Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Time”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 973 records · Page 54

Response Time Analysis and Test of Protection System Instrument Channels for APR1400 and OPR1000

Safety limits are required to maintain the integrity of physical barriers designed to prevent the uncontrolled release of radioactive materials in nuclear power plants. The safety analysis establishes two critical constraints that include an analytical limit in terms of a measured or calculated variable, and a specific time after the analytical limit is reached to begin protective action. Keeping with the nuclear regulations and industry standards, satisfying these two requirements will ensure that the safety limit will not be exceeded during the design basis event, either an anticipated operational occurrence or a postulated accident. Various studies on the setpoint determination methodology for the safety-related instrumentation have been actively performed to ensure that the requirement of the analytical limit is satisfied. In particular, the protection setpoint methodology for the advanced power reactor 1400 (APP1400) and the optimized power reactor 1000 (OPR1000) has been recently developed to cover both the design basis event and the beyond design basis event. The developed setpoint methodology has also been quantitatively validated using specific computer programs and setpoint calculations. However, the safety of nuclear power plants cannot be fully guaranteed by satisfying the requirement of the analytical limit. In spite of the response time verification requirements of nuclear regulations and industry standards, it is hard to find the studies on the systematically integrated methodology regarding the response time evaluation. In cases of APR1400 and OPR1000, the response time analysis for the plant protection system is partially included in the setpoint calculation and the response time test is separately performed via the specific plant procedure. The test technique has a drawback which is the difficulty to demonstrate completeness of timing test. The analysis technique has also a demerit of resulting in extreme times that not actually possible. Thus, the establishment of the systematic response time evaluation methodology is needed to justify the conformance to the response time requirement used in the safety analysis. This paper proposes the response time evaluation methodology for APR1400 and OPR1000 using the combined analysis and test technique to confirm that the plant protection system can meet the analytical response time assumed in the safety analysis. In addition, the results of the quantitative evaluation performed for APR1400 and OPR1000 are presented in this paper. The proposed response time analysis technique consists of defining the response time requirement, determining the critical signal path for the trip parameter, allocating individual response time to each component on the signal path, and analyzing the total response time for the trip parameter, and demonstrates that the total analyzed response time does not exceed the response time requirement. The proposed response time test technique is composed of defining the response time requirement, determining the critical signal path for the trip parameter, determining the test method for each component on the signal path, performing the response time test, and demonstrates that the total test result does not exceed the response time requirement. The total response time should be tested in a single test that covers from the sensor to the final actuation device on the instrument channel. When the total channel is not tested in a single test, separate tests on groups of components or single components including the total instrument channel shall be combined to verify the total channel response. For APR1400 and OPR1000, the ramp test technique is used for the pressure and differential pressure transmitters and the step function testing technique is applied to the signal processing equipment and final actuation device. As a result, it can be demonstrated that the response time requirement is satisfied by the combined analysis and test technique. Therefore, the proposed methodology in this paper plays a crucial role in guaranteeing the safety of the nuclear power plants systematically satisfying one of two critical requirements from the safety analysis. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Ecosystem carbon transit versus turnover times in response to climate warming and rising atmospheric CO 2 concentration

Ecosystem carbon (C) transit time is a critical diagnostic parameter to characterize land C sequestration. This parameter has different variants in the literature, including a commonly used turnover time. However, we know little about how different transit time and turnover time are in representing carbon cycling through multiple compartments under a non-steady state. In this study, we estimate both C turnover time as defined by the conventional stock over flux and mean C transit time as defined by the mean age of C mass leaving the system. We incorporate them into the Community Atmosphere Biosphere Land Exchange (CABLE) model to estimate C turnover time and transit time in response to climate warming and rising atmospheric [CO 2 ]. Modelling analysis shows that both C turnover time and transit time increase with climate warming but decrease with rising atmospheric [CO 2 ]. Warming increases C turnover time by 2.4 years and transit time by 11.8 years in 2100 relative to that at steady state in 1901. During the same period, rising atmospheric [CO 2 ] decreases C turnover time by 3.8 years and transit time by 5.5 years. Our analysis shows that 65 % of the increase in global mean C transit time with climate warming results from the depletion of fast-turnover C pool. The remaining 35 % increase results from accompanied changes in compartment C age structures. Similarly, the decrease in mean C transit time with rising atmospheric [CO 2 ] results approximately equally from replenishment of C into fast-turnover C pool and subsequent decrease in compartment C age structure. Greatly different from the transit time, the turnover time, which does not account for changes in either C age structure or composition of respired C, underestimated impacts of warming and rising atmospheric [CO 2 ] on C diagnostic time and potentially led to deviations in estimating land C sequestration in multi-compartmental ecosystems.

54 ENVIRONMENTAL SCIENCES↗

Spinor Field Nonlinearity and Space-Time Geometry

Within the scope of Bianchi type VI,VI0,V, III, I, LRSBI and FRW cosmological models we have studied the role of nonlinear spinor field on the evolution of the Universe and the spinor field itself. It was found that due to the presence of non-trivial non-diagonal components of the energy-momentum tensor of the spinor field in the anisotropic space-time, there occur some severe restrictions both on the metric functions and on the components of the spinor field. In this report we have considered a polynomial nonlinearity which is a function of invariants constructed from the bilinear spinor forms. It is found that in case of a Bianchi type-VI space-time, depending of the sign of self-coupling constants, the model allows either late time acceleration or oscillatory mode of evolution. In case of a Bianchi VI{sub 0} type space-time due to the specific behavior of the spinor field we have two different scenarios. In one case the invariants constructed from bilinear spinor forms become trivial, thus giving rise to a massless and linear spinor field Lagrangian. This case is equivalent to the vacuum solution of the Bianchi VI{sub 0} type space-time. The second case allows non-vanishing massive and nonlinear terms and depending on the sign of coupling constants gives rise to accelerating mode of expansion or the one that after obtaining some maximum value contracts and ends in big crunch, consequently generating space-time singularity. In case of a Bianchi type-V model there occur two possibilities. In one case we found that the metric functions are similar to each other. In this case the Universe expands with acceleration if the self-coupling constant is taken to be a positive one, whereas a negative coupling constant gives rise to a cyclic or periodic solution. In the second case the spinor mass and the spinor field nonlinearity vanish and the Universe expands linearly in time. In case of a Bianchi type-III model the space-time remains locally rotationally symmetric all the time, though the isotropy of space-time can be attained for a large proportionality constant. As far as evolution is concerned, depending on the sign of coupling constant the model allows both accelerated and oscillatory mode of expansion. A negative coupling constant leads to an oscillatory mode of expansion, whereas a positive coupling constant generates expanding Universe with late time acceleration. Both deceleration parameter and EoS parameter in this case vary with time and are in agreement with modern concept of space-time evolution. In case of a Bianchi type-I space-time the non-diagonal components lead to three different possibilities. In case of a full BI space-time we find that the spinor field nonlinearity and the massive term vanish, hence the spinor field Lagrangian becomes massless and linear. In two other cases the space-time evolves into either LRSBI or FRW Universe. If we consider a locally rotationally symmetric BI(LRSBI) model, neither the mass term nor the spinor field nonlinearity vanishes. In this case depending on the sign of coupling constant we have either late time accelerated mode of expansion or oscillatory mode of evolution. In this case for an expanding Universe we have asymptotical isotropization. Finally, in case of a FRW model neither the mass term nor the spinor field nonlinearity vanishes. Like in LRSBI case we have either late time acceleration or cyclic mode of evolution. These findings allow us to conclude that the spinor field is very sensitive to the gravitational one.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Performance and Commissioning of the BigBite Timing Hodoscope for Nucleon Form Factor Measurements at Jefferson Lab

The BigBite Timing Hodoscope detector is the primary subject of this thesis. The Super BigBite Spectrometer is a Jefferson Lab Hall A Collaboration project that has and will continue to measure nucleon electromagnetic form factors. This spectrometer includes the Timing Hodoscope which provides high resolution particle timing data for scattered electrons in the electron arm of BigBite. The Timing Hodoscope utilizes 90, 25 × 25 × 600 mm3 scintillator bars stacked on top of each other to form a single detector plane, and these bars are connected to 180 photo-multiplier tubes via light guides. Particles collide with the scintillating material creating a shower of optical photons and these particle events in the bars are collected to generate signals that are readout by the data acquisition (DAQ) electronics. NINO ASIC amplifier-discriminator cards output signals from the photo-multiplier tubes into analogue and logic signals, which are sent to analogue-to-digital (ADC) and time-to-digital (TDC) converter data acquisition readout modules. This data is then used for analysis of the detector. The focus of this thesis is the construction, commissioning, calibration, and performance of the BigBite Timing Hodoscope before and during the first of five nucleon electromagnetic form factor experiments at Jefferson Lab Hall A. Before the neutron magnetic form factor, G n M, experiment, cosmic ray data was collected during commissioning to confirm proper operation of the Timing Hodoscope electronics by observing the ADC and TDC data. Commissioning studies for charge normalization, gain matching, and other ADC and TDC detector data variables were performed before moving the detector into Hall A. Following installation in Hall A, several calibration studies were implemented to fine-tune the detector in preparation for use in the experiment. The calibration studies included analysis of timing cuts, TDC alignment, the time-walk effect, time difference offsets, and scintillator velocity corrections. Once the Timing Hodoscope was well-calibrated, data-taking during the experiment commenced and the beam-on-target data was used to characterize the Timing Hodoscope performance during the G n M experiment run-time. The performance analysis included studies observing energy deposit, cluster size, rates, accidentals, pile-up, tracking efficiency, position resolution, and time resolution. After application of physics cuts to ensure a data set comprised of particle tracks corresponding to elastic electrons, which is the main data of interest for measurement of G n M, the Timing Hodoscope is shown on average across all kinematic settings to have a >98% tracking efficiency, a position resolution of 4-6 cm in the non-dispersive plane and 1.5-2 cm in the dispersive plane, and a time resolution of 500-750 ps. These performance results are compared to a GEANT4 based performance simulation of the BigBite Timing Hodoscope for reference, showing to what degree the measured performance values match those taken from the simulation.

Marinaro, Ralph↗

Breeding latitude is associated with the timing of nesting and migration around the annual calendar among Purple Martin (Progne subis) populations

Timing is critical for species that migrate seasonally, as timing mismatches can lead to reduced reproductive success and population declines. We investigated the effect of breeding latitude on the migration timing of a long-distance migratory songbird (Purple Martin, Progne subis subis) by using light-level geolocators deployed across breeding sites between 26° and 53° latitude (n = 329). We used nesting data (1st egg dates; n=28,165) to explore latitudinal patterns in the timing of breeding. Using generalized linear mixed models (GLMMs) we found that breeding latitude was highly associated with timing around the calendar, explaining population-level timing across both spring and fall migration. Populations breeding at more northern latitudes migrated later in fall (mean days/degree latitude =2), in spring (mean days/degree latitude =3), and nested later (days/degree latitude = 3) than populations breeding at more southern latitudes. Generalized additive mixed models (GAMMs) revealed significant non-linearity between breeding latitude and spring and fall migration timing, and the timing of nesting. In spring, the most northern breeders (> 40 degrees N) were more synchronous in their timing, departing their nonbreeding sites and arriving earlier at their breeding sites relative to their breeding latitude. These most northern breeders also had similar nest timing and fall migration departure timing. Breeding latitude was also associated with seasonal partitioning of migratory and sedentary periods. The most northern breeders spent 10% more time on fall migration, 2% more at wintering grounds, 1% more on spring migration, and 13% less time at their breeding sites. Our results support the notion that selection for timing at breeding latitudes can have year-round effects on the timing of seasonal events in long-distance migratory songbirds. Future studies should examine whether these timing patterns associated with latitude limit phenotypic responses to climate change.

54 ENVIRONMENTAL SCIENCES↗

Effect of intermediate annealing time on microstructure, texture and mechanical properties of Al-Mg-Si-Cu alloy

Highlights: • Long intermediate annealing time could be beneficial to the improvement of deep drawability. • Long intermediate annealing time could give rise to more particles with a larger average size. • As intermediate annealing time increases, strength will change and it has no positive correlation with annealing time, • A particle dissolution model is proposed to illustrate the variation of the strengths with intermediate annealing time. - Abstract: The effect of intermediate annealing time on the microstructure, texture and mechanical properties of Al-Mg-Si-Cu alloys was studied by mechanical properties, microstructure and texture characterization in the present study. The results show that the intermediate annealing time has some influence on the microstructure, recrystallization texture, and final mechanical properties. After the pre-aging treatment and natural aging treatment (T4P treatment), in contrast to the sheet with short intermediate annealing time, the sheet with long intermediate annealing time possesses higher plastic strain ratio r value. Strength has no positive correlation with annealing time, and when applying the annealing time of 16 h, the strength is highest. Before solution treatment, the sheet with long intermediate annealing time has more particles with a larger average size, compared with the sheet with short intermediate annealing time. After solution treatment, they possess the similar recrystallization equiaxed grain structure and recrystallization texture. The sheet with short intermediate annealing time is comprised of Cube{sub ND} {001} <310>, Goss {110}<001> and P {011}<122> orientations, while the sheet with long intermediate annealing time possesses weak texture including Cube{sub ND} {001}<310>, Goss {110}<001> and {015}<751> orientations. Finally, a particle dissolution model during solution treatment is proposed to explain the variation of strength with annealing time.

36 MATERIALS SCIENCE↗

THE BENEFITS OF VLBI ASTROMETRY TO PULSAR TIMING ARRAY SEARCHES FOR GRAVITATIONAL RADIATION

Precision astrometry is an integral component of successful pulsar timing campaigns. Astrometric parameters are commonly derived by fitting them as parameters of a timing model to a series of pulse times of arrival (TOAs). TOAs measured to microsecond precision over spans of several years can yield position measurements with sub-milliarcsecond precision. However, timing-based astrometry can become biased if a pulsar displays any red spin noise or a red signal produced by the stochastic gravitational wave background. We investigate how noise of different spectral types is absorbed by timing models, leading to significant estimation biases in the astrometric parameters. We find that commonly used techniques for fitting timing models in the presence of red noise (Cholesky whitening) prevent the absorption of noise into the timing model remarkably well if the time baseline of observations exceeds several years, but are inadequate for dealing with shorter pulsar data sets. Independent of timing, pulsar-optimized very long baseline interferometry (VLBI) is capable of providing position estimates precise to the sub-milliarcsecond levels needed for high-precision timing. In order to make VLBI astrometric parameters useful in pulsar timing models, the transformation between the International Celestial Reference Frame (ICRF) and the dynamical solar system ephemeris used for pulsar timing must be constrained to within a few microarcseconds. We compute a transformation between the ICRF and pulsar timing frames and quantitatively discuss how the transformation will improve in coming years. We find that incorporating VLBI astrometry into the timing models of pulsars for which only a couple of years of timing data exist will lead to more realistic assessments of red spin noise and could enhance the amplitude of gravitational wave signatures in post-fit timing residuals by factors of 20 or more.

79 ASTRONOMY AND ASTROPHYSICS↗

SU-E-T-629: Prediction of the ViewRay Radiotherapy Treatment Time for Clinical Logistics

Purpose: An algorithm is developed in our clinic, given a new treatment plan, to predict treatment delivery time for radiation therapy (RT) treatments of patients on ViewRay magnetic resonance-image guided radiation therapy (MR-IGRT) delivery system. This algorithm is necessary for managing patient treatment appointments, and is useful as an indicator to assess the treatment plan complexity. Methods: A patient’s total treatment delivery time, not including time required for localization, may be described as the sum of four components: (1) the treatment initialization time; (2) the total beam-on time; (3) the gantry rotation time; and (4) the multileaf collimator (MLC) motion time. Each of the four components is predicted separately. The total beam-on time can be calculated using both the planned beam-on time and the decay-corrected delivery dose rate. To predict the remaining components, we quantitatively analyze the patient treatment delivery record files. The initialization time is demonstrated to be random since it depends on the final gantry angle and MLC leaf positions of the previous treatment. Based on modeling the relationships between the gantry rotation angles and the corresponding rotation time, and between the furthest MLC leaf moving distance and the corresponding MLC motion time, the total delivery time is predicted using linear regression. Results: The proposed algorithm has demonstrated the feasibility of predicting the ViewRay treatment delivery time for any treatment plan of any patient. The average prediction error is 0.89 minutes or 5.34%, and the maximal prediction error is 2.09 minutes or 13.87%. Conclusion: We have developed a treatment delivery time prediction algorithm based on the analysis of previous patients’ treatment delivery records. The accuracy of our prediction is sufficient for guiding and arranging patient treatment appointments on a daily basis. The predicted delivery time could also be used as an indicator to assess the treatment plan complexity. This work was supported by a research grant from Viewray Inc.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Multiple output timing and trigger generator

In support of the development of a multiple stage pulse modulator at the Los Alamos National Laboratory, we have developed a first generation, multiple output timing and trigger generator. Exploiting Commercial Off The Shelf (COTS) Micro Controller Units (MCU's), the timing and trigger generator provides 32 independent outputs with a timing resolution of about 500 ns. The timing and trigger generator system is comprised of two MCU boards and a single PC. One of the MCU boards performs the functions of the timing and signal generation (the timing controller) while the second MCU board accepts commands from the PC and provides the timing instructions to the timing controller. The PC provides the user interface for adjusting the on and off timing for each of the output signals. This system provides 32 output or timing signals which can be pre-programmed to be in an on or off state for each of 64 time steps. The width or duration of each of the 64 time steps is programmable from 2 {micro}s to 2.5 ms with a minimum time resolution of 500 ns. The repetition rate of the programmed pulse train is only limited by the time duration of the programmed event. This paper describes the design and function of the timing and trigger generator system and software including test results and measurements.

47 OTHER INSTRUMENTATION↗

Electronics for a Picosecond Time-of-flight Measurement

TITLE: Electronics for a Picosecond Time-of-flight Measurement ABSTRACT: Time-of-flight (TOF) detectors have historically been used as part of the particle identification capability of multi-purpose particle physics detectors. An accurate time measurement, combined with a momentum measurement based on the curvature of the track in a magnetic field, is often sufficient to determine the particle's mass, and thus its identity. Such detectors typically have measured the particle flight time extremely precisely, with an uncertainty of one hundred trillionths of a second (also referred to as 100 picoseconds). To put this in perspective it would be like counting all the people on the Earth and getting it right within 1 person! Another use of TOFs is to measure the vertex of the event, which is the location along the beam line where the incoming particles (typically protons) collide. This vertex positon is a well measured quantity for events where the protons collide “head on” as the outgoing particles produced when you blast the proton apart can be used to trace back to a vertex point from which they originated. More frequently the protons just strike a glancing blow and remain intact—in this case they are nearly parallel to the beam and you cannot tell their vertex without this ability to precisely measure the time of flight of the protons. Occasionally both happen in the same event, that is, a central system and two protons are produced. But are they from the same collision, or just a boring background where more than one collision in the same bunch crossing conspire to fake the signal of interest? That’s where the timing of the protons comes into play. The main idea is to measure the time it takes for the two protons to reach TOF detectors positioned equidistant from the center of the main detector. If the vertex is displaced to one side than that detector will measure a shorter time while the other side detector will measure a correspondingly longer time. Taking into account the speed of the particles, which is very close to the speed of light, an accuracy of 100 ps gives a vertex measurement of a few cm or a little more than an inch. At the Large Hadron Collider, where there are up to a hundred billion protons per bunch, and the collision region is compressed to a few inches, that is just not good enough. A higher level of precision is needed to determine whether the vertex of the protons and that of the central system are the same. A factor 10 improvement in the timing measurement to the 10 trillionths of a second level, for example would give the requisite 10 times improvement in the vertex measurement. An accurate measurement of the flight time depends on three key elements: the radiator that produces light when the proton passes through it, the photo-sensor that converts the light to an electrical signal, and the electronics that convert this electrical signal into a time measurement with a compact recordable format. With recent improvements in detector design featuring a series of quartz radiators connected to a micro-channel plate photomultiplier tube, this superior measurement capability is within reach if the readout electronics are sufficiently performant. As a result of the funding of this proposal, we have achieved our primary goals. 1) We have developed from scratch or improved upon existing designs of the full chain of electronics that can maintain the performance of a TOF detector from the output of the photo-sensor to the recording of a compressed data packet containing the timing information. We have accomplished this with a cost effective modular approach such that some or all of the components in the chain could easily be adapted for use in diverse particle physics experiments or in other areas where precise timing is required, such as medical and homeland security devices.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Geothermal Drilling: A Baseline Study of Nonproductive Time Related to Lost Circulation

A single production geothermal well costs up to seven million dollars and a typical geothermal field contains 10 to 20 wells for a development cost of potentially $140 million according to a Geothermal Resources Group study. Capital cost coupled with exploration and resource uncertainty lead to high upfront project risk. This study analyzed the time and cost of detailed geothermal drilling operations. We found the largest cause of nonproductive time in geothermal wells is advancing through lost circulation zones, where drilling fluid is lost from the well. Mitigation measures implemented during lost circulation events can increase drilling time by a significant fraction of the drilling days. There is opportunity to reduce the drilling costs by addressing logistical inefficiencies and ineffective mitigation measures to minimize nonproductive time. This study reviewed daily drilling data for 38 geothermal wells drilled since 2009 in the U.S. The analysis presented here summarizes the lost circulation events identified in the available drilling data by assessing time per event, costs incurred, materials used, success of mitigation strategies, and resolution time. This study found that wells averaged over 100 hours of unprogrammed nonproductive time due to lost circulation, adding an estimated $185,000 to each well in rig costs. A plan for future research aimed at reducing lost circulation nonproductive time and cost is presented. operations. We found the largest cause of nonproductive time in geothermal wells is advancing through lost circulation zones, where drilling fluid is lost from the well. Mitigation measures implemented during lost circulation events can increase drilling time by a significant fraction of the drilling days. There is opportunity to reduce the drilling costs by addressing logistical inefficiencies and ineffective mitigation measures to minimize nonproductive time. This study reviewed daily drilling data for 38 geothermal wells drilled since 2009 in the U.S. The analysis presented here summarizes the lost circulation events identified in the available drilling data by assessing time per event, costs incurred, materials used, success of mitigation strategies, and resolution time. This study found that wells averaged over 100 hours of unprogrammed nonproductive time due to lost circulation, adding an estimated $185,000 to each well in rig costs. A plan for future research aimed at reducing lost circulation nonproductive time and cost is presented.

15 GEOTHERMAL ENERGY↗

Artifacts in digital coincidence timing

Digital methods are becoming increasingly popular for measuring time differences, and are the de facto standard in PET cameras. These methods usually include a master system clock and a (digital) arrival time estimate for each detector that is obtained by comparing the detector output signal to some reference portion of this clock (such as the rising edge). Time differences between detector signals are then obtained by subtracting the digitized estimates from a detector pair. A number of different methods can be used to generate the digitized arrival time of the detector output, such as sending a discriminator output into a time to digital converter (TDC) or digitizing the waveform and applying a more sophisticated algorithm to extract a timing estimator.All measurement methods are subject to error, and one generally wants to minimize these errors and so optimize the timing resolution. A common method for optimizing timing methods is to measure the coincidence timing resolution between two timing signals whose time difference should be constant (such as detecting gammas from positron annihilation) and selecting the method that minimizes the width of the distribution (i.e. the timing resolution). Unfortunately, a common form of error (a nonlinear transfer function) leads to artifacts that artificially narrow this resolution, which can lead to erroneous selection of the 'optimal' method. In conclusion, the purpose of this note is to demonstrate the origin of this artifact and suggest that caution should be used when optimizing time digitization systems solely on timing resolution minimization.

97 MATHEMATICS AND COMPUTING↗

Eisenbud–Wigner–Smith time delay in atom–laser interactions

We report recent development of ultrafast measurement techniques on the sub-femtosecond time scale has enabled us to see the atom–laser interaction in real time. One of the important observables to study the temporally resolved dynamics is the various time delay in the process. Time delays is an experimentally measurable quantity, where the time is not. Time delays in quantum collisions and in photoionization/photodetachment of atomic and molecular systems is reviewed. The formalisms of time delay in the context of quantum collisions by Eisenbud and Wigner that by Smith and their equivalence is discussed. The time-reversal symmetry between solutions with outgoing and ingoing wave boundary conditions allow us to interpret photoionization/photodetachment as half-scattering. Subsequently, the formalism of Eisenbud–Wigner–Smith time delay is extended in photoionization/photodetachment from collisions. We discuss that the time delay can be written as a self-adjoint quantum operator which depicts its measurability. On the experimental side, the measurement protocols are reviewed for attosecond streaking and RABBITT. Along with the EWS time delay, the measurement introduces an additional (which is negative) time delay. From the measurement of total delay and an analytical/numerical estimate of the measurement induced part, one gets the EWS time delay in the process. A few illustrative examples of studies on time delay are given to get a flavour of the outstanding advances made in this field in the last two decades.

74 ATOMIC AND MOLECULAR PHYSICS↗

Layer Time Control for Large Scale Additive Manufacturing Using High Performance Computing

This work proposes to optimize an additive manufacturing AM process to reduce energy and printing cost. The polymer AM process is inherently dependent on the time-temperature history of each layer to maintain geometric tolerances and mechanical integrity. Our preliminary study shows that regression-based layer time control model using thermal images could result in up to 30% build time reduction for simple geometries. This proposed work would use high-performance computing (HPC) to couple the data-driven model with thermal simulation for better predicting layer temperature profiles, improving throughput of large-scale additive manufacturing, and reducing its energy cost. We have developed a method to optimize a layer deposition time (a.k.a. layer time) for large-scale AM via physics-based simulations. A long layer time leads to an over-cooled surface on which a new layer is deposited, and therefore, it may result in a weak bonding or debonding between layers, cracking, or warping. A short layer time leads to a high temperature of the structure due to insufficient cooling, and therefore, the structure may not be stiff enough and may collapse during manufacturing. Therefore, it is important to estimate the optimal layer time in additive manufacturing for a high-quality product. The temperature of a top layer right before deposition is recommended to be slightly higher than the glass temperature of the material. A temperature cooling was approximated to an exponential function of time, and the optimized layer time was obtained based on a target temperature while maintaining a minimal printing time. The material used is carbon fiber-reinforced polycarbonate (CF/PC), and the large-scale deposition system used is LSAM TM from Thermwood Corporation. Three different layer time cases were used for experiments, and a series of thermal images were obtained via an infra-red (IR) camera during the entire AM processes. AM process simulations were performed using a finite element method and the temperature profiles from the simulation were in good agreements with those from experiments. The layer time optimization was performed based on the temperature profiles from the simulations. A layer temperature with the optimal layer time was confirmed as the target temperature through simulation. In addition to the development of a layer time optimization method, we have developed a numerical framework for AM simulation with element activations in sync with toolpath, based on an open source finite element framework, DEAL.II. A major portion of this work was presented at SAMPE 2022 Conference and Exhibition on May 2022, and published in Proceedings of SAMPE 2022.

42 ENGINEERING↗

Time reversal symmetry of generalized quantum measurements with past and future boundary conditions

Here we expand the time reversal symmetry arguments of quantum mechanics, originally proposed by Wigner in the context of unitary dynamics, to contain situations including generalized measurements for monitored quantum systems. We propose a scheme to derive the time-reversed measurement operators by considering the Schrödinger picture dynamics of a qubit coupled to a measuring device, and show that the time-reversed measurement operators form a Positive Operator Valued Measure (POVM) set. We present three particular examples to illustrate time reversal of measurement operators: (1) the Gaussian spin measurement, (2) a dichotomous POVM for spin, and (3) the measurement of qubit fluorescence. We then propose a general rule to unravel any rank two qubit measurement, and show that the backward dynamics obeys the retrodicted equations of the forward dynamics starting from the time reversed final state. We demonstrate the time reversal invariance of dynamical equations using the example of qubit fluorescence. We also generalize the discussion of a statistical arrow of time for continuous quantum measurements introduced by Dressel et al. (Phys Rev Lett 119:220507, 2017): we show that the backward probabilities can be computed from a process similar to retrodiction from the time-reversed final state, and extend the definition of an arrow of time to ensembles prepared with pre- and post-selections, where we obtain a non-vanishing arrow of time in general. We discuss sufficient conditions for when time’s arrow vanishes and show our method also captures the contributions to time’s arrow due to natural physical processes like relaxation of an atom to its ground state. As a special case, we recover the time reversibility of the weak value as its complex conjugate using our method, and discuss how our conclusions differ from the time-symmetry argument of Aharonov–Bergmann–Lebowitz rule.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Monte Carlo calculations of PET coincidence timing: single and double-ended readout

We present Monte Carlo computational methods for estimating the coincidence resolving time (CRT) of scintillator detector pairs in positron emission tomography (PET) and present results for Lu 2 SiO 5 : Ce (LSO), LaBr 3 : Ce, and a hypothetical ultra-fast scintillator with a 1 ns decay time. The calculations were applied to both single-ended and double-ended photodetector readout with constant-fraction triggering. They explicitly include (1) the intrinsic scintillator properties (luminosity, rise time, decay time, and index of refraction), (2) the exponentially distributed depths of interaction, (3) the optical photon transport efficiency, delay, and time dispersion, (4) the photodetector properties (fill factor, quantum efficiency, transit time jitter, and single electron response), and (5) the determination of the constant fraction trigger level that minimizes the CRT. The calculations for single-ended readout include the delayed photons from the opposite reflective surface. The calculations for double-ended readout include (1) the simple average of the two photodetector trigger times, (2) more accurate estimators of the annihilation photon entrance time using the pulse height ratio to estimate the depth of interaction and correct for annihilation photon, optical photon, and trigger delays, and (3) the statistical lower bound for interactions at the center of the crystal. For time-of-flight (TOF) PET we combine stopping power and TOF information in a figure of merit equal to the sensitivity gain relative to whole-body non-TOF PET using LSO. For LSO crystals 3 mm × 3 mm × 30 mm, a decay time of 37 ns, a total photoelectron count of 4000, and a photodetector with 0.2 ns full-width at half-maximum (fwhm) timing jitter, single-ended readout has a CRT of 0.16 ns fwhm and double-ended readout has a CRT of 0.111 ns fwhm. For LaBr 3 : Ce crystals 3 mm × 3 mm × 30 mm, a rise time of 0.2 ns, a decay time of 18 ns, and a total of 7600 photoelectrons the CRT numbers are 0.14 ns and 0.072 ns fwhm, respectively. For a hypothetical ultra-fast scintillator 3 mm × 3 mm × 30 mm, a decay time of 1 ns, and a total of 4000 photoelectrons, the CRT numbers are 0.070 and 0.020 ns fwhm, respectively. Over a range of examples, values for double-ended readout are about 10% larger than the statistical lower bound.

Monte Carlo↗

Dependence of Brownian and Néel relaxation times on magnetic field strength

Purpose: In magnetic particle imaging (MPI) and magnetic particle spectroscopy (MPS) the relaxation time of the magnetization in response to externally applied magnetic fields is determined by the Brownian and Néel relaxation mechanisms. Here the authors investigate the dependence of the relaxation times on the magnetic field strength and the implications for MPI and MPS. Methods: The Fokker–Planck equation with Brownian relaxation and the Fokker–Planck equation with Néel relaxation are solved numerically for a time-varying externally applied magnetic field, including a step-function, a sinusoidally varying, and a linearly ramped magnetic field. For magnetic fields that are applied as a step function, an eigenvalue approach is used to directly calculate both the Brownian and Néel relaxation times for a range of magnetic field strengths. For Néel relaxation, the eigenvalue calculations are compared to Brown's high-barrier approximation formula. Results: The relaxation times due to the Brownian or Néel mechanisms depend on the magnitude of the applied magnetic field. In particular, the Néel relaxation time is sensitive to the magnetic field strength, and varies by many orders of magnitude for nanoparticle properties and magnetic field strengths relevant for MPI and MPS. Therefore, the well-known zero-field relaxation times underestimate the actual relaxation times and, in particular, can underestimate the Néel relaxation time by many orders of magnitude. When only Néel relaxation is present—if the particles are embedded in a solid for instance—the authors found that there can be a strong magnetization response to a sinusoidal driving field, even if the period is much less than the zero-field relaxation time. For a ferrofluid in which both Brownian and Néel relaxation are present, only one relaxation mechanism may dominate depending on the magnetic field strength, the driving frequency (or ramp time), and the phase of the magnetization relative to the applied magnetic field. Conclusions: A simple treatment of Néel relaxation using the common zero-field relaxation time overestimates the relaxation time of the magnetization in situations relevant for MPI and MPS. For sinusoidally driven (or ramped) systems, whether or not a particular relaxation mechanism dominates or is even relevant depends on the magnetic field strength, the frequency (or ramp time), and the phase of the magnetization relative to the applied magnetic field.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗