Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “risk mitigation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 973 records · Page 54

DCS: A Case Study of Identification of Knowledge and Disposition Gaps Using Principles of Continuous Risk Management

The Human Research Program (HRP) is formulated around the program architecture of Evidence-Risk-Gap-Task-Deliverable. Review of accumulated evidence forms the basis for identification of high priority risks to human health and performance in space exploration. Gaps in knowledge or disposition are identified for each risk, and a portfolio of research tasks is developed to fill them. Deliverables from the tasks inform the evidence base with the ultimate goal of defining the level of risk and reducing it to an acceptable level. A comprehensive framework for gap identification, focus, and metrics has been developed based on principles of continuous risk management and clinical care. Research towards knowledge gaps improves understanding of the likelihood, consequence or timeframe of the risk. Disposition gaps include development of standards or requirements for risk acceptance, development of countermeasures or technology to mitigate the risk, and yearly technology assessment related to watching developments related to the risk. Standard concepts from clinical care: prevention, diagnosis, treatment, monitoring, rehabilitation, and surveillance, can be used to focus gaps dealing with risk mitigation. The research plan for the new HRP Risk of Decompression Sickness (DCS) used the framework to identify one disposition gap related to establishment of a DCS standard for acceptable risk, two knowledge gaps related to DCS phenomenon and mission attributes, and three mitigation gaps focused on prediction, prevention, and new technology watch. These gaps were organized in this manner primarily based on target for closure and ease of organizing interim metrics so that gap status could be quantified. Additional considerations for the knowledge gaps were that one was highly design reference mission specific and the other gap was focused on DCS phenomenon.

Norcross, Jason↗

EC Transmission Line Risk Identification and Mitigation Analysis

The purpose of this document is to assist in evaluating and planning for the cost, schedule, and technical project risks associated with the delivery and operation of the EC (Electron cyclotron) transmission line system. In general, the major risks that are anticipated to be encountered during the project delivery phase associated with the implementation of the Procurement Arrangement for the EC transmission line system are associated with: (1) Undefined or changing requirements (e.g., functional or regulatory requirements); (2) Underperformance of prototype, first unit, or production components during testing; (3) Unavailability of qualified vendors for critical components Technical risks associated with the design and operation of the system are also identified.

24 POWER TRANSMISSION AND DISTRIBUTION↗

INFORMATION: Special Report on "Selected Department of Energy Program Efforts to Implement the American Recovery and Reinvestment Act"

The American Recovery and Reinvestment Act of 2009 (Recovery Act) was enacted on February 17, 2009, to jumpstart the economy by creating or saving millions of jobs, spurring technological advances in health and science, and investing in the Nation's energy future. The Department of Energy received over $32.7 billion in Recovery Act funding for various science, energy, and environmental programs and initiatives. As of November 2009, the Department had obligated $18.3 billion of the Recovery Act funding, but only $1.4 billion had been spent. The Department's Offices of Energy Efficiency and Renewable Energy, Fossil Energy, Environmental Management, Science, and Electricity Delivery and Energy Reliability received the majority of funding allocated to the Department, about $32.3 billion. Obligating these funds by the end of Fiscal Year 2010, as required by the Recovery Act, and overseeing their effective use in succeeding years, represents a massive workload increase for the Department's programs. The effort to date has strained existing resources. As has been widely acknowledged, any effort to disburse massive additional funding and to expeditiously initiate and complete projects increases the risk of fraud, waste and abuse. It is, therefore, important for the Department's program offices to assess and mitigate these risks to the maximum extent practicable. In this light, we initiated this review as an initial step in the Office of Inspector General's charge to determine whether the Department's major program offices had developed an effective approach for identifying and mitigating risks related to achieving the goals and objectives of the Recovery Act. The Department's program offices included in our review identified risks and planned mitigation strategies that, if successfully implemented and executed, should help achieve the goals and objectives of the Recovery Act. While each office identified risks unique to its respective areas of responsibility, there were a number of risks shared in common. These included the mechanical and substantive requirements related to the award and distribution of funds; program and project performance monitoring; and, program and project execution activities. In particular, the offices self-identified common risks such as: (1) The inability to award and distribute funds in a timely manner to achieve the goals of the Recovery Act; (2) The sufficiency of monitoring procedures and resources to, among other things, prevent and detect fraud, waste and abuse throughout the performance period of financial assistance awards and contracts; and (3) The inherent cost, schedule and performance risks associated with first-of-a-kind, innovative research and demonstration projects. Our review confirmed that the Department had begun to implement a number of strategies designed to mitigate these and other program-specific risks. Our testing, however, identified challenges to the effective implementation of these mitigation strategies that need to be addressed if the Department is to meet the goals and objectives established by the Recovery Act. At the time of our review: (1) Program staffing resources, critical to the success of all other mitigation strategies, remained inadequate both in numbers and qualifications (certifications and training) for positions in procurement and acquisition, project management, and monitoring and oversight functions; (2) Performance measures for achieving Recovery Act goals such as distributing funds in an expeditious manner had not always been established and included in performance plans, and, in financial assistance and contract documents; and (3) Programs had not consistently demonstrated that previously reported deficiencies, identified through audits, inspections, investigations and other oversight activities, had been considered in designing mitigation strategies for the Recovery Act related risks. As we noted in our Special Report on the American Recovery and Reinvestment Act at the Department of Energy (OAS-RA-09-01, March 2009) these sorts of deficiencies, which were described in the March 2009 report, had adversely impacted the success of earlier Departmental projects. We concluded that consideration of these previously encountered internal control weaknesses was essential if the Department was to avoid the same or similar problems in executing the Recovery Act programs/projects. During the course of our audit we identified other internal control weakness indicators. When brought to their attention by the Office of Inspector General audit staff, program officials acted promptly to address these problems by modifying or improving their risk mitigation strategies. For instance, we found that the Office of Energy Efficiency and Renewable Energy, responsible for $16.8 billion in Recovery Act program activities, took steps to strengthen its merit review process to avoid potential conflict of interest concerns.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Dam Construction in Lancang-Mekong River Basin Could Mitigate Future Flood Risk From Warming-Induced Intensified Rainfall

Water resources management, in particular flood control, in the Mekong River Basin (MRB) faces two key challenges in the 21st century: climate change and dam construction. Herein, a large scale distributed Geomorphology-Based Hydrological Model coupled with a simple reservoir regulation model (GBHM-MK-SOP) is used to investigate the relative effects of climate change and dam construction on the flood characteristics in the MRB. Results suggest an increase in both flood magnitude and frequency under climate change, which is more severe in the upstream basin and increases over time. However, dam construction and stream regulation reduce flood risk consistently throughout this century, with more obvious effects in the upstream basin where larger reservoirs will be located. The flood mitigation effect of dam regulation dominates over the flood intensification effect of climate change before 2060, but the latter emerges more prominently after 2060 and dominates the flood risk especially in the lower basin.

54 ENVIRONMENTAL SCIENCES↗

GPS Spoofing Mitigation and Timing Risk Analysis in Networked Phasor Measurement Units via Stochastic Reachability

To address phasor measurement unit (PMU) vulnerability to spoofing, we propose the use of a set-valued state estimation technique known as stochastic reachability (SR)-based distributed Kalman filter (DKF) that computes secure global positioning system (GPS) timing across a network of receivers. Utilizing SR, we estimate not only GPS time but also its stochastic reachable set, which is parameterized by probabilistic zonotope (p-Zonotope). While requiring known measurement error bounds in only non-spoofed conditions, we designed a two-tiered approach. We first performed measurement-level spoofing mitigation via deviation of a measurement innovation from its expected p-Zonotope. We then performed state-level timing risk analysis via a determination of the intersection probability of the estimated p-Zonotope with an unsafe set that violates IEEE C37.118.1a-2014 standards. Finally, we validated our SR-DKF algorithm by subjecting it to a simulated receiver network to coordinate signal-level spoofing. We demonstrate improved timing accuracy and successful spoofing mitigation via the use of our SR-DKF algorithm. We also validated the robustness of the estimated timing risk as the number of receivers were varied.

47 OTHER INSTRUMENTATION↗

An Introduction to Risk with a Focus on Design Diversity in the Stockpile

The maintenance and security of nuclear weapons in the stockpile involves decisions based on risk analysis and quantitative measures of risk. Risk is a factor in all decisions, a particularly important factor in decisions of a large scale. One example of high-risk decisions we will discuss is the risk involved in design diversity within the stockpile of nuclear weapons arsenal. Risk is defined as 'possibility of loss or injury' and the 'degree of probability of such loss' (Kaplan and Garrick 12). To introduce the risk involved with maintaining the weapons stockpile we will draw a parallel to the design and maintenance of Southwest Airlines fleet of Boeing 737 planes. The clear benefits for cost savings in maintenance of having a uniform fleet are what historically drove Southwest to have only Boeing 737s in their fleet. Less money and resources are need for maintenance, training, and materials. Naturally, risk accompanies those benefits. A defect in a part of the plane indicates a potential defect in that same part in all the planes of the fleet. As a result, safety, business, and credibility are at risk. How much variety or diversity does the fleet need to mitigate that risk? With that question in mind, a balance is needed to accommodate the different risks and benefits of the situation. In a similar way, risk is analyzed for the design and maintenance of nuclear weapons in the stockpile. In conclusion, risk must be as low as possible when it comes to the nuclear weapons stockpile. Design and care to keep the stockpile healthy involves all aspects of risk management. Design diversity is a method that helps to mitigate risk, and to help balance options in stockpile stewardship.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Assessing the Risk of Crew Injury Due to Dynamic Loads During Spaceflight

Spaceflight requires tremendous amounts of energy to achieve Earth orbit and to attain escape velocity for interplanetary missions. Although the majority of the energy is managed in such a way as to limit the accelerations on the crew, several mission phases may result in crew exposure to dynamic loads. In the automotive industry, risk of serious injury can be tolerated because the probability of a crash is remote each time a person enters a vehicle, resulting in a low total risk of injury. For spaceflight, the level of acceptable injury risk must be lower to achieve a low total risk of injury because the dynamic loads are expected on each flight. To mitigate the risk of injury due to dynamic loads, the NASA Human Research Program has developed a research plan to inform the knowledge gaps and develop relevant tools for assessing injury risk. The risk of injury due to dynamic loads can be further subdivided into extrinsic and intrinsic risk factors. Extrinsic risk factors include the vehicle dynamic profile, seat and restraint design, and spacesuit design. Human tolerance to loads varies considerably depending on the direction, amplitude, and rise-time of acceleration therefore the orientation of the body to the dynamic vector is critical to determining crew risk of injury. Although a particular vehicle dynamic profile may be safe for a particular design, the seat, restraint, and suit designs can affect the risk of injury due to localized effects. In addition, characteristics intrinsic to the crewmember may also contribute to the risk of injury, such as crewmember sex, age, anthropometry, and deconditioning due to spaceflight, and each astronaut may have a different risk profile because of these factors. The purpose of the research plan is to address any knowledge gaps in the risk factors to mitigate injury risk. Methods for assessing injury risk have been well documented in other analogous industries and include human volunteer testing, human exposure to dynamic environments, post-mortem human subject (PMHS) testing, animal testing, anthropomorphic test devices (ATD), dynamic models of the human, numerical models of ATDs, and numerical models of the human. Each has inherent strengths and limitations. For example, human volunteer testing is advantageous because a population can be selected that is similar to the astronaut corps; however, because of the inherent ethical limitations, only sub-injurious conditions can be tested. PMHSs can be tested in a variety of conditions including injurious levels, but the responses are not completely analogous to living human subjects. In addition, it is exceedingly difficult to select a PMHS population that is similar to the astronaut corps. ATDs are currently widely used in the automotive industry and military because they are highly repeatable and durable. Unfortunately, because they are mechanical models of the human body, the biofidelity of the responses are limited to dynamic conditions used to validate the ATD. Numerical models of the ATD, in addition to the strengths and limitations for ATDs, are easy to use for a variety of designs before a design is fabricated, but also have additional limitations for ATDs, are easy to use for a variety of designs before a design is fabricated, but also have additional uncertainty. Dynamic models are simple and easy to use, but do not account for localized effects of the seat and suit. Finally, numerical models of the human have the potential to have the most advantages; however, the current models are not validated for the conditions expected during spaceflight. To properly assess spaceflight conditions with numerical human models, human data would be needed to optimize the model responses for those conditions. Using the appropriate assessment method with the knowledge gained for each risk factor, an appropriate approach for mitigating the risk of injury due to dynamic loads can be developed ensuring crew safety in future NASA vehicles.

Somers, J. T.↗

C-Band Airport Surface Communications System Engineering-Initial High-Level Safety Risk Assessment and Mitigation

This document is being provided as part of ITT's NASA Glenn Research Center Aerospace Communication Systems Technical Support (ACSTS) contract: "New ATM Requirements--Future Communications, C-Band and L-Band Communications Standard Development." ITT has completed a safety hazard analysis providing a preliminary safety assessment for the proposed C-band (5091- to 5150-MHz) airport surface communication system. The assessment was performed following the guidelines outlined in the Federal Aviation Administration Safety Risk Management Guidance for System Acquisitions document. The safety analysis did not identify any hazards with an unacceptable risk, though a number of hazards with a medium risk were documented. This effort represents an initial high-level safety hazard analysis and notes the triggers for risk reassessment. A detailed safety hazards analysis is recommended as a follow-on activity to assess particular components of the C-band communication system after the profile is finalized and system rollout timing is determined. A security risk assessment has been performed by NASA as a parallel activity. While safety analysis is concerned with a prevention of accidental errors and failures, the security threat analysis focuses on deliberate attacks. Both processes identify the events that affect operation of the system; and from a safety perspective the security threats may present safety risks.

Zelkin, Natalie↗

L-Band Digital Aeronautical Communications System Engineering - Initial Safety and Security Risk Assessment and Mitigation

This document is being provided as part of ITT's NASA Glenn Research Center Aerospace Communication Systems Technical Support (ACSTS) contract NNC05CA85C, Task 7: "New ATM Requirements--Future Communications, C-Band and L-Band Communications Standard Development." ITT has completed a safety hazard analysis providing a preliminary safety assessment for the proposed L-band (960 to 1164 MHz) terrestrial en route communications system. The assessment was performed following the guidelines outlined in the Federal Aviation Administration Safety Risk Management Guidance for System Acquisitions document. The safety analysis did not identify any hazards with an unacceptable risk, though a number of hazards with a medium risk were documented. This effort represents a preliminary safety hazard analysis and notes the triggers for risk reassessment. A detailed safety hazards analysis is recommended as a follow-on activity to assess particular components of the L-band communication system after the technology is chosen and system rollout timing is determined. The security risk analysis resulted in identifying main security threats to the proposed system as well as noting additional threats recommended for a future security analysis conducted at a later stage in the system development process. The document discusses various security controls, including those suggested in the COCR Version 2.0.

Zelkin, Natalie↗

Mitigating Thermal Runaway Risk in Lithium Ion Batteries

The JSC/NESC team has successfully demonstrated Thermal Runaway (TR) risk reduction in a lithium ion battery for human space flight by developing and implementing verifiable design features which interrupt energy transfer between adjacent electrochemical cells. Conventional lithium ion (li-Ion) batteries can fail catastrophically as a result of a single cell going into thermal runaway. Thermal runaway results when an internal component fails to separate electrode materials leading to localized heating and complete combustion of the lithium ion cell. Previously, the greatest control to minimize the probability of cell failure was individual cell screening. Combining thermal runaway propagation mitigation design features with a comprehensive screening program reduces both the probability, and the severity, of a single cell failure.

Darcy, Eric↗

A prototype cooling blanket for mitigating occupant overheating risk in a hot indoor environment: Modeling and assessments

Conventional ways of cooling a room or an entire house for occupant thermal comfort during summer consume a significant amount of energy and are vulnerable to overheating risk during power outages that lead to loss of cooling system operations. This study investigates a low-power cooling blanket, as a Personal Cooling System (PCS), that covers the upper human body for direct cooling during a five-day heat wave in a single-family house. A modeling framework is developed for evaluating the thermal and energy performance of the cooling blanket, which builds upon the co-simulation of three models: a house energy model, a personal thermal comfort model, and a cooling blanket model. Simulation results show that under the power outage scenario, the cooling blanket can greatly reduce the occupant heat stress with a reduction of daily hours of exceedance (discomfort hours defined as TSV>2) by up to 17.2 h (a 95.3 % improvement from the baseline power outage without the blanket). The cooling blanket, equipped with an innovative electrocaloric heat pump (COP as high as 10.1) consumes 6.31 W and can be operated by a portable battery for several days. The cooling blanket consumes only 0.28 % of the electricity of a central air-conditioning system running to provide cooling for the whole house during the five-day heatwave period. The findings justify further research of electrocaloric wearable PCS as low-power effective cooling to ensure thermal survivability of occupants during extreme indoor environments.

Electrocaloric heat pump↗

Modeling and mitigating airborne pathogen risk factors in school buses

Computational fluid dynamics (CFD) models were developed to simulate the impact of different ventilation scenarios on airborne exposure risks in a 72-passenger school bus. Here, scenarios and factors that were investigated included a moving vs. stationary bus, impacts of a heating unit within the bus, and impacts of alternative ventilation scenarios with different combinations of openings (e.g., windows, door, emergency hatch). Results of the simulations showed that when the bus was stationary, use of the heater increased receptor concentrations unless there was another opening. When the bus was moving, simulations with at least two sets of openings separated from each other in the forward and aft directions produced a through-flow condition that reduced concentrations via dilution from outside air by a factor of ten or more. A single opening in a moving bus generally increased concentrations throughout the cabin due to increased mixing with minimal ventilation. The cumulative exposure risk (time-averaged concentrations) was found to be inversely correlated to the air exchange rate. Stationary and moving-bus scenarios that yielded above ~20 air changes per hour resulted in the lowest cumulative exposures. Recommendations from this study were implemented in new safety and operating procedures by the Albuquerque Public Schools Transportation Center.

60 APPLIED LIFE SCIENCES↗

Strategy Guideline: Mitigation of Retrofit Risk Factors

The Alliance for Residential Building Innovation (ARBI) is currently developing strategies designed to promote and achieve increased energy savings and promote upgrades in the residential retrofit sector. These strategies are targeted to retrofit program managers, retrofit contractors, policy makers, academic researchers, and non-governmental organizations. This report focuses on four key areas to promote home energy upgrades: fostering accurate energy savings projections; understanding consumer perceptions for energy savings; measuring energy savings, and ensuring quality control for retrofit installations.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Three Dimensional Analysis of Pier Extension and Guide Wall Design Alternatives to Mitigate Local Scour Risk at the BNSF Railroad Bridge Downstream of the Prado Dam

The primary objectives of the computational fluid dynamics (CFD) analysis are (1) to verify that the design concept of using wedge shaped pier extensions to divert flow around piers as a scour counter measure has the intended effect on the flow, (2) to refine the design of the length and orientation of the pier extensions within the channel and (3) to optimize the guide walls that will protect a set of outer piers and the abutments on each side of the channel. The original proposed design is shown in Figure 1.3. The results of this effort are the recommended designs that are judged to be the best designs based on results from the set of test cases run combined with engineering judgment. The refined designs from the CFD analysis are expected to be tested in a limited set of physical model experiments to verify that they work well.

42 ENGINEERING↗

NSR&D Program Fiscal Year (FY) 2015 Call for Proposals Mitigation of Seismic Risk at Nuclear Facilities using Seismic Isolation

Seismic isolation (SI) has the potential to drastically reduce seismic response of structures, systems, or components (SSCs) and therefore the risk associated with large seismic events (large seismic event could be defined as the design basis earthquake (DBE) and/or the beyond design basis earthquake (BDBE) depending on the site location). This would correspond to a potential increase in nuclear safety by minimizing the structural response and thus minimizing the risk of material release during large seismic events that have uncertainty associated with their magnitude and frequency. The national consensus standard America Society of Civil Engineers (ASCE) Standard 4, Seismic Analysis of Safety Related Nuclear Structures recently incorporated language and commentary for seismically isolating a large light water reactor or similar large nuclear structure. Some potential benefits of SI are: 1) substantially decoupling the SSC from the earthquake hazard thus decreasing risk of material release during large earthquakes, 2) cost savings for the facility and/or equipment, and 3) applicability to both nuclear (current and next generation) and high hazard non-nuclear facilities. Issue: To date no one has evaluated how the benefit of seismic risk reduction reduces cost to construct a nuclear facility. Objective: Use seismic probabilistic risk assessment (SPRA) to evaluate the reduction in seismic risk and estimate potential cost savings of seismic isolation of a generic nuclear facility. This project would leverage ongoing Idaho National Laboratory (INL) activities that are developing advanced (SPRA) methods using Nonlinear Soil-Structure Interaction (NLSSI) analysis. Technical Approach: The proposed study is intended to obtain an estimate on the reduction in seismic risk and construction cost that might be achieved by seismically isolating a nuclear facility. The nuclear facility is a representative pressurized water reactor building nuclear power plant (NPP) structure. Figure 1: Project activities The study will consider a representative NPP reinforced concrete reactor building and representative plant safety system. This study will leverage existing research and development (R&D) activities at INL. Figure 1 shows the proposed study steps with the steps in blue representing activities already funded at INL and the steps in purple the activities that would be funded under this proposal. The following results will be documented: 1) Comparison of seismic risk for the non-seismically isolated (non-SI) and seismically isolated (SI) NPP, and 2) an estimate of construction cost savings when implementing SI at the site of the generic NPP.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗