Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Power system operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 973 records · Page 54

Switching strategy for increased efficiency of power converters

Systems and methods for operating a power converter are provided. A DC to AC converter can include an inner converter and an outer converter. The inner converter can include an isolation transformer a first plurality of switching devices. The outer converter can include a second plurality of switching devices. A control method can include determining an output voltage of the outer converter. The control method can further include controlling operation of the inner converter based at least in part on the output voltage of the outer converter.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Design and Operation of Energy Systems with Large Amounts of Variable Generation: IEA Wind TCP Task 25 (Final Summary Report)

This report summarizes findings on wind integration from the 17 countries or sponsors participating in the International Energy Agency Wind Technology Collaboration Program (IEA Wind TCP) Task 25 from 2006-2020. Both real experience and studies are reported. Many wind integration studies incorporate solar energy, and most of the results discussed here are valid for other variable renewables in addition to wind. The national case studies address several impacts of wind power on electric power systems. In this report, they are grouped under long-term planning issues and short-term operational impacts. Long-term planning issues include grid planning and capacity adequacy. Short-term operational impacts include reliability, stability, reserves, and maximizing the value of wind in operational timescales (balancing related issues). The first section presents the variability and uncertainty of power system-wide wind power, and the last section presents recent studies toward 100% shares of renewables. The appendix provides a summary of ongoing research in the national projects contributing to Task 25 for 2021-2024. The design and operation of power and energy systems is an evolving field. As ambitious targets toward net-zero carbon energy systems are announced globally, many scenarios are being made regarding how to reach these future decarbonized energy systems, most of them involving large amounts of variable renewables, mainly wind and solar energy. The secure operation of power systems is increasingly challenging, and the impacts of variable renewables, new electrification loads together with increased distribution system resources will lead to somewhat different challenges for different systems. Tools and methods to study future power and energy systems also need to evolve, and both short-term operational aspects (such as power system stability) and long-term aspects (such as resource adequacy) will probably see new paradigms of operation and design. The experience of operating and planning systems with large amounts of variable generation is accumulating, and research to tackle the challenges of inverter-based, nonsynchronous generation is on the way. Energy transition and digitalization also bring new flexibility opportunities, both short and long term.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Ion cyclotron resonance heating systems upgrade toward high power and CW operations in WEST

The design of the WEST (Tungsten-W Environment in Steady-state Tokamak) Ion cyclotron resonance heating antennas is based on a previously tested conjugate-T Resonant Double Loops prototype equipped with internal vacuum matching capacitors. The design and construction of three new WEST ICRH antennas are being carried out in close collaboration with ASIPP, within the framework of the Associated Laboratory in the fusion field between IRFM and ASIPP. The coupling performance to the plasma and the load-tolerance have been improved, while adding Continuous Wave operation capability by introducing water cooling in the entire antenna. On the generator side, the operation class of the high power tetrodes is changed from AB to B in order to allow high power operation (up to 3 MW per antenna) under higher VSWR (up to 2:1). Reliability of the generators is also improved by increasing the cavity breakdown voltage. The control and data acquisition system is also upgraded in order to resolve and react on fast events, such as ELMs. A new optical arc detection system comes in reinforcement of the V{sub r}/V{sub f} and SHAD systems.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Optimal Load Ensemble Control in Chance-Constrained Optimal Power Flow

Distribution system operators (DSOs) world-wide foresee a rapid roll-out of distributed energy resources. From the system perspective, their reliable and cost effective integration requires accounting for their physical properties in operating tools used by the DSO. This work describes an decomposable approach to leverage the dispatch flexibility of thermostatically controlled loads (TCLs) for operating distribution systems with a high penetration level of photovoltaic resources. Each TCL ensemble is modeled using the Markov Decision Process (MDP). The MDP model is then integrated with a chance constrained optimal power flow that accounts for the uncertainty of PV resources. Since the integrated optimization model cannot be solved efficiently by existing dynamic programming methods or off-the-shelf solvers, this paper proposes an iterative Spatio-Temporal Dual Decomposition algorithm (ST-D2). Finally, we demonstrate the merits of the proposed integrated optimization and ST-D2 algorithm on the IEEE 33-bus test system.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Adaptive Load Shedding as Part of Primary Frequency Response To Support Networked Microgrid Operations

Global changes in the deployment of distributed energy resources, control and communications technologies, business models, and regulatory policy are increasing the operational options for future distribution systems. One such option is the coordinated operation of distributed resources to form microgrids and networks of microgrids to support traditional bulk power systems during normal operations and critical end-use loads during outages. While individual standalone microgrids have been extensively studied and deployed, the coordinated operation of networked microgrids is operationally more challenging due to the dynamic boundaries and changing mix of generation resources. Here, this paper presents a method of using a distributed control architecture to support primary frequency response in networked microgrids operations. The support of primary frequency response is accomplished using the Open Field Message Bus reference architecture and Grid Friendly Appliance controllers.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

An Overview of ANN Application in the Power Industry

The paper presents a survey on the development and experience with artificial neural net (ANN) applications for electric power systems, with emphasis on operational systems. The organization and constraints of electric utilities are reviewed, motivations for investigating ANN are identified, and a current assessment is given from the experience of 2400 projects using ANN for load forecasting, alarm processing, fault detection, component fault diagnosis, static and dynamic security analysis, system planning, and operation planning.

artificial neural networks ANN electric power syst↗

Extended Operation Testing of Stirling Convertors in Support of Stirling Radioisotope Power System Development

100 We class Stirling convertors began extended operation testing at NASA Glenn Research Center (GRC) in 2003 with a pair of Technology Demonstration Convertors (TDCs) operating in air. Currently, the number of convertors on extended operation test has grown to 12, including both TDCs and Advanced Stirling Convertors (ASCs) operating both in air and in thermal vacuum. Additional convertors and an electrically heated radioisotope generator will be put on test in the near future. This testing has provided data to support life and reliability estimates and the quality improvements and design changes that have been made to the convertor. The convertors operated 24/7 at the nominal amplitude and power levels. Performance data were recorded on an hourly basis. Techniques to monitor the convertors for change in internal operation included gas analysis, vibration measurements and acoustic emission measurements. This data provided a baseline for future comparison. This paper summarizes the results of over 145,000 hours of TDC testing and 40,000 hours of ASC testing and discusses trends in the data. Data shows the importance of improved materials, hermetic sealing, and quality processes in maintaining convertor performance over long life.

Lewandowski, Edward J.↗

Extended Operation Testing of Stirling Convertors in Support of Stirling Radioisotope Power System Development

100 We class Stirling convertors began extended operation testing at NASA Glenn Research Center (GRC) in 2003 with a pair of Technology Demonstration Convertors (TDCs) operating in air. Currently, the number of convertors on extended operation test has grown to 12, including both TDCs and Advanced Stirling Convertors (ASCs) operating both in air and in thermal vacuum. Additional convertors and an electrically heated radioisotope generator will be put on test in the near future. This testing has provided data to support life and reliability estimates and the quality improvements and design changes that have been made to the convertor. The convertors operated 24/7 at the nominal amplitude and power levels. Performance data were recorded on an hourly basis. Techniques to monitor the convertors for change in internal operation included gas analysis, vibration measurements, and acoustic emission measurements. This data provided a baseline for future comparison. This paper summarizes the results of over 145,000 hr of TDC testing and 40,000 hr of ASC testing and discusses trends in the data. Data shows the importance of improved materials, hermetic sealing, and quality processes in maintaining convertor performance over long life.

Lewandowski, Edward J.↗

Bill Savings vs. Backup Power: Evaluating operational tradeoffs for home solar+storage systems [Slides]

This study explores tradeoffs between the use of home solar+storage systems for backup power versus day-to-day utility bill savings. The study focuses specifically on the “reserve setting” available with most home battery storage systems, which allow the customer to maintain some minimum level of storage in reserve in case of an unforeseen power interruption. The more capacity that is held in reserve, the greater the customer’s ability to ride-through possible power interruptions, but less capacity is then available to manage utility bills on a day-to-day basis. This study evaluates this operational tradeoff across a diverse set of locations and residential electricity tariff structures, relying on Berkeley Lab’s PRESTO model to stochastically simulate power interruption events, and exploring a range of sensitivities, including variations in customer value of lost load (VoLL), interruption frequency, and other key drivers. The results show that, in most circumstances, the opportunity cost of holding storage capacity in reserve, in terms of foregone bill saving, tends to outweigh any gains in reliability value associated with mitigated power interruptions. This finding is robust across tariff structures and across most of the sensitivities considered, including those related to rate level, customer load level, and storage sizing. There are a limited set of circumstances where raising the reserve setting improves the overall customer value (comprised of bill savings plus reliability value). Specifically, that exception occurs when all of the following conditions apply: (a) the customer resides in a location with exceptionally poor reliability, (b) the customer has exceptionally high VoLL; (c) the customer is on a net billing rate or on a TOU rate that allows grid discharging but not grid charging; and (d), depending on the location, the price arbitrage differential on that rate is relatively small. In all other circumstances analyzed, total customer value declines with reserve level.

14 SOLAR ENERGY↗

Control of large wind turbine generators connected to utility networks

This is an investigation of the control requirements for variable pitch wind turbine generators connected to electric power systems. The requirements include operation in very small as well as very large power systems. Control systems are developed for wind turbines with synchronous, induction, and doubly fed generators. Simulation results are presented. It is shown how wind turbines and power system controls can be integrated. A clear distinction is made between fast control of turbine torque, which is a peculiarity of wind turbines, and slow control of electric power, which is a traditional power system requirement.

Hinrichsen, E. N.↗

Innovations for ISS Plug-In Plan (IPiP) Operations

Limited resources and increasing requirements will continue to influence decisions on ISS. The ISS Plug-In Plan (IPiP) supports power and data for utilization, systems, and daily operations through the Electrical Power System (EPS) Secondary Power/Data Subsystem. Given the fluid launch schedule, the focus of the Plug-In Plan has evolved to anticipate future requirements by judicious development and delivery of power supplies, power strips, Alternating Current (AC) power inverters, along with innovative deployment strategies. A partnership of ISS Program Office, Engineering Directorate, Mission Operations, and International Partners poses unique solutions with existing on-board equipment and resources.

Moore, Kevin D.↗

Scalable Heuristics for Planning, Placement and Sizing of Flexible AC Transmission System Devices

Aiming to relieve transmission grid congestion and improve or extend feasibility domain of the operations, we build optimization heuristics, generalizing standard AC Optimal Power Flow (OPF), for placement and sizing of Flexible Alternating Current Transmission System (FACTS) devices of the Series Compensation (SC) and Static VAR Compensation (SVC) type. One use of these devices is in resolving the case when the AC OPF solution does not exist because of congestion. Another application is developing a long-term investment strategy for placement and sizing of the SC and SVC devices to reduce operational cost and improve power system operation. SC and SVC devices are represented by modification of the transmission line inductances and reactive power nodal corrections respectively. We find one placement and sizing of FACTs devices for multiple scenarios and optimal settings for each scenario simultaneously. Our solution of the nonlinear and nonconvex generalized AC-OPF consists of building a convergent sequence of convex optimizations containing only linear constraints and shows good computational scaling to larger systems. The approach is illustrated on single- and multi-scenario examples of the Matpower case-30 model.

24 POWER TRANSMISSION AND DISTRIBUTION↗

ICRH operations and experiments during the JET-ILW tritium and DTE2 campaigns

2021 has culminated with the completion of the JET-ILW DTE2 experimental campaign. This contribution summarizes Ion Cyclotron Resonance Heating (ICRH) operations from system and physics point of view. Improvements to the (ICRH) system, to operation procedures and to real time RF power control were implemented to address specific constraints from tritium and deuterium-tritium operations and increase the system reliability and power availability during D-T pulses. ICRH was operated without the ITER-Like Antenna (ILA) because water leaked from an in-vessel capacitor into the vessel on day-2 of the D-T campaign. Three weeks were required to identify and isolate the leak and resume plasma operations. Dedicated RF-Plasma Wall Interaction (PWI) experiments were conducted; tritium plasmas exhibit a higher level of Be sputtering on the outer wall and impurity content when compared to deuterium or hydrogen plasmas. The JET-DTE2 campaigns provided the opportunity to characterize ICRH schemes foreseen for the ITER operation, in the ITER like wall environment in ELMy H-mode scenarios aiming at maximizing fusion performance. The second harmonic tritium resonance heating and to a lesser extent minority 3He heating (ITER D-T ICRH reference schemes) lead to improved ion temperature and fusion performance when compared to hydrogen minority ICRH. However, these discharges suffered from a lack of stationarity and gradual impurity accumulation potentially because of a deficit of ICRH power when using JET antennas at lower frequencies. Fundamental deuterium ICRH was used in tritium-rich plasmas and with deuterium Neutral Beam Heating; this ICRH scheme proved to be very efficient boosting ion temperature and fusion performance in these plasmas.

Klepper, C. Christopher↗

Using State Estimation Residuals to Detect Abnormal SCADA Data

Detection of manipulated supervisory control and data acquisition (SCADA) data is critically important for the safe and secure operation of modern power systems. In this paper, a methodology of detecting manipulated SCADA data based on state estimation residuals is presented. A framework of the proposed methodology is described. Instead of using original SCADA measurements as the bad data sources, the residuals calculated based on the results of the state estimator are used as the input for the outlier detection process. The BACON algorithm is applied to detect outliers in the state estimation residuals. The IEEE 118-bus system is used as a test case to evaluate the effectiveness of the proposed methodology. The accuracy of the BACON method is compared with that of the 3-σ method for the simulated SCADA measurements and residuals.

SCADA, BACON algorithm, state estimation, outlier ↗

Design and emplacement of an integrated lunar power system - Issues and concerns

Issues regarding the construction and operation of a stationary lunar surface power system that must be resolved in order to create a permanent manned presence on the moon are addressed. The issues considered include: (1) the centralization or decentralization of the electrical power system; (2) whether power transmission should be ac or dc; (3) what mix of power generating technology should be used; and (4) the physical interface requirements between the power-system hardware and the construction equipment to be used in placing the hardware on the lunar surface.

Sprouse, Kenneth M.↗

Wholesale Electricity Market Design with Increasing Levels of Renewable Generation: Incentivizing Flexibility in System Operations

This paper discusses the importance and challenges of incentivizing flexibility during short-term operations of the bulk power system due to the increasing variability and uncertainty from growing penetrations of variable generation (VG). Operational flexibility can refer to many aspects of a resource's capability to support the power system, such as the speed, range, and duration of power output, as well as the ability to autonomously respond to frequency or voltage changes. Inefficient utilization of existing flexibility, or unwillingness of resources to provide flexibility, can compromise system reliability by not meeting the changing net load, and it can also lead to higher costs when an inefficient use of flexibility resources occurs. There are many existing characteristics of market design that incentivize flexibility in some manner. How they incentivize the provision of flexibility as well as the level of flexibility is still debated. We explore some of these existing market designs, as well as new market mechanisms, such as pay-for-performance regulating reserve and flexible ramping products, that aim to explicitly incentivize the provision of more flexibility to the system, particularly as a result of increasing VG penetration levels.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Thermal, mass, and power interactions for lunar base life support and power systems

A model has been developed for quantitative examination of the integrated operation of the lunar base power system, employing regenerative fuel cell technology, which would lead to incorporation into a lunar base life support system. The model employs methods developed for technology and system trade studies of the Life Support System configuration for the National Aeronautics and Space Administration (NASA). This paper describes the power system and its influence on life support while comparing various technologies, including pressurized gas storage and cryogenic storage, and different operation conditions. Based on preliminary assumptions, the mass, power, and thermal requirement estimates are made at the level of major components. The relative mass contribution and energy requirements of the components in various configurations are presented. The described intractions between power and life support include direct influence, such as water and oxygen storage, and indirect influence, through reliability and maintenance considerations.

Jan, Darrell L.↗