Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Projects”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 973 records · Page 54

The Verification and Validation Strategy Within the Second Wind Forecast Improvement Project (WFIP 2)

The Wind Forecast Improvement Project 2 (WFIP2), in the complex terrain of the Columbia Gorge, focuses on a set of weather phenomena that poses particular challenges for wind and wind power forecasting. It further aims to understand and improve the skill of weather forecast models, particularly the National Oceanic and Atmospheric Administration's (NOAA's) High Resolution Rapid Refresh (HRRR), in complex terrain. The project also includes an extensive field campaign in the Columbia River Gorge, during which data from many different instruments were collected. WFIP2 is funded by the U.S. Department of Energy (DOE). Scientists from four U.S. national laboratories, NOAA, Vaisala, and universities contribute to the project with wide and varied interests and skill sets. Therefore, coordinated verification & validation (V&V) efforts across these members allows for the development of a clear picture of model improvements and scientific findings within WFIP2. The WFIP2 V&V team is tasked with providing tools, methods, and guidance to enable repeatable, metrics-based assessment of the Weather Research and Forecasting (WRF) model and associated modeling suites for analysis and forecasting of mesoscale weather phenomena that are important for wind energy in the Columbia River Gorge and other parts of the continental United States. This report summarizes what has been worked on and accomplished within the duration of the WFIP2 project, 4 years, by the V&V team.

17 WIND ENERGY↗

Cost Projections for Utility-Scale Battery Storage (2020 Update)

In this work we describe the development of cost and performance projections for utility-scale lithium-ion battery systems, with a focus on 4-hour duration systems. The projections are developed from an analysis of 19 publications that consider utility-scale storage costs. The suite of publications demonstrates varied cost reductions for battery storage over time. Figure ES-1 shows the low, mid, and high cost projections developed in this work (on a normalized basis) relative to the published values. Figure ES-2 shows the overall capital cost for a 4-hour battery system based on those projections, with storage costs of $\$$144/kWh, $\$$208/kWh, and $\$$293/kWh in 2030 and $\$$88/kWh, $\$$156/kWh, and $\$$219/kWh in 2050. Battery variable operations and maintenance costs, lifetimes, and efficiencies are also discussed, with recommended values selected based on the publications surveyed.

14 SOLAR ENERGY↗

Cost Projections for Utility-Scale Battery Storage: 2021 Update

In this work we describe the development of cost and performance projections for utility-scale lithium-ion battery systems, with a focus on 4-hour duration systems. The projections are developed from an analysis of recent publications that consider utility-scale storage costs. The suite of publications demonstrates varied cost reductions for battery storage over time. Figure ES-1 shows the low, mid, and high cost projections developed in this work (on a normalized basis) relative to the published values. Figure ES-2 shows the overall capital cost for a 4-hour battery system based on those projections, with storage costs of $\$$143/kWh, $\$$198/kWh, and $\$$248/kWh in 2030 and $\$$87/kWh, $\$$149/kWh, and $\$$248/kWh in 2050. Battery variable operations and maintenance costs, lifetimes, and efficiencies are also discussed, with recommended values selected based on the publications surveyed.

25 ENERGY STORAGE↗

The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan

Pacific Northwest National Laboratory researchers are working on the Columbia River Protection Supplemental Technologies Project. This project is a U. S. Department of Energy, Office of Environmental Management-funded initiative designed to develop new methods, strategies, and technologies for characterizing, modeling, remediating, and monitoring soils and groundwater contaminated with metals, radionuclides, and chlorinated organics. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Technologies Project staff.

54 ENVIRONMENTAL SCIENCES↗

The 300 Area Integrated Field Research Challenge Quality Assurance Project Plan

Pacific Northwest National Laboratory and a group of expert collaborators are using the U.S. Department of Energy Hanford Site 300 Area uranium plume within the footprint of the 300-FF-5 groundwater operable unit as a site for an Integrated Field-Scale Subsurface Research Challenge (IFRC). The IFRC is entitled Multi-Scale Mass Transfer Processes Controlling Natural Attenuation and Engineered Remediation: An IFRC Focused on the Hanford Site 300 Area Uranium Plume Project. The theme is investigation of multi-scale mass transfer processes. A series of forefront science questions on mass transfer are posed for research that relate to the effect of spatial heterogeneities; the importance of scale; coupled interactions between biogeochemical, hydrologic, and mass transfer processes; and measurements/approaches needed to characterize and model a mass transfer-dominated system. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the 300 Area IFRC Project. This plan is designed to be used exclusively by project staff.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

SAPHIRE 8 Software Project Plan

This project is being conducted at the request of the DOE and the NRC. The INL has been requested by the NRC to improve and maintain the Systems Analysis Programs for Hands-on Integrated Reliability Evaluation (SAPHIRE) tool set concurrent with the changing needs of the user community as well as staying current with new technologies. Successful completion will be upon NRC approved release of all software and accompanying documentation in a timely fashion. This project will enhance the SAPHIRE tool set for the user community (NRC, Nuclear Power Plant operations, Probabilistic Risk Analysis (PRA) model developers) by providing improved Common Cause Failure (CCF), External Events, Level 2, and Significance Determination Process (SDP) analysis capabilities. The SAPHIRE development team at the Idaho National Laboratory is responsible for successful completion of this project. The project is under the supervision of Curtis L. Smith, PhD, Technical Lead for the SAPHIRE application. All current capabilities from SAPHIRE version 7 will be maintained in SAPHIRE 8. The following additional capabilities will be incorporated: • Incorporation of SPAR models for the SDP interface. • Improved quality assurance activities for PRA calculations of SAPHIRE Version 8. • Continue the current activities for code maintenance, documentation, and user support for the code.

99 GENERAL AND MISCELLANEOUS↗

Decline in Seasonal Snow during a Projected 20-Year Dry Spell

Snowpack loss in midlatitude mountains is ubiquitously projected by Earth system models, though the magnitudes, persistence, and time horizons of decline vary. Using daily downscaled hydroclimate and snow projections, we examine changes in snow seasonality across the U.S. Pacific Southwest region during a simulated severe 20-year dry spell in the 21st century (2051–2070) developed as part of the 4th California Climate Change Assessment to provide a “stress test” for water resources. Across California’s mountains, substantial declines (30–100% loss) in median peak annual snow water equivalent accompany changes in snow seasonality throughout the region compared to the historic period. We find that 80% of historic seasonal snowpacks transition to ephemeral conditions. Subsetting empirical-statistical wildfire projections for California by snow seasonality transition regions indicates a two-to-four-fold increase in the area burned, consistent with recent observations of high elevation wildfires following extended drought conditions. By analyzing six of the major California snow-fed river systems, we demonstrate snowpack reductions and seasonality transitions result in concomitant declines in annual runoff (47–58% of historical values). The negative impacts to statewide water supply reliability by the projected dry spell will likely be magnified by changes in snowpack seasonality and increased wildfire activity.

54 ENVIRONMENTAL SCIENCES↗

Could what that ESCO sales rep said really be true? Savings realization rates in ESPC versus bid-to-spec projects

Claims that savings realization is greater in energy savings performance contracts (ESPCs) are rampant at least among energy service company representatives and other ESPC cheerleaders. But hard supporting evidence for these claims has been virtually non-existent. The Department of Energy's Federal Energy Management Program uses its Compliance Tracking System (CTS) database to document the performance of federal buildings and projects towards meeting various federal energy-saving goals. This paper focuses on preliminary analysis from CTS to understand and compare the performance of federal ESPCs with projects that have been implemented with more conventional government appropriations funding. The authors have found preliminary evidence using CTS that shows markedly higher savings realization rates among ESPC projects than appropriations-funded ones. There are numerous caveats to the data comparison that clamor for further study, but the difference is still intriguing. If borne out, this finding will provide concrete support to the idea that ESPCs guarantees and measurement and verification, long touted by energy service companies (ESCOs) as offering savings assurance, may truly yield substantial benefits. If ESPCs actually do perform better (i.e., have higher realization rates and savings persistence) than conventional bid-to-spec projects, the perceived premium for conducting them may look like a very good deal after all.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

NREL Tools Help Identify and Evaluate Renewable Energy Projects

NREL offers no-cost, publicly available web tools that can be used throughout the development of behind-the-meter renewable energy projects. These tools help gauge initial project potential, optimize system sizing, and refine project economics. This flyer compares four tools that can be used at various stages of project development: Economic Site Analysis (ESA) Tool, PVWatts Calculator, REopt (TM) Lite, and System Advisor Model (SAM).

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Walls Come Tumbling Down: Decontamination and Demolition of 29 Manhattan Project and Cold War-Era Buildings and Structures at Los Alamos National Laboratory-12301

When the nation's top scientists and military leaders converged on Los Alamos, New Mexico in the 1943, to work on the Manhattan Project, the facilities they used to conduct their top-secret work were quickly constructed and located in the middle of what eventually became the Los Alamos town site. After one of these early facilities caught on fire, it seemed wise to build labs and production facilities farther away from the homes of the town's residents. They chose to build facilities on what was then known as Delta Prime (DP) Mesa and called it Technical Area 21, or TA-21. With wartime urgency, a number of buildings were built at TA-21, some in as little as a few months. Before long, DP Mesa was populated with several nondescript metal and cinder-block buildings, including what became, immediately following the war, the world's first plutonium production facility. TA-21 also housed labs that used hazardous chemicals and analyzed americium, tritium and plutonium. TA-21 was a bustling center of research and production for the next several decades. Additional buildings were built there in the 1960's, but by the 1990's many of them had reached the end of their service lives. Labs and offices were moved to newer, more modern buildings. When Los Alamos National Laboratory received $212 million in funding from the American Recovery and Reinvestment Act in July 2009 for environmental cleanup projects, about $73 million of the funds were earmarked to decontaminate and demolish 21 of the old buildings at TA-21. Although some D and D of TA-21 buildings was performed in the 1990's, many of the facilities at DP Site remained relatively untouched for nearly three decades following their final operational use. In 2006, there were over three dozen buildings or structures on the mesa to be removed so that soil cleanup could be completed (and the land made available for transfer and reuse). The total footprint of buildings across the mesa was approximately 18,580 m{sup 2} (200,000 ft{sup 2}). The initially approved baseline for the ARRA D and D Project was to remove 22 buildings and structures that included approximately 14,680 m{sup 2} (158,000 ft{sup 2}) of footprint. By employing efficiencies during subcontracting, demolition, and waste segregation, the savings allowed an additional 1,580 m{sup 2} (17,000 ft{sup 2}) of footprint to be removed using ARRA funds. Additionally, the lessons learned from this experience were used to apply NNSA funding to the removal of six additional non-contaminated buildings and structures. In the end, 29 buildings and structures, including stacks, cooling towers and tanks, were removed from the mesa. The entire DP East area was cleared of buildings and sub-grade structures and the soils cleaned to residential standards. The total footprint reduction at TA-21 as a result of this effort was in excess of 17,650 m{sup 2} (190,000 ft{sup 2}). The use of a Laboratory self-performance team to start demolition of non-contaminated structures resulted in steady work performance early in the project while subcontracts were being put in place to perform more complicated abatement and contaminated demolition activities. Most importantly, there were no serious worker injuries and the minor injuries recorded were those common to construction type activities. Extensive monitoring along the site boundary demonstrated that no hazardous chemicals or radioactive contamination were released and radiological dose to the public was negligible. The ARRA demolition activities were completed six months in advance of the deadline for employing ARRA funds. Additionally, over 17,585 m{sup 3} (23,000 yds{sup 3}) of building demolition debris was safely removed from DP Mesa. All of the major buildings have been removed, unencumbered access to the SWMUs that are required to be cleaned up by the Consent Order with the state of New Mexico, has been achieved, and a significant portion of the mesa has been prepared to support a process that will eventually transfer this land from federal government control for further use. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The PHASE Project: New Research and Tools to Inform Pollinator Habitat on Utility-Scale Solar

The solar industry is responding to demand for building a clean energy future. At the same time, pollinator declines and habitat losses are resulting in listing consideration for once-common species like monarch butterflies, plus petitions to list bees and other species. How can projects responsibly co-locate pollinator plantings at solar facilities? What ecological and performance benefits can be realized from pollinator plantings? How do developers and owners weigh the costs and challenges of maintaining pollinator plantings and determine the effects it has on power generation, community acceptance, and operations? The Pollinator Habitat Aligned with Solar Energy (PHASE) project is a four-year research project that aims to answer these questions and better support the solar industry in successfully implementing pollinator plantings. This project is funded by the U.S. Department of Energy's Solar Energy Technologies Office. In collaboration with an advisory group composed of industry and technical professionals, the PHASE team developed methodologies to evaluate the impacts of plantings on both biodiversity and the facility operations, including the diversity of plant and insect communities, pollinator services being provided by the site, and the effects of pollinator vegetation on panel temperature and efficiency. The PHASE team also used data to develop tools designed to better support solar industry decision-making on pollinator vegetation including a Pollinator Planting Implementation Manual, a Cost Comparison Tool, a Seed Selection Tool, and Habitat Assessment Module Guidance. Final versions of the four tools will be released this year.

agrivoltaic↗

Leveraging Artificial Intelligence in Federal Projects

Artificial intelligence (AI) has the potential to transform grid operations. As energy demand rises, weather patterns shift, and foreign threats to critical infrastructure grow, it is essential to harness advanced technology to modernize the grid and increase overall resiliency. This paper examines the integration of AI in federally funded grid infrastructure projects. By analyzing project data, it evaluates the penetration and use cases of AI technologies within key funding initiatives and explores opportunities and challenges associated with their deployment. This analysis categorizes AI adoption in recent federal grid investments, establishing a baseline for measuring near-term impacts and identifying promising AI applications. The research found that 16% of recent federal energy projects included AI integration, and approximately 75% of these projects used AI for more than one primary application.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Framework for Project Development in the Renewable Energy Sector

The concepts, descriptions, diagrams, and acronyms developed and described herein are meant to provide a contextual framework as well as a systematic, repeatable process to assist a potential project sponsor in understanding and navigating early-stage project development. Professional project developers will recognize these concepts and hold them as intuitive and even obvious, though the fundamentals of this specialized field are rarely written down and defined as they are here.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A projection of changes in landfalling atmospheric river frequency and extreme precipitation over western North America from the Large Ensemble CESM simulations

Simulations from the Community Earth System Model Large Ensemble project are analyzed to investigate the impact of global warming on atmospheric rivers (ARs). Here, the model has notable biases in simulating the subtropical jet position and the relationship between extreme precipitation and moisture transport. After accounting for these biases, the model projects an ensemble mean increase of 35% in the number of landfalling AR days between the last twenty years of the 20th and 21st centuries. However, the number of AR associated extreme precipitation days increases only by 28% because the moisture transport required to produce extreme precipitation also increases with warming. Internal variability introduces an uncertainty of ±8% and ±7% in the projected changes in AR days and associated extreme precipitation days. In contrast, accountings for model biases only change the projected changes by about 1%. The significantly larger mean changes compared to internal variability and to the effects of model biases highlight the robustness of AR responses to global warming.

54 ENVIRONMENTAL SCIENCES↗

Uncertainty in future projections of the North Pacific subtropical high and its implication for California winter precipitation change: FUTURE CALIFORNIA PRECIPITATION

This study examines future projections of sea level pressure change in the North Pacific and its impact on winter precipitation changes in California. The multi-model analysis, based on the Coupled Model Inter-comparison Project phase 5 (CMIP5) models under the Representative Concentration Pathway 8.5 (RCP8.5) scenario, shows a robust sea-level pressure change in the late 21st century over the western North Pacific in which both the Aleutian Low and North Pacific Subtropical High (NPSH) shift poleward in concert with a widening of the Hadley Cell. This change is partly explained by a systematic increase of static stability in the subtropics. However, over the eastern North Pacific, the projected NPSH changes exhibit a substantial inter-model spread, resulting in uncertain projections of precipitation changes in California. This inter-model spread in the eastern North Pacific is associated with a Pacific Decadal Oscillation-like surface temperature change in the western North Pacific and the resulting meridional temperature gradient change. This study points to a major source of uncertainty for the response of winter precipitation to global warming over the West Coast of North America: atmosphere-ocean coupling in the North Pacific.

Environmental Molecular Sciences Laboratory↗

Fate of the Atlantic Meridional Overturning Circulation: Strong decline under continued warming and Greenland melting

The most recent Intergovernmental Panel on Climate Change assessment report concludes thatthe Atlantic Meridional Overturning Circulation (AMOC) could weaken substantially but is very unlikely tocollapse in the 21st century. However, the assessment largely neglected Greenland Ice Sheet (GrIS)mass loss, lacked a comprehensive uncertainty analysis, and was limited to the 21st century. Here in acommunity effort, improved estimates of GrIS mass loss are included in multicentennial projections usingeight state-of-the-science climate models, and an AMOC emulator is used to provide a probabilisticuncertainty assessment. We find that GrIS melting affects AMOC projections, even though it is of secondaryimportance. By years 2090–2100, the AMOC weakens by 18% [3%, 34%; 90% probability] in an intermediategreenhouse-gas mitigation scenario and by 37% [15%, 65%] under continued high emissions. Afterward, itstabilizes in the former but continues to decline in the latter to 74% [+4%, 100%] by 2290–2300, with a 44%likelihood of an AMOC collapse. This result suggests that an AMOC collapse can be avoided by CO2mitigation.

54 ENVIRONMENTAL SCIENCES↗

High-resolution ensemble projections of near-term regional climate over the continental United States

We present high-resolution near-term ensemble projections of hydro-climatic changes over the contiguous U.S. using a regional climate model (RegCM4) that dynamically downscales 11 Global Climate Models from the 5th phase of Coupled Model Inter-comparison Project at 18km horizontal grid spacing. All model integrations span 41 years in the historical period (1965 – 2005) and 41 years in the near-term future period (2010 – 2050) under Representative Concentration Pathway 8.5 and cover a domain that includes the contiguous U.S. and parts of Canada and Mexico. Should emissions continue to rise, surface temperatures in every region within the U.S. will reach a new climate norm well before mid 21st century regardless of the magnitudes of regional warming. Significant warming will likely intensify the regional hydrological cycle through the acceleration of the historical trends in cold, warm and wet extremes. The future temperature response will be partly regulated by changes in snow hydrology over the regions that historically receive a major portion of cold season precipitation in the form of snow. Our results indicate the existence of the Clausius-Clapeyron scaling at regional scales where per degree centigrade rise in surface temperature will lead to a 7.4% increase in precipitation from extremes. More importantly, both winter (snow) and summer (liquid) extremes are projected to increase across the U.S. These changes in precipitation characteristics will be driven by a shift towards shorter and wetter seasons. Altogether, projected changes in the regional hydro-climate can have substantial impacts on the natural and human systems across the U.S.

54 ENVIRONMENTAL SCIENCES↗

Risk-based area of review estimation in overpressured reservoirs to support injection well storage facility permit requirements for CO 2 storage projects

This paper by the Energy & Environmental Research Center presents a workflow and modeling approach for delineating a risk-based area of review (AOR) to support a U.S. Environmental Protection Agency (EPA) Class VI permit for a carbon dioxide (CO 2 ) storage project. The approach combines semianalytical solutions for estimating formation fluid leakage through a hypothetical leaky wellbore with the results of numerical reservoir simulations to define the AOR. The modeling utilizes 1) semianalytical solutions from the peer-reviewed literature for formation fluid leakage through abandoned wellbores by Raven (1990) and Avci (1994), 2) a FORTRAN model compiled and described in Cihan et al. (2011, 2012) called ASLMA (Analytical Solution for Leakage in Multilayered Aquifers), and 3) a computational framework for estimating a risk-based AOR first proposed by Oldenburg et al. (2014, 2016). Therefore, the approach builds upon well-established research and underlying hydrogeological principles that have been upheld for nearly three decades. Moreover, the ASLMA model has been broadly applied to an array of storage projects. The work presented herein extends these earlier works using a custom wrapper written in the software environment, R (R Core Team, 2020), which was developed to perform multiple runs of the ASLMA model using given ranges for one or more input parameters. In addition, the current work simulates the pressure buildup within the storage reservoir in response to CO 2 injection using a compositional simulator to better accommodate the temporospatial evolution of pressure buildup within the storage reservoir that is more accurately modeled using a heterogeneous geologic model and a compositional simulator that accounts for the multiphase interactions. The workflow is demonstrated using a case study for a 180,000-metric-ton-per-year storage project located in the PCOR (Plains CO 2 Reduction) Partnership region. For the storage project evaluated here, under the scenario where the leaky wellbore is open to a saline aquifer (thief zone) between the overlying seal (cap rock) and the underground sources of drinking water (USDW), the risk-based AOR essentially collapses to the areal extent of the CO 2 plume in the storage reservoir because the pressure buildup in the storage reservoir beyond the CO 2 plume is insufficient to drive formation fluids up a hypothetical leaky wellbore into the USDW. However, even under the conservative assumption that the leaky wellbore is not open to a thief zone, beyond the areal extent of the CO 2 plume, the incremental leakage is less than 400 m 3 over 20 years, which represents ~0.0001% or less of the total volume of water contained within the USDW rock volume. As discussed in the text, the threshold criterion for defining the risk-based AOR is site-specific and should be informed by the results of the sensitivity analysis and available site characterization data. The approach outlined in this paper is designed to be protective of USDWs and, therefore, comply with the Safe Drinking Water Act requirements and provisions for the U.S. EPA Class VI Underground Injection Control (UIC) Program (Class VI Rule) and North Dakota Administrative Code Chapter 43-05-01.

54 ENVIRONMENTAL SCIENCES↗