Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PNEUMATICS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 973 records · Page 54

Characterization of the Mechanical Trash Compactor Bag Removal Force

Managing trash accumulation is a critical challenge in human space explorations since the trash volume and mass can significantly influence launch cost and operational efficiency. This study aids the development of a Mechanical Trash Compactor (Mpactor) by testing the removal force required to remove a “trash bag” from the Mpactor. To do this, a Pneumatic Pressure Mandrel System was designed to simulate the normal force trash would exerts on the trash bag and subsequently the sidewalls of the Mpactor. For various levels of sidewall normal force, the removal force required to remove the simulated trash bag from the Mpactor compaction chamber was measured. This testing is used to identify optimal bag materials. Additionally, testing was done on both the native stainless steel walls of the compaction chamber as well as the walls after being Teflon lined. Split-plot ANOVA, simple main effects analysis, Holm’s post hoc comparisons for interaction, and sensitivity analyses were conducted to assess the influence of trash bag and sidewall materials on the required removal force. It was found that Teflon reduced the force required to remove the trash bag as well as reduced material-dependent variation in removal force. Testing showed that Teflon reduced the required removal force with a Polyvinylidene Fluoride , an unidentified Ethylene acrylate - Low Density Polyethylene copolymer, and a Polyvinyl Chloride all requiring significantly less removal force than the other materials tested.

pressure mandrel↗

Radiation-transparent windows, method for imaging fluid transfers

A thin, x-ray-transparent window system for environmental chambers involving pneumatic pressures above 40 bar is presented. The window allows for x-ray access to such phenomena as fuel sprays injected into a pressurized chamber that mimics realistic internal combustion engine cylinder operating conditions.

47 OTHER INSTRUMENTATION↗

Near Net Shape Manufacturing of New Titanium Powders for Industry

This factsheet describes a research project whose goal is to develop a manufacturing technology to process new titanium powders into fully consolidated near net shape components for industrial applications. This will be achieved using various technologies, including press and sinter, pneumatic isostatic forging (PIF), hot isostatic pressing (HIP), and adiabatic compaction.

Energy Intensive Processes↗

ADAPTATION OF CRACK GROWTH DETECTION TECHNIQUES TO US MATERIAL TEST REACTORS

A key component in evaluating the ability of Light Water Reactors to operate beyond 60 years is characterizing the degradation of materials exposed to radiation and various water chemistries. Of particular concern is the response of reactor materials to Irradiation Assisted Stress Corrosion Cracking (IASCC). Some test reactors outside the United States, such as the Halden Boiling Water Reactor (HBWR), have developed techniques to measure crack growth propagation during irradiation. The basic approach is to use a custom-designed compact loading mechanism to stress the specimen during irradiation, while the crack in the specimen is monitored in-situ using the Direct Current Potential Drop (DCPD) method. In 2012 the US Department of Energy commissioned the Idaho National Laboratory and the MIT Nuclear Reactor Laboratory (MIT NRL) to take the basic concepts developed at the HBWR and adapt them to a test rig capable of conducting in-pile IASCC tests in US Material Test Reactors. The first two and half years of the project consisted of designing and testing the loader mechanism, testing individual components of the in-pile rig and electronic support equipment, and autoclave testing of the rig design prior to insertion in the MIT Reactor. The load was applied to the specimen by means of a scissor like mechanism, actuated by a miniature metal bellows driven by pneumatic pressure and sized to fit within the small in-core irradiation volume. In addition to the loader design, technical challenges included developing robust connections to the specimen for the applied current and voltage measurements, appropriate ceramic insulating materials that can endure the LWR environment, dealing with the high electromagnetic noise environment of a reactor core at full power, and accommodating material property changes in the specimen, due primarily to fast neutron damage, which change the specimen resistance without additional crack growth. The project culminated with an in-pile demonstration at the MIT Reactor. The test rig and associated support equipment were used to apply loads to a representative Compact Tensile specimen during one MITR operating cycle, while measuring crack growth using the DCPD method. Although the test period was short (approximately 70 days), and the accumulated neutron dose relatively small, successful operation of the test rig was demonstrated. The specimen was cycled more than 8000 times (more than would be typical for a long term IASCC test), which was sufficient to propagate a crack of over 2 mm.

Crack Growth↗

Tire with outer groove containing bonded tube

The invention relates generally to a pneumatic rubber tire which contains an outer, annular, circular groove which contains a flexible tube bonded to the walls of the groove.

36 MATERIALS SCIENCE↗

Systems and methods for harvesting and storing materials produced in a nuclear reactor

Systems produce desired isotopes through irradiation in nuclear reactor instrumentation tubes and deposit the same in a robust facility for immediate shipping, handling, and/or consumption. Irradiation targets are inserted and removed through inaccessible areas without plant shutdown and placed in the harvesting facility, such as a plurality of sealable and shipping-safe casks and/or canisters. Systems may connect various structures in a sealed manner to avoid release of dangerous or unwanted matter throughout the nuclear plant, and/or systems may also automatically decontaminate materials to be released. Useable casks or canisters can include plural barriers for containment that are temporarily and selectively removable with specially-configured paths inserted therein. Penetrations in the facilities may limit waste or pneumatic gas escape and allow the same to be removed from the systems without over-pressurization or leakage. Methods include processing irradiation targets through such systems and securely delivering them in such harvesting facilities.

07 ISOTOPE AND RADIATION SOURCES↗

System for instrumenting and manipulating apparatuses in high voltage

A system for energizing, operating and manipulating apparatuses in high voltage systems. The system uses a dielectric gas such as SF.sub.6 as a driving power supply for a pneumatic motor which ultimately charges a battery or other energy storage device. The stored energy can then be used for instrumentation equipment, or to power any electrical equipment, in the high voltage deck. The accompanying method provides for the use of the SF6 system for operating an electrical device in a high-voltage environment.

25 ENERGY STORAGE↗

Fluid control structures in microfluidic devices

Methods and apparatus for implementing microfluidic analysis devices are provided. A monolithic elastomer membrane associated with an integrated pneumatic manifold allows the placement and actuation of a variety of fluid control structures, such as structures for pumping, isolating, mixing, routing, merging, splitting, preparing, and storing volumes of fluid. The fluid control structures can be used to implement a variety of sample introduction, preparation, processing, and storage techniques.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Identification of biomass fractions responsible for wear on biomass processing equipment

Abstract: There is a current problem in the DOE supported Integrated Bio refineries where metal parts, including grinder blades and pneumatic ducting, are wearing out too early in the lifetime of the equipment. Repairing and replacing the equipment leads to unexpected equipment costs and the complete shutdown of the affected production lines.. It is believed that the ash content of the biomass is the likely cause of the wear on the metals. To address this ongoing problem, INL staff are analyzing the wear of metals caused by interactions with biomass . A sandblaster was modified to shoot ground biomass at metal coupons to simulate the wear that is occurring in the bio refineries. This system was able to test several variables including which biomass causes erosive and abrasive wear, impingement angle, particle densities of the biomass, and how the quantity of mass impacts the wear of the metals. Coupon mass loss after blasting was used to evaluate the wear caused by different biomass fractions. It was determined that the bark fraction of biomass caused the most wear and the whitewood fraction caused the least wear. Coupon mass loss in logging residues was found to be positively correlated with ash content, indicating that the ash content in the biomass is responsible for wear. It was also found that hand separated forest residues, sodium, aluminum and iron were positively correlated with wear, while silicon showed no correlation with wear.

09 BIOMASS FUELS↗

Enterprise: a reduced-scale, flexible fuel, single-cylinder crosshead marine diesel research engine

A custom-built 1/10 scale, flexible-fuel, single-cylinder crosshead marine diesel research engine, dubbed the Enterprise, was designed and built as a platform for conducting marine lubricant research. The engine design was focused on maintaining lubricant boundary conditions similar those of full-scale engines. The Enterprise has a rated speed of 625 rpm to match the linear mean piston speed of full-scale marine engines with the reduced stroke and is capable of 18 bar brake mean effective pressure (BMEP). A high-swirl, uniflow-scavenged, two-stroke combustion system was designed to operate on either distillate diesel or heavy fuel oil (HFO). A hydraulic electronic unit injector (HEUI) fuel injection system with two injectors having customized three-hole nozzles provides fueling and is driven by the MAHLE Flexible ECU (MFE). Intake air boost is provided using a variable speed industrial air compressor along with closed-loop electronically controlled pressure regulation. Exhaust backpressure is also controlled electronically using an electro-pneumatic butterfly valve. A customized, miniaturized Hans Jensen Lubetronic cylinder lubrication system, which is capable of delivering 0.88 mg of cylinder oil per lubricator per injection to the ring pack at up to the maximum engine overspeed rating of 656 rpm, was commissioned for the Enterprise. Four independently temperature-controlled cooling zones are used to provide control of the liner temperature profile. The four coolant zones as well as the system oil and cylinder oil supplies are all controlled within 1°C for consistent thermal boundary conditions. The engine is instrumented with an in-cylinder pressure transducer as well as an inline torque transducer and numerous process temperature and pressure measurements to allow for detailed thermodynamic efficiency analysis, and experimental facilities allow for precise measurement of liner wear and characterization of deposits on the piston and rings. A radio telemetry system from IR Telemetrics is used to measure piston crown temperatures during engine operation. Engine design considerations and experimental facilities are described in detail, along with the results of a study investigating the impact of both system oil and cylinder oil viscosity on friction and efficiency. A test matrix was designed to compare base stock chemistries and viscosities for both system and cylinder oils. Experiments were completed using a fuel economy test protocol that was defined, consisting of repeating six speed/load operating conditions. An automated dynamometer control system was implemented to ensure repeatability of the test procedure. Preliminary testing indicated that the coolant, oil, and exhaust temperatures reach a steady state within 5 minutes of changing operating conditions. The system oil viscosity was found to have a significant impact on friction, with a reduction in viscosity from SAE 30 to SAE 20 resulting in over 6% reduction in friction mean effective pressure (FMEP) and over a 2% reduction in brake-specific fuel consumption (BSFC). Chemistry effects were also evident in the system and cylinder oils. Repeatability comparisons between the individual repetitions of each operating condition were used to ensure that results are statistically valid. For the initial cylinder oil viscosity experiments, observed changes were within the established/normal repeatability; ongoing experiments will determine whether improvements in boundary condition control will enable cylinder friction changes of this magnitude to be measured on this engine platform.

Kaul, Brian↗

Fluid control structures in microfluidic devices

Methods and apparatus for implementing microfluidic analysis devices are provided. A monolithic elastomer membrane associated with an integrated pneumatic manifold allows the placement and actuation of a variety of fluid control structures, such as structures for pumping, isolating, mixing, routing, merging, splitting, preparing, and storing volumes of fluid. The fluid control structures can be used to implement a variety of sample introduction, preparation, processing, and storage techniques.

Mathies, Richard A.↗

Air maintenance tire

The present invention is directed to a pneumatic tire comprising a sidewall component, the sidewall component including an air passageway extending at least partially about the circumference of the tire, the air passageway surrounded by and in fluid communication with a surface comprising a rubber composition, the rubber composition comprising: a diene based rubber; from 0.25 to 5 parts by weight, per 100 parts by weight of rubber (phr), of a self-lubrication agent capable of migrating from the rubber composition to the groove surface and disposing on the groove surface as a liquid; and from 1 to 15 parts by weight, per 100 parts by weight of rubber (phr), of a vulcanization modifier for use in the second rubber composition include α,ω-bis(N,N′-dihydrocarbylthiocarbamamoyldithio)alkanes, bismaleimides, and biscitraconimides.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

250 kWth Pilot Testing in Support of a 10 MWe Coal-Direct Chemical Looping Demonstration Feasibility Study

The Coal-Direct Chemical Looping (CDCL) process is emerging as a promising technology capable of high efficiency for producing electricity with low cost for carbon capture. In the CDCL process, coal is fully combusted to form carbon dioxide (CO2) and water via reaction with Fe2O3-based oxygen-carrier particles in a moving-bed reducer reactor. During reaction with coal, the Fe2O3 is reduced to form a mixture of Fe and FeO. The reduced particles are then transported to the combustor reactor where they are re-oxidized with air. The oxidation of the Fe and FeO mixture generates heat that can be used to produce steam for power generation. Once the particles are fully regenerated, they are pneumatically recycled to the reducer reactor where another reduction-oxidation (Redox) cycle begins. The Babcock & Wilcox Company (B&W) and The Ohio State University (OSU) have been developing the CDCL technology based on iron-based metal oxide particles circulating in a moving-bed reducer coupled with an entrained-flow combustor. As part of a Phase I effort of a DOE-sponsored project, B&W identified scale-up technology gaps for the coal-direct chemical looping reactor process, most of which fall under the moving-bed reactor design and operation. However, after the Phase I research, B&W concluded that the CDCL technology has the potential of generating electricity while meeting the DOE goals of greater than 90% CO2 capture and less than 35% increase in levelized cost of electricity (LCOE). B&W then moved to a Phase II project to design, build and demonstrate the CDCL technology at a 250 kWth capacity. B&W finished the construction and commissioning of the pilot test facility in 2017. The approach used to design a 250 kWth pilot-scale CDCL facility to investigate the technology gaps is presented. Important lessons from the commissioning activities that would transfer to commercial plant start-up are also shared. The findings from the test program are being incorporated into a Pre-FEED study for a 10 MWe large pilot demonstration. Under a separately-funded heat integration project, B&W and OSU are developing a multiphase computational fluid dynamic model (MFIX) of the combustor to quantify heat transfer to embedded steam generation surface, utilizing pinch analysis (ASPEN Energy Analyzer) to identify potential improvements of the heat integration scheme, and developing an integrated dynamic model (ProTRAX) of the steam turbine coupled with the chemical looping process to identify potential start-up and transient operation issues. Under an advanced control system for optimizing operation, B&W is supporting OSU to install a rules-based optimizer (B&W’s FocalPoint) on their 25 kWt bench-scale facility on the OSU West Campus. Finally, B&W and OSU were recently selected to perform a Phase I Feasibility study to evaluate installation of the 10 MWe pilot at the Dover Power & Light Municipal Power Plant in Dover, Ohio. The feasibility study includes compiling an Environmental Information Volume and generating a cost estimate for the design, construction and commissioning of the plant as well as lining up commitments from potential project participants and funding contributors. Updates on each project will be presented. The status of the technology development will be discussed. We focus on the progress made to date towards closing the technology gaps under each project.

20 FOSSIL-FUELED POWER PLANTS↗

Update on Design of 10 MWe Iron-Based Coal Direct Chemical Looping Demonstration Plant

The Coal-Direct Chemical Looping (CDCL) process is emerging as a promising technology capable of high efficiency for producing electricity with low cost for carbon capture. In the CDCL process, coal is fully combusted to form carbon dioxide (CO2) and water via reaction with Fe2O3-based oxygen-carrier particles in a moving-bed reducer reactor. During reaction with coal, the Fe2O3 is reduced to form a mixture of Fe and FeO. The reduced particles are then transported to the combustor reactor where they are re-oxidized with air. The oxidation of the Fe and FeO mixture generates heat that can be used to produce steam for power generation. Once the particles are fully regenerated, they are pneumatically recycled to the reducer reactor where another reduction-oxidation (Redox) cycle begins. The Babcock & Wilcox Company (B&W) and The Ohio State University (OSU) have been developing the CDCL technology based on iron-based metal oxide particles circulating in a moving-bed reducer coupled with an entrained-flow combustor. As part of a Phase I effort of a DOE-sponsored project, B&W identified scale-up technology gaps for the coal-direct chemical looping reactor process, most of which fall under the moving-bed reactor design and operation. However, after the Phase I research, B&W concluded that the CDCL technology has the potential of generating electricity while meeting the DOE goals of greater than 90% CO2 capture and less than 35% increase in levelized cost of electricity (LCOE). B&W then moved to a Phase II project to design, build and demonstrate the CDCL technology at a 250 kWth capacity. B&W finished the construction and commissioning of the pilot test facility in 2017. The approach used to design a 250 kWth pilot-scale CDCL facility to investigate the technology gaps is presented. Important lessons from the commissioning activities that would transfer to commercial plant start-up are also shared. The findings from the test program are being incorporated into a Pre-FEED study for a 10 MWe large pilot demonstration. Under a separately-funded heat integration project, B&W and OSU are developing a multiphase computational fluid dynamic model (MFIX) of the combustor to quantify heat transfer to embedded steam generation surface, utilizing pinch analysis (ASPEN Energy Analyzer) to identify potential improvements of the heat integration scheme, and developing an integrated dynamic model (ProTRAX) of the steam turbine coupled with the chemical looping process to identify potential start-up and transient operation issues. Under an advanced control system for optimizing operation, B&W is supporting OSU to install a rules-based optimizer (B&W’s FocalPoint) on their 25 kWt bench-scale facility on the OSU West Campus. Finally, B&W and OSU were recently selected to perform a Phase I Feasibility study to evaluate installation of the 10 MWe pilot at the Dover Power & Light Municipal Power Plant in Dover, Ohio. The feasibility study includes compiling an Environmental Information Volume and generating a cost estimate for the design, construction and commissioning of the plant as well as lining up commitments from potential project participants and funding contributors. Updates on each project will be presented. The status of the technology development will be discussed. We focus on the progress made to date towards closing the technology gaps under each project.

20 FOSSIL-FUELED POWER PLANTS↗

Large-Scale Thermoset Pick and Place Testing and Implementation

Oak Ridge National Laboratory is developing the first commercially available medium to large-scale thermoset additive manufacturing (AM) system with Magnum Venus Products (MVP). This 3D printer is capable of fabricating large-scale thermoset components at room temperature with a build volume of 16’ x 8’ x 42’’. The thermoset extrusion process uses irreversible exothermic chemical reactions to form a cross-linked polymer. Printing thermosets at such large scales with highly customizable materials at room temperature provides huge opportunities for complex and smart tooling applications. Integrating a pick and place actuator into this system will allow for the placement of heating/cooling channels as well as sensors to monitor tooling health and heat distribution. The pneumatically-driven pick and place actuator is integrated into the existing electrical and mechanical design and is controlled using custom M-code commands. The system is comprised mostly of commercially available components, providing easy adoptability by future thermoset systems.

Boulger, Alex↗

Self-sealing container for protecting air sensitive samples

A self-sealing container, used for transferring one or more air sensitive samples between vacuum systems, includes a housing with a cavity that holds the sample(s), and a lid disposed on top of the housing. The lid is configured to interface with the housing to form a seal over the cavity when the lid is closed. At least two flexure systems, each coupled to the housing and the lid, are disposed on opposing sides of the housing. The flexure systems apply forces to the lid that move the lid horizontally and vertically above the housing, into an open position. A pneumatic actuator, movably coupled to the housing and the lid, that is actuated by a change in ambient pressure. When actuated, it applies forces that move the lid horizontally and vertically to the closed position, in opposition to and in excess of the forces applied by the flexure systems.

42 ENGINEERING↗

AGC-4 Experiment Irradiation Monitoring Data Qualification Final Report

The Graphite Technology Development Program ran a series of six experiments to quantify the effects of irradiation on nuclear grade graphite. This report focuses on the fourth experiment, Advanced Graphite Creep 4 (AGC 4). The Advanced Reactor Development (ARD) Technology Development Office (TDO) Program for research and development activities require documentation of qualified monitoring data to design and license the first high-temperature reactor nuclear plant. Qualified data meets the requirements for use as described in the experiment planning and quality assurance documents. Failed data do not meet the requirements and provide no useable information. Trend data may not meet all requirements but still provide some useable information. Use of Trend data requires assessment of how any deficiencies affect a particular use of the data. AGC-4 began with Advanced Test Reactor (ATR) Cycle 157D on May 30, 2015. After irradiating the graphite for two cycles, the capsule was removed from the reactor after ATR Cycle 158A, which ended on January 2, 2016, due to interference with another experiment. Irradiation was resumed with Cycle 162A on October 7, 2017 after the interfering experiment was removed from the reactor. AGC-4 irradiation completed by the end of Cycle 166B on January 10, 2020. Between Cycles 162A and 166B, AGC-4 capsule was removed from the reactor core during two Powered Axial Locator Mechanism (PALM) Cycles 163A and 165A to avoid overheating. All thermocouples (TCs) have functioned throughout the AGC-4 experiment. A total of 9,256,184 out of all 11,167,213 temperature records (or 82.9%) are Qualified for use by the ARD Program and 1,911,029 missing values are Failed. Argon, helium, and total gas flow data were within expected ranges, except only eight out-of-range values occurred during outages. A total of 21,240,627 out of all 22,288,5103 gas flow rates (or 92.8%) are Qualified for use by the ARD Program and 1,644,476 are Failed records mostly due to missing values. Discharge gas line moisture values were consistently low during full ATR power, except for 162B, when moisture content was increasing to more than 200 ppmv by the end of this cycle. During outages, moisture content reached as high as 700 ppmv. 1,089,941 out of a total of 1,107,331 moisture values (or 98.4%) are within the measurement range of the instrument and are Qualified for use by the ARD Program and 17,390 missing moisture values are Failed. Graphite creep specimens were subjected to one of three loads: 393, 491, or 589 lbf. For a brief period during Cycle 157D between 12:19 on June 2, 2015, and 08:23 on June 11, 2015, the load cells were wired incorrectly, resulting in missing stack load data. Missing stack loads were estimated from measured ram pressures using regression equations developed from the existing data from Cycle 157D. Estimated stack loads during this period are considered to be an accurate representation of actual load applied to the stacks. These loads deviate slightly from the planned loads. This deviation does not prevent the data from being Qualified for use but must be taken into account when analyzing the effect of load on creep. 6,095,728 out of a total of 6,403,985 moisture values (or 95.2%) are within the measurement range of the instrument and are Qualified for use by the ARD Program and 308,257 missing load values are Failed. Stack displacement increased consistently throughout the eight cycles, with total displacement reached highest value of 2.4 in by the end of irradiation. During ATR outages, a set of pneumatic rams raised the stacks of graphite creep specimens to ensure the specimens were not stuck within the test train. This stack raising was performed seven times throughout irradiation. All stacks were raised successfully each time. 4,744,974 out of a total of 6,094,513 displacement values (or 77.9%) are within the measurement range of the instrument and are Qualified for use by the ARD Program and 1,349,539 displacement values are Failed mostly due to missing values. Analyses were conducted on correlations between TCs to look for trends and step changes that might indicate instrument degradation or failure. Correlation analysis was used to identify instances when TCs form short circuits, referred to as virtual junctions, which result in TCs reporting temperatures from some location in the capsule other than the location where they were intended to read. No evidence of virtual junctions was found. Analyses were also conducted on control charts of temperature differences of between two TCs, which are expected to behave consistently throughout the entire irradiation period. Upward or downward trend over time indicates at least one TC in the pair was drifted. Examining control charts for all 66 possible pairs out of twelve TCs installed in the AGC-4 capsules reveal no clear drift failures occurred, except unstable behavior of two TCs in Zone 3, TC-7 and TC-8, over irradiation time. In conclus

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Remote optical wind detection and aerodynamic control system for ground vehicle

An aerodynamic control system for a ground vehicle comprises a LiDAR module including at least one LiDAR sensor configured to obtain wind data upstream of the ground vehicle; a computing device; an aerodynamic device controller; and an aerodynamic device including a control surface. The computing device is configured to receive the wind data from the LiDAR module and generate output signals based on the wind data. The aerodynamic device controller is configured to receive the output signals from the computing device and generate control signals to control the aerodynamic device to adjust aerodynamic properties of the ground vehicle based at least in part the wind data. Changes to the configuration of the control surface may include increasing or decreasing a deflection angle of the at least one aerodynamic device. The aerodynamic device may include, e.g., a pneumatically actuated aerodynamic device or an electro-mechanically actuated aerodynamic device.

Damon, Kenneth H.↗