Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “planning optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 973 records · Page 54

SU-F-T-356: DosimetricComparison of VMAT Vs Step and Shoot IMRT Plans for Stage III Lung CancerPatients with Mediastinal Involvement

Purpose: For Stage III lung cancers that entail treatment of some or all of the mediastinum, anterior-posterior focused Step and Shoot IMRT (SS-IMRT) and VMAT plans have been clinically used to deliver the prescribed dose while working to minimize lung dose and avoid other critical structures. A comparison between the two planning methods was completed to see which treatment method is superior and minimizes dose to healthy lung tissue. Methods: Ten patients who were recently treated with SS-IMRT or VMAT plans for Stage III lung cancer with mediastinal involvement were selected. All patients received a simulation CT for treatment planning, as well as a 4D CT and PET/CT fusion for target delineation. Plans were prescribed 6250 cGy in 25 fractions and normalized such that 100% of the prescription dose covered 95% of the PTV. Clinically approved SS-IMRT or VMAT plans were then copied and planned using the alternative modality with identical optimization criteria. SS-IMRT plans utilized seven to nine beams distributed around the patient while the VMAT plans consisted of two full 360 degree arcs. Plans were compared for the lung volume receiving 20 Gy (V20). Results: Both SS-IMRT and VMAT can be used to achieve clinical treatment plans for patients with Stage III Lung cancer with targets encompassing the mediastinum. VMAT plans produced an average V20 of 23.0+/−8.3% and SS-IMRT produced an average of 24.2+/−10.0%. Conclusion: Results indicate that either method can achieve comparable dose distributions, however, VMAT can allow the optimizer to distribute dose over paths of minimal lung tissue and reduce the V20. Therefore, creating a VMAT with constraints identical to an SS-IMRT plan could help to reduce the V20 in clinical treatment plans.

60 APPLIED LIFE SCIENCES↗

Optimization strategies for produced water networks with integrated desalination facilities

Optimal management and desalination of produced water is a major challenge for U.S. oil and gas development. Integrating rigorous desalination models into multi-period produced water network optimization problems presents several hurdles, which need to be tackled using advanced optimization strategies. Here, in this work, a novel multi-period produced water network formulation with separate solid and liquid flows is introduced to avoid singularities at zero flows. Rigorous steady state desalination models based on mechanical vapor recompression are embedded at the desalination sites in the network model. An integrated optimization formulation is developed to co-optimize the design of desalination units along with the operation of the network. Furthermore, a more robust approach based on the trust region filter method is developed to efficiently integrate complex desalination models into the multi-period planning problem. Both optimization approaches are demonstrated on a produced water network from the PARETO library (Drouven et al., 2022) using thermal desalination units. Our results show that while the TRF and integrated approaches have comparable solve times, the TRF approach has better performance reliability in terms of solver convergence. Furthermore, the optimal solution obtained by embedding rigorous models into the network is significantly different than when desalination costs are approximated using simple cost models, which motivates further research in this field.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

SU-E-J-20: Adaptive Aperture Morphing for Online Correction for Prostate Cancer Radiotherapy

Purpose: Online adaptive aperture morphing is desirable over translational couch shifts to accommodate not only the target position variation but also anatomic changes (rotation, deformation, and relation of target to organ-atrisks). We proposed quick and reliable method for adapting segment aperture leaves for IMRT treatment of prostate. Methods: The proposed method consists of following steps: (1) delineate the contours of prostate, SV, bladder and rectum on kV-CBCT; (2) determine prostate displacement from the rigid body registration of the contoured prostate manifested on the reference CT and the CBCT; (3) adapt the MLC segment apertures obtained from the pre-treatment IMRT planning to accommodate the shifts as well as anatomic changes. The MLC aperture adaptive algorithm involves two steps; first move the whole aperture according to prostate translational/rotational shifts, and secondly fine-tune the aperture shape to maintain the spatial relationship between the planning target contour and the MLC aperture to the daily target contour. Feasibility of this method was evaluated retrospectively on a seven-field IMRT treatment of prostate cancer patient by comparing dose volume histograms of the original plan and the aperture-adjusted plan, with/without additional segments weight optimization (SWO), on two daily treatment CBCTs selected with relative large motion and rotation. Results: For first daily treatment, the prostate rotation was significant (12degree around lateral-axis). With apertureadjusted plan, the D95 to the target was improved 25% and rectum dose (D30, D40) was reduced 20% relative to original plan on daily volumes. For second treatment-fraction, (lateral shift = 6.7mm), after adjustment target D95 improved by 3% and bladder dose (D30, maximum dose) was reduced by 1%. For both cases, extra SWO did not provide significant improvement. Conclusion: The proposed method of adapting segment apertures is promising in treatment position correction, including target translational displacement, rotation and deformation. Additional SWO could improve ROIs dose distribution.

60 APPLIED LIFE SCIENCES↗

Study of onboard expert systems to augment space shuttle and space station autonomy

The feasibility of onboard crew activity planning was examined. The use of expert systems technology to aid crewmembers in locating stowed equipment was also investigated. The crew activity planning problem, along with a summary of past and current research efforts, was discussed in detail. The requirements and specifications used to develop the crew activity planning system was also defined. The guidelines used to create, develop, and operate the MFIVE Crew Scheduler and Logistics Clerk were discussed. Also discussed is the mathematical algorithm, used by the MFIVE Scheduler, which was developed to aid in optimal crew activity planning.

Kurtzman, C. R.↗

Implementing RapidArc into clinical routine: A comprehensive program from machine QA to TPS validation and patient QA

Purpose: With the increased commercial availability of intensity modulated arc therapy (IMAT) comes the need for comprehensive QA programs, covering the different aspects of this newly available technology. This manuscript proposes such a program for the RapidArc (RA) (Varian Medical Systems, Palo Alto) IMAT solution. Methods: The program was developed and tested out for a Millennium120 MLC on iX Clinacs and a HighDefinition MLC on a Novalis TX, using a variety of measurement equipment including Gafchromic film, 2D ion chamber arrays (Seven29 and StarCheck, PTW, Freiburg, Germany) with inclinometer and Octavius phantom, the Delta4 systam (ScandiDos, Uppsala, Sweden) and the portal imager (EPID). First, a number of complementary machine QA tests were developed to monitor the correct interplay between the accelerating/decelerating gantry, the variable dose rate and the MLC position, straining the delivery to the maximum allowed limits. Second, a systematic approach to the validation of the dose calculation for RA was adopted, starting with static gantry and RA specific static MLC shapes and gradually moving to dynamic gantry, dynamic MLC shapes. RA plans were then optimized on a series of artificial structures created within the homogeneous Octavius phantom and within a heterogeneous lung phantom. These served the double purpose of testing the behavior of the optimization algorithm (PRO) as well as the precision of the forward dose calculation. Finally, patient QA on a series of clinical cases was performed with different methods. In addition to the well established in-phantom QA, we evaluated the portal dosimetry solution within the Varian approach. Results: For routine machine QA, the ''Snooker Cue'' test on the EPID proved to be the most sensitive to overall problem detection. It is also the most practical one. The ''Twinkle'' and ''Sunrise'' tests were useful to obtain well differentiated information on the individual treatment delivery components. The AAA8.9 dose calculations showed excellent agreement with all corresponding measurements, except in areas where the 2.5 mm fixed fluence resolution was insufficient to accurately model the tongue and groove effect or the dose through nearly closed opposing leafs. Such cases benefited from the increased fluence resolution in AAA10.0. In the clinical RA fields, these effects were smeared out spatially and the impact of the fluence resolution was considerably less pronounced. The RA plans on the artificial structure sets demonstrated some interesting characteristics of the PRO8.9 optimizer, such as a sometimes unexpected dependence on the collimator rotation and a suboptimal coverage of targets within lung tissue. Although the portal dosimetry was successfully validated, we are reluctant to use it as a sole means of patient QA as long as no gantry angle information is embedded. Conclusions: The all-in validation program allows a systematic approach in monitoring the different levels of RA treatments. With the systematic approach comes a better understanding of both the capabilities and the limits of the used solution. The program can be useful for implementation, but also for the validation of major upgrades.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Intensity-Modulated Radiotherapy Optimization in a Quasi-Periodically Deforming Patient Model

Purpose: To present the implementation of a probability-based, four-dimensional (4D) intensity-modulated radiotherapy (IMRT) planning approach that explicitly optimizes the accumulated dose to moving tissue, estimated using the patient's probability density function (pdf) of respiratory motion. This is termed 'optimization in tissue's-eye-view'. Methods and Materials: The method incorporates 4D Monte Carlo dose calculation in multiple geometries of a respiratory-correlated CT dataset. The instance doses are weighted according to the breathing pdf and accumulated in a common reference geometry, which involves dose warping based on deformable registration. The algorithm produces deliverable multileaf collimator segments and was tested on a sample lung cancer patient dataset with large target excursion. Accumulated doses of the moving target and organs at risk of this plan were compared with those of corresponding margin-based static IMRT plans for free-breathing and gated treatment, as well as target tracking. Results: Target tracking provided best target coverage. Both the presented 4D IMRT approach for free-breathing treatment and gated treatment gave similar results for target coverage and lung dose, with significantly better target coverage than the margin-based static IMRT plan for free-breathing treatment. Conclusions: The presented 4D planning concept offers an alternative to gating by providing the optimal dose for free-breathing IMRT treatment. Although the focus of this study was 4D lung planning, the approach can be generally applied for IMRT optimization in randomly deforming patient models.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Magnetic Resonance Imaging-Guided Intracavitary Brachytherapy for Cancer of the Cervix

Purpose: To determine the feasibility and benefits of optimized magnetic resonance imaging (MRI)-guided brachytherapy (BT) for cancer of the cervix. Methods and Materials: A total of 20 patients with International Federation of Gynecology and Obstetrics Stage IB-IV cervical cancer had an MRI-compatible intrauterine BT applicator inserted after external beam radiotherapy. MRI scans were acquired, and the gross tumor volume at diagnosis and at BT, the high-risk (HR) and intermediate-risk clinical target volume (CTV), and rectal, sigmoid, and bladder walls were delineated. Pulsed-dose-rate BT was planned and delivered in a conventional manner. Optimized MRI-based plans were developed and compared with the conventional plans. Results: The HR CTV and intermediate-risk CTV were adequately treated (the percentage of volume treated to {>=}100% of the intended dose was >95%) in 70% and 85% of the patients with the conventional plans, respectively, and in 75% and 95% of the patients with the optimized plans, respectively. The minimal dose to the contiguous 2 cm{sup 3} of the rectal, sigmoid, and bladder wall volume was 16 {+-} 6.2, 25 {+-} 8.7, and 31 {+-} 9.2 Gy, respectively. With MRI-guided BT optimization, it was possible to maintain coverage of the HR-CTV and reduce the dose to the normal tissues, especially in patients with small tumors at BT. In these patients, the HR percentage of volume treated to {>=}100% of the intended dose approached 100% in all cases, and the minimal dose to the contiguous 2-cm{sup 3} of the rectum, sigmoid, and bladder was 12-32% less than with conventional BT planning. Conclusion: MRI-based BT for cervical cancer has the potential to optimize primary tumor dosimetry and reduce the dose to critical normal tissues, particularly in patients with small tumors.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Alternating Direction Decomposition with Strong Bounding and Convexification (ADDSBC) for Solving Security Constrained AC Unit Commitment Problems

This project aims to develop efficient and robust computational methods for solving the security-constrained unit commitment and alternating current optimal power flow problem (SC-UC-ACOPF). The SC-UC-ACOPF problem is at the center of the short-term operation of the U.S. Power Grid. It is solved every week, every day, and every 10 minutes to plan for the optimal action of electricity generation and consumption by minimizing the generation cost and maintaining power system reliability against potential disruptions of equipment failures. In mathematical terms, SC-UC-ACOPF is a challenging large-scale mixed-integer nonlinear optimization model. This means that the decisions involve both discrete variables, e.g. the turning on and off of generators and switching of transmission lines and transformers, and continuous decisions, e.g. the amount of energy generated by each generator and the power flows in the power grid. The physics of the power flow is described by nonlinear equations involving real and reactive power and bus voltages. Another key feature is the large number of contingencies, i.e. the system needs to stay reliable in face of failure of any one equipment, such as transmission lines and generators. The U.S. power grids are extremely complicated and large scale with more than 5,000 generators, 50,000 buses, and 100,000 high-voltage transmission lines, making the SC-UC-ACOPF a very large-scale computation challenge. The research developed in this project aims to solve the SC-UC-ACOPF problems in the three timescales, i.e. weekly, daily, and every 10-min. The proposed computational methods are built on a principled algorithmic approach of decomposition and penalization. More specifically, the algorithm develops spatial and temporal decomposition by exploiting the strong temporal coupling and weak spatial coupling of the UC problem and the complementary feature, i.e. weak temporal coupling and strong spatial coupling of the ACOPF problem. The algorithm also leverages recent progresses in strong convex relaxation of ACOPF. A unique feature of the proposed approach is that it generates a valid, global upper bound on the optimal maximum profit. In this way, a global optimality gap is available to measure the quality of the solution. To further speed up computation, the research team has developed a plethora of effective heuristics to strengthen the iterative penalty-based decomposition framework. For instance, a heuristic is developed to construct inner approximations of the time coupling constraints within the time decoupled problems. Contingencies are pre-screened and low-rank matrix computation is exploited to find the almost unique solution to each contingency. A novel heuristic for line switching is proposed and tested with positive impacts on instances where line switching is beneficial. Taking a systematic approach and carefully handling every detail of the problem pays off. The TIM-GO’s performance throughout the trials and the final event was stellar. TIM-GO garnered the second highest total prize money and is ranked in the top three positions across all categories of comparison.

97 MATHEMATICS AND COMPUTING↗

Thermally-Constrained Fuel-Optimal ISS Maneuvers

Optimal Propellant Maneuvers (OPMs) are now being used to rotate the International Space Station (ISS) and have saved hundreds of kilograms of propellant over the last two years. The savings are achieved by commanding the ISS to follow a pre-planned attitude trajectory optimized to take advantage of environmental torques. The trajectory is obtained by solving an optimal control problem. Prior to use on orbit, OPM trajectories are screened to ensure a static sun vector (SSV) does not occur during the maneuver. The SSV is an indicator that the ISS hardware temperatures may exceed thermal limits, causing damage to the components. In this paper, thermally-constrained fuel-optimal trajectories are presented that avoid an SSV and can be used throughout the year while still reducing propellant consumption significantly.

Bhatt, Sagar↗

Computer facilities optimization studies

A comprehensive plan was developed to determine the best options for integrating and upgrading various ADP systems in scientific research environments, such as at NASA Ames Research Center.

Lyle, Gilbert C.↗

Connected and Learning Based Optimal Freight Management for Efficiency

The management of the future heterogenous fleet is a complex decision-making problem. The heterogenous fleet is emerging as decarbonization technologies are deployed by fleets toward lowering the freight operation emissions in Medium and Heavy-duty vehicles. Traditionally, in fleets characterized by a homogeneous Diesel Internal Combustion Engine (ICE) powertrain, the process of fleet planning and operational optimization unfolds sequentially without the necessity to account for powertrain and vehicle-specific characteristics during dispatch decisions. Fleets with trucks less than 5 years old tend to maintain stable vehicle efficiency with minimal operational reliability risks for fleet managers. However, the landscape changes with the incorporation of emerging powertrain technologies, which lack extensive operational data and service experiences. This includes technologies like hybrid, Electric, Fuel Cell, or alternative fuel ICE. Operational decisions for fleets featuring heterogeneous powertrain technologies and facing limited access to alternative fueling and charging stations become intricate, requiring careful consideration and optimization at each dispatch. The difference in efficiency characteristics of emerging technologies, their range limitations, and the restricted availability of charging/alternative fueling infrastructure, coupled with sensitivity to driving conditions (e.g., EV range reduction in low temperatures) and their impact on component aging (such as batteries), become pivotal factors influencing the reliable and efficient freight transportation. To make the path toward low emission freight transportation efficient and reliable, an AI-assisted fleet management software is developed in this project to help fleet managers in optimizing both adoption of emerging powertrain decarbonization, connected and automated technologies and also operating the fleet after such technologies are deployed as schematically. Freight transportation requirements are different depending on the cargos to be shipped, customer requirements and regions of operations. This further highlights the need for software and digital solutions to tailor deployment and operation of emerging powertrain, connectivity, and automation technologies toward the specific fleet operation requirements. The fleet management optimizer was also integrated with a model of the fleet to simulate the operation of the fleet over 1 year of the baseline fleet operation (250,000+ shipments) indicating the significance of day-to-day variations on emissions and energy consumption of a freight transportation fleet. The results demonstrate ≥20% improvement in freight efficiency in terms of WTW CO2 per ton-mile of cargo shipments while all fleet operation constraints are enforced, and the cost (CapEx and OpEx) is minimized.

33 ADVANCED PROPULSION SYSTEMS↗

Least-Cost Pathways for India's Electric Power Sector

The Government of India has a target of deploying 175 GW from renewable energy by 2022 and 40% of electricity capacity from renewable energy by 2030 and has indicated that ambitions for 2030 could be higher. Rapid changes in technology costs and performance could drive further deployment of wind and solar capacity beyond these policy targets. Increased deployment of variable renewable energy (VRE) raises new questions for power system planning regarding the optimal siting of generation capacity, trade-offs between generation and transmission infrastructure, and system flexibility needs. This study aims to evaluate least-cost pathways for India's electric power system over the period 2017-2047. Uniquely, this work considers an expanded planning horizon and range of scenarios not previously analyzed in national planning studies in India. The data collection and model design processes undertaken for this study provides a framework for recurring planning studies. This study finds anticipated changes in electricity demand and component costs can drive a significant shift in India's future electricity supply and how this system will be operated. In the Base scenario, the share of generation from VRE reaches 54% by 2047. Reducing the capital cost of wind has a larger impact on VRE penetration than reducing the capital cost of solar PV or battery storage. In the lowest wind cost scenario (40% capital cost decline by 2047 relative to the Base scenario), the penetration of VRE in the generation mix reaches 722%, exceeding the penetration levels achieved when the cost of battery storage or solar PV are reduced by an even greater 50%. In a future system with high penetrations of RE, capacity additions are driven by the coincidence of demand and RE generation rather than peak demand alone. This study finds the system could have surplus capacity during the peak demand months of July–September because this period corresponds to periods with high wind speeds and more wind generation available to meet peak demand. By contrast, new capacity is needed to meet demand during moderate demand months of October–November when output from wind plants falls more than 75% nationally compared to the previous two months. Finally, the success for gas for electricity production may depend on cost competitiveness rather than fuel availability. Increasing the amount of gas available for electricity production had no significant impact on the capacity or generation mix by 2047, as determined from a scenario that significantly increases fuel availability throughout the planning horizon. In fact, over 80% of new gas fuel available for the power sector remains unused. This suggests the high cost of gas plant operations relative to other technologies may constrain the expansion of gas generation in India more than fuel availability.

14 SOLAR ENERGY↗

Efficient Algorithm for Locating and Sizing Series Compensation Devices in Large Transmission Grids: Model Implementation (PART 1)

We explore optimization methods for planning the placement, sizing and operations of Flexible Alternating Current Transmission System (FACTS) devices installed to relieve transmission grid congestion. We limit our selection of FACTS devices to Series Compensation (SC) devices that can be represented by modification of the inductance of transmission lines. Our master optimization problem minimizes the l 1 norm of the inductance modification subject to the usual line thermal-limit constraints. We develop heuristics that reduce this non-convex optimization to a succession of Linear Programs (LP) which are accelerated further using cutting plane methods. The algorithm solves an instance of the MatPower Polish Grid model (3299 lines and 2746 nodes) in 40 seconds per iteration on a standard laptop—a speed up that allows the sizing and placement of a family of SC devices to correct a large set of anticipated congestions. We observe that our algorithm finds feasible solutions that are always sparse, i.e., SC devices are placed on only a few lines. In a companion manuscript, we demonstrate our approach on realistically-sized networks that suffer congestion from a range of causes including generator retirement. In this manuscript, we focus on the development of our approach, investigate its structure on a small test system subject to congestion from uniform load growth, and demonstrate computational efficiency on a realistically-sized network.

25 ENERGY STORAGE↗

SU-E-T-96: An Analysis of VMAT SBRT Lung Treatment Plans

Purpose: To present an analysis of 218 lung sbrt treatment plans delivered using Varian Eclipse RapidArc software and delivered with Varian linear accelerators. Methods: A retrospective analysis of treatment plans generated using the Varian Eclipse PRO RapidArc VMAT optimization and AAA photon beam calculation algorithms was done for 218 plans delivered using Varian Trilogy and TrueBeam linear accelerators. Some of the patients were enrolled in the RTOG 0813 and RTOG 0915 lung protocols. All of the patients’ plans were optimized using the guidelines outlined by these protocols. The plans presented were normalized so that 95% of the PTV volume received 100% of the prescribed dose. Results: The dose co formality constraints from the RTOG protocols and the number of plans within those constraints were:Tumor dose between 60% of maximum dose and 90% of maximum: 218/218 = 100%.Volume of 105% tumor dose outside put less than 15% of the PTV volume: 218/218 = 100%.Maximum dose 2 cm away from PTV within protocol table guidelines: No minor deviation: 188/218 = 86.2%. No major deviation: 216/218 = 99.1%.Ratio of 50% dose volume to PTV volume less than R50 in protocol table: No minor deviation 148/218 = 67.9%. No major deviation: 213/218 = 97.7%.Percent of lung receiving 20 Gy less than 10% (no minor violation): 218/218 = 100%.99% of PTV receiving at least 90% of the tumor dose: 214/218 = 98.2%. Conclusion: Varian RapidArc VMAT can successfully deliver lung SBRT treatments as outlined in the RTOG 0813 and 0915 protocols. The largest deviations were seen in the R50 constraints for the larger PTV volumes.

60 APPLIED LIFE SCIENCES↗

Efficient algorithm for locating and sizing series compensation devices in large power transmission grids: I. Model implementation

We explore optimization methods for planning the placement, sizing and operations of Flexible Alternating Current Transmission System (FACTS) devices installed to relieve transmission grid congestion. We limit our selection of FACTS devices to Series Compensation (SC) devices that can be represented by modification of the inductance of transmission lines. Our master optimization problem minimizes the l 1 norm of the inductance modification subject to the usual line thermal-limit constraints. We develop heuristics that reduce this non-convex optimization to a succession of Linear Programs (LP) which are accelerated further using cutting plane methods. The algorithm solves an instance of the MatPower Polish Grid model (3299 lines and 2746 nodes) in 40 seconds per iteration on a standard laptop—a speed up that allows the sizing and placement of a family of SC devices to correct a large set of anticipated congestions. We observe that our algorithm finds feasible solutions that are always sparse, i.e., SC devices are placed on only a few lines. In a companion manuscript, we demonstrate our approach on realistically-sized networks that suffer congestion from a range of causes including generator retirement. In this manuscript, we focus on the development of our approach, investigate its structure on a small test system subject to congestion from uniform load growth, and demonstrate computational efficiency on a realistically-sized network.

24 POWER TRANSMISSION AND DISTRIBUTION↗

SU-G-BRC-05: Conundrum for VMAT Cranial Multiple Lesions Treated with HD120 MLC

Purpose: To commission a custom 6MV-SRS-AAA Eclipse beam model for VMAT multiple lesions cranial SRS treatment on a Varian TrueBeam STx. Methods: Six clinical plans were created using a customized beam model with dosimetric-leaf-gap(DLG) optimized for clinical treatments. Each plan had 4–6 non-isocentric targets with size from 0.2 to 7.1cc. All fields were measured with EBT3 film in the coronal plane in a solid water phantom and with an AS1000 EPID using gantry rotation. In addition, an end-to-end test was performed with coronal and sagittal films in an anthropomorphic phantom verifying dosimetry and localization accuracy. Portal dose distributions were generated with a custom portal dosimetry algorithm(PDIP). Measured dose distributions were compared with calculations using average dose difference (DD), and gamma function, γ. Using a 1.25mm grid, the γ criteria, local DD ≤ 3% and 2mm distance-to-agreement, were applied in regions with dose 50% of maximum. Results: The respective DD and γ for all films were <±2% and >94.2%. The portal dose γ scores for all the plans were >94.9%. However, local regions with underdose >10%, were observed when targets were treated with the 5mm leaves. The same plans re-optimized with two isocenters such that all lesions were under the 2.5mm leaves did not show this effect. The DD and localization error of the end-to-end test were within 3.4% and 1.0mm respectively. Conclusion: The custom AAA beam model is capable of calculating acceptable dosimetry for targets using only the 2.5 mm leaves. This restricts lesions to within ±4cm of isocenter. The observed underdose beneath the 5mm leaves is attributed to a limitation in Eclipse that uses a single DLG representing the DLG’s of both 2.5mm and 5mm leaves. If lesions are >4cm from isocenter, a multiple isocenter technique should be considered to allow the use of only the 2.5mm leaves.

60 APPLIED LIFE SCIENCES↗

Accelerating Optimal Integration of Energy Efficiency Strategies with Industrialized Modular Construction: Preprint

The National Renewable Energy Laboratory's (NREL's) Industrialized Construction Innovation team first introduced the Industrialized Construction Assessment Framework to achieve affordable, net-zero energy (NZE) modular multifamily buildings in the 2020 ACEEE paper "Integrating Energy Efficiency Strategies with Industrialized Construction for our Clean Energy Future." Since then, NREL has continued to drive the ambitious plan to accelerate optimal integration of energy efficiency strategies during industrialized construction with little or no additional cost, labor, and production time. This follow-on paper introduces the Energy in Modular (EMOD) buildings method and presents NREL's research efforts over the last two years in collaboration with industry, including affordable housing partners. NREL has developed an idealized NZE modular multifamily building design that incorporates five energy efficiency strategies well suited for industrialized construction in factories: (1) envelope thermal control, (2) envelope infiltration control, (3) mechanical, electrical, and plumbing systems, (4) smart controls, and (5) solar plus storage. This paper highlights results from leveraging design for manufacturing and assembly principles, testing, and validation pilots with factory partners; demonstrating pod prototypes in test stand at NREL; and performing simulations. Overall, these research efforts address barriers to whole-building system integration, such as poor installation quality of thermal and air barriers; lack of unitized systems for space conditioning, energy recovery and ventilation, and water heating; problematic on-site installation, commissioning, and configuration of controls; and lack of cost-effective integration for grid-friendly design and emerging technologies. Conclusively, the paper delineates next steps for future work with NREL's partners toward developing a transformational pathway for our clean energy future.

affordable housing↗