Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “RISK ASSESSMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 973 records · Page 54

Tin Whisker Risk Assessment of TDRSS IV Transponder Units 101 and 102

This report documents the plating requirements for the electrical and mechanical parts used in the TDRSS IV transponder manufactured by MOTOROLA, INC., SSG, SSSD. The intent of this report is to identify any electrical, electromechanical or mechanical part that does not have adequate requirements to prevent the use of a pure tin finish.

Zellitti, Ron↗

CFD Applications in Support of the Space Shuttle Risk Assessment

The paper describes a numerical study of a potential accident scenario of the space shuttle, operating at the same flight conditions as flight 51L, the Challenger accident. The interest in performing this simulation is derived by evidence that indicates that the event itself did not exert large enough blast loading on the shuttle to break it apart. Rather, the quasi-steady aerodynamic loading on the damaged, unbalance vehicle caused the break-up. Despite the enormous explosive potential of the shuttle total fuel load (both liquid and solid), the post accident explosives working group estimated the maximum energy involvement to be equivalent to about five hundreds of pounds of TNT. This understanding motivated the simulation described here. To err on the conservative side, we modeled the event as an explosion, and used the maximum energy estimate. We modeled the transient detonation of a 500 lbs spherical charge of TNT, placed at the main engine, and the resulting blast wave propagation about the complete stack. Tracking of peak pressures and impulses at hundreds of locations on the vehicle surface indicate that the blast load was insufficient to break the vehicle, hence demonstrating likely crew survivability through such an event.

Baum, Joseph D.↗

Cancer Risk Assessment for Space Radiation

Predicting the occurrence of human cancer following exposure to any agent causing genetic damage is a difficult task. This is because the uncertainty of uniform exposure to the damaging agent, and the uncertainty of uniform processing of that damage within a complex set of biological variables, degrade the confidence of predicting the delayed expression of cancer as a relatively rare event within any given clinically normal individual. The radiation health research priorities for enabling long-duration human exploration of space were established in the 1996 NRC Report entitled 'Radiation Hazards to Crews of Interplanetary Missions: Biological Issues and Research Strategies'. This report emphasized that a 15-fold uncertainty in predicting radiation-induced cancer incidence must be reduced before NASA can commit humans to extended interplanetary missions. That report concluded that the great majority of this uncertainty is biologically based, while a minority is physically based due to uncertainties in radiation dosimetry and radiation transport codes. Since that report, the biologically based uncertainty has remained large, and the relatively small uncertainty associated with radiation dosimetry has increased due to the considerations raised by concepts of microdosimetry. In a practical sense, however, the additional uncertainties introduced by microdosimetry are encouraging since they are in a direction of lowered effective dose absorbed through infrequent interactions of any given cell with the high energy particle component of space radiation. Additional information is contained in the original extended abstract.

Richmond, Robert C.↗

Cancer Risk-Assessment of Radiation Damage in Ataxia Telangiectasia Heterozygous Human Breast Epithelial Cell Cultures

This paper describes the study of the markers of cellular changes that are found during the onset of carcinogenesis. Several of the biological factors are markers of stress response, oncoprotein expression, and differentiation factors. Oxidative stress response agents such as heat shock proteins (HSPs) protect cells from oxidative stresses such as ionizing radiation. The onocoprotein HER-2/neu, a specific breast cancer marker, indicates early onset of cancer. Additional structural and morphogenetic markers of differentiation were considered in order to determine initial cellular changes at the initial onset of cancer. As an additional consideration, all-trans retinoic acid (RA), a differentiation agent, was considered because of its known role in regulating normal differentiation and inhibiting tumor proliferation via specific nuclear receptors. This paper discusses study and results of the preliminary analyses of gamma irradiation of AT heterozygous human breast epithelial cells (WH). Comparisons are also made of the effects various RA concentrations post-irradiation.

Lisa C. Applewhite↗

System Risk Assessment and Allocation in Conceptual Design

As aerospace systems continue to evolve in addressing newer challenges in air and space transportation, there exists a heightened priority for significant improvement in system performance, cost effectiveness, reliability, and safety. Tools, which synthesize multidisciplinary integration, probabilistic analysis, and optimization, are needed to facilitate design decisions allowing trade-offs between cost and reliability. This study investigates tools for probabilistic analysis and probabilistic optimization in the multidisciplinary design of aerospace systems. A probabilistic optimization methodology is demonstrated for the low-fidelity design of a reusable launch vehicle at two levels, a global geometry design and a local tank design. Probabilistic analysis is performed on a high fidelity analysis of a Navy missile system. Furthermore, decoupling strategies are introduced to reduce the computational effort required for multidisciplinary systems with feedback coupling.

Mahadevan, Sankaran↗

Extraction of Airport Features from High Resolution Satellite Imagery for Design and Risk Assessment

The LPA Group, consisting of 17 offices located throughout the eastern and central United States is an architectural, engineering and planning firm specializing in the development of Airports, Roads and Bridges. The primary focus of this ARC project is concerned with assisting their aviation specialists who work in the areas of Airport Planning, Airfield Design, Landside Design, Terminal Building Planning and design, and various other construction services. The LPA Group wanted to test the utility of high-resolution commercial satellite imagery for the purpose of extracting airport elevation features in the glide path areas surrounding the Columbia Metropolitan Airport. By incorporating remote sensing techniques into their airport planning process, LPA wanted to investigate whether or not it is possible to save time and money while achieving the equivalent accuracy as traditional planning methods. The Affiliate Research Center (ARC) at the University of South Carolina investigated the use of remotely sensed imagery for the extraction of feature elevations in the glide path zone. A stereo pair of IKONOS panchromatic satellite images, which has a spatial resolution of 1 x 1 m, was used to determine elevations of aviation obstructions such as buildings, trees, towers and fence-lines. A validation dataset was provided by the LPA Group to assess the accuracy of the measurements derived from the IKONOS imagery. The initial goal of this project was to test the utility of IKONOS imagery in feature extraction using ERDAS Stereo Analyst. This goal was never achieved due to problems with ERDAS software support of the IKONOS sensor model and the unavailability of imperative sensor model information from Space Imaging. The obstacles encountered in this project pertaining to ERDAS Stereo Analyst and IKONOS imagery will be reviewed in more detail later in this report. As a result of the technical difficulties with Stereo Analyst, ERDAS OrthoBASE was used to derive aviation obstruction measurements for this project. After collecting ancillary data such as GPS locations, South Carolina Geodetic Survey and Aero Dynamics ground survey points to set up the OrthoBASE Block File, measurements were taken of the various glide path obstructions and compared to the validation dataset. This process yielded the following conclusions: The IKONOS stereo model in conjunction with Imagine OrthoBASE can provide The LPA Group with a fast and cost efficient method for assessing aviation obstructions. Also, by creating our own stereo model we achieved any accuracy better currently available commercial products.

Robinson, Chris↗

Application of Probabilistic Risk Assessment (PRA) During Conceptual Design for the NASA Orbital Space Plane (OSP)

In order to meet the space transportation needs for a new century, America's National Aeronautics and Space Administration (NASA) has implemented an Integrated Space Transportation Plan to produce safe, economical, and reliable access to space. One near term objective of this initiative is the design and development of a next-generation vehicle and launch system that will transport crew and cargo to and from the International Space Station (ISS), the Orbital Space Plane (OSP). The OSP system is composed of a manned launch vehicle by an existing Evolved Expendable Launch Vehicle (EELV). The OSP will provide emergency crew rescue from the ISS by 2008, and provide crew and limited cargo transfer to and from the ISS by 2012. A key requirement is for the OSP to be safer and more reliable than the Soyuz and Space Shuttle, which currently provide these capabilities.

Rogers, James H.↗

Model for Solar Proton Risk Assessment

A statistical model for cumulative solar proton event fluences and for worst-case flux during space missions is presented. New features include the solar minimum time period and proton energy spectra that extend to higher energies.

Xapsos, M. A.↗

Model for Solar Proton Risk Assessment

A statistical model for cumulative solar proton event fluences during space missions is presented that covers both the solar minimum and solar maximum phases of the solar cycle. It is based on data from the IMP and GOES series of satellites that is integrated together to allow the best features of each data set to be taken advantage of. This allows fluence-energy spectra to be extended out to energies of 327 MeV.

Xapos, M. A.↗

Assessing risk from a stakeholder perspective

Planetary exploration missions are subject to a vast array of interpretations of 'success' based on the concerns of multiple stakeholder groups. While project risk management generally focuses on issues of cost/schedule constraints or reliability issues, a broader interpretation of 'risk' as it applies to stakeholders such as sponsors (e.g., NASA), the public at large, the scientific community, the home organization, and the project team itself can provide important insights into the full spectrum of risk that needs to be managed. This paper presents a stakeholder view of risk which is divided into failure, not-a-failure, success, and stunning-success zones. Using the Mars Pathfinder mission as an example, an alternative interpretation of the risks to that mission is presented from the view of key stakeholders. The implications of the stakeholder perspective to project risk management are addressed.

risk management success/failure graph↗

Pulmonary Toxicity of Carbon Nanotubes: Ethical Implications and Human Risk Assessment

Presentation viewgraphs review the health considerations of working with and manufacturing Carbon Nanotubes. The inherent toxicity of Single Walled Carbon Nanotubes (SWNT) are reviewed, and how the preparation of the SWNTs are reviewed. The experimental protocol that was used is reviewed, and the results in lungs of rodents are shown. The presentation ends with posing the ethical questions in reference to the manufacture and use of carbon nanotubes.

James, John T.↗