The booster to AGS transfer line: comparison between model and measurements
The Booster to AGS (BtA) transfer line was to match both ions and protons into the AGS lattice. For proton beam operation the only constraint on the optics is to define a match to the AGS lattice. For ion operation there are additional constraints introduced by a stripping foil in the upstream part of the transfer line. For polarized proton operation there is the complication that the AGS lattice is distorted by the presence of two partial snake magnets. In the 2008 polarized proton run it was observed that there was a significant optical injection mismatch. Beam experiments were conducted that showed disagreement with the model of the BtA line. In addition, these studies revealed some minor problems with the instrumentation in the line. A new model and more reliable measurements of the transfer line magnet currents have been implemented. Another series of experiments was conducted to test these modifications and to collect a more complete set of data to allow better understanding of the beam dynamics during the transfer and better understanding of the instrumentation. In this paper we will present the results of these experiments and the comparison to the new model of the BtA.