the oil resource in an eight-county portion of the San Andres residual oil zone (ROZ) fairway in the Permian Basin. Using well log analysis, the study divided the ROZ into partitions, developed a database of geologic properties for each partition and estimated the oil in place in each partition. The study then used the FE/NETL CO 2 Prophet Model to estimate the oil that could be produced and CO 2 stored from applying CO 2 EOR to each partition. With the FE/NETL Onshore CO 2 EOR Cost Model, the commercially viable partitions were identified as those that could produce oil and store CO 2 economically at an oil price of $75/STB. The remaining geologically viable partitions could use CO 2 EOR to store CO 2 with production of oil to offset some of the costs. The database used for this study, and a report describing the database is available on NETL's website under the Collection Name Eight-County San Andres ROZ Appraisal.

02 PETROLEUM↗