Parametric testing of an externally configured thermionic converter

A 25.4-cm long externally configured converter was performance tested by electrically heating the emitter to simulate reactor thermal power input. The measured maximum output power was limited by the maximum input power available from the electric RF induction heater. With maximum heater input power, the converter electric output was 178 W (1.95 W/sq cm) at an emitter temperature of 1946 K. This electric output power was smaller than expected. A reactor-core-length (25.4-cm long) cylindrical thermionic converter power and maintaining the emitter-to-collector gap without shorting are of major importance to the feasibility of a 25.4-cm-long reactor fuel element. The emitter of the converter is located externally to the collector to increase the fuel-volume fraction and to allow redundant collector cooling in a reactor configuration.

Shimada, K.↗

Evaluation of class 2 biological cabinets

Basic investigations, consisting primarily of airflow measurements and visual smoke tests, were made on four commercially available units. The results indicated that performance varied considerably between units. Therefore, it was decided to outline the performance desired and to include in the overall equipment specifications a set of performance tests to assure a clean air safety cabinet with respect to chemical usage. The evaluation was to be based on aerodynamic performance under the various modes of operation.

Chamberlin, R. E.↗

Performance of the Aspect Camera Assembly for the Advanced X-Ray Astrophysics Facility: Imaging

The Aspect Camera Assembly (ACA) is a "state-of-the-art" star tracker that provides real-time attitude information to the Advanced X-Ray Astrophysics Facility - Imaging (AXAF-I), and provides imaging data for "post-facto" ground processing. The ACA consists of a telescope with a CCD focal plane, associated focal plane read-out electronics, and an on-board processor that processes the focal plane data to produce star image location reports. On-board star image locations are resolved to 0.8 arcsec, and post-facto algorithms yield 0.2 arcsec star location accuracies (at end of life). The protoflight ACA has been built, along with a high accuracy vacuum test facility. Image position determination has been verified to < 0.2 arcsec accuracies. This paper is a follow-on paper to one presented by the author at the AeroSense '95 conference. This paper presents the "as built" configuration, the tested performance, and the test facility's design and demonstrated accuracy. The ACA has been delivered in anticipation of a August, 1998 shuttle launch.

Michaels, Dan↗

Testing of the International Space Station and X-38 Crew Return Vehicle GPS Receiver

This paper discusses the process and results of the performance testing of the GPS receiver planned for use on the International Space Station (ISS) and the X- 38CrewReturnVehicle(CRV). The receiver is a Force-19 unit manufactured by Trimble Navigation and modified in software by NASA:s Goddard Space Flight Center (GSFC) to perform navigation and attitude determination in space. The receiver is the primary source of navigation and attitude information for ISS and CRV. Engineers at GSFC have developed and tested the new receiver with a Global Simulation Systems Ltd (GSS) GPS Signal Generator (GPSSG). This paper documents the unique aspects of ground testing a GPS receiver that is designed for use in space. A discussion of the design of tests using the GPSSG, documentation, data capture, data analysis, and lessons learned will precede an overview of the performance of the new receiver. A description of the challenges that were overcome during this testing exercise will be presented. Results from testing show that the receiver will be within or near the specifications for ISS attitude and navigation performance. The process for verifying other requirements such as Time to First Fix, Time to First Attitude, selection/deselection of a specific GPS satellite vehicles (SV), minimum signal strength while still obtaining attitude and navigation, navigation and attitude output coverage, GPS week rollover, and Y2K requirements are also given in this paper.

Simpson, James↗

Leading Your Leaders

Even though working on a problem has been your primary effort for the past year, your leadership may have heard about this once in a briefing a decade ago. Now they are basically clueless. Pretend that you are talking to your daughter's fifth-grade class. Explain how your complicated gizmo works. If possible, do not use acronyms. Define your terms. Put your work in context. Assume your leader has no idea what you do, who you work for, or what your gizmo does. That is a good place to start. Remember, taking the next century to study the problem or spending the Gross National Product to invent a new solution are probably not going to be acceptable solutions. Real engineers and technicians build real hardware that works in the real world in a reasonable manner within a reasonable time at a reasonable cost. True, skimping on time or money can cause mistakes, but folks whose gizmos are delayed unreasonably or cost more than is practical get their programs canceled, force the business into bankruptcy, or give the market over to the competition. Real engineers and technicians always consider cost and schedule in their work. Raising questions is important. However, we are in the business of doing things. Engineers and technicians are paid to get things done. Yes, you have to identify the problem, frame the design, identify the tests, perform the analysis, and assemble the hardware. But the goal is to solve the problem. Nobody ever said flying in space was easy. We make it look easy the same way that an Olympic champion makes her sport look easy: by working hard at improving performance every day. Better are the results of a well-defined test. Remember that a test on a laboratory bench is always an approximation of reality, and rules similar to those for good analysis also apply. One should always be mindful of Mechelay's rule: "It is better to be stupid than to run a stupid test." Often we try to overtest. If a piece of hardware passes an unbelievably difficult test, then life is good. More often when an unbelievably difficult test fails, we are left with a very long discussion of why and what was wrong in the design or execution of the test. Make sure that the test is well defined. Even then, it is important to explain to your leaders what inherent accuracy (or error) the test conditions or equipment have and what the assumptions or initial conditions were for the test. Test results without a good understanding of the test's accuracy or the pedigree of the test assumptions are worth very little. Finally, there is flight test data. Always limited, never at the edge of the envelope, it still shows how the real hardware works in a combined environment. Flight experience is dangerous because it typically doesn't show how close to the edge of the cliff the equipment is operating, but it does demonstrate how the hardware really works. A flight test is the ultimate test, again taken with the knowledge that it is probably not the extreme but something more like the middle of the environmental and systems performance. Good understanding of a problem and its solution always relies on a combination of all these methods. Be sure to lead your leaders by using all the tools you have at your disposal. At the end of the day, decisions in space flight always come down to a risk trade. Our business is not remotely safe, not in the sense that the public, the media, or our legislators use the term. Everything we do has a risk, cost, schedule, or performance trade-off. For your leaders to make an appropriate decision, you need to educate them, lead them, talk with them, and engage them in the discussion until full understanding takes place. It's your job. *

Hale, Wayne N.↗

Testing of the International Space Station and X-38 Crew Return Vehicle GPS Receiver

This paper discusses the process and results of the performance testing of the GPS receiver planned for use on the International Space Station (ISS) and the X-38 Crew Return Vehicle (CRV). The receiver is a Force-19 unit manufactured by Trimble Navigation and modified in software by the NASA Goddard Space Flight Center (GSFC) to perform navigation and attitude determination in space. The receiver is the primary source of navigation and attitude information for ISS and CRV. Engineers at GSFC have developed and tested the new receiver with a Global Simulation Systems Ltd (GSS) GPS Signal Generator (GPSSG). This paper documents the unique aspects of ground testing a GPS receiver that is designed for use in space. A discussion of the design of tests using the GPSSG, documentation, data capture, data analysis, and lessons learned will precede an overview of the performance of the new receiver. A description of the challenges that were overcome during this testing exercise will be presented. Results from testing show that the receiver will be within or near the specifications for ISS attitude and navigation performance. The process for verifying other requirements such as Time to First Fix, Time to First Attitude, selection/deselection of a specific GPS satellite vehicles (SV), minimum signal strength while still obtaining attitude and navigation, navigation and attitude output coverage, GPS week rollover, and Y2K requirements are also given in this paper.

Simpson, James↗

Three-Man Solid Electrolyte Carbon Dioxide Electrolysis Breadboard

The development of the Three-Man (2.2 lb CO2/man-day) Solid Electrolyte CO2 Electrolysis Breadboard consisted of a Phase 1 and 2 effort. The Phase 1 effort constituted fabrication of three electrolysis cell types and performing parametric testing, off-design testing, and cell life testing. The Phase 2 consisted of the preliminary design, incorporation of palladium (Pd) tubes for hydrogen separation from the electrolyzer cathode feed gases, design support testing, final design, fabrication, and performance testing of the breadboard system. The results of performance tests demonstrated that CO2 electrolysis in an oxygen reclamation system for long duration space-based habitats is feasible. Closure of the oxygen system loop, therefore, can be achieved by CO2 electrolysis. In a two step process the metabolic CO2 and H2O vapor are electrolyzed into O2, H2, and CO. The CO can subsequently be disproportionated into carbon and CO2 in a carbon deposition reactor and the CO2 in turn be recycled and electrolyzed for total O2 recovery. The development effort demonstrated electrolyzer system can be designed and built to operate safely and reliably and the incorporation of Pd tubes for hydrogen diffusion can be integrated safely with predictable performance.

Isenberg, Arnold O.↗

Testing of the International Space Station and X-38 Crew Return Vehicle GPS Receiver

This paper discusses the process and results of the performance testing of the GPS receiver planned for use on the International Space Station (ISS) and the X-38 Crew Return Vehicle (CRV). The receiver is a Force-19 unit manufactured by Trimble Navigation and Modified in software by the NASA Goddard Space Flight Center (GSFC) to perform navigation and attitude determination in space. The receiver is the primary source of navigation and attitude information for ISS and CRV. Engineers at GSFC have developed and tested the new receiver with a Global Simulation Systems Ltd (GSS) GPS Signal Generator (GPSSG). This paper documents the unique aspects of ground testing a GPS receiver that is designed for use in space. A discussion of the design and tests using the GPSSG, documentation, data capture, data analysis, and lessons learned will precede an overview of the performance of the new receiver. A description of the challenges of that were overcome during this testing exercise will be presented. Results from testing show that the receiver will be within or near the specifications for ISS attitude and navigation performance. The process for verifying other requirements such as Time to First Fix, Time to First Attitude, selection/deselection of a specific GPS satellite vehicles (SV), minimum signal strength while still obtaining attitude and navigation, navigation and attitude output coverage, GPS week rollover, and Y2K requirements are also given in this paper.

Simpson, James↗

Design, Fabrication, and Performance of Foil Gas Thrust Bearings for Microturbomachinery Applications

A methodology for the design and construction of simple foil thrust bearings intended for parametric performance testing and low marginal costs is presented. Features drawn from a review of the open literature are discussed as they relate to bearing performance. The design of fixtures and tooling required to fabricate foil thrust bearings is presented, using conventional machining processes where possible. A prototype bearing with dimensions drawn from the literature is constructed, with all fabrication steps described. A load-deflection curve for the bearing is presented to illustrate structural stiffness characteristics. Start-top cycles are performed on the bearing at a temperature of 425 C to demonstrate early-life wear patterns. A test of bearing load capacity demonstrates useful performance when compared with data obtained from the open literature.

Dykas, Brian↗

Investigation of a mixed compression axisymmetric inlet at Mach number 5.3

The hypersonic diffuser portion of an uncooled high performance mixed compression, axisymmetric inlet suitable for subsonic burning engines was designed and tested. Performance of a model with a 25.4-cm capture diameter was measured in a wind tunnel and the results were compared with theoretical predictions calculated by a comprehensive computer program. All tests were conducted at a Mach number of 5.3 at a total temperature of 667 K and a total pressure of 11.57 atm. The angle of attack ranged from 0 to + or - 3 deg. Performance at angle of attack remained high. Reasonably high performance in the throat (maximum throat pitot-pressure recovery of 77 percent and an average value of 58 percent) was obtained at 0 deg angle of attack with relatively large amounts of boundary-layer bleed (11 to 22 percent of the capture mass flow). The computer program used in the design of this inlet is considered marginally adequate for predicting hypersonic inlet flow fields. Although the program as it now exists is very useful, an improved computer program that more accurately predicts the boundary layer and the shock-wave-boundary-layer interaction and accounts for boundary-layer bleed should be developed for reliability predicting hypersonic inlet flow fields.

Latham, E. A.↗

Hollow Cathode Assembly Development for the HERMeS Hall Thruster

To support the operation of the HERMeS 12.5 kW Hall Thruster for NASA's Asteroid Redirect Robotic Mission, hollow cathodes using emitters based on barium oxide impregnate and lanthanum hexaboride are being evaluated through wear-testing, performance characterization, plasma modeling, and review of integration requirements. This presentation will present the development approach used to assess the cathode emitter options. A 2,000-hour wear-test of development model Barium Oxide (BaO) hollow cathode is being performed as part of the development plan. Specifically this test is to identify potential impacts cathode emitter life during operation in the HERMeS thruster. The cathode was operated with a magnetic field-equipped anode that simulates the HERMeS hall thruster operating environment. Cathode discharge performance has been stable with the device accumulating 743 hours at the time of this report. Observed voltage changes are attributed to keeper surface condition changes during testing. Cathode behavior during characterization sweeps exhibited stable behavior, including cathode temperature. The details of the cathode assembly operation of the wear-test will be presented.

Propulsion Technology↗

Design, fabrication, and testing of an external fuel (UO2), full-length thermionic converter

The development of a full-length external-fuel thermionic converter for in-pile testing is described. The development program includes out-of-pile performance testing of the fully fueled-converter, using RF-induction heating, before its installation in the in-pile test capsule. The external-fuel converter is cylindrical in shape, and consists of an inner, centrally cooled collector, and an outer emitter surrounded by nuclear fuel. The term full-length denotes that the converter is long enough to extend over the full height of the reactor core. Thus, the converter is not a scaled-down test device, but a full-scale fuel element of the thermionic reactor. The external-fuel converter concept permits a number of different design options, particularly with respect to the fuel composition and shape, and the collector cooling arrangement. The converter described was developed for the Jet Propulsion Laboratory, and is based on their concept for a thermionic reactor with uninsulated collector cooling as previously described. The converter is double-ended, with through-flow cooling, and with ceramic seals and emitter and collector power take-offs at both ends. The design uses a revolver-shaped tungsten emitter body, with the central emitter hole surrounded by six peripheral fuel holes loaded with cylindrical UO2 pellets.

Schock, A.↗

Space shuttle OMS helium regulator design and development

Analysis, design, fabrication and design verification testing was conducted on the technological feasiblity of the helium pressurization regulator for the space shuttle orbital maneuvering system application. A prototype regulator was fabricated which was a single-stage design featuring the most reliable and lowest cost concept. A tradeoff study on regulator concepts indicated that a single-stage regulator with a lever arm between the valve and the actuator section would offer significant weight savings. Damping concepts were tested to determine the amount of damping required to restrict actuator travel during vibration. Component design parameters such as spring rates, effective area, contamination cutting, and damping were determined by test prior to regulator final assembly. The unit was subjected to performance testing at widely ranging flow rates, temperatures, inlet pressures, and random vibration levels. A test plan for propellant compatibility and extended life tests is included.

Wichmann, H.↗

Precision Pointing Control System (PPCS) star tracker test

Tests performed on the TRW precision star tracker are described. The unit tested was a two-axis gimballed star tracker designed to provide star LOS data to an accuracy of 1 to 2 sec. The tracker features a unique bearing system and utilizes thermal and mechanical symmetry techniques to achieve high precision which can be demonstrated in a one g environment. The test program included a laboratory evaluation of tracker functional operation, sensitivity, repeatibility, and thermal stability.

Source record↗

Nonlinear structural crash dynamics analyses

Presented in this paper are the results of three nonlinear computer programs, KRASH, ACTION and DYCAST used to analyze the dynamic response of a twin-engine, low-wing airplane section subjected to a 8.38 m/s (27.5 ft/s) vertical impact velocity crash condition. This impact condition simulates the vertical sink rate in a shallow aircraft landing or takeoff accident. The three distinct analysis techniques for nonlinear dynamic response of aircraft structures are briefly examined and compared versus each other and the experimental data. The report contains brief descriptions of the three computer programs, the respective aircraft section mathematical models, pertinent data from the experimental test performed at NASA Langley, and a comparison of the analyses versus test results. Cost and accuracy comparisons between the three analyses are made to illustrate the possible uses of the different nonlinear programs and their future potential.

Hayduk, R. J.↗

Test results of the DOE/Sandia 17 meter VAWT

A review is given of the test program of a 17 meter Vertical Axis Wind Turbine VAWT. Performance test results are discussed including difficulties encountered during the VAWT operation along with ways of solving these problems.

Nellums, R. O.↗

Cable coupling lightning transient qualification

Simulated lightning strike testing of instrumentation cabling on the redesigned solid rocket motor was performed. Testing consisted of subjecting the lightning evaluation test article to simulated lightning strikes and evaluating the effects of instrumentation cable transients on cables within the system tunnel. The maximum short-circuit current induced onto a United Space Boosters, Inc., operational flight cable within the systems tunnel was 92 A, and the maximum induced open-circuit voltage was 316 V. These levels were extrapolated to the worst-case (200 kA) condition of NASA specification NSTS 07636 and were also scaled to full-scale redesigned solid rocket motor dimensions. Testing showed that voltage coupling to cables within the systems tunnel can be reduced 40 to 90 dB and that current coupling to cables within the systems tunnel can be reduced 30 to 70 dB with the use of braided metallic sock shields around cables that are external to the systems tunnel. Testing also showed that current and voltage levels induced onto cables within the systems tunnel are partially dependant on the cables' relative locations within the systems tunnel. Results of current injections to the systems tunnel indicate that the dominant coupling mode on cables within the systems tunnel is not from instrumentation cables but from coupling through the systems tunnel cover seam apertures. It is recommended that methods of improving the electrical bonding between individual sections of the systems tunnel covers be evaluated. Further testing to better characterize redesigned solid rocket motor cable coupling effects as an aid in developing methods to reduce coupling levels, particularly with respect to cable placement within the systems tunnel, is also recommended.

Cook, M.↗

Elimination of High-Frequency Combustion Instability in the Fastrac Engine Thrust Chamber

A series of tests were conducted to stabilize the combustion of the Fastrac engine thrust chamber. The first few stability tests resulted in unstable combustion due ineffective acoustic cavity designs. The thrust chamber exhibited unstable combustion in the first-tangential mode and its harmonics. Combustion was stabilized by increasing the volume of the acoustic cavities and by plugging the dump-cooling orifices so that the cavities were uncooled. Although the first few stability tests resulted in unstable combustion, prior and subsequent long-duration performance tests of the Fastrac thrust chamber were spontaneously stable. Stability considerations during the injector faceplate design were based on the Hewitt correlation.

Rocker, Marvin↗