Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “districts”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 973 records · Page 54

Utica Shale Energy and Environment Laboratory Final Scientific/Technical Report

The Ohio State University (OSU) was awarded a contract on October 1, 2014, from the Department of Energy National Energy Technology Laboratory (DOE-NETL) to develop the Utica Shale Energy and Environment Laboratory (USEEL) in the Utica-Point Pleasant shale play of the Appalachian Basin. It was designed to be an environmental and technology development lab that would enable the academic, industry, government, and non-governmental organization (NGO) research communities to better understand unconventional oil and gas (UOG) engineering practices and technology to increase production and safety, and decrease environmental effects. Political and economic consequences necessitated changes in project site location and design, from the Ohio State Eastern Agricultural Research Station (EARS) and the Muskingum Watershed Conservancy District (MWCD) in east-central Ohio to a site located at an Energy Corporation of America (ECA) Marcellus drill pad in Greene County, Pennsylvania. Although the overall project progressed little beyond planning and administration before termination on September 18, 2017, significant research and MS or PhD investigations were completed or continue today. An experimental study design for site specific and regional baseline assessments was developed utilizing ecoregions, United States Geological Survey (USGS) Hydraulic Unit Code watersheds, and GIS technology and databases. This can be utilized to build a defensible and scalable management and research framework for UOG investigations that can be extrapolated for predictive and comparative analyses. The most commonly mentioned perceived risks of shale energy development identified in a socioeconomic analysis included impacts to the environment and water resources, traffic and road deterioration, and crime. Economic benefits, such as the windfall wealth to residents, job opportunities, and the demand for hotels and restaurants emerged, as the main positive impact to the community. Preliminary results of an analysis of the location and mechanisms for extremely high pore pressures of the deep Utica-Point Pleasant formations of southwestern Pennsylvania and their possible relationship to high initial production rates indicate that the overpressure is caused by a combination disequilibrium compaction and fluid expansion. Drilling fluids research designed a proof-of-concept device to evaluate desalination and solvent separation in hydraulic fracturing flowback water that could facilitate water recycling and potentially mitigate deep-well injection. A groundwater study was devised to characterize the subsurface aquifers in terms of the geological framework and groundwater chemistry, including the chemistry of dissolved gases and salts. Brines and gases associated with hydrocarbon migration in groundwater (including noble gases and hydrocarbons) were to be specifically fingerprinted for use as tracers of fluid migration. Trace element analysis of fish otoliths, using laser ablation inductively coupled plasma mass spectrometry (LA-ICP-MS), is being utilized to assess surface water quality. This methodology will be used to reconstruct the exposure histories of fish from watersheds and discriminate between the signatures associated with hydraulic fracturing and coal mining activities.

03 NATURAL GAS↗

Community Solar Value Project

The Community Solar Value Project (CSVP) is designed to assist electric utilities in designing better community solar programs. Better programs seek new sources of value to promote “win-win” solutions between utilities and their customers. The CSVP focused on five “challenge areas” in identifying new sources of value: - Strategic solar design for community solar projects (including technology choices, siting, orientation, and related issues) - Market research and targeted marketing approaches (for program design and for customer recruitment) - Procurement and financing (for establishing best practices that can bring economies of scale and economies of expertise) - Integration of “companion measures” (such as storage and demand-response options that can benefit customer and utility net load shapes) - Pricing in program design (including best practices for integration of identified value in program prices or credits) The CSVP directly engaged the Sacramento Municipal Utility District (SMUD), the Public Service Company of New Mexico (PNM), and more than a dozen other utilities to develop improved community solar program designs. The outcomes include a plan at SMUD for over 100 MW or more of community and shared solar and support for new or expanded programs at 15 other utilities so far. Resulting best-practice solutions have not only informed program applications, but also have generated discussion among experts and industry associations about the new opportunities and challenges CSVP has brought forth. In these ways, the CSVP has impacted community solar programs and DER plans, competitive innovations and policies nationwide. The CSVP team has been led by Extensible Energy under John Powers, President and CEO. Jill Cliburn, of Santa Fe, NM-based Cliburn and Associates, has served as Principal Investigator. The team also benefitted from expertise from Navigant, Olivine Inc. and Millennium Energy, LLC, in addition to the collaborative and cost-sharing contributions of its utility partners. The CSVP team participated fully in the Solar Market Pathways Program, which was initiated under the U.S. Department of Energy SunShot program and reports to the U.S. Department of Energy Solar Energy Technologies Office. This report summarizes a multi-disciplinary project that took place over 33 months from January, 2015 through September, 2017.

14 SOLAR ENERGY↗

Hyundai FCEV Testing, Data Collection and Validation Fleet

This report summarizes the work conducted under Award Number DE-EE0005970 by Hyundai America Technical Center, Inc. (HATCI) to demonstrate and validate Hyundai Tucson Fuel Cell Electric Vehicles (FCEV) reliability in real world applications. HATCI operated 10 light-duty FCEVs throughout various geographical regions in United States to collect and submit vehicle performance durability data over 5 years. HATCI introduced FCEVs in two phases. First phase deployed 5 vehicles in Southern California to study customer real world usage and prove its reliability under commute and fleet driving pattern from 2013 to 2015. As the hydrogen station infrastructure expanded its network, second phase deployed and operated 5 additional vehicles under various climate zones (hot, cold, high altitude) and validated fuel cell performance from 2016 to 2017. California Air Resources Board (Sacramento, CA), California Fuel Cell Partnership, US Department of Energy (Washington DC), Hyundai Motor America, HATCI (Ann Arbor, Michigan), National Renewable Energy Laboratory (Golden, CO), and South Coast Air Quality Management District were the fleet operators. Four different stack degradation mechanism issues were addressed through validation project: fuel cell stack dry-out, flooding, cathode oxidation, and platinum dissolution. By developing counter-measures to each fuel cell stack degradation mechanism through performance validation fleet, Hyundai was able to successfully develop the next generation fuel cell vehicle NEXO, with longest range, large cost reduction, and best fuel cell powertrain warranty in its class (100,000 miles, 10 years warranty).

08 HYDROGEN↗

Final Report: Conceptual Design of an Electron Accelerator for Bio-Solid Waste Treatment

Several studies have identified electron beam (EB) irradiation of municipal wastewater and bio-solids as an effective and promising approach to the environmental remediation of the enormous quantities of human waste created by a growing world-wide population and increased urbanization. However, despite the technical success of experimental and pilot programs over the last several decades, the technique is still not in commercial use anywhere in the world. In addition, the report also identifies the need for “Financial and infrastructure participation from a utility for demonstration project” and “Education and awareness of safety of utilizing electron beam technology” as two additional roadblocks preventing technology adoption of EB treatment for bio-solids. In this concept design, we begin to address these barriers by working with Metropolitan Water Reclamation District of Greater Chicago (MWRD) and by the applying the latest accelerator technologies developed at Fermilab and within the DOE Office of Science laboratory complex.

43 PARTICLE ACCELERATORS↗

Nebraska Integrated Carbon Capture and Storage Pre-Feasibility Study

In collaboration with the Nebraska Public Power District (NPPD), the Energy & Environmental Research Center (EERC) has conducted a pre-feasibility study for a commercial-scale carbon dioxide (CO 2 ) geologic storage complex in western Nebraska integrated with potential CO 2 capture at Gerald Gentleman Station (GGS). GGS is the largest coal-fired electricity-generating station in Nebraska, emitting 8.5 million metric tons (Mt) of CO 2 annually, and is located near the town of Sutherland. This pre-feasibility (Phase 1) project has been executed as part of the U.S. Department of Energy (DOE) CarbonSAFE program, a multiphase initiative to support the deployment of large-scale carbon capture and storage (CCS) projects. Each CarbonSAFE project is required to demonstrate the potential to capture and store at least 50 million tonnes (Mt) of CO 2 over a 25-year operational period. The EERC and NPPD established a coordination team to identify challenges to a potential Nebraska CCS project, comprising local stakeholder organizations, which met twice in Lincoln and via several Webinars, providing feedback and guidance throughout the pre-feasibility study. The EERC also secured the technical support of Schlumberger Carbon Services and Computer Modelling Group Ltd. (CMG). The project comprised four technical themes, all using published information sources. Regional and stakeholder analysis, including identification of sensitive environmental areas, potential resource conflicts, and strategies for public outreach. A review of geographic and socioeconomic characteristics, in combination with geologic characterization in the subbasinal analysis described below, identified an area to the southwest and within a 75-mile radius of GGS as the most prospective for development of a storage site. This area largely avoided lands with protected status such as wetlands. A public outreach plan has also been developed for implementation in any further phases of CCS assessment in western Nebraska, for example a CarbonSAFE Phase 2 feasibility study. Scenario analysis, addressing economic and regulatory factors. GGS is the only single major source of CO 2 emissions capable of satisfying the CarbonSAFE 50-Mt scale requirement within the study region. Chemical absorption using amines was identified as the most viable technology for postcombustion CO 2 capture at GGS. The total cost of a CCS project at GGS was estimated to be between $67/tonne CO 2 for capture and auxiliary boiler to minimize parasitic load and $70/tonne CO 2 avoided cost, using the Carnegie-Mellon University Integrated Environmental Control Model (IECM). The total avoided cost included the capture facility and parasitic load, a flue gas desulfurization plant required for the use of amine solvent technology, transport via pipeline, and dedicated storage infrastructure. Nebraska has no legislation in place to address typical CCS-specific issues, for example pore space ownership for storage. Long-term liability, therefore, falls under the U.S. Environmental Protection Agency Underground Injection Control (UIC) Class 6 program regulations. Subbasinal analysis, addressing the potential for a dedicated subsurface “container” to store the required 50-Mt quantity of CO 2 . Modeling and simulation studies identified an area to the southwest of GGS with the potential for storage of 50 Mt CO 2 in the Cloverly Formation, comprising sandstones with interbedded and intermingled shales. The area of review (AOR) that would be required for monitoring under a Class VI operating permit was estimated to be as high as 400–700 square miles, due to uncertain pressure effects. The viability of this storage option is subject to significant uncertainty due to the relatively limited amount of existing characterization data available to the pre-feasibility study; for example, dynamic simulation indicated that the proposed storage rate might require as little as two or as many as 14 injection wells. A key uncertainty is the relative proportion and distribution of sandstone and shale within the Cloverly Formation. A preliminary, semiquantitative risk assessment also suggested uncertainty over storage capacity and injectivity constitute the most significant project risks at this pre-feasibility stage. No assessed risks were considered to rule out the possibility of a project moving to deployment. National Risk Assessment Partnership (NRAP) validation, using software tools developed by the National Energy Technology Laboratory (NETL) to assess risks associated with the potential 50-Mt CO 2 storage complex. NRAP tools were used to assess hypothetical leakage scenarios. Results broadly supported the conclusion of the semiquantitative risk analysis – for example, even worst-case analysis of theoretical leakage scenarios found limited migration rates and impacts. In summary, the work undertaken in this Phase 1 pre-feasibility study has shown that western Nebraska has potential to host a commercial-scale CCS project, including a dedicated storage “container” for 50 Mt of CO 2 . However, the following key challenges would need to be overcome: The business case for deploying CCS projects is uncertain; recently announced federal tax credits and sales of CO 2 for enhanced oil recovery may not cover the full costs of a CCS project at GGS, as estimated by this pre-feasibility study. The potential 50-Mt CO 2 dedicated storage container defined in this pre-feasibility study should be regarded as having a relatively low level of readiness to support a CCS project. Public outreach would be a vital element in western Nebraska, where sensitivities around such environmental issues as water resource protection and pipeline construction would need to be carefully addressed.

54 ENVIRONMENTAL SCIENCES↗

DOE/LANL Land Conveyances and Transfers - Progress Over 20 Years

Before any transfer or conveyance actions, DOE owned approximately 45 square miles (28,800 acres) and most of this comprised Los Alamos National Laboratory. Since 1999, under Public Law 105-119, DOE/LANL has conveyed 4.8 square miles (3072 acres) of property to Los Alamos County and 6 acres to the Los Alamos School District. In addition, 3.2 square miles (2,048 acres) and has been transferred to the Bureau of Indian Affairs to be held in trust for the Pueblo de San Ildefonso.

99 GENERAL AND MISCELLANEOUS↗

Replacement of Wooden Wing Walls and Deteriorated Concrete Pad at Manhattan Project Era Magazine TA-16-58

The U.S. Department of Energy, National Nuclear Security Administration, Los Alamos Field Office (Field Office) proposes to replace missing and broken asbestos shingles, reconstruct deteriorated wooden wing walls, and remove and replace a concrete pad on Building 58 in Technical Area (TA) 16 at Los Alamos National Laboratory (LANL). Building TA-16-58 is a Manhattan Project Era magazine that was evaluated and determined eligible, in consultation with the State Historic Preservation Office (June 5, 2003 and June 22, 2003, respectively), for listing in the National Register of Historic Places (Register) in ESA Division’s Five-Year Plan: Consolidation and Revitalization at Technical Areas 3, 8, 11, and 16 and in Sentinels of the Atomic Dawn: A Multiple -Property Evaluation of the Remaining Manhattan Project Properties at Los Alamos (1942–1946) (McGehee et al. 2003a, 2003b). The building is a LANL candidate for preservation as identified in A Plan for the Management of the Cultural Heritage at Los Alamos National Laboratory, New Mexico (LANL 2017a ). It is also eligible for inclusion in the Manhattan Project National Historical Park (i.e., identified in the Park legislation), and is located within the TA-16 potential Cold War historic district (McGeh ee 1995a, 1995b; LANL 2012,).

99 GENERAL AND MISCELLANEOUS↗

Washington Clean Energy Fund: Energy Storage System Performance Test Plans and Data Requirements

This report documents the test plans, including detailed duty cycles, used in evaluating the technical performance of five energy storage systems (ESSs) sponsored by the Washington State Clean Energy Fund (CEF). These ESSs were installed at three participating utilities’ (Avista, Snohomish Public Utility District or SnoPUD, and Puget Sound Energy or PSE) designated sites. Under each test plan, a number of baseline and use case tests are defined. This report documents the test plan for each utility, including duty cycles, data and performance reporting requirements. Baseline tests defined in this report mainly focus on determining an initial or reference performance for each ESS, which may be compared with the performance at any later time to assess the state of health of the ESS. Parameter values of a given ESS obtained from baseline tests are applied for different modeling purposes and use case tests. The stored energy capacity test is the first test conducted in the baseline test program, which generates data to calculate round trip efficiency (RTE). The response time and ramp rate tests provide the time required for an ESS to change from zero to full charging/discharging rate and hence the ramp rate, which is important in understanding ESS performance for applications calling for fast response. Internal resistance testing of ESS cells is also conducted in conjunction with the response time and ramp rate tests. Finally, the baseline tests include frequency regulation (FR) and peak shaving (PS) tests based on real-world duty cycles. Upon completion of the baseline tests, use case tests are conducted at each of the storage sites with duty cycles developed to meet the site-specific criteria and conditions. The use cases are grouped according to their intended target benefits within the electric infrastructure topology (e.g., transmission versus distribution). Although an ESS may be located on the low-voltage side of a substation that provides power to a distribution feeder, a use case that addresses bulk power services could still be provided and would be grouped under the transmission or bulk-power benefits. Use cases for ESS applications deep into the distribution circuit would be categorized under the distribution system cases.

25 ENERGY STORAGE↗

U.S. DOE Southwest CHP TAP Final Report

The objective of the Department of Energy’s Southwest Combined Heat and Power Technical Assistance Partnership (Southwest CHP TAP) is to provide essential support to continue the market penetration of CHP’s suite of technologies and to substantially contribute to the national goal of 40 GW of new CHP installations by 2020. The CHP TAP work is designed to assist CHP installations by providing technology and fuel-neutral technical assistance to potential end-users, and, to a lesser degree, providing education and engagement to a variety of stakeholders including end-users (commercial, industrial, institutional and more), electric and gas utilities, trade associations, non-profit organizations, and policymakers. This assistance includes evaluating the economic, energy savings, reliability, and environmental value of proposed CHP systems and conveying this value to encourage CHP installations. The CHP TAPs represent multi-state regions and are DOE’s CHP experts providing fact-based, unbiased information on CHP, including technologies, project development, project financing, local electric and natural gas utility interfaces, and related best practice policies. CHP applications (including WHP) can be both stand-alone as well as in District Energy or Microgrid configurations and the CHP TAPs will encourage the installation of CHP in these various configuration types as appropriate.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Hypothesis-Based Structural Biology in the High School Classroom

High school students from Shelter Island High School (a small rural district on Shelter Island N.Y. nestled between the Twin Forks of Long Island) are using rotein Data Bank data to answer questions about methylenetetrahydrofolate reductase (MTHFR) (3FSU, 1ZP3), an enzyme implicated in many human diseases. Students Francesca Frasco (class of 2018), Emma Gallagher, and Lauren Gurney are part of a multi-year research class.

59 BASIC BIOLOGICAL SCIENCES↗

Causal Analysis Report for "Demolition of Historic and Yet-to-be-Determined Radar Towers at TTR Without Completing Required NEPA Process"

Two radar towers at the Tonopah Test Range (TTR), Contraves Towers 22-00 and 12-00, were torn down prior to completion of the required National Environmental Policy Act (NEPA) process. National Technology and Engineering Solutions of Sandia, LLC, (NTESS) submission of the NEPA checklist triggered a Sandia Field Office (SFO) review of the proposed work scope and was to include a required consultation between SFO and the Nevada State Historic Preservation Office (SHPO) to assess any adverse effect(s) on historic properties or contributing element(s) to a historic district and, if so, determine a resolution. Following the consultation, SFO provides approval/denial of the proposed work detailed on the submitted NEPA checklist. Contraves Tower 22-00 is a historic structure, as formally determined by the SFO in consultation with the SHPO. The historical eligibility of Contraves Tower 12-00 is yet to be determined. On February 13, 2018, NTESS notified SFO that Contraves Tower 22-00 at TTR was torn down in May 2017 prior to completion of the required the NEPA process, including consultation with the SHPO. NTESS submitted two NEPA checklists to SFO in 2016 for the removal of several structures no longer required by NTESS. The first NEPA checklist listed three historic structures (one of which was Contraves Tower 22-00) and SFO determination on whether consultation with the SHPO is necessary as well as approval/denial of the NEPA checklist is pending. The second NEPA checklist listed five non-historic structures, one of which was Contraves Tower 12-00. SFO approved the NEPA checklist covering non historic structures except for the Contraves Tower 12-00, as the Contraves Tower 12-00 requires further consultation with the SHPO by SFO. Only after completion of the consultation would SFO determine approval/denial on the remaining property cited within the NEPA checklist. In late January 2018, NTESS personnel discovered that Contraves Tower 22-00 was no longer listed in the Facility Information Management System (FIMS). Upon further investigation, NTESS personnel verified that the Contraves Tower 22-00 had been removed in May 2017. During the initial extent of condition, it was discovered that Contraves Tower 12-00 had also been torn down in May 2017 as part of this same destruction and demolition (D&D) activity. Both Contraves Towers 22-00 and 12-00) had been torn down prior to completion of the NEPA process, including consultation with the SHPO.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Chicago Area Waterway System Microbiome Research

This report summarizes the research conducted by Argonne National Laboratory (Argonne) for the Metropolitan Water Reclamation District of Greater Chicago (MWRD) for the first five years (2013-2017) of a seven-year study with emphasis on the impact of disinfection (2016-2017) on the microbial community of the Chicago Area Waterway System (CAWS). The study examines microbial communities following disinfection of secondary treated effluents at the T.J. O’Brien (UV) and Calumet (chlorine and dechlorination) Water Reclamation Plants (WRPs) and the phased implementation of the Tunnel and Reservoir Plan (TARP). The Thornton Composite Reservoir (TCR) was completed in 2015. It provides 7.9 billion gallons of storage and since its completion has captured more than 11.0 billion gallons of combined stormwater and sewage from Calumet WRP that would otherwise overflow into CAWS in rainy weather. In addition to the effects of TARP and disinfection, we present an analysis of potential sources of the microbes found in the CAWS and the results of 16S rRNA amplicon gene sequencing which was used to characterize microbial community variability as a function of location, season, and environmental conditions. A total of 2,077 samples were collected from 2013 to 2017 from WRPs and CAWS and analyzed using high-throughput sequencing. The whole microbial community composition using all the genetic material in the environmental sample was characterized using 16S rRNA gene-based analysis, while functional subsystem attributes of these microbial communities were characterized using shotgun metagenomics. We used a Bayesian statistical tool, SourceTracker 2.0 to determine the likely sources of microbes found in CAWS by sampling location and sampling period.

54 ENVIRONMENTAL SCIENCES↗

Resilient Solar and Storage Roadmap

Resilience to natural disasters is imperative for safe, economically productive cities. In the immediate aftermath of an earthquake, flood, or other disaster, one key element of resilience is continued operation of shelters and critical emergency management facilities. Operation of these facilities depends on reliable emergency power. Traditional emergency power systems use diesel generators with storage tanks, which provide power for only a few days in the absence of the electric or gas grid. However, a recent study has shown that gas and electric networks can require days or weeks to recover from a disaster, leaving facilities with generators at risk of running out of fuel. This has already been experienced in New York City after Hurricane Sandy where a combination of lengthy outages and high flood waters compromised the traditional diesel storage and generator backup infrastructure at hospitals and shelters. With the risk of natural disasters increasing due to climate change, we must turn to more resilient solutions for providing backup power to shelters, medical centers, and emergency operations centers. From 2015 to 2017, the City and County of San Francisco Solar and Storage for Resilience Project examined the use of microgrids and stand-alone solar electric generation with battery storage to provide resilient post-disaster power to critical facilities. The project evaluated 1,263 potential congregation and shelter sites across the city, 67 of which were identified as shelter sites with power requirements and opportunities to develop resilient infrastructure through solar and storage. Site visits were conducted for 18 of these buildings, spanning all 11 supervisor districts in San Francisco and a range of normal and emergency use types. The project team used observations from these site visits to create representative emergency power profiles for all 67 shelters in San Francisco. Using these profiles, the team found that 8.2 megawatts (MW) of photovoltaic panels and 12.9 MW of battery storage would be required to provide resilient backup power for San Francisco’s shelters following a disaster. Given the high capital cost of deploying this large resource, the project team investigated various financing options — a public-private partnership was found to be a viable pathway for financing resilient solar and storage. Given the added benefit of energy cost savings in normal operation, a public-private partnership financing model would save the City and County of San Francisco 6% over a traditional design-bid-build approach over a 20-year portfolio lifetime. This roadmap documents the project’s steps of identifying critical facilities, surveying power requirements, assessing renewable potential, evaluating financing options to develop the solar and storage systems for resiliency, and modeling individual sites for solar and storage installation. This roadmap also examines the challenges critical facilities face in providing resilient power, such as key technical, political, and financing barriers, as well as the opportunities and policy recommendations to further advance resilient solar and storage development in San Francisco. While this report focuses on a detailed study of San Francisco, the methods and outcomes are applicable to any city or town.

14 SOLAR ENERGY↗

A GENERIC MICROGRID CONTROLLER

The main objective of this project was to develop and test a Generic Microgrid Controller (GMC) that provides (1) seamless islanding and reconnection of the microgrid, (2) efficient, reliable, and resilient operation of the microgrid with the required power quality, whether islanded or grid-connected, (3) existing and future ancillary services to the larger grid, (4) the capability for the microgrid to serve the resiliency needs of participating communities, (5) communication with the electric grid utility as a single controllable entity, and (6) increased reliability, efficiency and reduced emissions. The GMC developed under this project was designed to facilitate the deployment of microgrids, to be easily adapted to various microgrid configurations, and reduce up-front engineering costs associated with the design and development of microgrid controllers. Specifically, the GMC: 1. Provides a control structure amenable to accommodating an array of microgrid configurations and a portfolio of functional requirements; 2. Possesses a high level architecture that can readily be adopted by commercial suppliers; 3. Supports unlimited nesting of conforming microgrid control schemes; 4. Integrates into a full-featured Energy Management System (EMS) as a module. A select set of microgrids, operating a variety of microgrid configurations, served as “collaborating microgrid partners” in the project and assured thereby that the GMC developed under this program can readily be applied to microgrids of different sizes, and equipped with various resources, attributes, and equipment. Collaborating microgrid partners included the UCI Medical Center), the Port of Los Angeles, Port of Long Beach, and the Irvine Ranch Water District. The objectives of the project were achieved in two phases: (Phase I) Research, Development and Design (“Design”), and (Phase II) Testing, Evaluation, and Verification (“TEV”). In Phase I, specifications were developed for the GMC and a detailed test plan was established to test the functional requirements of the GMC. The GMC addresses two core functions, transition and dispatch, as well as several optional higher level functions such as economic dispatch, and renewable and load forecasting.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Report of the DOE Workshop on Management, Analysis, and Visualization of Experimental and Observational data – The Convergence of Data and Computing

The Department of Energy (DOE) Office of Science (SC) operates dozens of national science user facilities that span many different disciplines. These facilities include accelerators, colliders, supercomputers, light sources and neutron sources, as well as facilities for studying the nanoworld, the environment, and the atmosphere. In Fiscal Year 2014 over 33,000 researchers from academia, industry, and government laboratories, spanning all fifty states and the District of Columbia, utilized these unique facilities to perform new scientific research. Each of these facilities generates vast amounts of scientific data, and the rate, size, and complexity of this data is rapidly increasing, thanks to advances in technology. A growing concern, which motivates this workshop, is the likely significant adverse impact on science programs that will result without significant advances in the capabilities needed to manage and gain knowledge from these collections of data. The purpose of this workshop, held 29 September 2015 through 1 October 2015 in Bethesda, MD, is to help the Advanced Scientific Computing Research (ASCR) and research community better understand needs related to the management, analysis, and visualization of experimental and observational data (EOD) collected and generated by experimental and observational science projects (EOS) at Office of Science user facilities.

97 MATHEMATICS AND COMPUTING↗

Mid Atlantic CHP Technical Assistance Partnership (Final Technical Report)

The Mid Atlantic CHP Technical Assistance Partnership (MACHPTAP), managed by The Pennsylvania State University College of Engineering, served the six states in the Mid-Atlantic region (Pennsylvania, New Jersey, Delaware, Maryland, Virginia and West Virginia) plus the District of Columbia. The objective of the Combined Heat and Power Technical Assistance Partnerships (CHP TAPs) was to provide essential support to continue the market development of CHP’s suite of technologies to further the installation of highly efficient and cost effective CHP. The MACHPTAP’s work included education and outreach as well as technical assistance to a variety of stakeholders including end-users (commercial, industrial, institutional and more), state decision makers, electric and gas utilities, trade associations and non-profit organizations. This assistance included evaluating the economic, energy, reliability and environmental value of proposed systems. The CHP TAPs represented multi-state regions and are the CHP experts in the region who provide fact-based, un-biased information on CHP, including technologies, project development, project financing, local electric and natural gas utility interfaces, and related State best practice policies. Specifically, the MACHPTAP objectives were accomplished through taskings in four specific areas: Technical Assistance to end Users which involved engaging potential end-users to identify, evaluate, and technically support prospective CHP projects; Engagement and Education of End Users where the MACHPTAP engaged and educated end users about CHP, its benefits, and DOE resources available, and strategically hosted or participated in webinars, workshops and conferences; Policymaker Education where the MACHPTAP hosted or participated in webinars, one-on-one meetings, workshops, and other forums; and Program Administration, Management and Reporting, which included monthly and quarterly reporting, program meetings and coordination of activities with other regional TAPs. Accomplishments in the four specific project areas included providing direct Technical Assistance to 289 prospective CHP end users, conducting or participating in 82 End User Education events and hosting or participating in 73 Policy Maker Education events. During the contract period, 107 CHP installations were commissioned in the Mid Atlantic region, with a total generation capacity of over 160 megawatts, with an additional 34 sites with a capacity of over 100 megawatts currently in the planning/design/construction phase. Programmatically, all monthly metrics reports and quarterly reports were submitted in a timely manner.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Guide to Zero Energy and Zero Energy Ready K-12 Schools

This guide was developed as part of the U.S. Department of Energy's (DOE's) Zero Energy Schools Accelerator (ZESA), a collaborative effort between DOE; the National Renewable Energy Laboratory; and school districts, states, and educational support groups from around the country. Because education is managed locally in the United States, this research documents some of the ways U.S. school officials and educators configure school financing, design, construction, curriculum development, and other school-related matters in their areas. The steps outlined here document the process of creating a zero energy school, and can provide a strong foundation for future ZE school projects.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Conceptual Design of an Electron Accelerator for Bio-Solid Waste Treatment.

Several studies have identified electron beam (EB) irradiation of municipal wastewater and bio-solids as an effective and promising approach to the environmental remediation of the enormous quantities of human waste created by a growing world-wide population and increased urbanization. However, despite the technical success of experimental and pilot programs over the last several decades, the technique is still not in commercial use anywhere in the world. In addition, the report also identifies the need for “Financial and infrastructure participation from a utility for demonstration project” and “Education and awareness of safety of utilizing electron beam technology” as two additional roadblocks preventing technology adoption of EB treatment for bio-solids. In this concept design, we begin to address these barriers by working with Metropolitan Water Reclamation District of Greater Chicago (MWRD) and by the applying the latest accelerator technologies developed at Fermilab and within the DOE Office of Science laboratory complex.

43 PARTICLE ACCELERATORS↗