Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Space launch systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 973 records · Page 54

Flight Dynamics and Navigation Performance of the BioSentinel Mission

BioSentinel was one of the ten 6U CubeSats launched by the Space Launch System (SLS) as part of the Artemis-I mission on November 16th, 2022. The spacecraft was deployed after the trans-lunar injection imparted by the upper stage of SLS, and performed a lunar flyby that provided the necessary energy to escape the Earth-Moon system into heliocentric space. The BioSentinel mission required flight dynamics support prior to flight to assess the deployment conditions and the trajectory design, as well as navigation support during flight, to provide orbit determination solutions for the mission and the Deep Space Network (DSN). This paper discusses the BioSentinel mission flight dynamics campaign, from mission design to the challenges and lessons learned encountered during flight.

Astrodynamics↗

Kennedy Space Center: Apollo to Multi-User Spaceport

NASA Kennedy Space Center (KSC) was established as the gateway to exploring beyond earth. Since the establishment of KSC in December 1963, the Center has been critical in the execution of the United States of Americas bold mission to send astronauts beyond the grasp of the terra firma. On May 25, 1961, a few weeks after a Soviet cosmonaut became the first person to fly in space, President John F. Kennedy laid out the ambitious goal of landing a man on the moon and returning him safely to the Earth by the end of the decade. The resultant Apollo program was massive endeavor, driven by the Cold War Space Race, and supported with a robust budget. The Apollo program consisted of 18 launches from newly developed infrastructure, including 12 manned missions and six lunar landings, ending with Apollo 17 that launched on December 7, 1972. Continuing to use this infrastructure, the Skylab program launched four missions. During the Skylab program, KSC infrastructure was redesigned to meet the needs of the Space Shuttle program, which launched its first vehicle (STS-1) on April 12, 1981. The Space Shuttle required significant modifications to the Apollo launch pads and assembly facilities, as well as new infrastructure, such as Orbiter and Payload Processing Facilities, as well as the Shuttle Landing Facility. The Space Shuttle was a workhorse that supported many satellite deployments, but was key for the construction and maintenance of the International Space Station, which required additional facilities at KSC to support processing of the flight hardware. After reaching the new Millennium, United States policymakers searched for new ways to reduce the cost of space exploration. The Constellation Program was initiated in 2005 with a goal of providing a crewed lunar landing with a much smaller budget. The very successful Space Shuttle made its last launch on July 8, 2011, after 135 missions. In the subsequent years, KSC continues to evolve, and this paper will address past and future efforts of the transformation of the KSC Apollo and Space Shuttle heritage infrastructure into a more versatile, multi-user spaceport. The paper will also discuss the US Congressional and NASA initiatives for developing and supporting multiple commercial partners, while simultaneously supporting NASAs human exploration initiative, consisting of Space Launch System (SLS), Orion spacecraft and associated ground launch systems. In addition, the paper explains the approach with examples for NASA KSC to leverage new technologies and innovative capabilities developed to reduce the cost to individual users.

launchpad↗

Potential Mission Scenarios Post Asteroid Crewed Mission

A deep-space mission has been proposed to identify and redirect an asteroid to a distant retrograde orbit around the moon, and explore it by sending a crew using the Space Launch System and the Orion spacecraft. The Asteroid Redirect Crewed Mission (ARCM), which represents the third segment of the Asteroid Redirect Mission (ARM), could be performed on EM-3 or EM-4 depending on asteroid return date. Recent NASA studies have raised questions on how we could progress from current Human Space Flight (HSF) efforts to longer term human exploration of Mars. This paper will describe the benefits of execution of the ARM as the initial stepping stone towards Mars exploration, and how the capabilities required to send humans to Mars could be built upon those developed for the asteroid mission. A series of potential interim missions aimed at developing such capabilities will be described, and the feasibility of such mission manifest will be discussed. Options for the asteroid crewed mission will also be addressed, including crew size and mission duration.

Lopez, Pedro, Jr.↗

Adaptive Independent Verification and Validation (IV&V) Reduces Risk of Software Impacting Safety in Artemis Missions

The National Aeronautics and Space Administration (NASA) is asking more of its human spaceflight programs than ever before through the collective Artemis Missions. The NASA Independent Verification and Validation (IV&V) Program contributes to NASA’s human spaceflight goals by providing IV&V services for NASA’s critical spacecraft and ground software. The IV&V Program is tasked with providing assurance from both individual and integrated mission software perspectives. The Artemis IV&V organization is actively supporting six distinct development efforts: Orion, the Space Launch System (SLS), Exploration Ground Systems (EGS), Mission Control Center (MCC), the Lunar Gateway, and the Human Landing System (HLS), representing a wide diversity of developer organizations, management structures, and development approaches. With much of this extremely complex flight and ground software being essential to human safety both on the ground and in space, Artemis IV&V is likewise challenged to provide more value-added assurance to future Artemis missions within a constrained budget. To meet this challenge, Artemis IV&V employs a variety of novel and evolving “Adaptive IV&V” approaches for planning and executing IV&V analysis to increase both the efficiency and effectiveness of the IV&V Program’s assurance activities, and to address the difficulties imposed by assuring software for a large, highly integrated, multi-mission enterprise managed and executed by physically and organizationally distinct programs. Instilling agile principles like iterative planning cycles, self-organizing teams, and regular retrospectives, into IV&V planning and execution has led to a more rapid turnaround of a minimum viable assurance product and allowed for increased alignment of assurance activities with development progress. Adopting an assurance case methodology has led to greater consistency and clearer communication of assurance design and provided a foundation for long-term maintenance of assurance plans, products, and results across missions. The IV&V-developed Assurance / Safety Case Analytical Network (A-SCAN) framework and tool has enabled the quantification and tracking of system/software risk and confidence. These confidence measures provide a means to repeatedly express the impact of planned and completed assurance work and the remaining residual risk. Applied as part of a “Follow-the-Risk” organizational ethos, this allows consistent rightsizing of analysis rigor and intensity commensurate with the perceived risk of defects, as well as appropriate targeting of the highest risk areas of the software to find safety issues before they can manifest. Finally, the development of the IV&V Advanced Risk Reduction Integrated Software Test and Operations Tri-program Lightweight Environment (ARRISTOTLE), an integrated software-only simulation of Orion, SLS, and EGS systems, has made it possible to independently test integrated pad and flight scenarios and inject faults to observe how the Artemis multi-program, mission software behaves in degraded modes and in response to hazards. These adaptive IV&V investments have enabled Artemis IV&V to become more efficient and effective in IV&V planning and execution and respond more readily to changes in the risk landscape, increasing the breadth and depth of risk reduction possible within the available resources. Residual risk tracking allows IV&V to communicate more effectively with stakeholders, both internal and external at all levels, and inform key decision-making personnel. This evolving assurance design approach provides IV&V surety that work is performed in the highest risk, most value-added areas of the software, to keep our astronauts and ground crews safe and ensure mission success.

Gerek A Whitman↗

Adaptive Independent Verification and Validation (IV&V) Reduces Risk of Software Impacting Safety in Artemis Missions

The National Aeronautics and Space Administration (NASA) is asking more of its human spaceflight programs than ever before through the collective Artemis Missions. The NASA Independent Verification and Validation (IV&V) Program contributes to NASA’s human spaceflight goals by providing IV&V services for NASA’s critical spacecraft and ground software. The IV&V Program is tasked with providing assurance from both individual and integrated mission software perspectives. The Artemis IV&V organization is actively supporting six distinct development efforts: Orion, the Space Launch System (SLS), Exploration Ground Systems (EGS), Mission Control Center (MCC), the Lunar Gateway, and the Human Landing System (HLS), representing a wide diversity of developer organizations, management structures, and development approaches. With much of this extremely complex flight and ground software being essential to human safety both on the ground and in space, Artemis IV&V is likewise challenged to provide more value-added assurance to future Artemis missions within a constrained budget. To meet this challenge, Artemis IV&V employs a variety of novel and evolving “Adaptive IV&V” approaches for planning and executing IV&V analysis to increase both the efficiency and effectiveness of the IV&V Program’s assurance activities, and to address the difficulties imposed by assuring software for a large, highly integrated, multi-mission enterprise managed and executed by physically and organizationally distinct programs. Instilling agile principles like iterative planning cycles, self-organizing teams, and regular retrospectives, into IV&V planning and execution has led to a more rapid turnaround of a minimum viable assurance product and allowed for increased alignment of assurance activities with development progress. Adopting an assurance case methodology has led to greater consistency and clearer communication of assurance design and provided a foundation for long-term maintenance of assurance plans, products, and results across missions. The IV&V-developed Assurance / Safety Case Analytical Network (A-SCAN) framework and tool has enabled the quantification and tracking of system/software risk and confidence. These confidence measures provide a means to repeatedly express the impact of planned and completed assurance work and the remaining residual risk. Applied as part of a “Follow-the-Risk” organizational ethos, this allows consistent rightsizing of analysis rigor and intensity commensurate with the perceived risk of defects, as well as appropriate targeting of the highest risk areas of the software to find safety issues before they can manifest. Finally, the development of the IV&V Advanced Risk Reduction Integrated Software Test and Operations Tri-program Lightweight Environment (ARRISTOTLE), an integrated software-only simulation of Orion, SLS, and EGS systems, has made it possible to independently test integrated pad and flight scenarios and inject faults to observe how the Artemis multi-program, mission software behaves in degraded modes and in response to hazards. These adaptive IV&V investments have enabled Artemis IV&V to become more efficient and effective in IV&V planning and execution and respond more readily to changes in the risk landscape, increasing the breadth and depth of risk reduction possible within the available resources. Residual risk tracking allows IV&V to communicate more effectively with stakeholders, both internal and external at all levels, and inform key decision-making personnel. This evolving assurance design approach provides IV&V surety that work is performed in the highest risk, most value-added areas of the software, to keep our astronauts and ground crews safe and ensure mission success.

Gerek Whitman↗

Enterprise Mission Integration for Artemis Lunar Missions

Mission integration is an iterative process by which a specific mission is formulated, refined, planned, and executed within the established vehicle(s), architecture, and ground systems design. Mission integration includes the people, vehicle(s) and ground hardware/software, products, processes, analyses, schedules, facilities, Certification of Flight Readiness, etc. The Artemis Mission Integration Task Team (MITT) developed a series of products and processes to support the complex mission integration across various Programs within the Artemis Mission Campaign (Orion, Space Launch Systems, Exploration Ground Systems, Gateway, Human Landing System, and Extravehicular Activity and Human Surface Mobility). The Moon to Mars (M2M) Program is referred to as ‘the enterprise’ as it includes both the M2M organization and the Programs supporting the Artemis Mission Campaign. Artemis Mission Integration has five phases: mission capability, mission definition, mission preparation, mission execution, and post-mission assessment. This paper focuses on one of the enterprise-level mission checkpoints as a kick-off to the Mission Preparation phase, the Mission Integration Review (MIR), which occurs 18-24 months prior to launch. The MIR helps to confirm the defined mission technical baseline is within the existing analyzed design envelope. Details are provided on the identification of dependencies, issues, or gaps for mission-specific objectives and requirements, as well as the definition of the analysis, training, mission execution products, facilities, and detailed supporting operations requirements. The MIR was held for both Artemis I and II and this paper aims to share with the aerospace community its value as we prepare for upcoming Artemis Missions.

Mary Anne Plaza↗

Unsteady Pressure Acquisition on the 1.75% Scale SLS Block 1B Cargo Liftoff Configuration

Time-varying pressure on the core of the Space Launch System (SLS) Block 1B Cargo vehicle was acquired using instrumentation typically used for steady, time averaged pressure. Resono Pressure Systems, Inc. in partnership with the University of Wyoming have developed a unique hardware and software system for measuring unsteady pressure, which was implemented in a large-scale wind tunnel test through a nonreimbursable Space Act Agreement with NASA. The technique was applied to 12 pressure ports on the 1.75% scale SLS wind tunnel model. Tubing lengths of approximately 14 inches separated the pressure transducer module from the pressure taps on the model surface, and surface-mount validation sensors (Kulites) were installed in close proximity to 5 of the 12 pressure ports. Up to about 500 Hz, the frequency response of pressure fluctuations agreed to within 1 dB of amplitude and 10° of phase difference compared to the simultaneously-acquired surface-mount transducers. Sample results using the reconstructed pressure from the full azimuthal ring of taps are presented.

unsteady pressure↗

Human Missions to Near-Earth Asteroids: An Update on NASA's Current Status and Proposed Activities for Small Body Exploration

Introduction: Over the past several years, much attention has been focused on the human exploration of near-Earth asteroids (NEAs). Two independent NASA studies examined the feasibility of sending piloted missions to NEAs, and in 2009, the Augustine Commission identified NEAs as high profile destinations for human exploration missions beyond the Earth-Moon system as part of the Flexible Path. More recently the current U.S. presidential administration directed NASA to include NEAs as destinations for future human exploration with the goal of sending astronauts to a NEA in the mid to late 2020s. This directive became part of the official National Space Policy of the United States of America as of June 28, 2010. Dynamical Assessment: The current near-term NASA human spaceflight capability is in the process of being defined while the Multi-Purpose Crew Vehicle (MPCV) and Space Launch System (SLS) are still in development. Hence, those NEAs in more accessible heliocentric orbits relative to a minimal interplanetary exploration capability will be considered for the first missions. If total mission durations for the first voyages to NEAs are to be kept to less than one year, with minimal velocity changes, then NEA rendezvous missions ideally will take place within 0.1 AU of Earth (approx about 5 million km or 37 lunar distances). Human Exploration Considerations: These missions would be the first human expeditions to inter-planetary bodies beyond the Earth-Moon system and would prove useful for testing technologies required for human missions to Mars, Phobos and Deimos, and other Solar System destinations. Missions to NEAs would undoubtedly provide a great deal of technical and engineering data on spacecraft operations for future human space exploration while conducting detailed scientific investigations of these primitive objects. Current analyses of operational concepts suggest that stay times of 15 to 30 days may be possible at these destinations. In addition, the resulting scientific investigations would refine designs for future extraterrestrial In Situ Resource Utilization (ISRU), and assist in the development of hazard mitigation techniques for planetary defense. Conclusions: The scientific and hazard mitigation benefits, along with the programmatic and operational benefits of a human venture beyond the Earth-Moon system, make a piloted mission to a NEA using NASA's proposed human exploration systems a compelling endeavor

Abell, P. A.↗

Cutting More than Metal: Breaking the Development Cycle

New technology is changing the way we do business at NASA. The ability to use these new tools is made possible by a learning culture able to embrace innovation, flexibility, and prudent risk tolerance, while retaining the hard-won lessons learned of other successes and failures. Technologies such as 3-D manufacturing and structured light scanning are re-shaping the entire product life cycle, from design and analysis, through production, verification, logistics and operations. New fabrication techniques, verification techniques, integrated analysis, and models that follow the hardware from initial concept through operation are reducing the cost and time of building space hardware. Using these technologies to be more efficient, reliable and affordable requires we bring them to a level safe for NASA systems, maintain appropriate rigor in testing and acceptance, and transition new technology. Maximizing these technologies also requires cultural acceptance and understanding and balancing rules with creativity. Evolved systems engineering processes at NASA are increasingly more flexible than they have been in the past, enabling the implementation of new techniques and approaches. This paper provides an overview of NASA Marshall Space Flight Center's new approach to development, as well as examples of how that approach has been incorporated into NASA's Space Launch System (SLS) Program, which counts among its key tenants - safety, affordability, and sustainability. One of the 3D technologies that will be discussed in this paper is the design and testing of various rocket engine components.

Singer, Chris↗

SLS First Flight: Assessment of Artemis-I Motor Performance

NASA’s Artemis-I mission, which launched from Kennedy Space Center on November 16, 2022 and lasted 25 days, was the first flight test of the new Space Launch System vehicle as well as its twin solid rocket boosters. This flight test was the culmination of many years of development, testing, construction, and assembly completed by NASA and a large consortium of corporate partners, including Northrop Grumman. The solid rocket boosters are updated five-segment versions of those used during the Space Shuttle program, re-designed to provide enhanced performance and lifting capability. Booster motor performance had been characterized over the course of seven ground static tests conducted between 2009 and 2022, including three development tests, two qualification tests, and two supplemental flight support tests. The Artemis-I flight provided the first opportunity to assess solid rocket motor performance in a flight environment for any potential flight-ground biases and to ensure that measured flight performance was within requirement and analytical model limits and expectations.

Nikolas Ciaston↗

Development of a Data Fusion Methodology for Lineload Aerodynamic Databases for a Launch Vehicle during Liftoff and Transition

The need for databases for the distributed loading on launch vehicles during the early portion of flight necessitates the use of expensive computational flows in regimes where wake effects dominate. While also being expensive, this is a regime that computational tools tend to historically have problems simulating accurately. To help tackle this problem, a method of data fusion to combine computational results to wind tunnel derived force and moment data is developed. Using this method, significant reduction in computational costs and increases in confidence of the final product is possible and has been used to generate several databases for the Space Launch System (SLS) at NASA. While the full details of database generation are not part of this work, the crucial method at its core is developed here. Two SLS geometries are used throughout the work to demonstrate the techniques. These are two of the larger geometries and represent both planned crewed missions to the Moon as well as potential cargo missions to deep space. The method uses principal component analysis (PCA) to generate a reduced ordered model (ROM) to help fill in the full parameter space. Other similar techniques are explored, but were not found to have a significant result on the predictions of the ROM. Because the full number of components are kept to generate the model, this lack of difference is expected. This method is then extended to ensure that predicted surfaces match trusted force and moment data derived from wind tunnel testing. This extension is done by setting up a constrained optimization problem in order to minimize the deviation from the surface resolved computational data while still integrating to the desired values. When generating the constrained optimization problem, a weighting factor to balance these competing needs is introduced. The work compares previously introduced weighting terms from similar work to the proposed terms and shows that the previously used terms do not have as desirable behavior in this flow regime. This method is then expanded by developing a technique to incorporate uncertainty quantification into the developed data fusion methodology. This expansion takes a two pronged approach. One examines transferring the uncertainties in the force and moment database and characterizes how those adjustments change the predicted lineloads. The second looks at model form error and looks how rebuilding the model using slightly different data changes the predictions. These two terms are then combined in order to create an uncertainty model that takes both effects into account. The limitations of the proposed methods is then discussed as well as possible techniques to address these shortcomings.

Launch Vehicles↗

Digital Prototyping Methods to Enable Product Development Analysis Cycle Compression in Aerospace Systems

Historically, the product development life cycle (spanning from origination of a systems concept to initial delivery or fielding) for large-scale aerospace systems is 10-25 years. Examples of recent programs exhibiting this timeline are the Space Shuttle (13 years), , International Space Station (18 years), NASA Hubble telescope (16 years), USAF F-35 Strike Fighter (22 years), Missile Defense Agency THAAD (21 years), USAF V-22 Osprey (26 years), USAF B-2 Spirt (19 years), US Army RAH-66 Comanche (22 years, cancelled prior to fielding), James Webb Space Telescope (25 years), Space Launch System (10 years). This list illustrates the challenges of developing and fielding a modern integrated multi-disciplinary aerospace system. These development timelines are often preceded by significant research and development programs and followed by multiple increments, blocks, or spirals to reach planned operational capability. In the modern era of aerospace system acquisition, there is significant pressure to reduce system development timelines to meet system objectives and enable competitiveness in the current industry and landscape. Across the aerospace industry, a range of rapid acquisition and prototyping programs are seeking to achieve system development within timelines considerably less than 10 years. Notably, in September of 2019, NASA issued a solicitation for the development and demonstration of a Human Landing System (HLS) to deliver humans to the lunar surface by 2024 (5 years) and for the development and demonstration of a more sustainable HLS by 2026 (7 years). Lengthy product development cycle timelines are a product of multiple factors ranging from programmatic, sociological, technical, and systems engineering issues. New approaches in systems engineering provide new ways to enable these compressed development timelines. These approaches employ expanded application of advanced systems engineering methods and cross-cutting digital tools to accelerate system development, utilizing digital prototyping to connect maturing sub-system or component technologies into system or system-of-systems hardware prototypes. Approaches such as the use of system integrating physics relationships to reduce the number of design analysis cycle iterations and state analysis modeling to reduce necessary software testing (and improving coverage of system execution scenarios) represent steps forward in reducing the engineering time needed to field new systems. In addition to cost, schedule and performance benefits, expanded digital exploration and demonstration reduce risk in live system test and demonstration. This incremental demonstration approach, where digital prototyping and demonstration leads and informs full system test and demonstration, could be more important for space applications because of the increased difficulty of test and demonstration of space systems and architectures. The Advanced Concepts Office (ACO) at Marshall Space Flight Center merges traditional multi-disciplinary concept definition methods with modern, cross-cutting systems engineering concepts to enable iterative design and analysis of space architectures and systems through coordinated, strategic management of human capital, technical processes, and technology. This paper provides an overview of that approach, including recent examples and a strategic path forward to enabling continued reduction of aerospace system product development life cycles.

Michael D Watson↗

2nd Generation QUATARA Flight Computer Project

Single core flight computer boards have been designed, developed, and tested (DD&T) to be flown in small satellites for the last few years. In this project, a prototype flight computer will be designed as a distributed multi-core system containing four microprocessors running code in parallel. This flight computer will be capable of performing multiple computationally intensive tasks such as processing digital and/or analog data, controlling actuator systems, managing cameras, operating robotic manipulators and transmitting/receiving from/to a ground station. In addition, this flight computer will be designed to be fault tolerant by creating both a robust physical hardware connection and by using a software voting scheme to determine the processor's performance. This voting scheme will leverage on the work done for the Space Launch System (SLS) flight software. The prototype flight computer will be constructed with Commercial Off-The-Shelf (COTS) components which are estimated to survive for two years in a low-Earth orbit.

Falker, Jay↗

Propulsion Technology Assessment: Science and Enabling Technologies to Explore the Interstellar Medium

The Advanced Concepts Office at NASA’s George C. Marshall Space Flight Center conducted a study to assess what low-thrust advanced propulsion system candidates, existing and near term, could deliver a small, Voyager-like satellite to our solar system’s heliopause, approximately 100 AU from the sun, within 10 years. The advanced propulsion system trade study consisted of three candidates, including a Magnetically Shielded Miniature Hall thruster, a solar sail and an electric sail. A second analysis was conducted to determine which solid rocket motor kick stage(s) would be required to provide additional thrust at various points in the trajectory, assuming a characteristic energy capability provided by a Space Launch System Block 1B vehicle architecture carrying an 8.4 meter payload fairing. Two trajectory profiles were considered, including an escape trajectory using a Jupiter gravity assist and an escape trajectory first performing a Jupiter gravity assist followed by an Oberth maneuver around the sun and an optional Saturn gravity assist. Results indicated that if the Technology Readiness Level of an electric sail could be increased in time, this technology could not only enable a satellite to reach 100 AU in 10 years but it could potentially do so in even less time.

Hopkins, Randall C.↗

BioSentinel: An Adaptable Platform for Studying the Biological Effects of Deep Space Radiation

NASA's BioSentinel mission is a 6U nanosatellite with autonomous life support that will utilize the budding yeast Saccharomyces cerevisiae to study the DNA damage response to the deep space radiation environment. BioSentinel is planned to launch in 2019 as a secondary payload on the Space Launch System's first Exploration Mission (EM-1), and will undergo a lunar fly-by and enter heliocentric orbit after deployment. As the first biological mission beyond Low Earth Orbit (LEO) in nearly half a century, this mission will help fill critical gaps in knowledge about the effects of uniquely composed, chronic, low-flux deep space radiation on biological systems. Yeast is well-suited for this mission due to its desiccation tolerance and space-flight heritage. As a eukaryotic model organism, it also serves as a robust analog for human cells. Data gathered on this mission will thus inform us of the hazards involved in long-duration human exploration in deep space, and the protections necessary to mitigate them. Due to its low-cost, flexible and advanced technology, the 4U BioSensor payload contained within the nanosatellite is adaptable to other model microorganisms, exploration platforms and environments relevant to human exploration, such as the ISS, the Lunar Orbital Platform - Gateway and future lunar landers. In order to query the DNA damage response to deep space radiation, BioSentinel contains a wild type yeast strain as a positive control, and a radiation sensitive rad51 mutant strain that is defective for DNA repair. Yeast cells are desiccated in microfluidic cards, and rehydrated with growth medium and metabolic indicator dye at the desired time points during the mission. A thermal control system supports these stasis and growth states, and an optical system continuously measures cell growth and metabolism. An onboard radiation spectrometer and dosimeter allows us to correlate the dose, energy and particle-type of deep space radiation to the biological response. Data received from the deep space biosensor will be compared to control payloads on Earth and the ISS. Ongoing science testing for the BioSentinel project includes optimization for cell viability, desiccation tolerance, and long-term biocompatibility, as well as radiation experiments to understand the sensitivity and responsiveness of cells to varying radiation doses and particle types.

BioSentinel↗

Design Process of Flight Vehicle Structures for a Common Bulkhead and an MPCV Spacecraft Adapter

Design and manufacturing space flight vehicle structures is a skillset that has grown considerably at NASA during that last several years. Beginning with the Ares program and followed by the Space Launch System (SLS); in‐house designs were produced for both the Upper Stage and the SLS Multipurpose crew vehicle (MPCV) spacecraft adapter. Specifically, critical design review (CDR) level analysis and flight production drawing were produced for the above mentioned hardware. In particular, the experience of this in‐house design work led to increased manufacturing infrastructure for both Marshal Space Flight Center (MSFC) and Michoud Assembly Facility (MAF), improved skillsets in both analysis and design, and hands on experience in building and testing (MSA) full scale hardware. The hardware design and development processes from initiation to CDR and finally flight; resulted in many challenges and experiences that produced valuable lessons. This paper builds on these experiences of NASA in recent years on designing and fabricating flight hardware and examines the design/development processes used, as well as the challenges and lessons learned, i.e. from the initial design, loads estimation and mass constraints to structural optimization/affordability to release of production drawing to hardware manufacturing. While there are many documented design processes which a design engineer can follow, these unique experiences can offer insight into designing hardware in current program environments and present solutions to many of the challenges experienced by the engineering team.

Aggarwal, Pravin↗

What's the Cube Quest Challenge?

Cube Quest Challenge, sponsored by Space Technology Mission Directorates Centennial Challenges program, is NASAs first in-space prize competition. Cube Quest is open to any U.S.-based, non-government CubeSat developer. Entrants will compete for one of three available 6U CubeSat dispenser slots on the EM-1 mission the first un-crewed lunar flyby of the Orion spacecraft launched by the Space Launch System in early 2018. The Cube Quest Challenge will award up to $5M in prizes. The advanced CubeSat technologies demonstrated by Cube Quest winners will enable NASA, universities, and industry to more quickly and affordably accomplish science and exploration objectives. This paper describes the teams, their novel CubeSat designs, and the emerging technologies for CubeSat operations in deep space environment.

Cube Quest Challenge↗

From Paper to Production to Test: An Update on NASA's J-2X Engine for Exploration

The NASA/industry team responsible for developing the J-2X upper stage engine for the Space Launch System (SLS) Program has made significant progress toward moving beyond the design phase and into production, assembly, and test of development hardware. The J-2X engine exemplifies the SLS Program goal of using proven technology and experience from more than 50 years of United States spaceflight experience combined with modern manufacturing processes and approaches. It will power the second stage of the fully evolved SLS Program launch vehicle that will enable a return to human exploration of space beyond low earth orbit. Pratt & Whitney Rocketdyne (PWR) is under contract to develop and produce the engine, leveraging its flight-proven LH2/LOX, gas generator cycle J-2 and RS-68 engine capabilities, recent experience with the X-33 aerospike XRS-2200 engine, and development knowledge of the J-2S tap-off cycle engine. The J- 2X employs a gas generator operating cycle designed to produce 294,000 pounds of vacuum thrust in primary operating mode with its full nozzle extension. With a truncated nozzle extension suitable to support engine clustering on the stage, the nominal vacuum thrust level in primary mode is 285,000 pounds. It also has a secondary mode, during which it operates at 80 percent thrust by altering its mixture ratio. The J-2X development philosophy is based on proven hardware, an aggressive development schedule, and early risk reduction. NASA Marshall Space Flight Center (MSFC) and PWR began development of the J-2X in June 2006. The government/industry team of more than 600 people within NASA and PWR successfully completed the Critical Design Review (CDR) in November 2008, following extensive risk mitigation testing. Assembly of the first development engine was completed in May 2011 and the first engine test was conducted at the NASA Stennis Space Center (SSC), test stand A2, on 14 July 2011. Testing of the first development engine will continue through the autumn of 2011, be paused for test stand modifications to the passive diffuser, and then restart in the spring of 2012. This testing will be followed by specialized powerpack testing intended to examine the design and operating margins of the engine turbomachinery. The development plan beyond this point leads through more system-level, engine testing of several samples, analytical model validation activities, functional and performance verification, and then ultimate certification to support human spaceflight. This paper will discuss the J-2X development background, provide top-level information on design and development planning, and will explore some of the development challenges and mitigation activities pursued to date.

Kynard, Michael↗