Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “mated”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 973 records · Page 54

STS-92 Crew Interview/L. Chiao

The STS-92 Mission Specialist Leroy Chiao is seen being interviewed. He answers questions about his inspiration to become an astronaut, his training, and gives details of the mission, including overviews of the Z1 truss, the third pressurized mating adapter (PMA-3), the common berthing mechanism (CBM), and the spacewalks. He shares his thoughts on the role of STS-92 in preparing the International Space Station (ISS) for the first resident crew, Russia's contribution to the ISS, and the importance of the ISS and Space Shuttle in the future.

Source record↗

STS-92 Crew Activity Report/Flight Day 7 Highlights

On this seventh day of the STS-92 mission, the flight crew, Commander Brian Duffy, Pilot Pamela A. Melroy, and Mission Specialists Koichi Wakata, Leroy Chiao, Peter J.K. Wisoff, Michael E. Lopez-Alegria, and William S. McArthur continue work on the Z1 truss and the third pressurized mating adapter (PMA-3) on the International Space Station (ISS). Footage is seen of Chiao's and McArthur's spacewalk while they install two DC-to-DC converter units and attach a second tool storage box on the Z1 truss.

Source record↗

STS-92 Crew Interview - Wakata

STS-92 Mission Specialist Koichi Wakata is interviewed. He answers questions about his inspiration to become an astronaut, his training, and gives details on the mission, including overviews of the ZI truss, the S-band antenna, the third pressurized mating adapter (PMA-3), the common berthing mechanism, and his part in controlling the robotic arm during the spacewalks. He shares his thoughts on Russia's contribution to the International Space Station (ISS), the role of STS-92 in preparing the ISS for its first resident crew, and the importance of ISS in the future.

Source record↗

Technologies for Refueling Spacecraft On-Orbit

This paper discusses the current technologies for on-orbit refueling of spacecraft. The findings of 55 references are reviewed and summarized. Highlights include: (1) the Russian Progress system used by the International Space Station; (2) a flight demonstration of superfluid helium transfer; and (3) ground tests of large cryogenic systems. Key technologies discussed include vapor free liquid outflow, control of fluid inflow to prevent liquid venting, and quick disconnects for on-orbit mating of transfer lines.

Chato, David J.↗

Evaluation of a Human Modeling Software Tool in the Prediction of Extra Vehicular Activity Tasks for an International Space Station Assembly Mission

The difficulty of accomplishing work in extravehicular activity (EVA) is well documented. It arises as a result of motion constraints imposed by a pressurized spacesuit in a near-vacuum and of the frictionless environment induced in microgravity. The appropriate placement of foot restraints is crucial to ensuring that astronauts can remove and drive bolts, mate and demate connectors, and actuate levers. The location on structural members of the foot restraint sockets, to which the portable foot restraint is attached, must provide for an orientation of the restraint that affords the astronaut adequate visual and reach envelopes. Previously, the initial location of these sockets was dependent upon the experienced designer's ability to estimate placement. The design was tested in a simulated zero-gravity environment; spacesuited astronauts performed the tasks with mockups while submerged in water. Crew evaluation of the tasks based on these designs often indicated the bolt or other structure to which force needed to be applied was not within an acceptable work envelope, resulting in redesign. The development of improved methods for location of crew aids prior to testing would result in savings to the design effort for EVA hardware. Such an effort to streamline EVA design is especially relevant to International Space Station construction and maintenance. Assembly operations alone are expected to require in excess of four hundred hours of EVA. Thus, techniques which conserve design resources for assembly missions can have significant impact. We describe an effort to implement a human modelling application in the design effort for an International Space Station Assembly Mission. On Assembly Flight 6A, the Canadian-built Space Station Remote Manipulator System will be delivered to the U.S. Laboratory. It will be released from its launch restraints by astronauts in EVA. The design of the placement of foot restraint sockets was carried out using the human model Jack, and the modelling results were compared with actual underwater test results. The predicted locations of the sockets was found to be acceptable for 94% of the tasks attempted by the astronauts, This effort provides confidence in the capabilities of this package to accurately model tasks. It therefore increases assurance that the tool maybe used early in the design process.

Dischinger, H. Charles↗

STS-49 Endeavour/Compiled Video for Editors

Compiled footage includes shots taken of the rollout of Endeavour at Palmdale, CA, the departure and arrival of Endeavour for Kennedy Space Center (KSC), main engine three installation, solid rocket booster (SRB) segment lift and stack at the Vehicle Assembly Building (VAB), external tank mate to SRB, Intelsat rotation at the Vertical Processing Facility (VPF), Endeavour rollover from the Orbiter Processing Facility (OPF) to VAB, rollout to Pad B, and the flight readiness firing (FRF). The crew is seen during the Terminal Countdown and Demonstration Test (TCDT) training activities, at breakfast, suiting up, and exiting the Operations and Checkout (O&C) Building.

Source record↗

STS-92 Extravehicular Activity Overview

Daryl Schuck, STS-92 Lead Extravehicular Activity (EVA) Officer, gives an overview of the four EVAs scheduled for the STS-92 mission. He discusses the construction phase of the International Space Station (ISS) and the equipment to be installed onto the ISS, such as the Z-1 Truss, PMA-3 (Third Pressurized Mating Adapter), S-Band Antenna, and the DC to DC Power Converter. Mr. Schuck describes the challenges of the mission, and the activities and objectives of the spacewalks. He then answers questions from the press.

Source record↗

STS-102 Crew Activity Report/Flight Day 4 Highlights

On this fourth day of the STS-102 mission, Expedition 2 crewmembers Jim Voss and Susan Helms are seen preparing for and performing their spacewalks. Discovery Pilot Jim Kelly is shown maneuvering the robotic arm as he helps Helms and Voss to install the Third Pressurized Mating Adapter (PMA-3) to the Unity Module on the International Space Station (ISS).

Source record↗

International Space Station General Resource Reel

The construction and evolution of the International Space Station (ISS) is seen through various clips. Live footage shows the following: (1) the Zarya Module under construction and during launch preparations; (2) the Unity Module under construction, during launch preparations, and being lowered into the payload canister; (3) STS-88 Mission Specialists Jerry Ross and Jim Newman during training for their spacewalks, including activities in the Neutral Buoyancy Laboratory (NBL); (4) Zarya and Unity docking to the Service Module; (5) the Expedition 1 crew (William Shepherd, Yuri Gidzenko, and Sergei Krikalev) during emergency escape training in the Black Sea and during water survival training at Johnson Space Center; (6) the X-38 Crew Return Vehicle Drop Test; and (7) the US Destiny Laboratory Module, Pressurized Mating Adapter (PMA), Service Module, Italian Multi-Purpose Logistics Module, US Airlock, and US Habitation Module under construction. Computerized animations show the following: (1) an ISS fly-around; (2) the STS-88 Space Shuttle as it docks with Zarya and attaches Zarya to the Unity Module; (3) the Space Shuttle as it docks with ISS and installs the Z1 truss segment and PMA; (4) the Soyuz spacecraft as it docks with ISS; (5) interior and exterior views of the Columbus Attached Pressurized Module; and (6) a Transhab animation showing the interior and exterior and marking the components.

Source record↗

STS-102/Expedition 2 Mission Overview

John Shannon, STS-102 Lead Flight Director, Bernestine Dickey, STS-102 Launch Package Manager, and Rick La Brode, International Space Station (ISS) Lead Flight Director, give an overview of the STS-102 mission during a prelaunch press conference. Mr. Shannon discusses how the mission came into being and its objectives, including information on the launch and a day-by-day account of mission activities. Ms. Dickey gives details on the payload of STS-102, describing the system racks, cargo elements, and crew supplies delivered via the Leonardo Multi-Purpose Logistics Module. Mr. La Brode describes the current configuration of the ISS and upcoming changes. He also discusses the activities of the Expedition 2 crew during the next four months. Computer simulations show the ISS' current and future (after the STS-102 mission) configurations, the installations of Leonardo, and the move of the Pressurized Mating Adapter from one port to another on the Destiny Laboratory. The panel then answers questions from the press.

Source record↗

STS-102 Extravehicular Activities Briefing

Keith Johnson, STS-102 Lead Extravehicular Activities Officer, gives an overview of the mission's spacewalks in this prelaunch press conference. He describes the activities, objectives, and timeline of the spacewalks during the STS-102 mission. Computerized simulations show the move of the Third Pressurized Mating Adapter (PMA3) and the retrieval of the rigid umbilicals from the payload bay of Discovery. Mr. Johnson then answers questions from the press.

Source record↗

Modeling Thermal Contact Resistance

One difficulty in using cryocoolers is making good thermal contact between the cooler and the instrument being cooled. The connection is often made through a bolted joint. The temperature drop associated with this joint has been the subject of many experimental and theoretical studies. The low temperature behavior of dry joints have shown some anomalous dependence on the surface condition of the mating parts. There is also some doubts on how well one can extrapolate from the test samples to predicting the performance of a real system. Both finite element and analytic models of a simple contact system have been developed. The model assumes (a) the contact is dry (contact limited to a small portion of the total available area and the spaces in-between the actual contact patches are perfect insulators), (b) contacts are clean (conductivity of the actual contact is the same as the bulk), (c) small temperature gradients (the bulk conductance may be assumed to be temperature independent), (d) the absolute temperature is low (thermal radiation effects are ignored), and (e) the dimensions of the nominal contact area are small compared to the thickness of the bulk material (the contact effects are localized near the contact). The models show that in the limit of actual contact area much less than the nominal area (a much less than A), that the excess temperature drop due to a single point of contact scales as a(exp -1/2). This disturbance only extends a distance approx. A(exp 1/2) into the bulk material. A group of identical contacts will result in an excess temperature drop that scales as n(exp -1/2), where n is the number of contacts and n dot a is constant. This implies that flat rough surfaces will have a lower excess temperature drop than flat polished surfaces.

Kittel, Peter↗

Design and Verification of Space Station EVA-Operated Truss Attachment System

This paper describes the design and verification of a system used to attach two segments of the International Space Station (ISS). This system was first used in space to mate the P6 and Z1 trusses together in December 2000, through a combination of robotic and extravehicular tasks. Features that provided capture, coarse alignment, and fine alignment during the berthing process are described. Attachment of this high value hardware was critical to the ISS's sequential assembly, necessitating the inclusion of backup design and operational features. Astronauts checked for the proper performance of the alignment and bolting features during on-orbit operations. During berthing, the system accommodates truss-to-truss relative displacements that are caused by manufacturing tolerances and on-orbit thermal gradients. After bolt installation, the truss interface becomes statically determinate with respect to in-plane shear loads and isolates attach bolts from bending moments. The approach used to estimate relative displacements and the means of accommodating them is explained. Confidence in system performance was achieved through a cost-effective collection of tests and analyses, including thermal, structural, vibration, misalignment, contact dynamics, underwater simulation, and full-scale functional testing. Design considerations that have potential application to other mechanisms include accommodating variations of friction coefficients in the on-orbit joints, wrench torque tolerances, joint preload, moving element clearances at temperature extremes, and bolt-nut torque reaction.

Katell, Gabriel↗

STS-92 Mission Highlights Resource Tape

A continuation of 'STS-92 Mission Highlights Resource Tape, Part 1 of 2' (internal ID 2001120375), this video shows footage from flight day six of the STS-92 mission. Mission Specialists Jeff Wisoff and Mike Lopez-Alegria are seen as they perform their spacewalks to work on the Third Pressurized Mating Adapter and Z1 truss. Additional scenes show Mission Specialist Pam Melroy washing her hair and Commander Brian Duffy shaving. For footage from flight days 7-14, see 'STS-92 Mission Highlights Resource Tape, Part 3 of 4' (internal ID 2001120376) and 'STS-92 Mission Highlights Resource Tape, Part 4 of 4' (internal ID 2001120371).

Source record↗

A Fully Coupled Multi-Rigid-Body Fuel Slosh Dynamics Model Applied to the Triana Stack

A somewhat general multibody model is presented that accounts for energy dissipation associated with fuel slosh and which unifies some of the existing more specialized representations. This model is used to predict the mutation growth time constant for the Triana Spacecraft, or Stack, consisting of the Triana Observatory mated with the Gyroscopic Upper Stage of GUS (includes the solid rocket motor, SRM, booster). At the nominal spin rate of 60 rpm and with 145 kg of hydrazine propellant on board, a time constant of 116 s is predicted for worst case sloshing of a spherical slug model compared to 1,681 s (nominal), 1,043 s (worst case) for sloshing of a three degree of freedom pendulum model.

London, K. W.↗

Computational Analyses of Propulsion Aeroacoustics for Mixed Flow Nozzle Pylon Installation at Takeoff

A CFD analyses is presented for a set of baseline and noise suppression mixed flow nozzles with and without a pylon installation. The five model configurations are as follows; a baselinecore/fan dual-stream nozzle with an external plug, a chevron mixer nozzle with a peak on the symmetry plane with external plug, both of the above nozzles with an installed bifurcatingpylon and lastly a clocked chevron mixer nozzle such that a trough is aligned with the center of the pylon. The fluid flow is simulated by solving the asymptotically steady, compressible, Reynolds-averaged Navier-Stokes equations using an implicit, up-wind, flux-difference splitting finite volume scheme and standard two equation k-epsilon turbulence model with a linear stress representation. All computations are performed using the multiblock, parallel, structuredcode PAB3D. Results indicate that the clocked chevron with pylon case achieves the most optimal levels of average and peak turbulence kinetic energy and vorticity and therefore is expected to be the quietest of the five configurations tested. Further study is required to refine expressions which are indicative of noise and mate these with rigorous noise prediction models.

Massey, Steven J.↗