Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “STORAGE AND NETWORKING SYSTEMS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 973 records · Page 54

ACES: Infrastructure As Code. Model Optimization and Performance Capability

Infrastructure as Code (IaC) refers to managing infrastructure (networks, physical/virtual machines, storage, and connection topology) in a descriptive model/language, rather than configuring it manually or using interactive configuration tools. Just like source code can be compiled to generate the same binary code, IaC enables generating the same environment every time it is applied. IaC is a key DevOps practice and is generally used in conjunction with continuous integration (CI) and continuous delivery (CD). In CI, all code changes are merged into a mainline branch and validated multiple times a day as developers check in their changes to the source code. In CD on the other hand, code changes are automatically packaged for a new release-to-production on a regular basis. This typically enables teams to deliver software changes much more quickly and often. Developing and managing the ACES platform using (IaC) is vital for the robust deployment and continued sustainment of this foundational computing capability. IaC and DevOps practices will help us solve many of the common challenges often encountered in developing and maintaining compute infrastructure. First, it will make the provisioning, deployment, and maintenance of the compute infrastructure across multiple environments much more efficient. Second, these processes help make the overall system much more stable by continuously testing new changes as they are introduced to the system. Third, it allows us to be much more confident of the security controls in place since they can be tested as part of the CI process and all new changes can be audited and tracked. Finally, IaC enables the ACES Platform to be adaptable to the emerging technologies due to its ability to spin up different test beds to evaluate and incorporate these technologies. This document addresses common infrastructure-management challenges, describes what happens if they are not addressed, and highlights the value of utilizing IaC to tackle them. Finally, we will provide a high-level overview of the IaC and DevOps practices being utilized by the ACES Platform team.

97 MATHEMATICS AND COMPUTING↗

Geospatial Data Platform for All

Spatiotemporal data has evolved in scale due to augmented use in cross-domain applications. Simultaneously, there is substantial growth in the availability of Geographic Information Systems (GIS) data provided by the United States Geological Survey (USGS) along with other federal, state, county, or local agencies through open-data portals and public access APIs. However, data availability does not equate with accessibility. Large-scale analyses and applications require robust, performant data management with co-location of data storage and computing. The insufficiency of data management infrastructure compels researchers to adopt ad hoc project- specific GIS data storage solutions (e.g., copying data to High-Performance computer file systems). As an ad hoc storage strategy does not scale, it hampers cross-domain analyses causing difficulty in data reuse and utilizing existing code bases. Furthermore, GIS data is complex and requires expertise to analyze and manipulate due to its intricate data structures and data-specific projection transformations. Despite the challenges, we recognize that derived GIS data products, e.g., satellite or LIDAR-based images, can be used in downstream applications such as AI by domain, but non-GIS experts. To address the data needs and overcome the challenges, we are working towards a GIS Data Platform focused on efficient data storage, data discovery and access, and an API to enable common workflows. We propose a knowledge-graph (KG) approach for data discovery, whereby datasets are semantically linked to higher- level constructs such as projects and research areas. The semantic data links enable researchers to explore datasets in a top-down approach by specifying relevant and meaningful terms (assists in finding hidden data). An advantage is that the nodes and edges in a knowledge graph create built-in semantic documentation. Deeper spatiotemporal connections between data sources can be encoded via Graph Neural Networks (GNN) (Zhang et al., 2021). The KG approach can be extended to integrate the data itself in a Virtual KG (VKG). Our work will derive inspiration from large-scale VKG efforts that have been undertaken or are currently underway as part of the OpenStreetMap project (Ding et al., 2021). For DOE Data Days, we share the proposed geospatial data platform hybrid (cloud/on-prem) architecture, our work-to-date on storing, retrieving, and transforming LiDAR and raster data relevant to two important NREL use-cases, including the Renewable Energy Potential (reV) Model, and present our proposal for a KG based data discovery engine.

data platform↗

Maintenance of Maywood Laboratory Operations Support During Contractor Transition and Replacement of the Project Databases - 16329

In December 2013, Cabrera Services (Cabrera) executed transition of the FUSRAP Maywood Superfund Site remediation project operations, including an on-site accredited environmental lab, from a large business that had established technology infrastructure in place for over a decade which required updating to support the expected remediation scope and client needs. As of November 2015, Cabrera has shipped over 116,000 yd{sup 3} of contaminated soil to disposal facilities. During the transition, the USACE FUSRAP Maywood Laboratory (UFML) continued to support project operations, providing the expected timely and reliable results and maintaining their New Jersey Department of Environmental Protection certification for all parameters of concern, while having to cope with new challenges and additional tasks having the potential to disrupt the laboratory's ability to support project operations. This case study examines the challenges with maintaining a certified radiochemistry laboratory and an aggressive remediation schedule during a period of prime contractor transition which included a complete IT infrastructure overhaul, and conversion of the existing Microsoft Access laboratory database and project Electronic Data Management System (EDMS) to a customized commercial solution. Challenges: I. Procurement of a new database subcontractor and working closely with them to achieve the following: a. Migration of all environmental (including radiological, chemical, and quality control), health and safety, and spatial data as well as reports, queries, and analytical instrument software processes from a MS Access data management system to a SQL server system; and b. Verification that the functionality and data integrity of the databases remained intact. II. The onsite laboratory was changed over to a new onsite network and the following tasks were completed with little or no interruption to site operations by January 10, 2014: i. Installation of new instrument personal computers (PCs) and making them fully operational; ii. Configuration of the lab domain and server to host the LIMS (replaced all servers/domain/workstations with Windows 7 and Server 2012 machines). iii. Networking of the laboratory building into the rest of the project site via fiber optic cabling across the site. iv. Upgrade of the wide area network (WAN) data connection to high-speed Fiber Optic service; v. Upgrade of the telephones into voice over internet protocol (VOIP) phones. vi. Splitting of the database into front ends and a centralized back-end hosted on the new server to allow simultaneous access for fixes and improvements. III. Phone service interruption; phone systems were operational by January 10, 2014. Additional Tasks: I. Revision of the USACE FUSRAP Maywood Laboratory (UFML) Quality Systems Manual Rev. 1 Submitted 01/16/14; II. Writing of the Uniform Federal Policy Quality Assurance Project Plan Rev. 1 (UFP-QAPP) submitted 1/21/14. This document replaced the prior project data quality plan, the Chemical Data Quality Management Plan. III. Support of USACE communications to the New Jersey Department of Environmental Protection (NJDEP) on lab management and personnel transition to Cabrera. This work was important since it ensured a smooth transition and shows how critical project records infrastructure such as databases, can be upgraded with minimal interruption of project support. Such work may provide benefit to other similar projects, especially long term projects where database infrastructure upgrades may be beneficial in terms of improved efficiencies in data recording and transfer, and improved security in data storage. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Synergy of Graphene Nanoribbons and Graphene Sheets for High-Rate Lithium-Sulfur Batteries

According to the increasing demands for shortening the battery charging time, high current rate (C-rate) performances become more significant in practical applications. With a higher theoretical capacity, lithium-sulfur batteries are treated as promising candidates for the next-generation batteries. In this work, the utilization of graphene nanoribbons (GNRs) exhibits the benefits in conductivity and other electrochemical performances, especially for high-rate applications. With air-controlled electrospray as the method, carbon encapsulated sulfur particles, poly(acrylic acid), reduced graphene oxide (rGO) sheets, and GNRs are mixed and directly deposited onto the carbon coated aluminum collector, to employ as the cathode. The scanning electron microscopy (SEM) imaging exhibits that the two-dimensional structure of GNRs helps construct inter-connected networks. This improved structure of cathode can increase the electroconductivity, confirmed by the electrochemical impedance spectroscopy (EIS), and modify the porosity, indicated through pore size distribution profiles. In this way, the polysulfides can be more efficiently trapped and utilized, realizing the promising behavior with faster charge transfer. In terms of the cycling performance at 0.2 C, the batteries with GNRs can perform 18% higher in capacity than those without GNRs, without decreasing the charge retention. According to the rate-capability tests, systems with GNRs can achieve enhanced performance compared to batteries with precursor carbon nanotubes (CNTs), especially at high C-rates. At 2 C, with 80 wt % of graphene-based materials as GNRs, batteries can achieve an increase in capacity by 78% and 41% compared with systems without GNRs and those with CNTs, respectively. Accordingly, the results testify the synergy of GNRs and rGO sheets in Li-S batteries.

25 ENERGY STORAGE↗

Efficient Algorithm for Locating and Sizing Series Compensation Devices in Large Transmission Grids: Solutions and Applications (PART II)

In a companion manuscript, we developed a novel optimization method for placement, sizing, and operation of Flexible Alternating Current Transmission System (FACTS) devices to relieve transmission network congestion. Specifically, we addressed FACTS that provide Series Compensation (SC) via modification of line inductance. In this manuscript, this heuristic algorithm and its solutions are explored on a number of test cases: a 30-bus test network and a realistically-sized model of the Polish grid (~2700 nodes and ~3300 lines). The results on the 30-bus network are used to study the general properties of the solutions including non-locality and sparsity. The Polish grid is used as a demonstration of the computational efficiency of the heuristics that leverages sequential linearization of power flow constraints and cutting plane methods that take advantage of the sparse nature of the SC placement solutions. Using these approaches, the algorithm is able to solve an instance of Polish grid in tens of seconds. We explore the utility of the algorithm by analyzing transmission networks congested by (a) uniform load growth, (b) multiple overloaded configurations, and (c) sequential generator retirements

25 ENERGY STORAGE↗

Deep reinforcement learning assisted co-optimization of Volt-VAR grid service in distribution networks

With the increasing penetration of distributed energy resources in distribution networks, Volt-VAR control and optimization (VVC/VVO) have become very important to ensure an acceptable quality of service to all customers. System operators can rely on slow-responding utility devices, including capacitor banks and on-load tap changing transformers, along with fast-responding battery and photovoltaic (PV) inverters for the VVC/VVO implementation. Because of variations in response time of these two classes of devices, and different control actions (discrete versus continuous), coordinated and optimal scheduling and operation have become of utmost importance. Here, this paper develops a look-ahead deep reinforcement learning (DRL)-based multi-objective VVO technique to improve the voltage profile of active distribution networks, decrease network and inverter power loss, and save the operational cost of the grid. It proposes a deep deterministic policy gradient (DDPG)-based approach to schedule the optimal reactive and/or active power set-points of fast-responding inverters, and a deep Q-network (DQN)-based DRL agent to schedule the discrete decisions variables of slow-responding assets. The reactive power output of PV and battery smart inverters are scheduled at 30-minute intervals and the capacitors’ commitment status is scheduled with several hour intervals. The proposed framework is validated on the modified IEEE 34-bus and 123-bus test cases with embedded PV and PV-plus-storage. To validate the efficacy of the proposed VVO, it is compared with several scenarios, including the base case without VVO, localized droop control of DERs, DDPG-only, and twin delayed DDPG (TD3) agent-based DRL techniques. The results justify the superior performance of the proposed method to improve the voltage profile, reduce network power loss, and minimize the look-ahead grid operational cost while minimizing the undesirable power losses in inverters as a result of power factor adjustments.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Reactive Transport Modeling with Physics-Informed Machine Learning for Critical Minerals Applications

This study presents a physics-informed neural network (PINN) framework for reactive transport modeling for simulating fast bimolecular reactions in porous media. Accurate characterization of cAhemical interactions and product formation in surface and subsurface environments is essential for advancing critical mineral extraction and related geoscience applications. The proposed methodology sequentially addresses the flow and diffusion–reaction subproblems. The flow field is computed using a mixed formulation, while the diffusion–reaction system is modeled via two uncoupled tensorial diffusion equations reformulated in terms of chemical invariants. PINNs are employed to solve the governing equations, enabling data-efficient, mesh-free prediction of chemical concentration fields. The framework is validated through a series of benchmark problems involving flow in heterogeneous porous media. Initial verification is conducted using patch tests for the flow field, followed by validation of the transport problem with emphasis on preserving non-negativity of concentrations. The complete fast bimolecular reaction scenario is then solved, yielding spatial distributions of reactants and product species. Results demonstrate that the PINNs-based approach effectively captures sharp, mixing-limited reaction fronts and dispersive mixing behavior, offering reliable predictions of reactive plume evolution. These capabilities are crucial for evaluating long-term subsurface behavior in applications such as fluid storage, energy extraction, and efficient extraction of critical minerals.

42 ENGINEERING↗

Toward A High-Performance Emulation Platform for Brain-Inspired Intelligent Systems Exploring Dataflow-Based Execution Model and Beyond

Brain-inspired computing is a novel computing technology based on neural morphological engineering, which draws lessons from methods of human brain information processing and storage. Combining with the high-performance computing (HPC) platform, they constitute the foundation of general artificial intelligence. However, current brain HPC platforms generally suffer from slow speed, poor scalability, and high energy consumption, which severely restrain its potential and circumscribe the development of general artificial intelligence. The dataflow model was first proposed in the 1970s, providing a novel idea for the development of HPC. In addition, the dataflow model shares similar information processing mechanisms with human's neural system, which makes dataflow models naturally suit the emulation of brain-inspired computing. Based on the contemporary progress of the dataflow model, the Codelet model was proposed. Through a fine-grained asynchronous program execution and resource allocation, the Codelet model successfully realized the distributed computing on the heterogeneous system, effectively improved the computing power and speed, and open up a new path to overcome the shortcomings of the existing high-performance computing technology. We propose a dataflow-based emulation platform, aiming at providing high-performance computing technology support for general brain-inspired intelligent system, as well as using characteristics of dataflow models to fully explore the potential of brain-inspired intelligence. As an example, we will select a convolutional neural network (LeNet5) that already has a spectacular user base to initially verify the superiority and feasibility of our proposal.

brain-inspired intelligent system↗

Machine learning-enabled discovery of ionic liquid–solvent electrolytes exhibiting high ionic conductivity

Ionic liquids (ILs), which are a class of materials with versatile nature and growing popularity, are facing impediments toward widespread usage as electrolytes due to various factors such as low ionic conductivity, high viscosity, high market price etc. One of the ways these limitations can be addressed is by mixing ILs with a molecular solvent. In a combinatorial sense, there exists an immense number of specific IL–solvent combinations. An exhaustive experimental or even simulation-based investigation of the chemical space spanned by such combinations can be extremely time-consuming, expensive, and nearly impossible. An alternative approach is to employ machine learning-based models developed from available databases. Although there exists prior literature that integrates machine learning to investigate mixtures of specific solvents with ILs, these models lack generalization necessitating development of a large number of ML models to handle various solvents. To remedy this shortcoming, as a part of designing green electrolytes with high ionic conductivity that can have potential applications in next-generation batteries and solar cells, this work aims to develop a unified machine learning model to predict ionic conductivity of any IL–solvent mixture system. In this regard, three models, namely, Random Forest, extreme gradient boosting (XGBoost), and artificial neural network (ANN) were formulated using the NIST ILThermo database. The dataset contained 549 unique ionic liquids from 16 cation families and 81 unique solvents, representing a total of 23 712 datapoints. SHAPLEY additive explanation (SHAP) method was used to assess the impact of various features on model prediction and their significance was compared with literature to gain physical insight about the model behavior. Finally, using the developed models, approximately 2.5 million IL–solvent mixtures at five different compositions were screened at room temperature. The high-throughput screening yielded nearly 19 000 IL–solvent mixtures for which ionic conductivity was found to exceed the ionic conductivity of conventional Li-ion battery electrolyte.

25 ENERGY STORAGE↗

Evaluation of Hybrid FPOG Applications in Regulated and Deregulated Markets Using HERON

Recent changes in the U.S. energy market, such as low natural gas prices and increased electricity production for variable renewable energy (VRE) sources, have led to an economic crisis for existing light-water reactor (LWR) nuclear power plants (NPP). Many owners and operators of LWRs have elected to decommission these plants rather than continue using them as consistent sources of clean baseload power. This has led to exploration of various possibilities to increase the economic viability of these units, including market restructuring to monetize benefits LWRs already provide to the grid through ancillary markets, load following and economic dispatch, and possible integration of secondary systems directly to the NPP for production of additional products through technologies such as hydrogen electrolysis or water desalination. Previous studies have considered the technologies associated with these Integrated Energy Systems (IES) activities, and the analysis of markets for these secondary products. To analyze the economic viability of various system configurations including IES, especially given the uncertainty surrounding load demand, electricity prices, and the availability of VRE resources, the stochastic technoeconomic analysis package HERON (Heuristic Energy Resource Optimization Network) was released earlier this year as an extension of the risk analysis framework RAVEN (Risk Analysis Virtual Environment). HERON focuses foremost on making the complex uncertainty quantification analysis tools approachable for energy systems analysts, also providing general dispatch optimization algorithms for those workflows. HERON continues to be improved and tested as a significant part of the IES viability analyses performed in this work. HERON is not a capacity expansion model. To consider market and grid energy system development in a variety of scenarios, HERON is best used in coupling with modelling tools such as US-REGEN, which sacrifice some of the uncertainty analysis and resolution of HERON's modelling for the ability to efficiently predict the change in the grid energy system's profile due to economic drivers over decades. HERON can then use this information to explore the economic viability of introducing changes to the predicted outcomes, such as the introduction of an IES. In this work, experts at EPRI using US-REGEN provide six projection scenarios for use in HERON stochastic technoeconomic analysis (STEA) in considering the options available for increasing LWR economic viability through introduction of a hydrogen-centric IES using a high-temperature steam electrolysis plant (HTSE), hydrogen storage, and a constant-rate contracted hydrogen consumer. The results obtained are differential in nature; they do not report expected profits for any configuration, but rather report on the possible increase in the NPV of a configuration with respect to a baseline no-IES configuration. Due to the uncertainty captured in the variable net load of the systems, there is likewise uncertainty in the mean values reported. We consider this viability both in terms of a regulated market, where the energy producers and IES are owned and operated by single entity, as well as a deregulated market, where the IES chooses its bid for electricity generation and is then dispatched by the grid system operator. Results indicate that for deregulated markets, the inclusion of the IES is often statistically beneficial. This is especially true in policies that are not favorable towards nuclear, as nuclear is less often dispatched and is forced to deal with frequent idle capacity. In the nominal case as well as the case of carbon tax policies, inclusion of the IES clearly benefited the economic performance of the NPP. In the regulated case, however, there was a trend towards minimizing the IES, likely due to the optimal sizing performed by US-REGEN of the NPP within the system as well as the lack of penalty for idle capacity at the NPP in the regulated market analyses.

99 GENERAL AND MISCELLANEOUS↗

Ecobuoys for Scalable Oceanography

An approach to scalable surface-drifting buoys is needed to enable the high spatial and temporal resolution of oceanographic data that the science and meteorological communities are asking for. With the number of active buoys predicted to increase by a factor of 100 or more, the impact on the environment becomes even more important. Here, we present a pathway to a scalable and sustainable generation of buoys. We identify the main criteria to be used when developing such buoys to be low cost, with reliable data and neutral or even positive environmental impact. For each buoy subsystem—hull, electronics, energy generation and storage, sensors, and communication system—cutting-edge technological solutions are presented, many of them from emerging research in marine or other disciplines. We then assess the potential solutions against the design criteria and plot a path toward small, environmentally friendly, low-cost, and low-power buoys.

54 ENVIRONMENTAL SCIENCES↗

Multi-time scale control of demand flexibility in smart distribution networks

This study presents a multi-timescale control strategy to deploy demand flexibilities of electric vehicles (EV) for providing system balancing and local congestion management by simultaneously ensuring economic benefits to participating actors. First, the EV charging problem from consumer, aggregator, and grid operator’s perspective is investigated. A hierarchical control architecture (HCA) comprising scheduling, coordinative, and adaptive layers is then designed to realize their coordinative goal. This is realized by integrating a multi-time scale control, which works from a day-ahead scheduling up to real-time adaptive control. The performance of the developed method is investigated with high EV penetration in a typical distribution network. The simulation results demonstrates that HCA exploit EV flexibility to solve grid unbalancing and congestions with simultaneous maximization of economic benefits by ensuring EV participation to day-ahead, balancing, and regulation markets. For the given network configuration and pricing structure, HCA ensures the EV owners to get paid up to 5 times the cost they were paying without control.

24 POWER TRANSMISSION AND DISTRIBUTION↗

System and Component Transport Considerations of Micro-Pin Based Solar Receivers With High Temperature Gaseous Working Fluids

This paper explores the interactions between micro-pin concentrated receiver designs with overall solar thermal energy system performance, with different operating conditions, working fluid, and required materials of construction. A 320 MW thermal plant coupled to a 160 MW electric sCO2 Brayton cycle is considered as the baseline. The circulating fluid enters the receiver at 550°C, and leaves at 720°C. The thermal storage/power block are located 150 m from the receiver at the base of the receiver tower. A resistance network based thermal and hydraulic model is used to predict heat transfer and pressure drop performance of the micro-pin receiver. This output of this model is coupled to a system level model of the pressure loss and compressor power required in the remainder of the high temperature gas loop. Overall performance is investigated for supercritical carbon dioxide and helium as working fluids, at pressures from 7.5 to 25 MPa, and at delivery temperatures of 720°C. The results show that by modifying pin depth and flow lengths, there are design spaces for micro-pin devices that can provide high thermal performance without significantly reducing the overall solar thermal system output at lower operating pressures. Use of lower pressure fluids enables lower cost materials of construction in the piping and distribution system, reducing the cost of electricity.

14 SOLAR ENERGY↗

Recommended Actions to Improve Adapter Safety

With the rapid advancement and acceleration in the electric vehicle (EV) industry within the United States, major automakers and EV charging companies are increasingly adopting the North American Charging Standard (NACS) connector style, now officially known as J3400. This shift is expected to enhance charging infrastructure, providing a better customer experience by making it easier for all EV drivers to access a wider network of direct-current (DC) fast chargers (DCFCs). However, the adoption of the J3400 standard presents challenges for many EVs already on the roads and some currently coming off production lines that are equipped with the Combined Charging System (CCS) connector, which this report will refer to as the North American standard, CCS1. These vehicles will need adapters to use new or existing J3400 infrastructure. During this transition, several issues have emerged. Firstly, there is a need to standardize the new connector type to ensure it is interoperable, safe, and reliable. Second, existing CCS EV drivers need a way to access the J3400 network, which will require electric vehicle supply equipment (EVSE) or sites with both connector types, driver-provided adapters to physically convert from CCS to J3400, or EVSE with retained adapters designed for use with the EVSE. Third, adapter standards will need to be written to specify how they will be designed and what evaluations will be needed to ensure safe and reliable performance. To address these challenges, adapters that support different types of charging connectors will be essential. These adapters will play a crucial role in supporting the transition and ensuring continued service for legacy EVs with CCS inlets as the J3400 standard becomes the predominant one in the United States. Consequently, the National Charging Experience (ChargeX) Consortium has investigated and performed a teardown analysis on the different adapter versions on the market. The aim is to create a failure mode and effects analysis (FMEA) on what are expected to be the most common adapter types used in this transition. In order to support this work, we executed an FMEA exercise with the main goal of identifying gaps in the existing adapters' performance and conformance to the most common safety requirements of high-power and high-voltage devices. This effort focused on adapters provided by the driver, as these may present the highest safety and reliability risks. The recommendations made here apply to both retained and driver-provided adapters.

25 ENERGY STORAGE↗

Solid-State Transformer and Hybrid Transformer With Integrated Energy Storage in Active Distribution Grids: Technical and Economic Comparison, Dispatch, and Control

Solid-state transformer (SST) and hybrid transformer (HT) are promising alternatives to the line-frequency transformer (LFT) in smart grids. The SST features medium-frequency isolation, full controllability for voltage regulation, reactive power compensation, and the capability of battery energy storage system (BESS) integration with multiport configuration. The HT has a partially-rated converter for fractional controllability and can integrate a small BESS. Fast grid-edge voltage fluctuations from increased solar photovoltaic (PV) and electric vehicle (EV) penetration are difficult to manage for mechanical load tap changers. Hence, along with the trend towards more BESS in the grid, the controllability and the storage integration capability of the SST and HT are of strong interest. However, a review of literature shows existing SST and HT research is mostly at converter level, while system-level assessments are scarce. Assessing technical and economic impacts is critical to understanding the benefits and role of the SST and HT to guide future research, which is presented for the first time in this article. Experimental results from medium-voltage (MV) SST and MV HT prototypes are shown to confirm equipment-level feasibility, where the voltage controllability waveforms of a MV HT prototype are reported for the first time. Comparative simulations are performed on a modified IEEE 34-bus system. Here, a grid-model-less decentralized grid-edge voltage control method and a day-ahead BESS dispatch method are proposed for the SST and HT. The simulations show that the SST and HT with integrated storage can host more PV, achieve peak shaving, mitigate voltage fluctuation and reverse power flow, and support energy arbitrage for operational cost reduction, as compared to the LFT. Moreover, comprehensive analyses of net present value (NPV) and internal rate of return (IRR) are performed under different installed PV capacities, HT’s partial converter ratings, and BESS capacities. Sensitivities to future cost reductions of the PV and BESS are studied. Although the NPV and IRR are currently negative, 60% capital cost reduction or 150% revenue increase will make the SST and HT economically viable in the use case studied.

14 SOLAR ENERGY↗

Market-Based and System-Wide Fuel Cycle Optimization

The Dynamic Resource Exchange (DRE) gives agency to consumer facilities to determine the preference of any particular trade that is offered by suppliers to satisfy its requests. This provides a natural balance of power in the relationship between consumers and suppliers. However, in situations in which suppliers have flexibility surrounding the way that they respond to individual requests, they have no mechanism to assess how different bids will be received by the consumer. Theoretically, a supplier can offer multiple bids to respond to a given request in an attempt to “cover their bases”, but this introduces more arcs into the underlying network flow problem, increasing the cost to solve the problem. In the extreme, when a supplier can continuously vary the characteristics of the bid, this can represent a large number of additional arcs and have real performance consequences. To remedy this inefficiency in the implementation of the market-level optimization, the definition of a request has been extended to include a function that can be used by the supplier to query the preference that would be assigned by a consumer for a potential bid. The supplier is then free to implement arbitrarily complex algorithms to revise/optimize its bid based on responses to this function. A supplier can chose to not invoke the function at all, mimicking the original DRE behavior, can use it to select among a small set of discrete choices, or can implement an internal algorithm to seek an optimum bid on a continuous parameter space. This capability was demonstrated with a storage facility that preferred material with a specific decay heat that was as close as possible to the maximum allowable decay heat, while requiring the specific decay heat to fall between a minimum and maximum level. This archetype was used to fill multiple storage roles in a simulation that also included a standard recipe reactor: wet storage with no maximum allowable specific decay heat, dry storage with a modest maximum allowable specific decay heat, and a geologic repository with a low maximum allowable specific decay heat. In such a simulation, the reactor, wet storage and dry storage always offer their material to be taken by one of the other storage facilities. The preference function of the consumer would always ensure that material only flowed when the decay heat was sufficiently low, but in the absence of objective function callbacks, would allow for many superfluous offers that exceeded those limits. If this archetype also uses a callback function to probe the preference of the receiving facility for each possible offer, it can avoid making offers that are not going to be accepted by the receiving facility.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

FY23 Update: Aerosol Sampling for the Canister Deposition Field Demonstration

This report describes the results of preliminary testing of aerosol monitoring equipment that will be used to continuously monitor the aerosol source term for the multi-year Canister Deposition Field Demonstration (CDFD). These data are required inputs for the development and validation of models for the deposition of dust and potentially corrosive salts on the surface of spent nuclear fuel (SNF) dry storage canisters. Surface salt loads correlate with the extent of corrosion damage on a metal surface, and potentially to the likelihood and timing of initiation of stress corrosion cracks. Aerosols will be monitored at the CDFD site using three instruments. A Dekati ® ELPI+ cascade impactor will be used for real-time monitoring of aerosol particle sizes. It will also collect dust in 14 size bins on impactor targets that can be chemically analyzed to determine the soluble salts present as a function of particle size. However, this instrument can only measure dried aerosols, with a diameter of <10 µm. The second instrument is a Topas laser particle size spectrometer, which provides real-time monitoring of aerosol particle sizes up to ~40 µm in size. It monitors both the ambient (potentially deliquesced) aerosol particle size distributions required for the dust deposition models and the distributions of the equivalent dried particles, allowing correlation with the Dekati ® data. However, it does not discriminate between inert dust particles and salt aerosols, and it does not retain samples of the different particle sizes for later analysis. The third instrument that will monitor aerosols at the CDFD site is a Clean Air Status and Trends Network (CASTNET) tower, which uses a multiple canister system to collect weekly samples for analysis to total suspended aerosol particle compositions and atmospheric gas concentrations. This status report describes work in FY23 to develop the capabilities for using these tools. In two training exercises, the cascade impactor and laser particle sizer were deployed in two different testing environments, one indoor and one outdoor. For the cascade impactor, the tests provided opportunities for the operators to familiarize themselves with impactor substrate preparation, and post-test sample removal and analysis. For the laser particle sizer, the tests were used to evaluate different instrument parameters, to determine the most appropriate settings for capturing transient events. Data and samples were collected for weeks to months for each test, and the results are presented here. In addition to the preliminary testing, contracts were developed with WSP Analytical Labs for sample preparation and analysis of the cascade impactor samples. The impactor tower from outdoor test was delivered to WSP and used to train the staff there in disassembly, sample extraction, sample analysis, and tower reassembly with new target substrates. These are tasks that WSP will be performing routinely for the CDFD project. The CASTNET system cannot be purchased or tested until an actual site has been selected for the CDFD test. Work for this FY has been restricted to preparation of contracts for purchasing the CASTNET tower, and for sample analysis, once the tower is in operation.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A Components Database Design and Implementation for Accelerators and Detectors

Many accelerator and detector systems being fabricated for the PEP-II Accelerator and BABAR Detector needed configuration control and calibration measurements tracked for their components. Instead of building a database for each distinct system, a Components Database was designed and implemented that can encompass any type of component and any type of measurement. In this paper we describe this database design that is especially suited for the engineering and fabrication processes of the accelerator and detector environments where there are thousands of unique component types. We give examples of information stored in the Components Database, which includes accelerator configuration, calibration measurements, fabrication history, design specifications, inventory, etc. The World Wide Web interface is used to access the data, and templates are available for international collaborations to collect data off-line.

43 PARTICLE ACCELERATORS↗