Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “operator decision support”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 973 records · Page 54

Fast Determination of Distribution-Connected PV Impacts Using a Variable Time-Step Quasi-Static Time-Series Approach: Preprint

The increasing deployment of distribution-connected photovoltaic (DPV) systems requires utilities to complete complex interconnection studies. Relatively simple interconnection study methods worked well for low penetrations of photovoltaic systems, but more complicated quasi-static time-series (QSTS) analysis is required to make better interconnection decisions as DPV penetration levels increase. Tools and methods must be developed to support this. This paper presents a variable-time-step solver for QSTS analysis that significantly shortens the computational time and effort to complete a detailed analysis of the operation of a distribution circuit with many DPV systems. Specifically, it demonstrates that the proposed variable-time-step solver can reduce the required computational time by as much as 84% without introducing any important errors to metrics, such as the highest and lowest voltage occurring on the feeder, number of voltage regulator tap operations, and total amount of losses realized in the distribution circuit during a 1-yr period. Further improvement in computational speed is possible with the introduction of only modest errors in these metrics, such as a 91 percent reduction with less than 5 percent error when predicting voltage regulator operations.

14 SOLAR ENERGY↗

Certifying the Performance of Fixative Technologies under Open Air Demolition Activities for D and D - 20096

Department of Energy (DOE) facilities undergoing deactivation and decommissioning (D and D) activities struggle with safety concerns of residual radioactive contamination leftover after gross decontamination efforts have concluded. The positive effects of implementing fixative technologies for decommissioning and maintenance is known across the DOE complex. However, there is no standardized metric in place that quantifies the performance of these technologies such as incombustible fixative platforms that immobilize the contamination in a solid polymer material under normal operating conditions or when exposed to stressors. The primary focus of this research is to provide the empirical data necessary to properly characterize the effects of implementing fixative technologies on mitigating the release of contamination. In addition, this effort has been used to identify and establish uniform testing protocols to quantify operational parameters of fixating platforms and properly credit such systems under a variety of operational conditions and stressors that can arise during open air demolition efforts (e.g. impact, water, thermal, etc.). The established protocols will be provided to the ASTM International E10.03 Subcommittee on Radiological Protection for Decontamination and Decommissioning of Nuclear Facilities and Components for the potential of formal standardization. Attributes to be addressed during testing are material compromise from impact stress, thermal stress for incombustible fixative materials, and immobilization factors (how well an immobilizing platform is capable of retaining fixated material during thermal and impact stressors). In developing these test methods, a greater understanding of the material's behavior under anticipated and unanticipated events, such as decommissioning activities and contingency events as outlined in the Basis of Interim Operations (BIO), can be successfully characterized. There are several key components of the experimental methodology that is essential in empirically certifying fixative technologies. A surrogate contaminant with a unique signature has been utilized with the implementation of a uniform contamination process of test coupons that is quantifiable and replicable for direct fixative comparisons. A modular test chamber has also been used to apply the various stressors of interest. Collection of released contamination that includes airborne and resettled contaminant particles and analyzed using mass spectrometry. This research directly supports DOE complex-wide concerns in terms of final disposition of nuclear facilities and the considerations made during their time between ceasing facility operation and final disposition. The results of this effort aims to provide a standardized road map and logical decision flow to better facilitate fixative technologies into D and D activities required to achieve the desired facility end state. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Safeguards-by-Design:Guidance for High Temperature Gas Reactors (HTGRs) With Prismatic Fuel

Introduction and Purpose The following is a guidance document from a series prepared for the U.S. Department of Energy (DOE) National Nuclear Security Administration (NNSA), under the Next Generation Safeguards Initiative (NGSI), to assist facility designers and operators in implementing international Safeguards-by-Design (SBD). SBD has two main objectives: (1) to avoid costly and time consuming redesign work or retrofits of new nuclear fuel cycle facilities and (2) to make the implementation of international safeguards more effective and efficient at such facilities. In the long term, the attainment of these goals would save industry and the International Atomic Energy Agency (IAEA) time, money, and resources and be mutually beneficial. This particular safeguards guidance document focuses on prismatic fuel high temperature gas reactors (HTGR). The purpose of the IAEA safeguards system is to provide credible assurance to the international community that nuclear material and other specified items are not diverted from peaceful nuclear uses. The safeguards system consists of the IAEA’s statutory authority to establish safeguards; safeguards rights and obligations in safeguards agreements and additional protocols; and technical measures implemented pursuant to those agreements. Of foremost importance is the international safeguards agreement between the country and the IAEA, concluded pursuant to the Treaty on the Non-Proliferation of Nuclear Weapons (NPT). According to a 1992 IAEA Board of Governors decision, countries must: notify the IAEA of a decision to construct a new nuclear facility as soon as such decision is taken; provide design information on such facilities as the designs develop; and provide detailed design information based on construction plans at least 180 days prior to the start of construction, and on "as-built" designs at least 180 days before the first receipt of nuclear material. Ultimately, the design information will be captured in an IAEA Design Information Questionnaire (DIQ), prepared by the facility operator, typically with the support of the facility designer. The IAEA will verify design information over the life of the project. This design information is an important IAEA safeguards tool. Since the main interlocutor with the IAEA in each country is the State Regulatory Authority/SSAC (or Regional Regulatory Authority, e.g. EURATOM), the responsibility for conveying this design information to the IAEA falls to the State Regulatory Authority/SSAC. For the nuclear industry to reap the benefits of SBD (i.e. avoid cost overruns and construction schedule slippages), nuclear facility designers and operators should work closely with the State Regulatory Authority and IAEA as soon as a decision is taken to build a new nuclear facility. Ideally, this interaction should begin during the conceptual design phase and continue throughout construction and start-up of a nuclear facility. Such early coordination and planning could influence decisions on the design of the nuclear material processing flow-sheet, material storage and handling arrangements, and facility layout (including safeguards equipment), etc.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Seven Years of Permanent Running of MELFI-1 on Board the ISS and Utilisation of the Three MELFI Units Refrigeration Pool

The pool of three Minus Eighty Laboratory freezer for ISS (MELFI) units continues providing the scientific community with robust and permanent freezer and refrigeration capabilities for life science experiments on the International Space Station (ISS). Launched in 2006, the first unit will complete, by summer 2013, seven years of continuous operations without intervention on the internal Nitrogen gas cycle, while all necessary hardware and operations were initially planned for preventive maintenance every two years. This unit has demonstrated outstanding performance on orbit and proved the technical decisions made during the development program. Current utilization of MELFI units in the ISS is taking full benefit of the initial specifications, which allows for wide adaptations to cope with the mission scenario imposed by the life extension in orbit. The two other MELFI units, launched respectively in 2008 and 2009, are supporting the first unit providing additional conditioned volume necessary for the science on board, and also for preparing thermal mass used to protect the samples on their way down to earth. The MELFI pool is outfitted with all supporting hardware to allow for extended operation on orbit including preventive and corrective maintenance. The internal components were designed to allow for easy on board maintenance. Spare equipment was installed in the MELFI rack on ISS and specific maintenance means were developed which required crew training before the cold gas cycle could be accessed. The paper will present first how the design choices made for the initial missions are identifying features necessary for extended duration missions, and will then give highlights on the utilization of the MELFI refrigeration pool during the recent years in ISS.

Chegancas, Jean↗

NBIC Biofeeds: A Digital Tool for Open Source Biosurveillance across Federal Agencies

The National Biosurveillance Integration Center (NBIC) is developing a scalable, flexible open source data collection, analysis, and dissemination tool to support biosurveillance operations by the U.S. Department of Homeland Security (DHS) and its federal interagency partners. The NBIC integrates, analyzes, and distributes key information about health and disease events to help ensure the nation’s responses are well-informed, save lives, and minimize economic impact. NBIC serves as a bridge between Federal, State, Local, Territorial, and Tribal entities to conduct biosurveillance across human, animal, plant, and environmental domains. The integration of information enables early warning and shared situational awareness of biological events to inform critical decisions directing response and recovery efforts. To meet its mission objectives, NBIC utilizes a variety of datasets, including open source information, to provide comprehensive coverage of biological events occurring across the globe. NBIC Biofeeds is a digital tool designed to improve the efficiency of reviewing and analyzing large volumes of open source reporting by biosurveillance analysts on a daily basis; moreover, the system provides a mechanism to disseminate tailored feeds allowing NBIC to better meet the specific information needs of individual, interagency partners. The tool is currently under development by the Department of Energy (DOE), Pacific Northwest National Laboratory (PNNL)and it is in a testing and evaluation phase supported by NBIC biosurveillance subject matter experts. Integration with the Defense Threat Reduction Agency (DTRA), Biosurveillance Ecosystem(BSVE) is also underway. NBIC Biofeeds Version 1 is expected to be fully operational in Fiscal Year 2017. The PNNL is applying agile methodology to streamline the build of NBIC Biofeeds to specifications required for operational use by NBIC and its federal interagency partners. Biosurveillance, analytics, and system engineering subject matter experts provide guidance on the implementation of features in the tool to ensure functionality aligns with operational workflows and production support. PNNL is leveraging software from a previous government effort to repurpose the technology to meet NBIC needs. NBIC Biofeeds incorporates the open source, document-orientated MongoDB database to capture user- and system-generated metadata on hundreds of thousands of records, in part, to establish baselines to aid prospective and retrospective analysis on emerging biological events. NBIC Biofeeds integrates a biosurveillance taxonomy (uniquely developed by NBIC),which includes input from interagency partners to recognize critical characteristics of a biological event. In NBIC Biofeeds Version1, metadata capture of reported events is done manually by NBIC analysts; however, moving forward in Version 2, the tool will be further automated to flag significant reporting on biological events with a human remaining in the loop to confirm the validity of the system-generated tags. To serve as a one-stop tool for open source biosurveillance, NBIC Biofeeds automatically harvests information from thousands of websites, utilizing third party aggregators, paid subscriptions to data feeds, and scraping of high priority sources. Users can develop desired queries for automatic updating, leverage a unique review and curation mechanism, and further analyze data from topical, geographic, and temporal visualization features in the tool. To meet NBIC’s information sharing needs, the tool allows for design of tailored RSS feeds and electronic message-based delivery of analysis on biological events, intended for recipients in the government with unique missions around human, animal, plant, and environmental health. Through current testing and evaluation – underway by biosurveillance subject matter experts – NBIC Biofeeds is demonstrating value in supporting open source biosurveillance by the Center for more rapid recognition and sharing of key event characteristics. Centralizing access and analysis of this data set into a single system is increasing the efficiency of daily, global biosurveillance, while enhancing the value of information identified through use of the querying, curation, and production support features in the tool.

59 BASIC BIOLOGICAL SCIENCES↗

Development of ITM Oxygen Technology for Integration in IGCC and Other Advanced Power Generation DECISION POINT 1 UNDER PHASE 3

Air Products and the DOE have partnered over a number of years in the development of ITM Oxygen technology in support of gasification technology. Throughout this process, studies of application of the technology to IGCC and oxy-coal combustion have shown significant reduction in capital and operating costs compared to similar systems using conventional cryogenic air separation. Phase 3, the current phase of the program, focuses on the design, construction and operation of a 30- to 100-TPD pilot facility, the Intermediate Scale Test Unit (ISTU). Execution of this phase to date has resulted in significant advances in a number of areas including ceramic membrane material development, module design and production, ceramic-to-metal seal design, process control strategies, and engineering development of process cycles. Phase 3 will be complete upon successful operation of the ISTU in a series of tests making oxygen from ceramic membrane modules and producing power from a hot gas expander. Phase 3 work has extended beyond the planned schedule due to a delay in delivery of equipment from vendors. Air Products is currently managing the equipment delay by close involvement with the vendor to redesign the problematic equipment and oversee its fabrication. The result of these unforeseen challenges is that the ISTU project completion date has been delayed. Tight cost controls have been implemented both by DOE program management and APCI to meet budget constraints despite increased costs due to budget delays. Total project costs have increased in several areas. Increased costs in the ISTU project include purchased equipment, instruments, construction, and contractor engineering. Increased costs for other tasks include additional work in support of module production by Ceramatec, Inc, and increased Air Products labor for component testing. Air Products plans to complete testing as outlined in the SOPO and successfully complete all project objectives by the end of FY14.

Anderson, Lori↗

Medical Data Architecture Platform and Recommended Requirements for A Medical Data System for Exploration Missions

Minimize or reduce the risk of adverse health outcomes and decrements in performance due to in-flight medical capabilities on human exploration missions. To mitigate this risk, the ExMC MDA project addresses the technical limitations identified in ExMC Gap Med 07: We do not have the capability to comprehensively process medically relevant information to support medical operations during exploration missions. This gap identifies that the current in-flight medical data management includes a combination of data collection and distribution methods that are minimally integrated with on-board medical devices and systems. Furthermore, there are a variety of data sources and methods of data collection. For an exploration mission, the seamless management of such data will enable a more medically autonomous crew than the current paradigm of medical data management on the International Space Station. ExMC has recognized that in order to make informed decisions about a medical data architecture framework, current methods for medical data management must not only be understood, but an architecture must also be identified that provides the crew with actionable insight to medical conditions. This medical data architecture will provide the necessary functionality to address the challenges of executing a self-contained medical system that approaches crew health care delivery without assistance from ground support. Hence, the products derived from the third MDA prototype development will directly inform exploration medical system requirements for Level of Care IV in Gateway missions.In fiscal year 2019, the MDA project developed Test Bed 3, the third iteration in a series of prototypes, that featured integrations with cognition tool data, ultrasound image analytics and core Flight Software (cFS). Maintaining a layered architecture design, the framework implemented a plug-in, modular approach in the integration of these external data sources. An early version of MDA Test Bed 3 software was deployed and operated in a simulated analog environment that was part of the Next Space Technologies for Exploration Partnerships (NextSTEP) Gateway tests of multiple habitat prototypes. In addition, the MDA team participated in the Gateway Test and Verification Demonstration, where the MDA cFS applications was integrated with Gateway-in-a-Box software to send and receive medically relevant data over a simulated vehicle network. This software demonstration was given to ExMC and Gateway Program stakeholders at the NASA Johnson Space Center Integrated Power, Avionics and Software (iPAS) facility. Also, the integrated prototypes served as a vehicle to provide Level 5 requirements for the Crew Health and Performance Habitat Data System for Gateway Missions (Medical Level of Care IV). In the upcoming fiscal year, the MDA project will continue to provide systems engineering and vertical prototypes to refine requirements for medical Level of Care IV and inform requirements for Level of Care V.

Krihak, M.↗

Application of quantitative risk assessment to address stakeholder questions in geologic carbon storage

Ambitious international greenhouse gas emissions reduction targets demand a rapid transformation to a low-carbon economy. This transformation includes the accelerated adoption of carbon dioxide (CO2) capture and storage (CCS) technology. However, as with any large-scale engineering enterprise, the widespread commercial-scale deployment of geologic carbon storage (GCS) raises important questions about technology and cost-effectiveness, safety, environmental risk, and long-term liability. Effectively assessing and managing risks and liability associated with GCS projects is a key technical need throughout the project life cycle-from site selection and permitting to monitoring design, operational risk management, and post-operational site closure. This presentation highlights recent advancements in tools for quantitative risk assessment, being developed by the National Risk Assessment Partnership (NRAP). NRAP is a multi-year, multinational laboratory research collaboration sponsored by the U.S. Department of Energy's Office of Fossil Energy and Carbon Management. Our focus will be on these tools' applications in addressing critical stakeholder questions related to supporting permitting to ensure secure and environmentally protective storage; designing effective and efficient monitoring plans; evaluating the effectiveness of remedial actions and risk management alternatives; and informing liability assessment and investment decisions. This paper will detail the key functionality of NRAP’s Open-Source Integrated Assessment Model (NRAP-Open-IAM), a computational framework for assessing leakage risk and containment assurance. This model features streamlined workflows for calculating leakage risk profiles, delineating risk-based area of review, and assessing contingency plans and post-injection site care requirements. ORION is an open-source, observation-based ensemble forecasting toolkit to help operators assess the seismic hazard at a carbon storage site. The State of Stress Analysis Tool (SOSAT), designed to assess subsurface stress conditions and evaluate geomechanical risk resulting from CO2 injection in an area of interest will also be presented. We will also introduce a prototype model to evaluate storage project costs and liability associated with risk management. The Technoeconomic and Liability Evaluation for Storage (TALES) model uses results from forecasts of leakage and induced seismicity risk to estimate the lifecycle cost of managing risk. Finally, a preliminary example of how the NRAP Risk-based Adaptive Monitoring Plan (RAMP) tool can be used to design efficient and effective site monitoring plans and estimate the detectability of fluid leakage will be provided. The relevance of these tools for addressing key stakeholder questions amidst uncertainty will be emphasized.

decision support↗

Mixed Integer Nonlinear Programming Approaches to Enhance Resiliency and Response Strategies in Critical Infrastructure

Motivation. Critical infrastructures are large, complex engineered systems that must be operated robustly under abnormal conditions resulting from natural hazards or intentional acts. For example, electric power systems must be robust to line faults, water utilities must rapidly mitigate contamination incidents, and computing networks must adapt to adversarial intrusions to protect critical information. Problem. It is difficult for decision-makers within resiliency analysis in critical infrastructure to optimize designs and develop effective response strategies that can account for uncertainties. Facing incomplete information and the sheer scope that a natural hazard or attack vector may incorporate, response can be ineffective without reliable, scalable decision support tools. These problems are intrinsically nonlinear and involve discrete decisions, and unfortunately, existing off-the-shelf mathematical programming methods cannot support optimization-based decision-making of these nonlinear at scale. Method/Approach and Results. This project emphasized development of fundamental optimization strategies that supported real- time mitigation and response for critical infrastructures. In particular, the project developed multi- tree approaches based on piecewise outer-approximations for solution of mixed-integer nonlinear programming (MINLP) problems. These techniques alternate between an MILP or MISOCP relaxation to obtain a lower bound and candidate discrete solutions and an NLP subproblem to obtain upper bounds. Using tailored relaxations based on problem structure, these methods were used to solve several key applications in resilience and response of critical infrastructure. This work resulted in two open-source, copyrighted software packages: CORAMIN (https://github.com/Coramin/Coramin) -- an object-oriented mathematical programming framework that supports tailored multi-tree algorithms for solution of large- scale mixed-integer nonlinear programming; and EGRET (Electrical Grid Research and Engineering Toolkit) (https://github.com/grid- parity-exchange/Egret) -- a declarative mathematical programming framework built upon CORAMIN and Pyomo for formulation and solution of resilience and operations problems in power grid systems. Furthermore, these tools resulted in several important published results, including the following: The first known global optimization approach that could solve the unit-commitment problem with nonlinear power flow constraints on medium-sized test problems; Improved parallel optimization-based bounds tightening and strengthening of relaxations of AC power flow constraints; and, Optimization-based approaches for improved grid resilience and use of demand response to improve grid resilience with reduction in capital requirements. Result Implications. This project developed first-of-a-kind algorithms for decision-making in critical infrastructure resilience operations and planning, as well as a next-generation toolkit for MINLP researchers. These approaches leveraged high-performance computing architectures to solve some of the largest, most challenging nonlinear discrete optimization problems to global optimality, and these successes were captured in open-source software to enable optimization-based decision-making, and efficient solution of MINLP formulations for electric power transmission grids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Medical Data Architecture Platform and Recommended Requirements for a Medical Data System for Exploration Missions

The Medical Data Architecture (MDA) project supports the Exploration Medical Capability (ExMC) risk to minimize or reduce the risk of adverse health outcomes and decrements in performance due to in-flight medical capabilities on human exploration missions. To mitigate this risk, the ExMC MDA project addresses the technical limitations identified in ExMC Gap Med 07: We do not have the capability to comprehensively process medically- relevant information to support medical operations during exploration missions. This gap identifies that the current in-flight medical data management includes a combination of data collection and distribution methods that are minimally integrated with on-board medical devices and systems. Furthermore, there are a variety of data sources and methods of data collection. For an exploration mission, the seamless management of such data will enable a more medically autonomous crew than the current paradigm of medical data management on the International Space Station. ExMC has recognized that in order to make informed decisions about a medical data architecture framework, current methods for medical data management must not only be understood, but an architecture must also be identified that provides the crew with actionable insight to medical conditions. This medical data architecture will provide the necessary functionality to address the challenges of executing a self-contained medical system that approaches crew health care delivery without assistance from ground support. Hence, the products derived from the third MDA prototype development will directly inform exploration medical system requirements for Level of Care IV in Gateway missions. In fiscal year 2019, the MDA project developed Test Bed 3, the third iteration in a series of prototypes, that featured integrations with cognition tool data, ultrasound image analytics and core Flight Software (cFS). Maintaining a layered architecture design, the framework implemented a plug-in, modular approach in the integration of these external data sources. An early version of MDA Test Bed 3 software was deployed and operated in a simulated analog environment that was part of the Next Space Technologies for Exploration Partnerships (NextSTEP) Gateway tests of multiple habitat prototypes. In addition, the MDA team participated in the Gateway Test and Verification Demonstration, where the MDA cFS applications was integrated with Gateway-in-a-Box software to send and receive medically relevant data over a simulated vehicle network. This software demonstration was given to ExMC and Gateway Program stakeholders at the NASA Johnson Space Center Integrated Power, Avionics and Software (iPAS) facility. Also, the integrated prototypes served as a vehicle to provide Level 5 requirements for the Crew Health and Performance Habitat Data System for Gateway Missions (Medical Level of Care IV). In the upcoming fiscal year, the MDA project will continue to provide systems engineering and vertical prototypes to refine requirements for medical Level of Care IV and inform requirements for Level of Care V.

Krihak, M.↗

Shuttle Program Loads Integration: Going From Concept to Operations and Staying Successful

From the beginning of the Shuttle Program to its end, integrated loads and dynamics analyses and tests have been critical in shaping the vehicle design and operational decisions for NASA and its customers. Starting with scaled models and simple mathematical simulations of the structural dynamics, engineers defined the required structural stiffness and predicted the limit loads for each element of the system. Early structural tests provided reasonable confidence that the models and predictions were good. The first launch of the Space Shuttle brought surprises, though, when the ignition overpressure event caused a forward fuel tank support strut to buckle, among several unexpected effects. The launch pad and other ground equipment became an integral part of the system integration, especially where the acoustic and pressure environments of ignition and lift-off were concerned. Following the Challenger accident, operating limits were changed in response to new understandings of how the integrated system performed. Controlling loads while maximizing performance was a key tenet of the Performance Enhancement design process, which enabled construction of the International Space Station. During the return to flight after the Columbia accident, engineers grew to understand that loads during the roll maneuver were also important to the vehicle s structural margin and life. At this point the crawler transport from the Vehicle Assembly Building to the launch pad also became a part of the integrated loads analysis. Even in the last years of the Space Shuttle Program, new data still provided interesting insights into this complicated and fascinating spaceship. This paper will present some examples of the important findings by the team of specialists that supported the Integrated Loads and Dynamics Panel for the Space Shuttle Program.

Bernstein, Karen↗

A modernized approach to meet diversified earth observing system (EOS) AM-1 mission requirements

From a flight dynamics perspective, the EOS AM-1 mission design and maneuver operations present a number of interesting challenges. The mission design itself is relatively complex for a low Earth mission, requiring a frozen, Sun-synchronous, polar orbit with a repeating ground track. Beyond the need to design an orbit that meets these requirements, the recent focus on low-cost, 'lights out' operations has encouraged a shift to more automated ground support. Flight dynamics activities previously performed in special facilities created solely for that purpose and staffed by personnel with years of design experience are now being shifted to the mission operations centers (MOCs) staffed by flight operations team (FOT) operators. These operators' responsibilities include flight dynamics as a small subset of their work; therefore, FOT personnel often do not have the experience to make critical maneuver design decisions. Thus, streamlining the analysis and planning work required for such a complicated orbit design and preparing FOT personnel to take on the routine operation of such a spacecraft both necessitated increasing the automation level of the flight dynamics functionality. The FreeFlyer(TM) software developed by AI Solutions provides a means to achieve both of these goals. The graphic interface enables users to interactively perform analyses that previously required many parametric studies and much data reduction to achieve the same result In addition, the fuzzy logic engine enables the simultaneous evaluation of multiple conflicting constraints, removing the analyst from the loop and allowing the FOT to perform more of the operations without much background in orbit design. Modernized techniques were implemented for EOS AM-1 flight dynamics support in several areas, including launch window determination, orbit maintenance maneuver control strategies, and maneuver design and calibration automation. The benefits of implementing these techniques include increased fuel available for on-orbit maneuvering, a simplified orbit maintenance process to minimize science data downtime, and an automated routine maneuver planning process. This paper provides an examination of the modernized techniques implemented for EOS AM-1 to achieve these benefits.

Newman, Lauri Kraft↗

A Modernized Approach to Meet Diversified Earth Observing System (EOS) AM-1 Mission Requirements

From a flight dynamics perspective, the EOS AM-1 mission design and maneuver operations present a number of interesting challenges. The mission design itself is relatively complex for a low Earth mission, requiring a frozen, Sun-synchronous, polar orbit with a repeating ground track. Beyond the need to design an orbit that meets these requirements, the recent focus on low-cost, "lights out" operations has encouraged a shift to more automated ground support. Flight dynamics activities previously performed in special facilities created solely for that purpose and staffed by personnel with years of design experience are now being shifted to the mission operations centers (MOCs) staffed by flight operations team (FOT) operators. These operators' responsibilities include flight dynamics as a small subset of their work; therefore, FOT personnel often do not have the experience to make critical maneuver design decisions. Thus, streamlining the analysis and planning work required for such a complicated orbit design and preparing FOT personnel to take on the routine operation of such a spacecraft both necessitated increasing the automation level of the flight dynamics functionality. The FreeFlyer(trademark) software developed by AI Solutions provides a means to achieve both of these goals. The graphic interface enables users to interactively perform analyses that previously required many parametric studies and much data reduction to achieve the same result. In addition, the fuzzy logic engine .enables the simultaneous evaluation of multiple conflicting constraints, removing the analyst from the loop and allowing the FOT to perform more of the operations without much background in orbit design. Modernized techniques were implemented for EOS AM-1 flight dynamics support in several areas, including launch window determination, orbit maintenance maneuver control strategies, and maneuver design and calibration automation. The benefits of implementing these techniques include increased fuel available for on-orbit maneuvering, a simplified orbit maintenance process to minimize science data downtime, and an automated routine maneuver planning process. This paper provides an examination of the modernized techniques implemented for EOS AM-1 to achieve these benefits.

Newman, Lauri Kraft↗

A combined ANP-delphi approach to evaluate sustainable tourism

The evaluation of sustainable tourism strategies promoted by National Parks (NP) related stakeholders is a key concern for NP managers. To help them in their strategic evaluation procedures, in this paper we propose a methodology based on the Analytic Network Process and a Delphi-type judgment-ensuring procedure. The approach aims at involving stakeholders in a participatory and consensus-building process. The methodology was applied to Los Roques NP in Venezuela. The problem included three sustainable tourism strategies defined by the stakeholders: eco-efficient resorts, eco-friendly leisure activities and ecological transportation systems. Representatives of eight stakeholders participated in the methodology. 13 sustainability criteria were selected. Results provide some important insights into the overall philosophy and underlying participants' conception of what sustainable development of Los Roques NP means. This conception is broadly shared by stakeholders as they coincided in the weights of most of the criteria, which were assigned individually through the questionnaire. It is particularly noteworthy that tourists and environmentalists almost fully match in their assessments of criteria but not of the alternatives. Moreover, there is a great agreement in the final assessment. This suggests that the regular contact among the different stakeholders, i.e. tourists with inhabitants, authorities with environmentalists, tour operators with representatives of the ministry, etc. has led to a common understanding of the opportunities and threats for the NP. They all agreed that the procedure enhances participation and transparency and it is a necessary source of information and support for their decisions.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Hurricane Properties for KSC and Mid-Florida Coastal Sites

Hurricane information and climatologies are needed at Kennedy Space Center (KSC) Florida for launch operational planning purposes during the late summer and early fall Atlantic hurricane season. Also these results are needed to be used in estimating the potential magnitudes of hurricane and tropical storm impact on coastal Florida sites when passing within 50, 100 and 400 nm of that site. Roll-backs of the Space Shuttle and other launch vehicles, on pad, are very costly when a tropical storm approaches. A decision for the vehicle to roll-back or ride-out needs to be made. Therefore the historical Atlantic basin hurricane climatological properties were generated to be used for operational planning purposes and in the estimation of potential damage to launch vehicles, supporting equipment, buildings, etc.. The historical 1885-1998 Atlantic basin hurricane data were compiled and analyzed with respect to the coastal Florida site of KSC. Statistical information generated includes hurricane and tropical storm probabilities for path, maximum wind, and lowest pressure, presented for the areas within 50, 100 and 400 nm of KSC. These statistics are then compared to similar parametric statistics for the entire Atlantic basin.

Johnson, Dale L.↗

Development of a Route Crossing Tool for Shared Airspace Environments

In current-day Terminal Radar Approach Control (TRACON) operations, departure and arrival controllers maintain separate and dedicated airspace for their respective traffic flows. Although this practice has obvious safety features, it also leads to inefficiencies; for example, departure aircraft may be routinely capped beneath arrival airspace. With the right decision-support and coordination tools, departures could continue to climb through arrival airspace when sufficient gaps exist. Previous studies of ‘shared airspace’ have examined pre-arranged coordination procedures, as well as tools that gave feedback to the controllers on where gaps between arrivals were located and whether the departure aircraft could be scheduled to fly through those gaps [1, 2, 3, 4]. Since then, the Route Crossing Tool (RCT) has been developed to allow controllers to assess multiple pre-defined route options at points where the arrivals and departures cross, thereby increasing the possibility of climbing a departure through an arrival gap.The RCT aids in ensuring lateral separation between departure and arrival aircraft that pass through the same altitude. Since the RCT can be applied tactically, it can enable aircraft to fly through arrival flows even if these aircraft depart outside scheduled times. The RCT makes use of a set of predefined parallel departure routes crossing the arrival flow at equidistant intersecting points on the arrival route. The RCT uses the Estimated Time of Arrival (ETA) of the departure aircraft at each intersecting point to calculate the lateral separation with the neighboring arrivals when it crosses that point; this information is graphically displayed to the controller. Additionally, the RCT incorporates forecast winds in its ETA predictions.Multiple prototypes of the RCT have been iteratively developed with feedback from Subject Matter Experts (SMEs). This paper presents the final design, the design process, and lessons learned. Initial results from a simulation suggest that the tool was successful in helping controllers to safely climb more aircraft. Controller feedback on the tool was also positive.

shared airspace↗

Application of Objectives-Driven Assurance Cases to System Development in an Evolving Acquisition Model

System properties such as “safety” and “dependability” cannot, in practice, be proven, and must be argued in an “assurance case” aimed at supporting risk-acceptance decisions that have to be made by system acquirers and/or regulatory authorities. The paper is concerned with applications of the “assurance case” idea early in design and development of new systems, when (apart from dedicated testing) the only available operating experience information derives from previous (non-identical) systems. Much of the discussion is based on an evolving acquisition model at the US National Aeronautics and Space Administration; previously, most major systems were developed in-house, but some major systems will now be developed by and acquired from commercial providers. Key points discussed include the following. (1) By promoting a particular kind of focused discussion between acquirers and providers, the use of assurance cases should be particularly valuable under the new acquisition model. (2) In principle, objectives-driven (sometimes called “performance-based”) approaches to assurance of performance have significant advantages in cases where they are applicable. (3) For truly novel systems, completeness of the safety analysis is a significant issue; it is important for the assurance case to include a commitment by the provider (or applicant) to seriously pursue analysis of operating experience, so that previously unrecognized hazards can be identified and addressed. (4) Inquiries into major accidents often point to deficiencies in management oversight in all parts of the life cycle; management processes need to be addressed in the formulation and the implementation of an assurance case. Under the new acquisition model, these considerations imply a serious reconsideration of the way in which the development process is managed by both providers and acquirers.

Objectives-driven↗

Managing Current Earth Observation Needs through User-Driven Implementation of Upcoming Satellite Needs Working Group (SNWG) Solutions

Since 2016, the Satellite Needs Working Group (SNWG), an initiative of the U.S. Group on Earth Observations (USGEO), has surveyed federal agencies every two years to identify their satellite earth observation needs. For each expressed need, NASA-led assessment teams coordinate with responding agencies to devise remote sensing solutions that benefit multiple partners and span across a number of thematic areas including, but not limited to, Atmospheric Composition, Carbon Cycle and Ecosystems, Earth Surface and Interior, and Oceans and Cryosphere. Solutions can comprise existing or modified data products as well as the construction of new data products and technologies: since 2016, a multitude of SNWG activities have been theorized and developed, reaching a wide range of users in the science community. Due to an increase in survey responses in 2020 and to assure solution delivery to users within five years of budget appropriations, the SNWG Management Office was established to oversee the assessment of agency needs and the implementation and operations of solution development. The SNWG MO’s unique implementation strategy creates multiple touchpoints with agencies during solution development helping fulfill Earth Science to Action priorities (the 2024 NASA Earth Science Division strategic plan) and ensuring solutions are accessible, usable, and support decision-making for their intended audience. This presentation will outline the ways in which SNWG supports complementary goals of the Decadal Survey, with specific attention on the SNWG MO’s renewed user-centric implementation strategy for upcoming SNWG solutions.

Jenny Wood↗