Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “TANK”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 973 records · Page 54

Results for the September Bimonthly Calendar Year 2021 Tank 50 Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the 2021 September bimonthly sample of Tank 50 salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Remediation (SRR) for the transfer of aqueous waste from Tank 50 to the Saltstone Production Facility (SPF), where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) Limits and Targets that were established at the time the Tank 50 sample was obtained. The chemical and radionuclide contaminant results from the characterization of the 2021 September bimonthly sampling of Tank 50 were requested by SRR personnel via a Task Technical Request (TTR) and details of the testing are presented in the Savannah River National Laboratory (SRNL) Task Technical and Quality Assurance Plan (TTQAP). This Technical Report is the TTR deliverable relating Salt Solution Analysis from the SRR request.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Summary of Results from November 2021 Qualification Samples for Tank Closure Cesium Removal 1A (TCCR 1A)

Savannah River Remediation (SRR) is currently operating the Tank Closure Cesium Removal 1A (TCCR 1A) process to remove 137 Cs from tank waste supernate using an ion exchange process. As part of that process, Savannah River National Laboratory (SRNL) receives and analyzes samples in support of the qualification of each batch to be processed. SRNL recently received supernate samples retrieved from Tank 10H as well as in-tank batch contact samples for characterization in support of qualifying Batch 1 for processing through the TCCR 1A unit.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Summary of Results from Batch 1 Qualification Samples for Tank Closure Cesium Removal 1A (TCCR 1A)

Savannah River Remediation (SRR) is currently operating the Tank Closure Cesium Removal 1A (TCCR 1A) process to remove 137 Cs from tank waste supernate using an ion exchange process. As part of that process, Savannah River National Laboratory (SRNL) receives and analyzes samples in support of the qualification of each waste supernate batch to be processed. SRNL recently received supernate samples retrieved from Tank 10H as well as in-tank batch contact samples for characterization in support of qualifying Batch 1 for processing through the TCCR 1A unit.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of Defense Waste Processing Facility Sample: Recycle Collection Tank Sample Batch 4945

The Savannah River National Laboratory (SRNL) was requested by Savannah River Remediation (now Savannah River Mission Completion (SRMC)), through a Technical Task Request, to characterization the “as-received” Recycle Collection Tank (RCT) Sample identified as sample batch 4945 [Sludge Receipt and Adjustment Tank (SRAT) batch 796)], which was delivered to SRNL Shielded Cells on January 28, 2021. The RCT characterization data will be used as input to the Defense Waste Processing Facility (DWPF) Recycle Diversion Project. This RCT report is the first of three sample characterization reports that will be used for this DWPF Project. The other DWPF reports will involve the characterization of the Off-Gas Condensate Tank (OGCT) and the Slurry Mix Evaporator Condensate Tank (SMECT) samples.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the March Bimonthly Calendar Year 2022 Tank 50 Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the 2022 March bimonthly sample of Tank 50 salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Mission Completion (SRMC) for the transfer of aqueous waste from Tank 50 to the Saltstone Production Facility (SPF), where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) LIMITS and TARGETS that were established at the time the Tank 50 sample was obtained. The chemical and radionuclide contaminant results from the characterization of the 2022 March bimonthly sampling of Tank 50 were requested by SRMC personnel via a Task Technical Request (TTR) and details of the testing are presented in the Savannah River National Laboratory (SRNL) Task Technical and Quality Assurance Plan (TTQAP). This Technical Report is the TTR deliverable relating Salt Solution Analysis from the SRMC request.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Blend Pump Mixing in Tank 27 Evaluation

For future waste disposal operations, Savannah River Mission Completion (SRMC) plans to operate Tank 27 as a blend tank. It is desirable to avoid additional worker exposure by using the planned commercial submersible mixing pump (CSMP) installations in Risers B2 and B4 to function as the blend pumps for prolonged blend tank operations. The purpose of this task is to evaluate the impacts to mixing across a range of pump installation heights from 1 to 201 inches. Specifications include: A maximum pump diameter of 22.5 inches, dual nozzles placed tangentially opposed with nominal inside diameter of 2 inches, a total flow range (both nozzles combined) of 500 to 1950 gallons per minute (gpm) and a maximum revolutions per minute (RPM) of 1800. Tank 27 is expected to have maximum fill height of 360 inches.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the September Bimonthly Calendar Year 2022 Tank 50 Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the 2022 September bimonthly sample of Tank 50 salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Mission Completion (SRMC) for the transfer of aqueous waste from Tank 50 to the Saltstone Production Facility (SPF), where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) LIMITS and TARGETS that were established at the time the Tank 50 sample was obtained. The chemical and radionuclide contaminant results from the characterization of the 2022 September bimonthly sampling of Tank 50 were requested by SRMC personnel via a Task Technical Request (TTR). Details of the testing are presented in the Savannah River National Laboratory (SRNL) Task Technical and Quality Assurance Plan (TTQAP). This Technical Report is the TTR deliverable relating Salt Solution Analysis from the SRMC request. The following facts pertaining to the WAC are drawn from the analytical results, including analytical uncertainty, provided in this report. 1) WAC LIMITS and TARGETS were met for all analyzed chemical and radioactive contaminants for which the detection limits are below the WAC LIMITS and TARGETS; 2) Measured average concentrations of nitrate, nitrite and total mercury are approximately 24%, 9% and 12% of the WAC LIMITS, respectively; 3) Measured average concentrations of Tc-99 and I-129 are approximately 19% and 20% of the WAC LIMITS, respectively; 4) All other radionuclide average concentrations are at 4% or less of the WAC LIMITS and TARGETS.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DETERMINATION OF CORROSION INHIBITOR CRITERIA FOR TYPE III/IIIA TANKS DURING SALT DISSOLUTION OPERATIONS INTERIM REPORT

Preparation of high level waste for vitrification involves in part the dissolution of salt cake from the carbon steel storage tanks. During dissolution, a point is reached in which the corrosion inhibitors, hydroxide and nitrite, are diluted below established guidelines, and nitrate stress corrosion cracking (SCC) is possible. Because the addition of inhibitors may be counterproductive to process efficiency and waste minimization, corrosion testing was initiated to revisit and possibly revise the guidelines for inhibitor limits. The bases for the work summarized in this status report are results from previously-completed phases of study. In the first two phases of study, several reduced-inhibitor levels were tested in HLW simulants with nitrate concentrations ranging from 4.5 M to 8.5 M. The first two phases of work determined, among other things, the reduced-inhibitor levels and solution chemistries in which heat-treated and non-heat-treated A537 carbon steel is susceptible to SCC, crevice corrosion, and pitting. The work covered in this current task both builds on and verifies the conclusions of the previous work. The current work involves testing of low levels of inhibitors in HLW simulants with 5.5 M to 8.5 M nitrate concentrations. Stressed U-bend specimens, both polarized and non-polarized, were tested. Non-polarized U-bend testing is ongoing, with the U-bends currently in test for 100 days. The purpose of the testing is to determine SCC susceptibility in the vapor space (VS) and liquid air interface (LAI) regions of the HLW tanks under conditions expected during salt dissolution, and also to verify previous accelerated testing. The simulated wastes being tested have nitrate concentrations of 5.5 M and 8.5 M and inhibitor levels of 0.01 M/0.01 M hydroxide/nitrite and 0.1 M/ 0.1 M hydroxide/nitrite. The open circuit potential measurements being monitored and the corrosion morphology of the U-bends are in agreement with results and observations of previous phases of work. No SCC has occurred in the first 100 days of testing. The LAI specimens experienced minor corrosion at the liquid line with corrosion products visible on the weld material and in the heat-affected zones on either side of the welds. The VS specimens are more evenly and slightly more corroded. Polarized U-bend testing is complete after approximately 80 days of testing. No SCC occurred, but the results are inconclusive due to a competing, unexpected galvanic corrosion mechanism that interfered in the last 50 days of testing. No cracking was indicated during the first month. The tests will be repeated in order to satisfy the original objective which was to determine the effect of grinding HLW tank welds and heat treating the tanks had on corrosion. Both the non-polarized and polarized U-bend tests will continue. Additionally, cyclic polarization (CP) testing will be performed to examine the effects of surface oxides on corrosion and the differences in corrosion susceptibility between welded and un-welded areas.

36 MATERIALS SCIENCE↗

TANK 32 EVAPORATOR FEED PUMP TRANSFER ANALYSIS

The transfer of liquid salt solution from Tank 32 to an evaporator is to be accomplished by activating the evaporator feed pump, with the supernate surface at a minimum height of approximately 74.4 inches above the sludge layer, while simultaneously turning on the downcomer with a flow rate of 110 gpm. Previously, activation of the evaporator feed pump was an isolated event without any other components running at the same time. An analysis of the dissolved solution transfer has been performed using computational fluid dynamics (CFD) methods to determine the amount of entrained sludge solids pumped out of the tank toward the evaporator with the downcomer turned on. The analysis results shows that, for the minimum tank liquid level of 105 inches above the tank bottom (which corresponds to a liquid depth of 74.4 inches above the sludge layer), the evaporator feed pump will contain less than 0.1 wt% sludge solids in the discharge stream, which is an order of magnitude less than the 1.0 wt% undissolved solids (UDS) loading criteria to feed the evaporator. Lower liquid levels with respect to the sludge layer will result in higher amounts of sludge entrainment due to the increased plunging jet velocity from the downcomer disturbing the sludge layer.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Closure Report for Corrective Action Unit 134: Aboveground Storage Tanks, Nevada Test Site, Nevada

Corrective Action Unit (CAU) 134 is identified in the Federal Facility Agreement and Consent Order (FFACO) as “Aboveground Storage Tanks” and consists of the following four Corrective Action Sites (CASs), located in Areas 3, 15, and 29 of the Nevada Test Site: · CAS 03-01-03, Aboveground Storage Tank · CAS 03-01-04, Tank · CAS 15-01-05, Aboveground Storage Tank · CAS 29-01-01, Hydrocarbon Stain

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization, Leaching, and Filtrations Testing of Ferrocyanide Tank sludge (Group 8) Actual Waste Composite

This is the final report in a series of eight reports defining characterization, leach, and filtration testing of a wide variety of Hanford tank waste sludges. The information generated from this series is intended to supplement the Waste Treatment and Immobilization Plant (WTP) project understanding of actual waste behaviors associated with tank waste sludge processing through the pretreatment portion of the WTP. The work described in this report presents information on a high-iron waste form, specifically the ferrocyanide tank waste sludge. Iron hydroxide has been shown to pose technical challenges during filtration processing; the ferrocyanide tank waste sludge represented a good source of the high-iron matrix to test the filtration processing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Estimate of the Distribution of Solids Within Mixed Hanford Double-Shell Tank AZ-101: Implications for AY-102

This paper describes the current level of understanding of the suspension of solids in Hanford double-shell waste tanks while being mixed with the baseline configuration of two 300-horsepower mixer pumps. A mixer pump test conducted in Tank AZ-101 during fiscal year 2000 provided the basis for this understanding. Information gaps must be filled to demonstrate the capability of the baseline feed delivery system to effectively mix, sample, and deliver double-shell tank waste to the Hanford Tank Waste Treatment and Immobilization Plant (WTP) for vitrification.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

POTENTIAL IMPACT OF TANK F FLUSH SOLUTION ON H-CANYON EVAPORATOR OPERATION

Previous chemical analysis of a sample from the liquid heel found in Tank F of the High Activity Drain (HAD) system in F/H laboratory revealed the presence of n-paraffin, tributyl phosphate (TBP), Modifier from the Modular Caustic-Side Solvent Extraction Unit (MCU) process and a vinyl ester resin that is very similar to the protective lining on Tank F. Subsequent analyses detected the presence of a small amount of diisopropylnaphthalene (DIN) (major component of Ultima Gold{trademark} AB liquid scintillation cocktail). Indications are that both vinyl ester resin and DIN are present in small amounts in the flush solution. The flush solution currently in the LR-56S trailer likely has an emulsion which is believed to contain a mixture of the reported organic species dominated by TBP. An acid treatment similar to that proposed to clear the HAD tank heel in F/H laboratory was found to allow separation of an organic phase from the cloudy sample tested by SRNL. Mixing of that clear sample did re-introduce some cloudiness that did not immediately clear but that cloudiness is attributed to the DIN in the matrix. An organic phase does quickly separate from the cloudy matrix allowing separation by a box decanter in H-Canyon prior to transfer to the evaporator feed tank. This separation should proceed normally as long as the emulsion is broken-up by acidification.

54 ENVIRONMENTAL SCIENCES↗

Analysis of Thermal-Protection Systems for Space-Vehicle Cryogenic-Propellant Tanks

Analytical techniques are presented that permit the calculation of heat-transfer rates with various thermal-protection systems for liquid-cryogenic-propellant tanks subjected to on-board, solar, and planetary heat fluxes. The thermal-protection systems considered include using closely spaced reflective surfaces (foils) and widely spaced reflective surfaces (shadow shields), insulation, arrangement of vehicle components, orientation with respect to radiant heating sources, and coatings for the control of solar absorptivity. The effectiveness of these thermal-protection systems in reducing propellant heating is shown both for ideal heat-transfer models and for a simplified hydrogen-oxygen terminal stage on a Mars mission. The proper orientation of a space-vehicle cryogenic tank with respect to the Sun is one of the more beneficial methods of reducing the heating effect of solar flux. Shadow shields can be extremely effective in reducing the propellant heating due to both solar and on-board fluxes. However, low-altitude planet orbits can result in high propellant heating rates due to planetary radiation reflected from the shields. For low-altitude orbits of more than a few days, foils appear to be desirable for all cryogenic-tank surfaces. Foils are also effective in reducing the on-board heating. A choice of shadow shields or foils cannot be made until a particular vehicle and a particular mission are chosen. The thermal conductivity of insulation materials would have to be lower by about two orders of magnitude with no increase in density before insulation could compete with reflective surfaces for use in long-duration thermal protection of cryogenic tanks in space. To demonstrate the application of the methods devised, thermal-protection systems are developed for a hydrogen-oxygen terminal stage for typical Mars missions.

SPACE VEHICLE↗

Thermal Desktop Modeling of the 2016 CRYOTE-2 Tank Chill and Fill Tests

The storing and transfer of cryogenic propellants is an enabling technology for NASA as it moves to expand future missions into low Earth orbit (LEO) and beyond. The transfer of cryogenic propellants is of particular interest because it has never been successfully demonstrated in microgravity. Several ground tests have been conducted in past decades examining various tank chilldown and fill methods. Creating accurate models using these historical datasets is a vital step toward developing appropriate modeling tools to form pre-test predictions for eventual flight and ground tests of various novel injector concepts. The goal of this work was to create a working model in Thermal Desktop using data from the CRYOTE-2 experiments whose purpose was to demonstrate the chill and fill process in a spherical receiver tank parametrically examining the effect of injection method, receiver tank initial wall temperature and initial state, supply pressure, and mass flow rate on the NVF process. These tests were conducting using liquid nitrogen with different injectors with different injection patterns. The focus of the current work is on one particular spray nozzle. The pressure rise inside the tank, the fill level, and the change in the outside wall temperature were all tracked and compared with test data. The Thermal Desktop model was able to accurately predict each of these metrics for this nozzle within 11.0%, 22.0%, and 7.0%, respectively.

Cryogenic Tank Chilldown↗

Thermal Desktop Modeling of 2016 CRYOTE-2 Tank Chill and Fill Testing

The storing and transfer of cryogenic propellants is an enabling technology for NASA and industry as civilization moves to expand future missions into low Earth orbit and beyond. Several ground propellant transfer tests have been conducted in past decades examining various tank chilldown and fill methods. Creating accurate models using these historical datasets is a vital step toward developing appropriate modeling tools to form pre-test predictions for subsequent ground and flight propellant transfers. This paper presents model validation of Thermal Desktop using data from the 2016 CRYOTE-2 liquid nitrogen transfer experiments whose purpose was to demonstrate the chill and fill process in a spherical receiver tank. Tank pressure, fill level, and wall temperature were all modeled and compared with 8 test cases using two modeling methods, Mass Controlled, and Pressure Controlled. This test series is the hardest Thermal Desktop tank chill and fill validation case to-date, yet the model was able to accurately predict each of these metrics for the 2016 tests within 28%, 10%, 20% respectively, for pressure, fill level, and wall temperature using the Mass Controlled model, and 29%, 79%, and 12%, respectively for the Pressure Controlled model.

Cryogenic Tank Chilldown↗

Performance Testing of Liquid Hydrogen Tanks

Testing the performance of liquid hydrogen in tanks brings many unique challenges. Often methods used even for liquid nitrogen need to be modified to be able to address the details required to fully understand the performance of the tank. During the development and characterization of many novel insulation systems both for in-space and ground applications, NASA has tested many liquid hydrogen tanks where performance was a key outcome. Over the course of analyzing the performance of multiple different hydrogen tests, including several with both hydrogen and nitrogen, differences in the details of test data interpretation become clear. One of these key details is the thermal stratification of the tank and what it can tell you about the heat load dispersion.

Liquid Hydrogen↗

Blending of Radioactive Salt Solutions in Million Gallon Tanks - 13002

Research was completed at Savannah River National Laboratory (SRNL) to investigate processes related to the blending of radioactive, liquid waste, salt solutions in 4920 cubic meter, 25.9 meter diameter storage tanks. One process was the blending of large salt solution batches (up to 1135 - 3028 cubic meters), using submerged centrifugal pumps. A second process was the disturbance of a settled layer of solids, or sludge, on the tank bottom. And a third investigated process was the settling rate of sludge solids if suspended into slurries by the blending pump. To investigate these processes, experiments, CFD models (computational fluid dynamics), and theory were applied. Experiments were performed using simulated, non-radioactive, salt solutions referred to as supernates, and a layer of settled solids referred to as sludge. Blending experiments were performed in a 2.44 meter diameter pilot scale tank, and flow rate measurements and settling tests were performed at both pilot scale and full scale. A summary of the research is presented here to demonstrate the adage that, 'One good experiment fixes a lot of good theory'. Experimental testing was required to benchmark CFD models, or the models would have been incorrectly used. In fact, CFD safety factors were established by this research to predict full-scale blending performance. CFD models were used to determine pump design requirements, predict blending times, and cut costs several million dollars by reducing the number of required blending pumps. This research contributed to DOE missions to permanently close the remaining 47 of 51 SRS waste storage tanks. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗