Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “operability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 973 records · Page 54

Coordination and control – limits in standard representations of multi-reservoir operations in hydrological modeling

Abstract. Major multi-reservoir cascades represent a primary mechanism for dealing with hydrologic variability and extremes within institutionally complex river basins worldwide. These coordinated management processes fundamentally reshape water balance dynamics. Yet, multi-reservoir coordination processes have been largely ignored in the increasingly sophisticated representations of reservoir operations within large-scale hydrological models. The aim of this paper is twofold, namely (i) to provide evidence that the common modeling practice of parameterizing each reservoir in a cascade independently from the others is a significant approximation and (ii) to demonstrate potential unintended consequences of this independence approximation when simulating the dynamics of hydrological extremes in complex reservoir cascades. We explore these questions using the Water Balance Model, which features detailed representations of the human infrastructure coupled to the natural processes that shape water balance dynamics. It is applied to the Upper Snake River basin in the western US and its heavily regulated multi-reservoir cascade. We employ a time-varying sensitivity analysis that utilizes the method of Morris factor screening to explicitly track how the dominant release rule parameters evolve both along the cascade and in time according to seasonal high- and low-flow events. This enables us to address aim (i) by demonstrating how the progressive and cumulative dominance of upstream releases significantly dampens the ability of downstream reservoir rules' parameters to influence flow conditions. We address aim (ii) by comparing simulation results with observed reservoir operations during critical low-flow and high-flow events in the basin. Our time-varying parameter sensitivity analysis with the method of Morris clarifies how independent single-reservoir parameterizations and their tacit assumption of independence leads to reservoir release behaviors that generate artificial water shortages and flooding, whereas the observed coordinated cascade operations avoided these outcomes for the same events. To further explore the role of (non-)coordination in the large deviations from the observed operations, we use an offline multi-reservoir water balance model in which adding basic coordination mechanisms drawn from the observed emergency operations is sufficient to correct the deficiencies of the independently parameterized reservoir rules from the hydrological model. These results demonstrate the importance of understanding the state–space context in which reservoir releases occur and where operational coordination plays a crucial role in avoiding or mitigating water-related extremes. Understanding how major infrastructure is coordinated and controlled in major river basins is essential for properly assessing future flood and drought hazards in a changing world.

54 ENVIRONMENTAL SCIENCES↗

Experimental Operation of a Prototype 750C Advanced Chloride Molten Salt Bellows Valve

To achieve DOE 2030 SunShot targets that reduce the cost of liquid-based solar by an additional 40% to 70% beyond 2018 costs, a more reliable, highly manufacturable flow valve, capable of achieving operational temperatures of >700°C is required [1]. This paper investigates the development of an innovative high-temperature chloride molten salt valve, with operation up to 750°C. This valve is intended to be employed within Gen 3 CSP liquid-based thermal energy storage (TES) systems as well as Gen 4 modular salt reactor (MSR) technologies. This work details the general design and flow testing of a bellows-seal flow control valve (FCV). This design includes an integrated closed-loop thermal control system to ensure robust design for freeze-thaw cycles. The self-contained thermal management STM system, is unique in the salt valve industry since it is an integrated solution to provide a consistent, repeatable alternative to typical heat tracing. Additionally, the design includes the employment of a novel heat pipe valve stem to facilitate enhanced passive thermal management into the valve assembly. This valve stem heat pipe is designed to facilitate natural circulation within the bonnet to ensure robust operation, during both nominal and transient thermal operation. The valve body and trim will be designed using SS316H, consistent with Flowserve Corporation’s existing product base and is code qualified but will utilize clad material for materials corrosion, manufacturing cost reduction and compatibility to ensure design flexibility. A test campaign was performed in this investigation utilizing a novel 750°C ternary chloride (20%NaCl/40%MgCl2/40%KCl by mol. wt. %) molten salt flow loop. A discussion about the design and installation of the valves within this test bed is provided for this investigation. Valve test results from this study assessed Cv curves as well as multiple actuator cycles, under varying thermodynamic and operational mode conditions, which would be characteristic within a commercial molten salt facility. The results indicate nominal operation for the baseline design, though improved performance and reliability is expected with the full designed FCV.

Armijo, Kenneth (ORCID:0000000346832147)↗

Operator Insights and Usability Evaluation of Machine Learning Assistance for Power Grid Contingency Analysis

Introducing machine learning (ML) assistance into any established process comes with adoption barriers, including entrenched procedures, technological and human readiness levels, human-machine trust, and work culture resistance to change. These barriers are even greater in critical operations such as operating a national or regional power grid, in which both regulatory frameworks and the importance of maintaining reliability levels causes additional resistance to the adoption of new computational support. Developers of future systems and job aides must consider not only technical aspects, but also whether new systems are usable by power system operators. This work presents the methodology and results of a study to evaluate the usability and readiness of a prototype recommender system for power grid contingency analysis. We explore operator cognitive load and evaluate operator performance when solving a collection of scenarios both with and without recommender assistance. We also examine operator trust in the system. We report insights gained on the readiness of the system using a collection of evaluation techniques.

Human-Machine Teaming, Power Systems, usability ev↗

Effect of commercial and military performance requirements for transport category aircraft on space shuttle booster design and operation

The effect of two sets of performance requirements, commercial and military, on the design and operation of the space shuttle booster is evaluated. Critical thrust levels are established according to both sets of operating rules for the takeoff, cruise, and go-around flight modes, and the effect on engine requirements determined. Both flyback and ferry operations are considered. The impact of landing rules on potential shuttle flyback and ferry bases is evaluated. Factors affecting reserves are discussed, including winds, temperature, and nonstandard flight operations. Finally, a recommended set of operating rules is proposed for both flyback and ferry operations that allows adequate performance capability and safety margins without compromising design requirements for either flight phase.

Bithell, R. A.↗

Tug fleet and ground operations schedules and controls. Volume 1: Executive summary

This study presents Tug Fleet and Ground Operations Schedules and Controls plan. This plan was developed and optimized out of a combination of individual Tug program phased subplans, special emphasis studies, contingency analyses and sensitivity analyses. The subplans cover the Tug program phases: (1) Tug operational, (2) Interim Upper Stage (IUS)/Tug fleet utilization, (3) and IUS/Tug payload integration, (4) Tug site activation, (5) IUS/Tug transition, (6) Tug acquisition. Resource requirements (facility, GSE, TSE, software, manpower, logistics) are provided in each subplan, as are appropriate Tug processing flows, active and total IUS and Tug fleet requirements, fleet management and Tug payload integration concepts, facility selection recommendations, site activation and IUS to Tug transition requirements. The impact of operational concepts on Tug acquisition is assessed and the impact of operating Tugs out of KSC and WTR is analyzed and presented showing WTR as a delta. Finally, cost estimates for fleet management and ground operations of the DDT&E and operational phases of the Tug program are given.

Source record↗

Spacelab operations planning

The paper reviews NASA planning in the fields of ground, launch and flight operations and experiment integration to effectively operate Spacelab. Payload mission planning is discussed taking consideration of orbital analysis and the mission of a multiuser payload which may be either single or multidiscipline. Payload analytical integration - as active process of analyses to ensure that the experiment payload is compatible to the mission objectives and profile ground and flight operations and that the resource demands upon Spacelab can be satisfied - is considered. Software integration is touched upon and the major integration levels in ground operational processing of Spacelab and its experimental payloads are examined. Flight operations, encompassing the operation of the Space Transportation System and the payload, are discussed as are the initial Spacelab missions. Charts and diagrams are presented illustrating the various planning areas.

Lee, T. J.↗

A life cycle cost economics model for projects with uniformly varying operating costs

A mathematical model is developed for calculating the life cycle costs for a project where the operating costs increase or decrease in a linear manner with time. The life cycle cost is shown to be a function of the investment costs, initial operating costs, operating cost gradient, project life time, interest rate for capital and salvage value. The results show that the life cycle cost for a project can be grossly underestimated (or overestimated) if the operating costs increase (or decrease) uniformly over time rather than being constant as is often assumed in project economic evaluations. The following range of variables is examined: (1) project life from 2 to 30 years; (2) interest rate from 0 to 15 percent per year; and (3) operating cost gradient from 5 to 90 percent of the initial operating costs. A numerical example plus tables and graphs is given to help calculate project life cycle costs over a wide range of variables.

Remer, D. S.↗

Operations of the ATS-6 ion engine

The ion engine experiments on ATS 6 were operated in daylight and eclipse. The effect on particle fluxes to the spacecraft was monitored with the UCSD Auroral Particles Experiment. These data also provide information on the potential of the spacecraft with respect to the ambient plasma and on the local electric fields caused by the charge distribution on the satellite. Daylight operations of the plasma bridge neutralizer and the cesium thruster in fall, 1974, served to hold the spacecraft between -3 and -8 volts with respect to the ambient plasma. Neutralizer operation reduced differential charging effects, while operation of the thruster usually reduced the effects below the detectors sensitivity. Eclipse operations of the neutralizer reduced kilovolt negative potentials to a few volts. Operation of the thruster prevented possible charging of the satellite during substorms, making it possible to study low energy particle spectra which are at times obscured by charging during substorms.

Olsen, R. C.↗

Implementation of NASTRAN on the IBM/370 CMS operating system

The NASA Structural Analysis (NASTRAN) computer program is operational on the IBM 360/370 series computers. While execution of NASTRAN has been described and implemented under the virtual storage operating systems of the IBM 370 models, the IBM 370/168 computer can also operate in a time-sharing mode under the virtual machine operating system using the Conversational Monitor System (CMS) subset. The changes required to make NASTRAN operational under the CMS operating system are described.

Britten, S. S.↗

Spacelab flight operations

The paper covers the primary activities involved in Spacelab flight operations. These operations are characterized by a partnership between the operators of the Space Transportation System (STS) and the mission management organization which involves the activities of flight control personnel and the flight crew, and must exist as an integrated team to complete a Spacelab flight. An overview of this partnership is presented from the initial planning phase through the actual flight operation, noting the responsibilities and functions of the flight crew members and the makeup of the flight control team. A typical flight scenario describing the basic operation of the Spacelab and a description of the Mission Control Center and Payload Operations Control Center are given.

Harlan, C. S.↗

Performance of computer-designed small-sized four-stage depressed collector for operation of dual-mode traveling wave tube

A computer-designed axisymmetric 2.4-cm-diameter four-stage depressed collectors was evaluated in conjunction with an octave bandwidth, dual-mode traveling wave tube (TWT). The TWT was operated over a wide range of conditions to simulate different applications. The collector performance was optimized (within the constraint of fixed collector geometry which was designed for operation of the TWT at saturation) over the range of TWT operating conditons covered. For operation of the dual-mode TWT at saturation, average collector efficiencies of 81 1/2 and 82 percent for the high and low modes, respectively, were obtained across an octave bandwidth, leading to a three-fold increase in the TWT overall efficiency. For operation of the TWT in the linear, low distortion range, collector efficiencies of 87 to 92 percent were obtained, leading to TWT overall efficiencies as high as 35 percent. For operation of the dual-mode TWT over a 10 to 1 range in output power, overall efficiencies of 14 to 41 percent were obtained.

Ramins, P.↗

The elements of a space operations system

The Space Shuttle has completed its flight test program and is entering operational service with its fifth flight in November 1982. With the completion of Shuttle development, its entry to operational service, and delivery of additional units into field service, it is timely to initiate development of the next elements of the system. The elements of a Space Operations System are the Shuttle, a Station in low earth orbit, and upper stages for low and high energy orbit delivery. To design these elements properly will require a substantial operations analysis effort to characterize the most effective performance tradeoffs among the discrete elements. The Shuttle establishes a new context for the design and execution of operations in space. The components of the Shuttle, Space Station, and upper stages will need to share technology and components to minimize the cost and complexity of the logistics of ownership and operation.

Loftus, J. P., Jr.↗

The IRAS project organisation and mission operations

The project organisation of IRAS is described, showing the tasks assigned to each project group during post-launch operations. The satellite is described, emphasizing the detectors. In the task division, the role of the U.S. is to construct the telescope and survey instrument, launch the satellite, process final science data for the survey instrument, and provide certain standard satellite items. The Netherlands construct the spacecraft and three additional instruments, integrates and tests the overall satellite, and designs and participates in the development of the operational system. The U.K. provides the operational control center and primary tracking station, generates a system for preliminary science analysis of the survey data, provides housekeeping analysis software and science data distribution software, and staffs the control center operations. The teams involved in mission planning and operations, and their roles, are identified, and a block diagram of the operations organisation is presented.

Van Holtz, R. C.↗

Designing for a new era of launch vehicle operational efficiency

It is pointed out that early recognition of operational requirements and assessment of their effects provides the best chance of designing an economically viable future space transportation system (FSTS). Operational factors which may influence configuration design include fleet size, operation mode, refurbishment, and the resource requirements. FTST has a simplified operational role compared to the Space Shuttle, which, in addition to transportation, must perform experiments, support payloads, and stay long on orbit. In the future a space station will perform many of these tasks. The FSTS comprises a two-stage fully reusable launch vehicle designed to carry 150,000 lb to a space station, off-load, and return. It would always be launched fully loaded, and its cargo would be processed and redistributed at the space station. Attention is given to ground servicing, flight operations, rendezvous-compatible orbits, launch windows, standard trajectories, entry windows, operational costs, the mission model, and resource requirements.

Talay, T. A.↗

Proximity operations for space stations and platforms

The present study is concerned with concepts, techniques, and system requirements which would permit 'automated' proximity operations utilizing an unmanned vehicle such as the proposed Orbital Maneuvering Vehicle (OMV). Attention is given to proximity operations mission phases, tethered operations, operational control zones, operation control zone objectives, operational control zone definition, aspects of monitoring and tracking, the departure zone, the rendezvous zone, and coorbiting satellite zones.

Lineberry, E. C., Jr.↗

Mod-2 wind turbine field operations experiment

The three-machine, 7.5 MW Goodnoe Hills located near Goldendale, Washington and is now in a research/experimental operations phase that offers a unique opportunity to study the effects of single and multiple wind turbines interacting with each other, the power grid; and the environment. Following a brief description of the turbine and project history, this paper addresses major problem areas and research and development test results. Field operations, both routine and nonroutine, are discussed. Routine operation to date has produced over 13,379,000 KWh of electrical energy during 11,064 hr of rotation. Nonroutine operation includes suspended activities caused by a crack in the low speed shaft that necessitated a redesign and reinstallation of this assembly on all three turbines. With the world's largest cluster back in full operation, two of the turbines will be operated over the next years to determine their value as energy producer. The third unit will be used primarily for conducting research tests requiring configuration changes to better understand the wind turbine technology. Technical areas summarized pertain to system performance and enhancements. Specific research tests relating to acoustics, TV interference, and wake effects conclude the paper.

Gordon, L. H.↗

Space Station operations

An evaluation of the success of the Space Station will be based on the service provided to the customers by the Station crew, the productivity of the crew, and the costs of operation. Attention is given to details regarding Space Station operations, a summary of operational philosophies and requirements, logistics and resupply operations, prelaunch processing and launch operations, on-orbit operations, aspects of maintainability and maintenance, habitability, and questions of medical care. A logistics module concept is considered along with a logistics module processing timeline, a habitability module concept, and a Space Station rescue mission.

Gray, R. H.↗

Real-time simulator for helicopter rotor wind-tunnel operations

This paper describes the elements and operation of a simulator that is being used to train operators of the Rotor Test Apparatus (RTA) in the large-scale 40- by 80-Foot Wind Tunnel at Ames Research Center. The simulator, named TUTOR (for Tunnel Utilization Trainer with Operating Rotor) duplicates the controls of the rotor and its dynamic behavior, as well as the wind-tunnel controls. The simulation software uses a preexisting blade-element model of a four-bladed rotor with flapping and lead-lag degrees of freedom. Equations were developed for all hardware and controls of the RTA and of the wind tunnel that are normally required to perform a wind-tunnel test of a helicopter rotor. The simulator hardware consists of consoles designed to have the same appearance and functions as those in the control room of the 40- by 80-Foot Wind Tunnel, allowing input from three operators who normally establish the required operating conditions during a test run. Normal operating procedures can be practiced, as well as simulated emergencies such as rotor power failure.

Talbot, P. D.↗