System Engineering Challenges of Mars Science Laboratory's Entry, Descent and Landing... Or, "7 Years of Terror"
No abstract available
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
No abstract available
This report has been developed by the National Aeronautics and Space Administration (NASA) Human Exploration and Operations Mission Directorate (HEOMD) Risk Management team in close coordination with the Engineering Directorate at LaRC. This document provides a point-in-time, cumulative, summary of actionable key lessons learned derived from the design project. Lessons learned invariably address challenges and risks and the way in which these areas have been addressed. Accordingly the risk management thread is woven throughout the document.
Goal: Consider design challenges for X-Ray Surveyor beyond mirror segment fabrication and mounting. Unique challenges for modular Mirror Assembly.
No abstract available
No abstract available
No abstract available
No abstract available
No abstract available
No abstract available
No abstract available
My time here at KSC has involved creating and updating HMI displays to support Pad 39B and the Mobile Launcher. I also had the opportunity to be involved with testing PLC hardware for Electromagnetic interferences. This report explains in more detail of the steps involved in successfully completing these responsibilities I have been fortunate enough to be involved with.