Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “launch control systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 973 records · Page 54

Enhanced Flight Termination System Flight Demonstration and Results

This paper discusses the methodology, requirements, tests, and implementation plan for the live demonstration of the Enhanced Flight Termination System (EFTS) using a missile program at two locations in Florida: Eglin Air Force Base (AFB) and Tyndall AFB. The demonstration included the integration of EFTS Flight Termination Receivers (FTRs) onto the missile and the integration of EFTS-program-developed transmitter assets with the mission control system at Eglin and Tyndall AFBs. The initial test stages included ground testing and captive-carry flights, followed by a launch in which EFTS was designated as the primary flight termination system for the launch.

Tow, David↗

My Rewarding Summer Research Experience at NASA

My summer research experience at the Kennedy Space Center has been a truly rewarding one. As an electrical engineering student at the University of South Florida, I was blessed with a beneficial opportunity to gain valuable knowledge in my career, and also apply it through working at NASA. One of my inspirations in becoming an engineer is to work at NASA someday, and I was very excited and honored to have this opportunity. My goal in this internship was to strengthen my preparation in becoming an engineer by learning new material, acquiring skills by practicing what I learned, and discovering the expectations of engineering work at NASA. Through this summer research, I was able to learn new computer programs and perform various tasks that gave me experience and skills as an engineer. My primary job was to conduct work on the Constellation Test article, which is a simulation model of the Crew Launch Vehicle (CLV) tanking system. This is a prototype of a launch facility and an Ares I Vehicle, which God willing will transport astronauts to the moon. Construction of the CLV is in progress and a test launch is anticipated for 2010. Moreover, the Test Article serves as a demonstration too, training test bed, and may be expanded for new simulation of launch system elements, which could be applied to real life operations. The test article is operated and run by a Programmable Logic Controller (PLC), which is a digital computer that is used to control all forms of machinery such as those in manufacturing buildings and other industries. PLCs are different than other computers because of the physical protection they have against damaging environmental conditions that would destroy other computers. Also, PLCs are equipped with lots of input and output connections that allow extensive amounts of commands to be executed, which would normally require many computers to do. Therefore, PLCs are small, rugged, and extremely powerful tools that may continue to be employed at NASA. Furthermore, in order to conduct productive work on the Test Article, I needed to learn the computer program called RS Logics 5000.

Aviles, Andres↗

NASA Tech Briefs, April 2012

Topics include: Computational Ghost Imaging for Remote Sensing; Digital Architecture for a Trace Gas Sensor Platform; Dispersed Fringe Sensing Analysis - DFSA; Indium Tin Oxide Resistor-Based Nitric Oxide Microsensors; Gas Composition Sensing Using Carbon Nanotube Arrays; Sensor for Boundary Shear Stress in Fluid Flow; Model-Based Method for Sensor Validation; Qualification of Engineering Camera for Long-Duration Deep Space Missions; Remotely Powered Reconfigurable Receiver for Extreme Environment Sensing Platforms; Bump Bonding Using Metal-Coated Carbon Nanotubes; In Situ Mosaic Brightness Correction; Simplex GPS and InSAR Inversion Software; Virtual Machine Language 2.1; Multi-Scale Three-Dimensional Variational Data Assimilation System for Coastal Ocean Prediction; Pandora Operation and Analysis Software; Fabrication of a Cryogenic Bias Filter for Ultrasensitive Focal Plane; Processing of Nanosensors Using a Sacrificial Template Approach; High-Temperature Shape Memory Polymers; Modular Flooring System; Non-Toxic, Low-Freezing, Drop-In Replacement Heat Transfer Fluids; Materials That Enhance Efficiency and Radiation Resistance of Solar Cells; Low-Cost, Rugged High-Vacuum System; Static Gas-Charging Plug; Floating Oil-Spill Containment Device; Stemless Ball Valve; Improving Balance Function Using Low Levels of Electrical Stimulation of the Balance Organs; Oxygen-Methane Thruster; Lunar Navigation Determination System - LaNDS; Launch Method for Kites in Low-Wind or No-Wind Conditions; Supercritical CO2 Cleaning System for Planetary Protection and Contamination Control Applications; Design and Performance of a Wideband Radio Telescope; Finite Element Models for Electron Beam Freeform Fabrication Process Autonomous Information Unit for Fine-Grain Data Access Control and Information Protection in a Net-Centric System; Vehicle Detection for RCTA/ANS (Autonomous Navigation System); Image Mapping and Visual Attention on the Sensory Ego-Sphere; HyDE Framework for Stochastic and Hybrid Model-Based Diagnosis; and IMAGESEER - IMAGEs for Education and Research.

Source record↗

Cassini Attitude Control Operations - Guidelines Levied on Science to Extend Reaction Wheel Life

The Cassini spacecraft was launched on October 15, 1997 and arrived at Saturn on June 30, 2004. It has performed detailed observations and remote sensing of Saturn, its rings, and its satellites since that time. Cassini deployed the European-built Huygens probe, which descended through the Titan atmosphere (Saturn's largest moon) and landed on its surface on January 14, 2005. The Cassini mission has recently been approved by NASA to continue through September of 2017. This 7-year extension is called the Solstice mission and it presents challenges to the spacecraft operations team and its ability to maintain the health of the spacecraft. To keep the spacecraft healthy for 7 more years, the spacecraft team must carefully manage hydrazine use (about 48% of the 132 kg launch load remains as of January 2011). A vital part of conserving hydrazine is to use the reaction wheel assembly (RWA) control system for precise pointing and slews wherever possible. In any given week, the Cassini spacecraft is commanded to use RWA control about 99% of the time, with about 1% of the time requiring reaction control system (RCS) thruster control (to perform Delta V course corrections or to bias the RWA momentum). Such extensive use of the RWA hardware throughout the mission requires that the RWAs be operated in a way that minimizes degradation in the RWA electronics, DC motor, and spin bearing for each reaction wheel. Three consumables in particular have been identified for the RWAs: (1) Total number of revolutions for each RWA. (2) Time spent at very low wheel speeds. At these low speeds, good elasto-hydrodynamic (EHD) film lubrication may be compromised. (3) Total number of on/off power cycles. The second of these consumables, minimizing the time spent at very low wheel speeds, is especially important to keep the spin bearing healthy and well-lubricated. These consumables are actively managed by the attitude control operations team throughout the mission. One vital management technique is to predict individual RWA momentum (given the pointing and slews that are needed to collect the best science) and to bias the RWA momentum in a way that reduces both the total number of revolutions as well as the time spent below EHD wheel speed. Another strategy to protect RWA health is to alter the planned pointing of the spacecraft (which can affect science collection) so that the RWA consumables are conserved. This paper focuses on why this second technique is needed, and discusses how guidelines have been developed by the attitude control team which affects the planned science pointing, so that science data can be most optimally collected while still minimizing RWA consumable usage.

interplanetary trajectory↗

A Proposed Ascent Abort Flight Test for the Max Launch Abort System

The NASA Engineering and Safety Center initiated the Max Launch Abort System (MLAS) Project to investigate alternate crew escape system concepts that eliminate the conventional launch escape tower by integrating the escape system into an aerodynamic fairing that fully encapsulates the crew capsule and smoothly integrates with the launch vehicle. This paper proposes an ascent abort flight test for an all-propulsive towerless escape system concept that is actively controlled and sized to accommodate the Orion Crew Module. The goal of the flight test is to demonstrate a high dynamic pressure escape and to characterize jet interaction effects during operation of the attitude control thrusters at transonic and supersonic conditions. The flight-test vehicle is delivered to the required test conditions by a booster configuration selected to meet cost, manufacturability, and operability objectives. Data return is augmented through judicious design of the boost trajectory, which is optimized to obtain data at a range of relevant points, rather than just a single flight condition. Secondary flight objectives are included after the escape to obtain aerodynamic damping data for the crew module and to perform a high-altitude contingency deployment of the drogue parachutes. Both 3- and 6-degree-of-freedom trajectory simulation results are presented that establish concept feasibility, and a Monte Carlo uncertainty assessment is performed to provide confidence that test objectives can be met.

Tartabini, Paul V.↗

An Overview of the Characterization of the Space Launch Vehicle Aerodynamic Environments

Aerodynamic environments are some of the rst engineering data products that are needed to design a space launch vehicle. These products are used in performance predic- tions, vehicle control algorithm design, as well as determing loads on primary and secondary structures in multiple discipline areas. When the National Aeronautics and Space Admin- istration (NASA) Space Launch System (SLS) Program was established with the goal of designing a new, heavy-lift launch vehicle rst capable of lifting the Orion Program Multi- Purpose Crew Vehicle (MPCV) to low-earth orbit and preserving the potential to evolve the design to a 200 metric ton cargo launcher, the data needs were no di erent. Upon commencement of the new program, a characterization of aerodynamic environments were immediately initiated. In the time since, the SLS Aerodynamics Team has produced data describing the majority of the aerodynamic environment de nitions needed for structural design and vehicle control under nominal ight conditions. This paper provides an overview of select SLS aerodynamic environments completed to date.

Blevins, John A.↗

PRECISION POINTING OF IBEX-Lo OBSERVATIONS

Post-launch boresight of the IBEX-Lo instrument on board the Interstellar Boundary Explorer (IBEX) is determined based on IBEX-Lo Star Sensor observations. Accurate information on the boresight of the neutral gas camera is essential for precise determination of interstellar gas flow parameters. Utilizing spin-phase information from the spacecraft attitude control system (ACS), positions of stars observed by the Star Sensor during two years of IBEX measurements were analyzed and compared with positions obtained from a star catalog. No statistically significant differences were observed beyond those expected from the pre-launch uncertainty in the Star Sensor mounting. Based on the star observations and their positions in the spacecraft reference system, pointing of the IBEX satellite spin axis was determined and compared with the pointing obtained from the ACS. Again, no statistically significant deviations were observed. We conclude that no systematic correction for boresight geometry is needed in the analysis of IBEX-Lo observations to determine neutral interstellar gas flow properties. A stack-up of uncertainties in attitude knowledge shows that the instantaneous IBEX-Lo pointing is determined to within {approx}0.{sup 0}1 in both spin angle and elevation using either the Star Sensor or the ACS. Further, the Star Sensor can be used to independently determine the spacecraft spin axis. Thus, Star Sensor data can be used reliably to correct the spin phase when the Star Tracker (used by the ACS) is disabled by bright objects in its field of view. The Star Sensor can also determine the spin axis during most orbits and thus provides redundancy for the Star Tracker.

79 ASTRONOMY AND ASTROPHYSICS↗

Estimating the Life Cycle Cost of Space Systems

A space system's Life Cycle Cost (LCC) includes design and development, launch and emplacement, and operations and maintenance. Each of these cost factors is usually estimated separately. NASA uses three different parametric models for the design and development cost of crewed space systems; the commercial PRICE-H space hardware cost model, the NASA-Air Force Cost Model (NAFCOM), and the Advanced Missions Cost Model (AMCM). System mass is an important parameter in all three models. System mass also determines the launch and emplacement cost, which directly depends on the cost per kilogram to launch mass to Low Earth Orbit (LEO). The launch and emplacement cost is the cost to launch to LEO the system itself and also the rockets, propellant, and lander needed to emplace it. The ratio of the total launch mass to payload mass depends on the mission scenario and destination. The operations and maintenance costs include any material and spares provided, the ground control crew, and sustaining engineering. The Mission Operations Cost Model (MOCM) estimates these costs as a percentage of the system development cost per year.

Life cycle cost↗

The Development of the Ares I-X Flight Test

The National Aeronautics and Space Administration (NASA) Constellation Program (CxP) has identified a series of tests to provide insight into the design and development of the Ares I Crew Launch Vehicle (CLV) and the Orion Crew Exploration Vehicle (CEV). Ares I-X was created as the first suborbital development flight test to help meet CxP objectives. The Ares I-X flight vehicle is an early operational model of Ares, with specific emphasis on Ares I and ground operation characteristics necessary to meet Ares I-X flight test objectives. Ares I-X will encompass the design and construction of an entire system that includes the Flight Test Vehicle (FTV) and associated operations. The FTV will be a test model based on the Ares I design. Select design features will be incorporated in the FTV design to emulate the operation of the CLV in order to meet the flight test objectives. The operations infrastructure and processes will be customized for Ares I-X, while still providing data to inform the developers of the launch processing system for Ares/Orion. The FTV is comprised of multiple elements and components that will be developed at different locations. The components will be delivered to the launch/assembly site, Kennedy Space Center (KSC), for assembly of the elements and components into an integrated, flight-ready, launch vehicle. The FTV will fly a prescribed trajectory in order to obtain the necessary data to meet the objectives. Ares I-X will not be commanded or controlled from the ground during flight, but the FTV will be equipped with telemetry systems, a data recording capability and a flight termination system (FTS). The in-flight part of the test includes a trajectory to simulate maximum dynamic pressure during flight and perform a stage separation representative of the CLV. The in-flight test also includes separation of the Upper Stage Simulator (USS) from the First Stage and recovery of the First Stage. The data retrieved from the flight test will be analyzed and used in the design and development of the Ares I vehicle. This paper will discuss the challenges in developing a new launch vehicle in a very short timeframe. The duration from formal Authority to Proceed to launch is 32 months with launch scheduled for April, 2009. The discussion will include changes to organizational structure, system engineering approaches, and early lessons learned for a fast tracked and highly visible project.

Ess, Robert H.↗

International Space Station (ISS) Environmental Control and Life Support (ECLS) System Overview of Events: 2010-2014

Nov 2, 2014 marked the completion of the 14th year of continuous human presence in space on board the International Space Station (ISS). After 42 expedition crews, over 115 assembly & utilization flights, over 180 combined Shuttle/Station, US & Russian Extravehicular Activities (EVAs), the post-Assembly-Complete ISS continues to fly and the engineering teams continue to learn from operating its systems, particularly the life support equipment. Problems with initial launch, assembly and activation of ISS elements have given way to more long term system operating trends. New issues have emerged, some with gestation periods measured in years. Major events and challenges for each U.S. Environmental Control and Life Support (ECLS) subsystem occurring during calendar years 2010 through 2014 are summarily discussed in this paper, along with look-aheads for what might be coming in the future for each U.S. ECLS subsystem.

Gentry, Gregory J.↗

Inductive System Monitors Tasks

The Inductive Monitoring System (IMS) software developed at Ames Research Center uses artificial intelligence and data mining techniques to build system-monitoring knowledge bases from archived or simulated sensor data. This information is then used to detect unusual or anomalous behavior that may indicate an impending system failure. Currently helping analyze data from systems that help fly and maintain the space shuttle and the International Space Station (ISS), the IMS has also been employed by data classes are then used to build a monitoring knowledge base. In real time, IMS performs monitoring functions: determining and displaying the degree of deviation from nominal performance. IMS trend analyses can detect conditions that may indicate a failure or required system maintenance. The development of IMS was motivated by the difficulty of producing detailed diagnostic models of some system components due to complexity or unavailability of design information. Successful applications have ranged from real-time monitoring of aircraft engine and control systems to anomaly detection in space shuttle and ISS data. IMS was used on shuttle missions STS-121, STS-115, and STS-116 to search the Wing Leading Edge Impact Detection System (WLEIDS) data for signs of possible damaging impacts during launch. It independently verified findings of the WLEIDS Mission Evaluation Room (MER) analysts and indicated additional points of interest that were subsequently investigated by the MER team. In support of the Exploration Systems Mission Directorate, IMS is being deployed as an anomaly detection tool on ISS mission control consoles in the Johnson Space Center Mission Operations Directorate. IMS has been trained to detect faults in the ISS Control Moment Gyroscope (CMG) systems. In laboratory tests, it has already detected several minor anomalies in real-time CMG data. When tested on archived data, IMS was able to detect precursors of the CMG1 failure nearly 15 hours in advance of the actual failure event. In the Aeronautics Research Mission Directorate, IMS successfully performed real-time engine health analysis. IMS was able to detect simulated failures and actual engine anomalies in an F/A-18 aircraft during the course of 25 test flights. IMS is also being used in colla

Source record↗

Current Status of Martian Moons eXploration (MMX) Contamination Control and Curation Activity

Martian Moons eXploration (MMX) is a sample return mission from the Martian moon Phobos. The MMX spacecraft is scheduled to launch in 2026 and return to Earth in 2031. The main science goals of MMX are “to reveal the origin of the Martian moons and make progress in the understanding of planetary system formation and material transport in the solar system, and to observe processes that impact the circumplanetary and surface environments of Mars”. MMX has two sampling systems: coring (C)-sampler and pneumatic (P)-sampler and plans to bring back >10 g of Phobos sample. The retuned sample in the sample capsule will be transferred to the curation facility in ISAS/JAXA for sample curation and subsequent sample analysis. Contamination control of the sample return mission requires special care to prevent terrestrial contamination to the spacecraft, which would ruin the scientific value of the returned sample. Retaining the pristineness of the retuned sample is an important task of the MMX Curation and Sampler Science teams. The basis of the contamination control is (1) to minimize and understand the nature and amount of contaminants, (2) to perform contamination assessment and evaluate the effect of contaminants in the spacecraft on the retuned sample, (3) to employ a contamination knowledge (CK) material coupon in the spacecraft to identify the contaminants in the returned samples. In the MMX contamination control plan, the allowable contamination level for each contaminant is carefully defined. They are mostly set to be 1/1000 of the expected amount of each material in the returned sample and are divided into two main categories: organic and inorganic. The allowable atmospheric leakage rate to the sample container is also defined. The allowable contamination level of the organic materials is based on the composition of carbonaceous chondrites. The target contaminants are amino acids, aliphatic and aromatic hydrocarbons, carboxylic acids, etc. In case of the inorganic materials, the target contaminants are important elements to permit distinguishing the origin of the Martian moon by nucleosynthetic isotope anomalies (Cr, Ti, and Mo) and to reveal the evolution of the Martian moon by chronology (Hf, W, U, Pb, Rb, Sr, Sm, and Nd). The key instrument of contamination control in the sample return mission is the sampler system. The C-sampler has been developed by JAXA and the P-sampler was provided by Honeybee/NASA. In MMX, materials used in the two samplers (C- and P- sampler) were carefully selected to avoid potential contamination from the design stage of the system. The individual parts of the C-sampler FM (Flight Model) were thoroughly cleaned at the curation facility in ISAS/JAXA by the full-course cleaning procedure, which is an ultrasonic cleaning with organic solvents and ultrapure water in several steps. The equivalent level of cleaning was also carried out on the P-Samper FM as well by Honeybee Robotics in the USA. Now, MMX is in the critical phase for contamination control called ATLO: Assembly, Test, and Launch Operations. During the ATLO phase, sampler FM is constantly purged with nitrogen gas and maintained at positive pressure to prevent environmental contamination. The surrounding environments of the sampler FM are also simultaneously monitored using the CK Monitoring Coupon Set, which consists of several witness materials such as a glass petri dish, sapphire glass disk, and carbon adhesive tape (Figure 1). The detailed environmental assessment of each clean room used for the assembly and test of the sampler FM has also been conducted. This assessment includes microbial analysis, which was performed for OSIRIS-REx. Regarding the sample recovery and sample curation, we have started the designing of Sample Container Disassembling Instrument for the sample recovery from the sample container and the MMX curation chamber for sample curation. The curation protocol for the Phobos returned sample has also been discussed by the MMX Sample Analysis Working Team (SAWT). The MMX curation protocol consists of three phases: (1) quick analysis, (2) pre-basic characterization, and (3) basic characterization. (1) is extraction of the sample gas from the sample container and analysis by mass spectrometry, (2) is observation in bulk level, and (3) is observation in grain level and allocation of the sample aliquots. In parallel with the curation protocol, the returned sample undergoes preliminary examination for scientific investigations to achieve science goals. In addition, the CK witness plates made of sapphire glass are on board the sampler system. The CK witness plates will be recovered from the sampler system and analyzed by SAWT for the assessment of in-flight contamination.

Haruna Sugahara↗

Aerobot Autonomy Architecture

An architecture for autonomous operation of an aerobot (i.e., a robotic blimp) to be used in scientific exploration of planets and moons in the Solar system with an atmosphere (such as Titan and Venus) is undergoing development. This architecture is also applicable to autonomous airships that could be flown in the terrestrial atmosphere for scientific exploration, military reconnaissance and surveillance, and as radio-communication relay stations in disaster areas. The architecture was conceived to satisfy requirements to perform the following functions: a) Vehicle safing, that is, ensuring the integrity of the aerobot during its entire mission, including during extended communication blackouts. b) Accurate and robust autonomous flight control during operation in diverse modes, including launch, deployment of scientific instruments, long traverses, hovering or station-keeping, and maneuvers for touch-and-go surface sampling. c) Mapping and self-localization in the absence of a global positioning system. d) Advanced recognition of hazards and targets in conjunction with tracking of, and visual servoing toward, targets, all to enable the aerobot to detect and avoid atmospheric and topographic hazards and to identify, home in on, and hover over predefined terrain features or other targets of scientific interest. The architecture is an integrated combination of systems for accurate and robust vehicle and flight trajectory control; estimation of the state of the aerobot; perception-based detection and avoidance of hazards; monitoring of the integrity and functionality ("health") of the aerobot; reflexive safing actions; multi-modal localization and mapping; autonomous planning and execution of scientific observations; and long-range planning and monitoring of the mission of the aerobot. The prototype JPL aerobot (see figure) has been tested extensively in various areas in the California Mojave desert.

Elfes, Alberto↗

Validation and Simulation of Ares I Scale Model Acoustic Test - 3 - Modeling and Evaluating the Effect of Rainbird Water Deluge Inclusion

The Ares I Scale Model Acoustics Test (ASMAT) is a series of live-fire tests of scaled rocket motors meant to simulate the conditions of the Ares I launch configuration. These tests have provided a well documented set of high fidelity measurements useful for validation including data taken over a range of test conditions and containing phenomena like Ignition Over-Pressure and water suppression of acoustics. Building on dry simulations of the ASMAT tests with the vehicle at 5 ft. elevation (100 ft. real vehicle elevation), wet simulations of the ASMAT test setup have been performed using the Loci/CHEM computational fluid dynamics software to explore the effect of rainbird water suppression inclusion on the launch platform deck. Two-phase water simulation has been performed using an energy and mass coupled lagrangian particle system module where liquid phase emissions are segregated into clouds of virtual particles and gas phase mass transfer is accomplished through simple Weber number controlled breakup and boiling models. Comparisons have been performed to the dry 5 ft. elevation cases, using configurations with and without launch mounts. These cases have been used to explore the interaction between rainbird spray patterns and launch mount geometry and evaluate the acoustic sound pressure level knockdown achieved through above-deck rainbird deluge inclusion. This comparison has been anchored with validation from live-fire test data which showed a reduction in rainbird effectiveness with the presence of a launch mount.

Strutzenberg, Louise L.↗

Support to X-33/Resusable Launch Vehicle Technology Program

The X-33 Guidance, Navigation, and Control (GN&C) Peer Review Team (PRT) was formed to assess the integrated X-33 vehicle GN&C system in order to identify any areas of disproportionate risk for initial flight. The eventual scope of the PRT assessment encompasses the GN&C algorithms, software, avionics, control effectors, applicable models, and testing. The initial (phase 1) focus of the PRT was on the GN&C algorithms and the Flight Control Actuation Subsystem (FCAS). The PRT held meetings during its phase 1 assessment at X-33 assembly facilities in Palmdale, California on May 17-18, 2000 and at Honeywell facilities in Tempe, Arizona on June 7, 2000. The purpose of these meetings was for the PRT members to get background briefings on the X-33 vehicle and for the PRT team to be briefed on the design basis and current status of the X-33 GN&C algorithms as well as the FCAS. The following material is covered in this PRT phase 1 final report. Some significant GN&C-related accomplishments by the X-33 development team are noted. Some topics are identified that were found during phase 1 to require fuller consideration when the PRT reconvenes in the future. Some new recommendations by the PRT to the X-33 program will likely result from a thorough assessment of these subjects. An initial list of recommendations from the PRT to the X-33 program is provided. These recommendations stem from topics that received adequate review by the PRT in phase 1. Significant technical observations by the PRT members as a result of the phase 1 meetings are detailed. (These are covered in an appendix.) There were many X-33 development team members who contributed to the technical information used by the PRT during the phase 1 assessment, who supported presentations to the PRT, and who helped to address the many questions posed by the PRT members at and after the phase 1 meetings. In all instances the interaction between the PRT and the X-33 development team members was cordial and very professional. The members of the PRT are grateful for the time and effort applied by all of these individuals and hope that the contents of this report will help to make the X-33 program a success.

Source record↗

Developing a corss-project support system during mission operations: Deep Space 1 extended mission flight control

NASA is focusing on small, low-cost spacecraft for both planetary and earth science missions. Deep Space 1 (DS1) was the first mission to be launched by the NMP. The New Millennium Project (NMP) is designed to develop and test new technology that can be used on future science missions with lower cost and risk. The NMP is finding ways to reduce cost not only in development, but also in operations. DS 1 was approved for an extended mission, but the budget was not large, so the project began looking into part time team members shared with other projects. DS1 launched on October 24, 1998, in it's primary mission it successfully tested twelve new technologies. The extended mission started September 18, 1999 and ran through the encounter with Comet Borrelly on September 22,2001. The Flight Control Team (FCT) was one team that needed to use part time or multi mission people. Circumstances led to a situation where for the few months before the Borrelly encounter in September of 2001 DSl had no certified full time Flight Control Engineers also known as Aces. This paper examines how DS 1 utilized cross-project support including the communication between different projects, and the how the tools used by the Flight Control Engineer fit into cross-project support.

New Millennium Project NMP DS flight control↗

Description and simulation of an integrated power and attitude control system concept for space-vehicle application

An Integrated Power and Attitude Control System (IPACS) concept with potential application to a broad class of space missions is discussed. A description is given of the basic concept of combining the onboard energy storage and attitude control functions by storing energy in spinning flywheels which are used to provide control torques. A shuttle-launched Research and Applications Module (RAM) A303B solar-observatory mission having stringent pointing requirements (1.0 arc second) is selected to investigate possible interactions between energy storage and attitude control. A simulation of this spacecraft involving actual laboratory-model control-system hardware is presented. Simulation results are discussed which indicate that the IPACS concept, even in a failure-mode configuration, can readily meet the RAM A303B pointing requirements.

Will, R. W.↗

Artificial Diversity and Defense Security (ADDSec) Final Report

Critical infrastructure systems continue to foster predictable communication patterns and static configurations over extended periods of time. The static nature of these systems eases the process of gathering reconnaissance information that can be used to design, develop, and launch attacks by adversaries. In this research effort, the early phases of an attack vector will be disrupted by randomizing application port numbers, IP addresses, and communication paths dynamically through the use of overlay networks within Industrial Control Systems (ICS). These protective measures convert static systems into "moving targets," adding an additional layer of defense. Additionally, we have developed a framework that automatically detects and defends against threats within these systems using an ensemble of machine learning algorithms that classify and categorize abnormal behavior. Our proof-of-concept has been demonstrated within a representative ICS environment. Performance metrics of our proof-of-concept have been captured with latency impacts of less than a millisecond, on average.

97 MATHEMATICS AND COMPUTING↗