Decommissioning Cost Estimating Factors And Earned Value Integration

The Rocky Flats 771 Project progressed from the planning stage of decommissioning a plutonium facility, through the strip-out of highly-contaminated equipment, removal of utilities and structural decontamination, and building demolition. Actual cost data was collected from the strip-out activities and compared to original estimates, allowing the development of cost by equipment groupings and types and over time. Separate data was developed from the project control earned value reporting and compared with the equipment data. The paper discusses the analysis to develop the detailed factors for the different equipment types, and the items that need to be considered during characterization of a similar facility when preparing an estimate. The factors are presented based on direct labor requirements by equipment type. The paper also includes actual support costs, and examples of fixed or one-time start-up costs. The integration of the estimate and the earned value system used for the 771 Project is also discussed. The paper covers the development of the earned value system as well as its application to a facility to be decommissioned and an existing work breakdown structure. Lessons learned are provided, including integration with scheduling and craft supervision, measurement approaches, and verification of scope completion. In summary: The work of decommissioning the Rocky Flats 771 Project process equipment was completed in 2003. Early in the planning process, we had difficulty in identifying credible data and implementing processes for estimating and controlling this work. As the project progressed, we were able to collect actual data on the costs of removing plutonium contaminated equipment from various areas over the life of this work and associate those costs with individual pieces of equipment. We also were able to develop and test out a system for measuring the earned value of a decommissioning project based on an evolving estimate. These were elements that would have been useful to us in our early planning process, and we would expect that they would find application elsewhere as the DOE weapons complex and some commercial nuclear facilities move towards closure. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Recommended Practices for Managing Induced Seismicity Risk Associated with Geologic Carbon Storage

The geologic storage of carbon dioxide (CO 2 ) is one method to help reduce or eliminate atmospheric CO 2 emissions. The sequestered CO 2 is originally captured from the atmosphere or from a stationary industrial source and subsequently injected into a deep subsurface porous rock formation. To facilitate the successful deployment of field scale carbon storage projects, the U.S. Department of Energy (DOE) is developing tools and protocols for defensible, science-based frameworks to quantify and mitigate risks associated with the long-term storage of CO 2 . This protocol specifically addresses the risk of induced seismicity due to injection in a geologic carbon storage (GCS) site. This integrated and risk-based protocol is a product of the U.S. DOE Fossil Energy’s National Risk Assessment Partnership (NRAP), a multi-year collaborative research effort of Los Alamos National Laboratory (LANL), Lawrence Berkeley National Laboratory (LBNL), Lawrence Livermore National Laboratory (LLNL), National Energy Technology Laboratory (NETL), and Pacific Northwest National Laboratory (PNNL). These recommended practices describe a set of 7 steps to evaluate, manage, communicate, and mitigate the risk of induced seismicity at GCS sites. The base methodology of the recommended practices follows a framework similar to the Protocol for Addressing Induced Seismicity Associated with Enhanced Geothermal Systems (Majer et al., 2012), developed for the Geothermal Technology Office of the U.S. DOE. These recommended practices present a framework to systematically assess the induced seismicity risk and quantify the associated uncertainties. These recommendations are based on current research and are sufficiently general to allow for modification and application to a variety of different types of sites. The substance of the recommended practices contained herein includes both technical and non-technical issues, and covers all operational stages of the GCS project lifecycle. They start at the preliminary risk assessment phase, continue through site assessment and characterization, include best practice communication and seismic monitoring plan methodologies, discuss the evaluation and mitigation of seismic hazard and risk, and closes with an exploration of operational management plans, which conclude when the induced seismicity risk abates back to background level. The focus of these recommendations is on actively managing the risks associated with induced seismicity by developing an actionable risk management plan that starts at the project proposal stage and continues through site closure through an iterative assessment and improvement process. The audience of this document is expected to include all interested stakeholders (e.g., operators, project developers, regulators, and the general public) and is expressly written to be accessible to this broad range of partners. This document is intended to disseminate knowledge gained through recent advances in the science of induced seismicity hazard and risk assessments, to provide updates based on recent experience gained by similar corollary injection-induced seismicity cases, and most importantly to establish a uniform framework to carry out a successful induced seismicity risk management plan for carbon storage projects in the future. These recommendations do not directly address any domestic or international regulations or standards. A complementary NRAP report makes recommendations for the assessment and management of environmental subsurface risks associated with unwanted fluid migration at GCS sites (Thomas et al., 2021) and should be referred to in order to address those additional GCS site risks.

54 ENVIRONMENTAL SCIENCES↗

Recommended Practices for Managing Induced Seismicity Risk Associated with Geologic Carbon Storage

The geologic storage of carbon dioxide (CO 2 ) is one method to help reduce or eliminate atmospheric CO 2 emissions. The sequestered CO 2 is originally captured from the atmosphere or from a stationary industrial source and subsequently injected into a deep subsurface porous rock formation. To facilitate the successful deployment of field scale carbon storage projects, the U.S. Department of Energy (DOE) is developing tools and protocols for defensible, science-based frameworks to quantify and mitigate risks associated with the long-term storage of CO 2 . This protocol specifically addresses the risk of induced seismicity due to injection in a geologic carbon storage (GCS) site. This integrated and risk-based protocol is a product of the U.S. DOE Fossil Energy’s National Risk Assessment Partnership (NRAP), a multi-year collaborative research effort of Los Alamos National Laboratory (LANL), Lawrence Berkeley National Laboratory (LBNL), Lawrence Livermore National Laboratory (LLNL), National Energy Technology Laboratory (NETL), and Pacific Northwest National Laboratory (PNNL). These recommended practices describe a set of 7 steps to evaluate, manage, communicate, and mitigate the risk of induced seismicity at GCS sites. The base methodology of the recommended practices follows a framework similar to the $\textit{Protocol for Addressing Induced Seismicity Associated with Enhanced Geothermal Systems}$ (Majer et al., 2012), developed for the Geothermal Technology Office of the U.S. DOE. These recommended practices present a framework to systematically assess the induced seismicity risk and quantify the associated uncertainties. These recommendations are based on current research and are sufficiently general to allow for modification and application to a variety of different types of sites. The substance of the recommended practices contained herein includes both technical and non-technical issues, and covers all operational stages of the GCS project lifecycle. They start at the preliminary risk assessment phase, continue through site assessment and characterization, include best practice communication and seismic monitoring plan methodologies, discuss the evaluation and mitigation of seismic hazard and risk, and closes with an exploration of operational management plans, which conclude when the induced seismicity risk abates back to background level. The focus of these recommendations is on actively managing the risks associated with induced seismicity by developing an actionable risk management plan that starts at the project proposal stage and continues through site closure through an iterative assessment and improvement process. The audience of this document is expected to include all interested stakeholders (e.g., operators, project developers, regulators, and the general public) and is expressly written to be accessible to this broad range of partners. This document is intended to disseminate knowledge gained through recent advances in the science of induced seismicity hazard and risk assessments, to provide updates based on recent experience gained by similar corollary injection-induced seismicity cases, and most importantly to establish a uniform framework to carry out a successful induced seismicity risk management plan for carbon storage projects in the future. These recommendations do not directly address any domestic or international regulations or standards. A complementary NRAP report makes recommendations for the assessment and management of environmental subsurface risks associated with unwanted fluid migration at GCS sites (Thomas et al., 2021) and should be referred to in order to address those additional GCS site risks

58 GEOSCIENCES↗

State Energy Offices’ Engagement in Electric Distribution Planning to Meet State Policy Goals

NASEO and Berkeley Lab released a new publication on State Energy Offices’ Engagement in Electric Distribution Planning to Meet State Policy Goals. State and Territory Energy Offices develop plans, programs, policies, and projects that have a substantial impact on electric distribution systems. They also can participate in distribution system planning (DSP) processes to help ensure that utilities – consumer- and investor-owned – meet the state’s future energy needs. This paper recognizes the wide spectrum of roles that State Energy Offices can play in DSP processes, including planning for distributed energy resources and grid modernization. It highlights various examples of non-regulatory activities by State Energy Offices including planning, conducting studies, convening stakeholder processes, and implementing programs that inform and contribute to distribution system planning. It also provides examples of State Energy Offices’ engagement in proceedings before their respective public utility commissions. As State Energy Offices face myriad challenges associated with meeting state policy goals, preparing for anticipated rates of distributed energy resource deployment, addressing concerns regarding grid reliability and resilience, and recommending and making long-term investment decisions, the examples provided through this guide can serve as a resource in navigating those challenges.

24 POWER TRANSMISSION AND DISTRIBUTION↗

New England Wind Energy Education Project (NEWEEP) (Final Technical Report)

Project objective is to develop and disseminate accurate, objective information on critical wind energy issues impacting market acceptance of hundreds of land-based projects and vast off-shore wind developments proposed in the 6-state New England region, thereby accelerating the pace of wind installation from today's 140 MW towards the region's 20% by 2030 goals of 12,500 MW. Methodology: This objective will be accomplished by accumulating, developing, assembling timely, accurate, objective and detailed information representing the 'state of the knowledge' on critical wind energy issues impacting market acceptance, and widely disseminating such information. The target audience includes state agencies and local governments; utilities and grid operators; wind developers; agricultural and environmental groups and other NGOs; research organizations; host communities and the general public, particularly those in communities with planned or operating wind projects. Information will be disseminated through: (a) a series of topic-specific web conference briefings; (b) a one-day NEWEEP conference, back-to-back with a Utility Wind Interest Group one-day regional conference organized for this project; (c) posting briefing and conference materials on the New England Wind Forum (NEWF) web site and featuring the content on NEWF electronic newsletters distributed to an opt-in list of currently over 5000 individuals; (d) through interaction with and participation in Wind Powering America (WPA) state Wind Working Group meetings and WPA's annual All-States Summit, and (e) through the networks of project collaborators. Sustainable Energy Advantage, LLC (lead) and the National Renewable Energy Laboratory will staff the project, directed by an independent Steering Committee composed of a collaborative regional and national network of organizations. Major Participants - the Steering Committee: In addition to the applicants, the initial collaborators committing to form a Steering Committee consists of the Massachusetts Renewable Energy Trust; Maine Public Utilities Commission; New Hampshire office of Energy & Planning, the Connecticut Clean Energy Fund;, ISO New England; Utility Wind Interest Group; University of Massachusetts Wind Energy Center; Renewable Energy New England (a new partnership between the renewable energy industry and environmental public interest groups), and Lawrence Berkeley National Laboratory (conditionally). The Steering Committee will: (1) identify and prioritize topics of greatest interest or concern where detailed, objective and accurate information will advance the dialogue in the region; (2) identify critical outreach venues, influencers and experts; (3) direct and coordinate project staff; (4) assist project staff in planning briefings and conferences described below; (5) identify topics needing additional research or technical assistance and (6) identify and recruit additional steering committee members. Impacts/Benefits/Outcomes: By cutting through the clutter of competing and conflicting information on critical issues, this project is intended to encourage the market's acceptance of appropriately-sited wind energy generation.

14 SOLAR ENERGY↗

Energy-water analysis of the 10-year WECC transmission planning study cases.

In 2011 the Department of Energy's Office of Electricity embarked on a comprehensive program to assist our Nation's three primary electric interconnections with long term transmission planning. Given the growing concern over water resources in the western U.S. the Western Electricity Coordinating Council (WECC) requested assistance with integrating water resource considerations into their broader electric transmission planning. The result is a project with three overarching objectives: (1) Develop an integrated Energy-Water Decision Support System (DSS) that will enable planners in the Western Interconnection to analyze the potential implications of water stress for transmission and resource planning. (2) Pursue the formulation and development of the Energy-Water DSS through a strongly collaborative process between the Western Electricity Coordinating Council (WECC), Western Governors Association (WGA), the Western States Water Council (WSWC) and their associated stakeholder teams. (3) Exercise the Energy-Water DSS to investigate water stress implications of the transmission planning scenarios put forward by WECC, WGA, and WSWC. The foundation for the Energy-Water DSS is Sandia National Laboratories Energy-Power-Water Simulation (EPWSim) model (Tidwell et al. 2009). The modeling framework targets the shared needs of energy and water producers, resource managers, regulators, and decision makers at the federal, state and local levels. This framework provides an interactive environment to explore trade-offs, and 'best' alternatives among a broad list of energy/water options and objectives. The decision support framework is formulated in a modular architecture, facilitating tailored analyses over different geographical regions and scales (e.g., state, county, watershed, interconnection). An interactive interface allows direct control of the model and access to real-time results displayed as charts, graphs and maps. The framework currently supports modules for calculating water withdrawal and consumption for current and planned electric power generation; projected water demand from competing use sectors; and, surface and groundwater availability. WECC's long range planning is organized according to two target planning horizons, a 10-year and a 20-year. This study supports WECC in the 10-year planning endeavor. In this case the water implications associated with four of WECC's alternative future study cases (described below) are calculated and reported. In future phases of planning we will work with WECC to craft study cases that aim to reduce the thermoelectric footprint of the interconnection and/or limit production in the most water stressed regions of the West.

13 HYDRO ENERGY↗

Evolution of storage monitoring – update in response to commercial and regulatory drivers

Carbon Capture and Storage (CCS) is in transition from first-of-a kind projects and research-orientated pilots to commercially-motivated applications. Monitoring results from many newly developed and planned large scale commercial projects are limited; however, it is worthwhile to assess their evolution and consider new strategies as part of an effort to assess and document best practices. Commercial monitoring is targeted to activities that comply with regulatory drivers and de-risk investments. Commercial monitoring also supports accounting that storage has occurred and is tied to project financing. It deals with long time frames and large volumes injected into multiple wells and multiple projects in favorable areas. We see developing trends toward reproducible workflows that systematically reduce risks and clarify expectations for oversight and long-term surveillance. Monitoring techniques showing increasing trends include injection zone pressure as a history-matching and compliance tool. To reduce cost and environmental impact of time-lapse seismic data collection, deploying new approaches and tools, such as use of fibre and installed sources are increasingly applied. Concern over the risk of induced seismicity by regulatory bodies and the general public has increased, which has also resulted in increased monitoring. Some techniques used in the early research phases have been sidelined or used only in restricted applications. For example, geochemical analyses in the injection zone as well as the environment are now being deployed less than it was in research-oriented programs, except in the US where it is required by the permitting process. Expectations of frequent area-wide near surface monitoring have also decreased.

25 ENERGY STORAGE↗

Data Validation Package, December 2015, Groundwater and Surface Water Sampling at the Monument Valley, Arizona, Processing Site March 2016

Fifty-two groundwater samples and one surface water sample were collected at the Monument Valley, Arizona, Processing Site to monitor groundwater contaminants for evaluating the effectiveness of the proposed compliance strategy as specified in the 1999 Final Site Observational Work Plan for the UMTRA Project Site at Monument Valley, Arizona. Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated, http://energy.gov/lm/downloads/sampling-and-analysis-plan-us-department- energy-office-legacy-management-sites). Samples were collected for metals, anions, nitrate + nitrite as N, and ammonia as N analyses at all locations.

54 ENVIRONMENTAL SCIENCES↗

Do PEV Drivers Park Near Publicly Accessible EVSE in San Diego but Not Use Them?

The PEV charging stations deployed as part of The EV Project included both residential and non-residential sites. Non-residential sites included EVSE installed in workplace environments, fleet applications and those that were publicly accessible near retail centers, parking lots, and similar locations. The EV Project utilized its Micro-Climate® planning process to determine potential sites for publicly accessible EVSE in San Diego. This process worked with local stakeholders to target EVSE deployment near areas where significant PEV traffic and parking was expected. This planning process is described in The Micro-Climate deployment Process in San Diego1. The EV Project issued its deployment plan for San Diego in November 2010, prior to the sale of PEVs by Nissan and Chevrolet. The Project deployed residential EVSE concurrent with vehicle delivery starting in December 2010. The installation of non-residential EVSE commenced in April 2011 consistent with the original Project schedule, closely following the adoption of PEVs. The residential participation portion of The EV Project was fully subscribed by January 2013 and the non-residential EVSE deployment was essentially completed by August 2013.

33 ADVANCED PROPULSION SYSTEMS↗

Packages of Distributed Energy Technologies Demonstrating Demand Flexibility at Community Scale

The combination of increased electric load growth across all sectors, deferred electrical infrastructure investment, and other factors resulting in variable electric power supply, has created technical challenges to maintaining a resilient and reliable grid. Many federal, regional, and local efforts are in play to modernize the electric grid, including advancing building technologies and distributed energy resources (DERs) that are utilizing smarter controls to become responsive to both occupant and grid needs. This report reviews ten pilot projects demonstrating how groups of buildings combined with behind-the-meter (BTM) DERs such as electric vehicle (EV) charging, battery storage, flexible HVAC and domestic hot water systems, and photovoltaic systems can reliably and cost effectively provide grid services. Each of the ten pilot projects aim to deliver both energy efficiency and demand flexibility (DF) while supporting load growth. The ten demonstration teams are piloting flexible DER packages across diverse communities of residential and commercial buildings to address a variety of regional grid needs. The outcomes of these pilot projects will be used to inform future scaling through utility program development. This paper characterizes the ten teams, showcasing the decision-making process used by each group to develop their packages (Section 2), the grid services they plan to deliver (Section 3), the types of DER packages selected for deployment within building sectors (Section 4) and trends between building sector, DER types, and grid services In order to achieve community scale benefits, the pilot projects must utilize aggregated control mechanisms for coordinating buildings and DERs together. Several types of coordinated control architectures have evolved amongst the teams, influenced by use type, existing market conditions, and integration type. Three coordinated controls architectures have been characterized, highlighting their use cases, benefits, challenges, and tradeoffs in their design. These insights can aid utilities, control vendors, and developers in scaling community-level energy systems (Paul, 2024). Ultimately, the technology packages selected by the ten teams will be coordinated to provide power system services, also known as grid services. Insights from these demonstrations will be useful for grid operators, regulators, aggregators and other stakeholders as they look to deploy demand flexible resources as grid services in the future. The grid services that each team is targeting for demonstration are described in Section 3 and Section 4. Methods for evaluating the grid services have been described in the paper Metrics for Evaluating Grid Service Provision from Communities of Grid-interactive and Efficient Buildings and other DER (MacDonald, 2023). To identify technology packages for demonstration, Section 2 shows that project teams used a range of analysis approaches, including building energy modeling, AMI data analysis, cost-benefit frameworks, and utility pilot data. Some teams emphasized technical modeling to quantify grid impacts and demand reduction potential, while others prioritized economic evaluations, stakeholder input, or exploratory pilots to inform deployment decisions. This diversity reflects the need to tailor selection methods to project goals, available data, and organizational context. Section 5 discusses trends between the DER technologies deployed and the grid service provisions from each team. Residential buildings (multifamily and single family) lean towards technologies that enhance energy efficiency (e.g. weatherization upgrades, smart thermostats) and onsite power generation integration (e.g. solar PV). Commercial building demonstrations prioritize technologies that ensure operational reliability (e.g. battery storage) and centralized energy management systems and optimization solutions. Teams that are deploying controllable storage-based technologies are more likely to provide grid services that require a near real-time response. Teams incorporating load shifting technologies like smart thermostats with HEMs are likely to include energy markets participation and customer bill management offerings. Campus demonstrations are adopting diverse sets of DERs to emphasize renewable generation, paired with centralized control. This section also describes technologies that were considered during project planning but ultimately excluded from final deployment. These demonstrations reveal that effective DER package design should be tailored to building type, customer segment, and construction vintage. Multifamily buildings benefit from centralized HVAC upgrades and supervisory controls, while single-family homes are well-suited for individualized technologies like solar, storage, and smart home energy monitors. Commercial and campus settings prioritize EMIS integration and load optimization. New construction enables cost-effective integration of DER-ready infrastructure, whereas retrofits require deployments aligned with owner and tenant value streams. For utility program planners, early coordination with developers and building owners, paired with segmented and modular program offerings, can improve adoption, scalability, and grid impact.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Southeast Regional CO 2 Utilization and Storage Acceleration Partnership (SECARB-USA): Regional Commercialization Plan (Final): Work Products 4.4.b (Regional Commercialization Plan) & 4.3 (Socioeconomic Impacts of CCUS and Workforce Readiness)

Commercialization of carbon capture and storage (CCS) within the SECARB-USA region is scaling up and will continue as governments and private companies expand on current decarbonization efforts. The Inflation Reduction Act (2022) enhanced 45Q tax credits beyond the 2018 Bipartisan Budget Act levels by incentivizing previously uneconomic projects to develop CCS plans and infrastructure. Additionally, the continued interest and support for CCS mitigates the relative risk of commercial-scale projects that are seeking long-term viability to develop capture facilities to accommodate their emissions reduction goals. This multifaceted Commercialization Plan provides an overview of the current status and potential for CCS in the Southeast and the pathways to achieve emissions reduction goals in the region by 2050. Specifically, the study addresses: • The current status of CCS activities in the SECARB region, • Assessment of buildout pathways for CCS projects and carbon transport infrastructure development opportunities, • Estimation of CCS job creation and economic impacts, and • The social justice considerations and public benefits associated with CCS activities in the SECARB-USA region.

42 ENGINEERING↗

A Resiliency Action Plan for the National Renewable Energy Laboratory: May 23, 2014 -- June 5, 2015

The second stage in a two-stage project called the National Renewable Energy Laboratory (NREL) Climate Change Resiliency and Preparedness (CCRP) project is summarized in this resiliency action plan. This CCRP pilot project was funded by the U.S. Department of Energy's Sustainability Performance Office and launched in winter 2014. The resiliency action plan begins where the previous stage of the project -- the vulnerability assessment -- ended. This report discusses resiliency options to reduce the risk of the highest risk vulnerabilities that were identified in the NREL vulnerability assessment.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Data-driven Community-centered Resilient Assessment and Planning Toolkit for Nexus of Energy and Water (DCRAPT-NEW)

Urban areas, including Detroit and Pittsburgh, have suffered significant dual outages of the electrical and water infrastructure in the past decade due, in part, to the increasing number of extreme weather events. With increasing temperatures and rainfall intensity, these regions need to prepare for increasing extreme events through community-based energy and water resilience analysis, planning, and enhancement. This project developed a suite of open-source, open-access, community-centered, data-driven assessment and distributed energy resource (DER) and planning tools for energy and water resilience enhancement in urban areas. Through establishing a multi-level community awareness and engagement mechanism and a comprehensive collection of power outage and flooding data, an innovative group of community energy and water resilience assessment and planning tools have been developed for a wide range of users with differing and variable sets of data available to them. The developed tools include (1) DOE EAGLE-I data-driven, deep-learning assisted resilience assessment and DER planning tools at the county level with socioeconomic factors incorporated; (2) Utility annual power outage data-driven tools for long term resilience assessment and DER planning and 15-min power outage data-driven tools for short term resilience assessment and planning; (3) Detailed engineering tools for energy and water systems resilience assessment and planning when the system topology and component fragility curves are available; (4) Alternative Resiliency Metric Calculation that extracts and separates outage and restoration processes; and (5) Co-optimization tools that evaluate the resilience of the power and sewage system and allow users to conduct joint planning with energy and wastewater systems. The developed tools provide planners, decision-makers, and stakeholders with powerful capabilities to systematically evaluate system/community resilience and optimal and actionable guidance for enhancing resilience while prioritizing DER investments. The tools have been used and validated in Detroit and Pittsburgh and can be used in other areas of the nation. In addition, this project will (1) advance the knowledge and applications of machine-learning methods in analyzing and fusing different layers of information and generating meaningful data points such as generating rare weather events; (2) significantly improve the energy and water resilience of the identified communities in Detroit and Pittsburgh and prepare for more frequent and severe weather conditions; (3) help communities assess extreme weather event impacts and address short-term and long-term resilience-related issues The developed tools have been made public via GitHub and demonstrated to community stakeholders and utility companies via the two annual workshops and numerous community engagement meetings. The project outcomes are also disseminated through publications in various journals and conference proceedings, and presentations at top conferences.

13 HYDRO ENERGY↗

Status of the new SNS injector and external antenna ion source

The U.S. Spallation Neutron Source (SNS) now operates with 1.2 MW of beam power on target with the near-term goal of delivering 1.4 MW and a longer-term goal of delivering >2 MW required by the planned Proton Power Upgrade (PPU) and Second Target Station (STS) projects. In early 2018 we plan to replace the entire 2.5 MeV injector configuration which includes the ion source, the Low Energy Beam Transport (LEBT) and the Radio Frequency Quadrupole accelerator (RFQ) with one which is currently being tested on a research accelerator called the Beam Test Facility (BTF) located at the SNS facility. This report first provides a description of the new injector: the ion source and the cage enclosure, the new LEBT support structure and the new RFQ. Since fall of 2016, this system has been tested extensively with regard to output beam current, beam persistence, emittance and energy. The results of these experiments employing both internal and external antenna ion sources will be summarized here showing the system to be capable of supporting SNS 1.4 MW operations with a significant margin as well as potentially meeting facility upgrade requirements. This represents a significant performance upgrade over the current SNS front end system with the compromised RFQ and will replace that system in early 2018.

Welton, Robert F.↗

SU-E-T-815: In Vivo Dosimetry and Daily Arc Junction Verification Using EBT3 Gafchromic Film for Pediatric Cranio-Spinal Irradiation

Purpose: Perform dosimetric comparison between planned and delivered dose in the junction area, measure daily dose variation in the arc junction area for pediatric patients treated for medulloblastoma using Craniospinal axis irradiation(CSI) Material and methods Dose comparison in the junction area, daily dose variation in the arc junction area for a Rando Phantom and 5 pediatric patients treated using CSI technique were analyzed. Plans were created using the Eclipse treatment planning system. Two arcs for cranium and 1 arc for spine region were used. Planar dose matrix was created by projecting phantom and patient plan into the ArcCheck phantom. EBT3 film was placed in the middle of ArcCheck plug to measure dose distribution in the junction areaDuring patient treatment, strip of EBT3 film was placed daily at each junction area for verification. EBT3 films were scanned using a flatbed scanner, Epson Expression 10000 XL. Film QA pro software was used to analyze film. Scanning and analysis was performed according to vendor recommendations and AAPM TG-55 report. Films were scanned and analyzed daily after each treatment and at the end of treatment course. Planar dose distributions from films were compared with planar dose distribution from treatment planning system. Results: Comparison of planned vs. measured dose distributions for patients have passing rates of 90%–100% with 3% and 3 mm gamma analysis. In some of the treatment fractions, daily setup film showed variation in dose distribution in the junction area. Conclusion: It is critical to measure dose distribution in the arc junction area and use additional quality assurance measures to verify daily setup for CSI patient where one or more junctions are present. EBT3 film prove to be a good tool to achieve this task considering flexibility associated with the film such as symmetry, self-developing and ease of use.

60 APPLIED LIFE SCIENCES↗

Newberry Volcano EGS Demonstration - Phase I Results

Phase I of the Newberry Volcano Enhanced Geothermal System (EGS) Demonstration included permitting, community outreach, seismic hazards analysis, initial microseismic array deployment and calibration, final MSA design, site characterization, and stimulation planning. The multi-disciplinary Phase I site characterization supports stimulation planning and regulatory permitting, as well as addressing public concerns including water usage and induced seismicity. A review of the project's water usage plan by an independent hydrology consultant found no expected impacts to local stakeholders, and recommended additional monitoring procedures. The IEA Protocol for Induced Seismicity Associated with Enhanced Geothermal Systems was applied to assess site conditions, properly inform stakeholders, and develop a comprehensive mitigation plan. Analysis of precision LiDAR elevation maps has concluded that there is no evidence of recent faulting near the target well. A borehole televiewer image log of the well bore revealed over three hundred fractures and predicted stress orientations. No natural, background seismicity has been identified in a review of historic data, or in more than seven months of seismic data recorded on an array of seven seismometers operating around the target well. A seismic hazards and induced seismicity risk assessment by an independent consultant concluded that the Demonstration would contribute no additional risk to residents of the nearest town of La Pine, Oregon. In Phase II of the demonstration, an existing deep hot well, NWG 55-29, will be stimulated using hydroshearing techniques to create an EGS reservoir. The Newberry Volcano EGS Demonstration is allowing geothermal industry and academic experts to develop, validate and enhance geoscience and engineering techniques, and other procedures essential to the expansion of EGS throughout the country. Successful development will demonstrate to the American public that EGS can play a significant role in reducing foreign energy dependence, and provide clean, renewable, baseload geothermal power generation in the State of Oregon.

15 GEOTHERMAL ENERGY↗

Environmental Cleanup of the East Tennessee Technology Park Year One - Execution with Certainty SM - 13120

On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began its five-year, $1.4 billion cleanup of the East Tennessee Technology Park (ETTP), located on the U.S. Department of Energy's (DOE) Oak Ridge Reservation in Tennessee. UCOR will close out cleanup operations that began in 1998 under a previous contract. When the Contract Base scope of work [1] is completed in 2016, the K-25 gaseous diffusion building will have been demolished and all waste dispositioned, demolition will have started on the K-27 gaseous diffusion building, all contact-handled and remote-handled transuranic waste in inventory (approximately 500 cubic meters) will have been transferred to the Transuranic Waste Processing Center, previously designated 'No-Path-To-Disposition Waste' will have been dispositioned to the extent possible, and UCOR will have managed DOE Office of Environmental Management (EM)- owned facilities at ETTP, Oak Ridge National Laboratory (ORNL), and the Y-12 National Security Complex in a safe and cost-effective manner. Since assuming its responsibilities as the ETTP cleanup contractor, UCOR has completed its life-cycle Performance Measurement Baseline; received its Earned Value Management System (EVMS) certification; advanced the deactivation and demolition (D and D) of the K-25 gaseous diffusion building; recovered and completed the Tank W-1A and K-1070-B Burial Ground remediation projects; characterized, packaged, and shipped contact-handled transuranic waste to the Transuranic Waste Processing Center; disposed of more than 90,000 cubic yards of cleanup waste while managing the Environmental Management Waste Management Facility (EMWMF); and provided operations, surveillance, and maintenance activities at DOE EM facilities at ETTP, ORNL, and the Y-12 National Security Complex. Project performance as of December 31, 2012 has been excellent: - Cost Performance Index - 1.06; - Schedule Performance Index - 1.02. At the same time, since safety is the foundation of all cleanup work, UCOR's safety record goes hand in hand with its excellent project performance. Through calendar year 2012, UCOR's recordable injury rate was 0.33, and the company has worked close to 4 million hours without a lost work day injury. UCOR's safety record is one of the best in the DOE EM Complex. This performance was due, in large part, to the people and processes URS and CH2M HILL, the parent companies of UCOR, brought to the project. Key approaches included: - Selected and deployed experienced staff in key leadership positions throughout the organization; - Approached 'Transition' as the 'true' beginning of the cleanup project - kicking off a number of project initiatives such as Partnering, PMB development, D and D Plan execution, etc. - Established a project baseline for performance measurement and obtained EVMS certification in record time; - Determined material differences and changed conditions that warranted contract change - then quickly addressed these changes with the DOE client; - Aligned the project and the contract within one year - also done in record time; - Implemented Safety Trained Supervisor and Safety Conscious Work Environment Programs, and kicked off the pursuit of certification under DOE's Voluntary Protection Program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Resilience Roadmap: A Collaborative Approach to Multi-Jurisdictional Resilience Planning

Extreme weather and aging infrastructure are creating unprecedented challenges in the United States and around the globe. Many communities have suffered damages from a variety of weather-related events, such as severe weather such as hurricanes, droughts, increasing temperatures, wildfires, and storm surges. Numerous efforts exist to improve resilience to protect national security, energy and water security, economic well-being, and quality of life. As severe weather events increase in frequency and severity, many cities, states, tribes, and federal agencies are addressing the impacts through resilience planning and measures. In an effort to support communities with resilience planning, the White House Council on Environmental Quality (CEQ) initiated preparedness pilot projects designed to showcase community resilience planning in the City of Houston and the State of Colorado. This publication is the full, technical document, for the Colorado pilot project. The process is also summarized in a user-friendly web-version on NREL's website (visit www.nrel.gov/resilience-planning-roadmap) for easier access and replicability. NASA's pilot project with the City of Houston is summarized separately (visit https://toolkit.climate.gov/case-studies/climate-resilience to learn more). water security, economic well-being, and quality of life. As severe weather events increase in frequency and severity, many cities, states, tribes, and federal agencies are addressing the impacts through resilience planning and measures. In an effort to support communities with resilience planning, the White House Council on Environmental Quality (CEQ) initiated preparedness pilot projects designed to showcase community resilience planning in the City of Houston and the State of Colorado. This publication is the full, technical document, for the Colorado pilot project. The process is also summarized in a user-friendly web-version on NREL's website (visit www.nrel.gov/resilience-planning-roadmap) for easier access and replicability. NASA's pilot project with the City of Houston is summarized separately (visit https://toolkit.climate.gov/case-studies/climate-resilience to learn more).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗