Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Risk analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 973 records · Page 54

Planning Target Volume D95 and Mean Dose Should Be Considered for Optimal Local Control for Stereotactic Ablative Radiation Therapy

Purpose: To identify the optimal dose parameters predictive for local/lobar control after stereotactic ablative radiation therapy (SABR) in early-stage non-small cell lung cancer (NSCLC). Methods and Materials: This study encompassed a total of 1092 patients (1200 lesions) with NSCLC of clinical stage T1-T2 N0M0 who were treated with SABR of 50 Gy in 4 fractions or 70 Gy in 10 fractions, depending on tumor location/size, using computed tomography-based heterogeneity corrections and a convolution superposition calculation algorithm. Patients were monitored by chest CT or positron emission tomography/CT and/or biopsy after SABR. Factors predicting local/lobar recurrence (LR) were determined by competing risk multivariate analysis. Continuous variables were divided into 2 subgroups at cutoff values identified by receiver operating characteristic curves. Results: At a median follow-up time of 31.7 months (interquartile range, 14.8-51.3 months), the 5-year time to local recurrence within the same lobe and overall survival rates were 93.8% and 44.8%, respectively. Total cumulative number of patients experiencing LR was 40 (3.7%), occurring at a median time of 14.4 months (range, 4.8-46 months). Using multivariate competing risk analysis, independent predictive factors for LR after SABR were minimum biologically effective dose (BED{sub 10}) to 95% of planning target volume (PTVD95 BED{sub 10}) ≤86 Gy (corresponding to PTV D95 physics dose of 42 Gy in 4 fractions or 55 Gy in 10 fractions) and gross tumor volume ≥8.3 cm{sup 3}. The PTVmean BED{sub 10} was highly correlated with PTVD95 BED{sub 10.} In univariate analysis, a cutoff of 130 Gy for PTVmean BED{sub 10} (corresponding to PTVmean physics dose of 55 Gy in 4 fractions or 75 Gy in 10 fractions) was also significantly associated with LR. Conclusions: In addition to gross tumor volume, higher radiation dose delivered to the PTV predicts for better local/lobar control. We recommend that both PTVD95 BED{sub 10} >86 Gy and PTVmean BED{sub 10} >130 Gy should be considered for SABR plan optimization.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

On-line maintenance methodology development and its applications

With the increasing economic pressures being faced and the potential for shortening outage times under the conditions of deregulated electricity markets in the world, licensees are motivated to get an increasing amount of the on-line maintenance (OLM). The benefits of the OLM includes increased system and plant reliability, reduction of plant equipment and system material condition deficiencies that could adversely impact operations, and reduction of work scope during plant refueling outages. In Korea, allowance guidelines of risk assessment is specified in the safety regulation guidelines 16.7 and 16.8 of the Korea Inst. of Nuclear Safety (KINS), which is 'General guidelines of Risk-informed application for requesting permission of changes' and 'Requesting permission of changes of Risk-informed application for Technical Specification'. We select the emergency diesel generator (EDG) of the Ulchin unit 3 and 4 for risk assessment analysis by applying configuration changes. The EDG which has plant safety level IE belongs to on-site standby power (A, B train EDG) in electric distribution system. The EDG is important component because it should maintain standby status during plant is operating, therefore we select the EDG for target component of risk assessment analysis. The risk assessment is limited to CDF. The risk assessment is performed by using AIMS-PSA Release2. We evaluate CDF by applying the configuration changes with some assumptions. Evaluation of the full power operation and Low power/Shut down operation was performed. This study has been performed for introducing a methodology and performing risk assessment. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Ares Project Technology Assessment: Approach and Tools

Technology assessments provide a status of the development maturity of specific technologies. Along with benefit analysis, the risks the project assumes can be quantified. Normally due to budget constraints, the competing technologies are prioritized and decisions are made which ones to fund. A detailed technology development plan is produced for the selected technologies to provide a roadmap to reach the desired maturity by the project s critical design review. Technology assessments can be conducted for both technology only tasks or for product development programs. This paper is primarily biased toward the product development programs. The paper discusses the Ares Project s approach to technology assessment. System benefit analysis, risk assessment, technology prioritization, and technology readiness assessment are addressed. A description of the technology readiness level tool being used is provided.

Hueter, Uwe↗

Risk Assessment/Management Tool

RAMTool performs the following: • A tool to perform facility and programmatic risk assessments, produce risk registers, develop risk management plans (RMPs), link risks to improvement/risk-reduction projects, and actively manage risks • Ability to conduct risk assessments. Ease of determination of probability and consequence based on industry standard risk matrices. Complies with site risk management performance document. Provides multiple outputs/report for required risk forms. Conduct quick risk data analysis. • Performs/calculates a facility risk factor (RF) and a programmatic RF. Supports project and initiative prioritization and funding in order to make solid decisions on risk reduction. Assigns responsibility and accountability at a risk owner (RO) level. Monitors and tracks progress toward completing mitigation strategies. Ability to import massive amounts of data at the push of a button. Integrates development of a Risk Management Plan (RMP) Built for ease-of-use – design, built, and used by technical/management personnel. Can be customized (functions and/or reports) for further analysis

Carlos Castillo, Jerel Nelson↗

An Integrated Risk Assessment Process of Safety-Related Digital I&C Systems in Nuclear Power Plants

Upgrading the existing analog instrumentation and control (I&C) systems to state-of-the-art digital I&C (DI&C) systems will greatly benefit existing light water reactors. However, the issue of software common cause failure (CCF) remains an obstacle in terms of qualification for digital technologies. Existing analyses of CCFs in I&C systems mainly focus on hardware failures. With the application and upgrading of new DI&C systems, design flaws could cause software CCFs to become a potential threat to plant safety, considering that most redundancy designs use similar digital platforms or software in their operating and application systems. With complex multilayer redundancy designs to meet the single failure criterion, these I&C safety systems are of particular concern in U.S. Nuclear Regulatory Commission licensing procedures. In Fiscal Year 2019, the Risk-Informed Systems Analysis (RISA) Pathway of the U.S. Department of Energy’s Light Water Reactor Sustainability Program initiated a project to develop a risk assessment strategy for delivering a strong technical basis to support effective, licensable, and secure DI&C technologies for digital upgrades and designs. An integrated risk assessment for the DI&C process was proposed for this strategy to identify potential key digital-induced failures, implement reliability analyses of related digital safety I&C systems, and evaluate the unanalyzed sequences introduced by these failures (particularly software CCFs) at the plant level. Here this paper summarizes these RISA efforts in the risk analysis of safety-related DI&C systems at Idaho National Laboratory.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Optimizing Treatment in Intermediate-Risk Prostate Cancer: Secondary Analysis of a Randomized Phase 3 Trial

To identify patients with intermediate-risk prostate cancer (IRPC) benefiting from de-escalation of androgen deprivation therapy (ADT) and/or dose escalated radiation therapy (DERT), we performed a secondary analysis of a phase 3 trial by measuring biochemical failure (BF), distant metastases, prostate cancer–specific mortality, overall survival (OS), and distant metastases-free survival (DMFS) rates according to prognostic intermediate risk factors (IRF).

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Assessing the Adequacy of Models for Risk-Informed Decisions (P-109)

This report includes an overview of some ways to go wrong in making decisions – Common deficiencies in reasoning and in modeling, thinking clearly about uncertainty, Case Studies: 1: NASA Challenger 2: Davis-Besse vessel-head event, Interlude: Critical Thinking 3: NASA Columbia 4: Fukushima and concluding thoughts.

99 GENERAL AND MISCELLANEOUS↗

Risk-Informed ATF and FLEX Analysis for an Enhanced Resilient BWR Under Design-Basis and Beyond-Design-Basis Accidents

This report documents the activities performed by the Idaho National Laboratory (INL) during fiscal year (FY) 2020 for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk-Informed System Analysis (RISA) Pathway, Enhanced Resilient Plant (ERP) Systems research. The purpose of the RISA Pathway research and development is to support plant owner-operator decisions with the aim to improve the economics, reliability, and maintain the high levels of safety of current nuclear power plants over periods of extended plant operations. The concept of ERP refers to the combinations of accident-tolerant fuel (ATF), optimal use of diverse and flexible coping strategy (FLEX), enhancements to plant components and systems, and the incorporation of augmented or new passive cooling systems, as well as improved fuel cycle efficiency. The objective of the ERP research effort is to use the RISA methods and toolkit in industry applications, including methods development and early demonstration of technologies, in order to enhance existing reactors’ safety features (both active and passive) and to substantially reduce operating costs through risk-informed approaches to plant design modifications to the plant and their characterization. One main focus of the FY 2020 efforts documented in this report was to extend the analyses conducted in FYs 2018 and 2019 for a pressurized water reactor (PWR) to a boiling water reactor (BWR). The same analysis process, risk analysis approaches, and analysis tools as in the previous work for PWR were used for a generic BWR with near-term ATF cladding (i.e., Iron-Chromium-Aluminum [FeCrAl] cladding and Chromium [Cr]-coated cladding) designs under the postulated station blackout (SBO) and medium loss-of-coolant (MLOCA) accident scenarios. In addition, a FLEX model was developed and incorporated into a generic BWR probabilistic risk assessment (PRA) model using the INL-developed software tool, Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE), to assess the risk impact from FLEX. The other main focus of the FY 2020 efforts was to advance analysis methods, including developing dynamic approach for FLEX human reliability analysis (HRA) using the INL-developed software tool, Event Modeling Risk Assessment using Linked Diagrams (EMRALD), as well as developing a multicriterion benefit evaluation (MCBE) method for evaluating costs and benefits of safety enhancements in nuclear power plants (NPPs). As a case study, the MCBE method was applied to evaluate the costs and benefits brought by FLEX implementation.

99 GENERAL AND MISCELLANEOUS↗

Risk-Informed External Hazards Analysis for Seismic and Flooding Phenomena for a Generic PWR

This report describes the activities performed during the FY2017 for the US-DOE Light Water Reactor Sustainability Risk-Informed Safety Margin Characterization (LWRS-RISMC), Industry Application #2. The scope of Industry Application #2 is to deliver a risk-informed external hazards safety analysis for a representative nuclear power plant. Following the advancements occurred during the previous FYs (toolkits identification, models development), FY2017 focused on: increasing the level of realism of the analysis; improving the tools and the coupling methodologies. In particular the following objectives were achieved: calculation of buildings pounding and their effects on components seismic fragility; development of a SAPHIRE code PRA models for 3-loops Westinghouse PWR; set-up of a methodology for performing static-dynamic PRA coupling between SAPHIRE and EMRALD codes; coupling RELAP5-3D/RAVEN for performing Best-Estimate Plus Uncertainty analysis and automatic limit surface search; and execute sample calculations for demonstrating the capabilities of the toolkit in performing a risk-informed external hazards safety analyses.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Risk Trade-Space Analysis for Safe Human Expeditions to Mars

We assessed the integrated safety, health, and performance risk to crews on long-duration missions, specifically to Mars. Using a systems approach rather than one focused on individual countermeasures, we examined the trade space around several such risks to identify high-potential risk mitigation strategies and characterize aspects of Mars mission architectures that could lower aggregated risk. Current Mars Design Reference missions would require durations well over two years and would increase crew exposure to radiation and microgravity well beyond ISS levels, likely resulting in significantly reduced performance beyond our current capability to mitigate that could jeopardize mission success. A “fast Mars transit” round-trip mission concept was studied using an innovative flight dynamics approach to quantify the minimum total mission energy required for a Mars transit with total mission duration less than 400 days. This approach holds promise for sending humans to Mars and returning them safely with acceptable, potentially mitigatable, exposure to microgravity and radiation using current or near-term technologies. The fast transit concept would also result in fewer time-driven vehicle failures and enable sustainable deployment of humans and infrastructure to Mars on a regular cadence, allowing steady exploration and colonization of Mars. Finally, we conclude that reliance on the Low Earth Orbit (LEO) mission operations paradigm – i.e., one of near-complete real-time dependence on experts at Mission Control to manage the combined state of the mission, vehicle, and crew – is high risk given the communication delays and limited resupply of any Mars mission, and this risk is not eliminated by the shorter missions durations of fast transit scenarios. Based on historical trends, it is highly likely that the crew will face a high-consequence problem of uncertain origin during Mars transit when ground support will be greatly reduced. While it may be possible to reduce anomaly rates through improved reliability analysis and testing, and to reduce anomaly impacts through added robustness, such mitigations address only known failure modes and known uncertainties. Therefore, a radical shift in the Human-Systems Integration Architecture (HSIA) that defines the operational paradigm, systems design, and human-systems interactions is required to improve the risk posture to an acceptable level regardless of mission duration.

Mars↗

An Integrated Risk Assessment Process for Digital Instrumentation and Control Upgrades of Nuclear Power Plants

Most of the existing nuclear power plants (NPPs) in the world rely on traditional analog instrumentation and control (I&C) systems for monitoring, control, and protection functions. With the industrial base largely moving to digital systems, the operation and maintenance of plants involves managing issues including lack of needed analog spare parts, increasing maintenance costs, and the loss of vendor support. Compared with existing analog I&C systems, digital I&C systems have significant functional advantages, such as reliable system performance in terms of accuracy and computational capability, high data handling and storage capabilities to fully measure and display operating conditions, and improved capabilities (e.g., fault tolerance, self-testing, signal validation, process system diagnostics). Therefore, the U.S. nuclear power industry has initiated the replacement of existing, aging analog systems with digital I&C technology, and is developing new designs for advanced plants using digital systems in integrated control rooms to provide modern control and protection systems. However, the qualification of digital I&C systems remains a challenge, especially the issue of software common cause failure (CCF), which has been difficult to address. A CCF is the malfunction of two or more plant components or functions due to a single failure source. CCFs have the potential to generate unanalyzed events or sequences that may not be bounded by previous plant accident analyses, therefore, to challenge the plant safety. Existing analyses on CCF in I&C systems are mainly focusing on hardware failures. With the application and upgrades of new digital I&C systems, software CCFs due to design flaws have become a potential threat to plant safety considering most redundancy designs are using the similar digital platforms or software in the operating and application systems. With complex multi-layer redundancy designs to meet the single failure criterion, these I&C safety systems are of a particular concern in the U.S. Nuclear Regulatory Commission (NRC) licensing procedures. Therefore, there is a need to develop an integrated risk assessment strategy with digital CCF and plant transient responses considered to assure the long-term safety and reliability of vital digital systems and reduce uncertainties in costs, time, and support integration of digital systems in the plant. The overall goal of this project is to deliver a strong technical basis to support effective, licensable, and secure digital I&C technologies for the digital upgrades to existing NPPs. To deal with the expensive licensing justifications from regulatory insights, this technical basis is instructive for nuclear vendors and utilities to effectively lower the costs associated with digital compliance and speed-up industry advances by: (1) defining an integrated risk-informed analysis process for digital I&C upgrades including hazard analysis, reliability analysis, and consequence analysis; (2) applying systematic and risk-informed tools to address CCFs and quantify responding failure probabilities for digital I&C technologies; (3) evaluating the impact of digital failures at the individual level, system level, and plant level; and (4) providing insights and suggestions on designs to manage the risks, thus to support the development, licensing, and deployment of advanced digital I&C technologies on NPPs. Upgrading digital I&C (safety and non-safety related) systems in existing NPPs within a cost-effective and regulatory acceptable way offers the foremost means of performance improvements and cost-reductions for existing NPPs. One key outcome of this project is to perform plant-specific risk assessment to provide a sustainable scientific support for enabling industry to balance the digital-related risks, costs, reliability, and safety.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Development of Improved Caprock Integrity and Risk Assessment Techniques. Final report for period Oct. 1, 2012 - Sept. 30, 2014

GeoMechanics Technologies has completed a geomechanical caprock integrity analysis and risk assessment study funded through the US Department of Energy. The project included: a detailed review of historical caprock integrity problems experienced in the natural gas storage industry; a theoretical description and documentation of caprock integrity issues; advanced coupled transport flow modelling and geomechanical simulation of three large-scale potential geologic sequestration sites to estimate geomechanical effects from CO₂ injection; development of a quantitative risk and decision analysis tool to assess caprock integrity risks; and, ultimately the development of recommendations and guidelines for caprock characterization and CO₂ injection operating practices. Historical data from gas storage operations and CO₂ sequestration projects suggest that leakage and containment incident risks are on the order of 10 -1 to 10 -2 , which is higher risk than some previous studies have suggested for CO₂. Geomechanical analysis, as described herein, can be applied to quantify risks and to provide operating guidelines to reduce risks. The risk assessment tool developed for this project has been applied to five areas: The Wilmington Graben offshore Southern California, Kevin Dome in Montana, the Louden Field in Illinois, the Sleipner CO₂ sequestration operation in the North Sea, and the In Salah CO₂ sequestration operation in North Africa. Of these five, the Wilmington Graben area represents the highest relative risk while the Kevin Dome area represents the lowest relative risk.

58 GEOSCIENCES↗

Analysis of the individual risk of altitude decompression sickness under repeated exposures

In a case-control study, researchers examined the risk of decompression sickness (DCS) in individual subjects with higher number of exposures. Of the 126 subjects, 42 showed one or more episodes of DCS. Examination of the exposure-DCS relationship by odds ratio showed a linear relationship. Stratification analysis showed that sex, tissue ratio, and the presence of Doppler microbubbles were cofounders of this risk. A higher number of exposures increased the risk of DCS in this analysis.

Kumar, K. Vasantha↗

Adult weight change and premenopausal breast cancer risk: A prospective pooled analysis of data from 628,463 women

Early-adulthood body size is strongly inversely associated with risk of premenopausal breast cancer. It is unclear whether subsequent changes in weight affect risk. We pooled individual-level data from 17 prospective studies to investigate the association of weight change with premenopausal breast cancer risk, considering strata of initial weight, timing of weight change, other breast cancer risk factors and breast cancer subtype. Hazard ratios (HR) and 95% confidence intervals (CI) were obtained using Cox regression. Among 628,463 women, 10,886 were diagnosed with breast cancer before menopause. Models adjusted for initial weight at ages 18–24 years and other breast cancer risk factors showed that weight gain from ages 18–24 to 35–44 or to 45–54 years was inversely associated with breast cancer overall (e.g., HR per 5 kg to ages 45–54: 0.96, 95% CI: 0.95–0.98) and with oestrogen-receptor(ER)-positive breast cancer (HR per 5 kg to ages 45–54: 0.96, 95% CI: 0.94–0.98). Weight gain from ages 25–34 was inversely associated with ER-positive breast cancer only and weight gain from ages 35–44 was not associated with risk. None of these weight gains were associated with ER-negative breast cancer. Weight loss was not consistently associated with overall or ER-specific risk after adjusting for initial weight. Weight increase from early-adulthood to ages 45–54 years is associated with a reduced premenopausal breast cancer risk independently of early-adulthood weight. Biological explanations are needed to account for these two separate factors.

60 APPLIED LIFE SCIENCES↗

Demonstration of Coupled Multievent Scenario at a Subject Nuclear Power Plant

This report discusses how to perform a coupled, seismic and flooding, multievent risk-informed analysis. Presented in the following sections are the need for multievent risk-informed analysis, the tools needed to perform the analysis, and an example of solving a demonstration problem.

54 ENVIRONMENTAL SCIENCES↗

Mars Exploration Rover Heat Shield Recontact Analysis

The twin Mars Exploration Rover missions landed successfully on Mars surface in January of 2004. Both missions used a parachute system to slow the rover s descent rate from supersonic to subsonic speeds. Shortly after parachute deployment, the heat shield, which protected the rover during the hypersonic entry phase of the mission, was jettisoned using push-off springs. Mission designers were concerned about the heat shield recontacting the lander after separation, so a separation analysis was conducted to quantify risks. This analysis was used to choose a proper heat shield ballast mass to ensure successful separation with low probability of recontact. This paper presents the details of such an analysis, its assumptions, and the results. During both landings, the radar was able to lock on to the heat shield, measuring its distance, as it descended away from the lander. This data is presented and is used to validate the heat shield separation/recontact analysis.

Raiszadeh, Behzad↗