Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Goals”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 973 records · Page 54

Power Supply Options for the Marpi Landfill, Saipan: Comprehensive Feasibility Study

The Marpi Landfill (“Marpi” or “the landfill”), located on the northern end of the island of Saipan in the Commonwealth of the Northern Mariana Islands (CNMI), is powered by a single on-site diesel generator that only operates when the landfill is open and staffed. The project team, composed of representatives of the Department of Public Works and the Office of Planning and Development (OPD), aspires to provide the Marpi Landfill with 24-hour power availability despite its remote location to increase the use of sustainable energy and to ensure environmentally compliant landfill operations. This is consistent with the sustainable development goals documented in the 2021–2030 Comprehensive Sustainable Development Plan (OPD 2021), including Goal #12 (ensure environmentally compliant waste management facilities) and Goal #7 (renewable energy deployment). Further, the CNMI has a 20% target for renewable energy consumption by 2030, as documented in the 2021–2030 Comprehensive Sustainable Development Plan (OPD 2021) and the renewable portfolio standard (Public Law 18-62). To accomplish these goals, the Federal Emergency Management Agency, through its Interagency Reimbursable Work Agreement with the U.S. Department of Energy, funded a feasibility study and follow-up study in 2023–2024 to assess and prioritize power supply options for the landfill. This report combines the results from both feasibility studies.

14 SOLAR ENERGY↗

Tribal Engagement in Transmission Planning

The purpose of this white paper is to provide Tribes with information that (a) helps assess whether transmission access is important for their energy goals, and (b) provides guidance on how to engage in transmission planning, if and when doing so would help the Tribe achieve its energy goals. DOE's Office of Indian Energy notes that "Indian Country contains vast untapped energy resources" (OIE 2023). Individual tribes express a wide array of energy needs and goals, ranging from simple access to basic electricity service and energy efficiency tools, to the development of utility-scale generating plants. Access to transmission is a key part of this multifaceted tribal energy picture. About 2.3 percent of the nation's transmission miles are on tribal lands (OIE 2023). Even within that slice, however, circumstances vary widely. Much of that transmission is for local network delivery (138kV or less). There are some large-capacity 500kV lines, but in many cases the Tribe has limited access to them even when they run across the reservation. Some of the Tribes with the largest land area have little transmission, and some such as Navajo Nation and Hopi Tribe have many homes with no access to electricity. This white paper begins with a high-level summary of transmission issues that can affect a Tribe's energy goals. The discussion includes findings from major transmission-related studies, including the 2023 National Transmission Needs Study (GDO 2023). It then discusses strategies that could help a Tribe safeguard its interests when those interests intersect transmission infrastructure planning.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Development of Advanced, Radiation Resistant, Optical-based Detector Technology for Future Experiments.

The primary objective of this project has been to advance the design of high-performance electromagnetic (EM) calorimeters for future particle physics experiments, to identify and measure the timing, position and energy of electrons, positrons and gamma rays, particularly in high-luminosity environments with intense radiation and pileup conditions. To meet such challenges, the proposed research has focused on the development of ultra-compact, radiation-hard calorimeter modules, to provide excellent timing, spatial, and energy resolution. The work aligns with the DOE’s Basic Research Needs (BRN) for High Energy Physics (HEP) Instrumentation and the research team contributes actively to the Coordinating Panel on Advanced Detectors (CPAD) RDC9 calorimetry collaboration in the USA and the European Committee on Future Accelerators (ECFA) DRD-CALO calorimetry collaboration at CERN, the European Laboratory for Particle Physics located in Geneva, Switzerland. The research builds on the RADiCAL (radiation-hard, ultra-compact) modular sampling calorimeter approach, developed by the research team, which employs dense and very bright optical materials such as LYSO:Ce scintillator plates that are interleaved with very dense tungsten plates to minimize detector size while optimizing performance. The modules are comparable in size to a human index finger, dimensionally 14 mm x 14 mm in cross section and 135 mm in length. And despite the small size, the structure is capable of providing excellent timing and energy resolution. This is facilitated through the use of specialized quartz capillaries filled with wavelength-shifting filaments, positioned at various depths along the length of a module, to collect and guide light signals to silicon photomultipliers (SiPMs) which detect and convert the optical signals to electronic signals for analysis. The primary goals of this project have been: (1) Achieve a timing resolution to σ t ≤ 30 ps for high-energy electrons and photons, important for their association with specific events produced in colliding-beam experiments and for the detection of decays-in-flight of long-lived particles. The project has achieved this goal in beam tests of a single RADiCAL module at CERN, during which a timing resolution of σ t = 27 ps was measured for electrons of energy E = 150 GeV. Based upon a mathematical fit to the data measured over a broad energy range from low energy to high energy, a resolution of σ t ≤ 18 ps has been estimated for electrons of very high (TeV) energy. From these measurements and with further expected technical improvements, the timing resolution should reach σ t ≤ 10 ps, important for searches for discovery physics in upcoming and future experiments. (2) Achieve an energy resolution of σ E / E ≤ 10% / $\sqrt{E}$. The project has yet to achieve this goal, but is close to it, having measured a value of σ E / E ≤ 15.9% / $\sqrt{E}$ using a modular array. Ultimately, the resolution goal is expected to be reached by adjustments to material thicknesses within the modules, which will improve the sampling fraction to measure more precisely the shower energy for lower energy particles. The versatility of the modular RADiCAL approach enables the testing of advanced materials, photosensors and electronics, developed in collaboration with CPAD RDC and ECFA DRD-CALO groups. The structure can distinguish electrons, positrons and gamma rays from hadrons and muons and beam-induced backgrounds, making it a valuable tool in a variety of detector environments, including future circular colliders (FCC-ee, FCC-hh) proposed for the European Laboratory for Particle Physics (CERN), the muon-collider proposed for Fermi National Accelerator Laboratory (Fermilab), and searches for new physics in beam-dump, fixed target and forward-physics experiments. And, while designed with particle physics applications in mind, the technologies developed in this project have the potential for application more broadly in particle and nuclear physics, materials science, and medical physics, underscoring the far-reaching potential of this line of instrumentation research and development.

47 OTHER INSTRUMENTATION↗

Plasma-Assisted Pre-Chamber Ignition System for Highly Dilute Stoichiometric Heavy-Duty Natural Gas Engines (Final Technical Report)

This project explored advanced ignition technologies to significantly enhance efficiency and reduce operating costs for heavy-duty natural gas engines operating at stoichiometric conditions, while meeting ultra-low NOx emission standards. The main goal was to develop and validate a plasma-assisted pre-chamber ignition system that could deliver at least a 2% increase in brake thermal efficiency (BTE) and a 4% decrease in total cost of ownership (TCO) compared to a typical multi-cylinder engine with three-way catalyst aftertreatment, ensuring compatibility with the expected 2027 EPA/CARB regulations. In the first half of the project, the research team concentrated on developing and testing plasma-assisted pre-chamber ignition using nanosecond pulsed discharges. Extensive experiments were conducted in an optically accessible rapid-compression and expansion machine, a constant-volume chamber, and an optical single-cylinder engine. Experiments were coupled with CFD simulations. The work produced unique insights into pre-chamber flame formation, jet ignition, dilution effects, and flame quenching at pressures, temperatures, and dilution levels relevant to engines. Although plasma-assisted ignition showed promise in controlled lab settings, the research also identified fundamental and practical challenges when applying this technology to real engine conditions. Midway through the project, a crucial pivot was made, guided by three key findings. First, the power electronics required for nanosecond plasma discharges were found to be too costly for commercial use, undermining the project’s cost-of-ownership goals. Second, nanosecond plasma ignition was highly sensitive to turbulent flow in the pre-chamber, resulting in lower ignition reliability than traditional spark under engine-like conditions. Third, achieving a truly diffuse low-temperature plasma at high pressures near top dead center was not possible, reducing the anticipated chemical enhancement benefits. These results collectively suggested that continuing with plasma-assisted ignition was unlikely to meet both efficiency and cost objectives. In response, the project shifted focus to a more realistic approach: enhancing traditional spark-based pre-chamber ignition with significantly less spark energy. Using insights gained earlier in the project, the team redesigned the pre-chamber to maintain high dilution tolerance and quick combustion, even with lower ignition energy. Testing confirmed that with optimized pre-chamber design and combustion timing, a lower-energy spark could reliably ignite highly diluted stoichiometric mixtures, reduce burn time, and boost thermal efficiency. Final engine testing and techno-economic analysis verified that this revised approach successfully achieved the project goals. The optimized pre-chamber ignition system provided over a 2% increase in calculated brake thermal efficiency compared to the baseline engine. Notably, the lower ignition energy and simplified hardware reduced component stress, extended maintenance intervals, and lowered the total cost of ownership. When used with stoichiometric operation and traditional three-way aftertreatment, the system remained compatible with near-zero NOx emissions targets without increasing cost or complexity in the emissions control system. In summary, although the project deviated from its initial plasma-assisted ignition idea, the work produced a more practical and commercially viable solution. The results show that precisely optimized, low-energy pre-chamber spark ignition can significantly improve efficiency and reduce overall ownership costs for heavy-duty natural gas engines. This directly aligns with DOE goals for cleaner, more efficient, and cost-effective transportation technologies.

03 NATURAL GAS↗

“Frameworks, Algorithms and Scalable Technologies for Mathematics (FASTMath) SciDAC Institute” (Final Technical Report)

SMU personnel formed a portion of the overall “Time Integration” team within the FASTMath SciDAC-5 Institute, and we interacted very closely with team members from collaborating institutions. The major goals of our team within the FASTMath institute may be categorized into two groups: the development of advanced and application-aware time integration methods and software, and close interactions with DOE application scientists to facilitate their use of these new methods and software. The two goals are intimately linked, since our research and development of novel tools is informed by the needs of our application partners, who in turn benefit from subsequent mathematical and software advances. While the SMU personnel collaborated with the rest of the Time Integration FASTMath team on most of our shared deliverables within the larger FASTMath institute, SMU personnel primarily contributed to the following subset of those goals: ● expanding capabilities for higher-order and solve-decoupled multirate methods, ● enhancing support for temporal adaptivity within multirate methods, and ● adding structure-aware time integration methods. Each of these goals focused both on intellectual contributions through journal articles or research presentations, and on enhancements to the open-source SUNDIALS library of time integrators and nonlinear solvers, of which the SMU PI Reynolds is a core developer.

97 MATHEMATICS AND COMPUTING↗

TREATABILITY TEST REPORT FOR THE REMOVAL OF CHROMIUM FROM GROUNDWATER AT 100-D AREA USING ELECTROCOAGULATION

The U.S. Department of Energy (DOE) has committed to accelerate cleanup of contaminated groundwater along the Columbia River. The current treatment approach was driven by a series of Interim Action Records of Decision (IAROD) issued in the mid-1990s. Part of the approach for acceleration involves increasing the rate of groundwater extraction for the chromium plume north of the 100-D Reactor and injecting the treated water in strategic locations to hydraulically direct contaminated groundwater toward the extraction wells. The current treatment system uses ion exchange for Cr(VI) removal, with off-site regeneration of the ion exchange resins. Higher flow rates will increase the cost and frequency of ion exchange resin regeneration; therefore, alternative technologies are being considered for treatment at high flow rates. One of these technologies, electrocoagulation (EC), was evaluated through a pilot-scale treatability test. The primary purpose of the treatability study was to determine the effectiveness of Cr(VI) removal and the robustness/implementability of an EC system. Secondary purposes of the study were to gather information about derivative wastes and to obtain data applicable to scaling the process from the treatability scale to full-scale. The treatability study work plan identified a performance objective and four operational objectives. The performance objective for the treatability study was to determine the efficiency (effectiveness) of hexavalent chromium removal from the groundwater, with a desired concentration of {le} 20 micrograms per liter ({micro}g/L) Cr(VI) in the effluent prior to re-injection. Influent and effluent total chromium and hexavalent chromium data were collected using a field test kit for multiple samples per week, and from off-site laboratory analysis of samples collected approximately monthly. These data met all data quality requirements. Two of three effluent chromium samples analyzed in the off-site (that is, fixed) laboratory met the performance objective during the continuous operational testing. Effluent hexavalent chromium analyzed by the field laboratory met the performance goal in over 90 percent of the samples. All effluent hexavalent chromium samples during the batch testing with high influent hexavalent chromium concentrations ({approx}2000 {micro}g/L) met the performance objective. Although the EC system was able to meet the performance goal, it must be noted that it was not uncommon for the system to be operated in recycle mode to achieve the performance goal. The EC unit was sometimes, but not always, capable of a single pass treatment efficiency high enough to meet the performance goal, and recycling water for multiple treatment passes was effective. An operational objective was to determine the volume and composition of the waste streams to enable proper waste designation. The toxicity characteristic leaching procedure (TCLP) concentrations, pH, and free liquids were determined for solid material from the EC electrodes (mechanically removed scale), the filter press, and the tank bottoms for the effluent and waste collector tanks. These data met all data quality requirements. All solid-phase secondary waste streams were found to be below the TCLP limits for the toxicity characteristic, and a pH value within the limits for the corrosivity characteristic. Out of three samples, two (one of scale from the EC unit and one from filter press solids) failed the free liquid (paint filter) test, which is one of the acceptability criteria for Hanford's Environmental Restoration Disposal Facility (ERDF). The solid-phase waste generation rate was about 0.65-gallon of solid waste per 100 gallons of water treated. It is concluded that the solid-phase secondary waste generated from this technology under the conditions at the test site will meet the toxicity and corrosivity criteria for disposal. It is also concluded that with engineering and/or operational improvements, a solid-phase secondary waste could be produced that would meet the free liquid disposal requirements. The second operational objective was to assess the operational reliability and safety of the system. For the continuous operations testing period from July 23 to September 12,2007, the system was not able to operate unattended. An extensive period of startup and adjustment preceded continuous operations, but was unsuccessful in providing a suitable and robust operating condition. Primary operational reliability problems were related to the sensitivity of the solid separation process to operational conditions such that a robust operating procedure (for example, chemical dosage) was not identified during the treatability test. Poor solids separation and high effluent iron concentrations also led to operational difficulties associated with injection well fouling.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Appendix E: Other NEMS-MP results for the base case and scenarios.

The NEMS-MP model generates numerous results for each run of a scenario. (This model is the integrated National Energy Modeling System [NEMS] version used for the Multi-Path Transportation Futures Study [MP].) This appendix examines additional findings beyond the primary results reported in the Multi-Path Transportation Futures Study: Vehicle Characterization and Scenario Analyses (Reference 1). These additional results are provided in order to help further illuminate some of the primary results. Specifically discussed in this appendix are: (1) Energy use results for light vehicles (LVs), including details about the underlying total vehicle miles traveled (VMT), the average vehicle fuel economy, and the volumes of the different fuels used; (2) Resource fuels and their use in the production of ethanol, hydrogen (H{sub 2}), and electricity; (3) Ethanol use in the scenarios (i.e., the ethanol consumption in E85 vs. other blends, the percent of travel by flex fuel vehicles on E85, etc.); (4) Relative availability of E85 and H2 stations; (5) Fuel prices; (6) Vehicle prices; and (7) Consumer savings. These results are discussed as follows: (1) The three scenarios (Mixed, (P)HEV & Ethanol, and H2 Success) when assuming vehicle prices developed through literature review; (2) The three scenarios with vehicle prices that incorporate the achievement of the U.S. Department of Energy (DOE) program vehicle cost goals; (3) The three scenarios with 'literature review' vehicle prices, plus vehicle subsidies; and (4) The three scenarios with 'program goals' vehicle prices, plus vehicle subsidies. The four versions or cases of each scenario are referred to as: Literature Review No Subsidies, Program Goals No Subsidies, Literature Review with Subsidies, and Program Goals with Subsidies. Two additional points must be made here. First, none of the results presented for LVs in this section include Class 2B trucks. Results for this class are included occasionally in Reference 1. They represent a small, though noticeable, segment of the 'LV plus 2B' market (e.g., a little more than 3% of today's energy use in that market). We generally do not include them in this discussion, simply because it requires additional effort to combine the NEMS-MP results for them with the results for the other LVs. (Where there is an exception, we will indicate so.) Second, where reference is made to E85, the ethanol content is actually 74%. The Energy Information Administration (EIA) assumes that, to address cold-starting issues, the percent of ethanol in E85 will vary seasonally. The EIA uses an annual average ethanol content of 74% in its forecasts. That assumption is maintained in the NEMS-MP scenario runs.

08 HYDROGEN↗

Benefits and Costs of Aggressive Energy Efficiency Programs and the Impacts of Alternative Sources of Funding: Case Study of Massachusetts

Increased interest by state (and federal) policymakers and regulatory agencies in pursuing aggressive energy efficiency efforts could deliver significant utility bill savings for customers while having long-term implications for ratepayers (e.g. potential rate impacts). Equity and distributional concerns associated with the authorized recovery of energy efficiency program costs may necessitate the pursuit of alternative program funding approaches. In 2008, Massachusetts passed the Green Communities Act which directed its energy efficiency (EE) program administrators to obtain all cost-effective EE resources. This goal has translated into achieving annual electric energy savings equivalent to a 2.4% reduction in retail sales from energy efficiency programs in 2012. Representatives of electricity consumer groups supported the new portfolio of EE programs (and the projected bill savings) but raised concerns about the potential rate impacts associated with achieving such aggressive EE goals, leading policymakers to seek out alternative funding sources which can potentially mitigate these effects. Utility administrators have also raised concerns about under-recovery of fixed costs when aggressive energy efficiency programs are pursued and have proposed ratemaking policies (e.g. decoupling) and business models that better align the utility's financial interests with the state's energy efficiency public policy goals. Quantifying these concerns and identifying ways they can be addressed are crucial steps in gaining the support of major stakeholder groups - lessons that can apply to other states looking to significantly increase savings targets that can be achieved from their own ratepayer-funded energy efficiency programs. We use a pro-forma utility financial model to quantify the bill and rate impacts on electricity customers when very aggressive annual energy efficiency savings goals ({approx}2.4%) are achieved over the long-term and also assess the impact of different cost recovery approaches that integrate alternative revenue sources. We also analyze alternative lost fixed cost recovery approaches to better understand how to mitigate the erosion of utility shareholder returns in states that have adopted (and achieved) very aggressive savings targets.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Annual Site Environmental Report: 2009(ASER)

This report provides information about environmental programs during the calendar year of 2009 at the SLAC National Accelerator Laboratory (SLAC), Menlo Park, California. Activities that span the calendar year, i.e., stormwater monitoring covering the winter season of 2009/2010 (October 2009 through May 2010), are also included. Production of an annual site environmental report (ASER) is a requirement established by the United States Department of Energy (DOE) for all management and operating (M&O) contractors throughout the DOE complex. SLAC is a federally-funded research and development center with Stanford University as the M&O contractor. Under Executive Order (EO) 13423, Strengthening Federal Environmental, Energy, and Transportation Management, EO 13514, Federal Leadership in Environmental, Energy, and Economic Performance, and DOE Order 450.1A, Environmental Protection Program, SLAC effectively implements and integrates the key elements of an Environmental Management System (EMS) to achieve the site's integrated safety and environmental management system goals. For normal daily activities, SLAC managers and supervisors are responsible for ensuring that policies and procedures are understood and followed so that Worker safety and health are protected, The environment is protected, and Compliance is ensured. Throughout 2009, SLAC continued to improve its management systems. These systems provided a structured framework for SLAC to implement 'greening of the government' initiatives such as EO 13423, EO 13514, and DOE Orders 450.1A and 430.2B. Overall, management systems at SLAC are effective, supporting compliance with all relevant statutory and regulatory requirements. SLAC continues to demonstrate significant progress in implementing and integrating EMS into day-to-day operations and construction activities at SLAC. SLAC's EMS was audited by a review team from the DOE Oak Ridge Office and the DOE SLAC Site Office (SSO) on March 31, 2009. The review team found the EMS to be in substantial conformance with the appropriate EMS requirements. Based on the audit results, SLAC and DOE were able to declare conformance with DOE Order 450.1A ahead of the June 30, 2009 mandated deadline. During 2009, there were no reportable releases to the environment from SLAC operations. In addition, many improvements in waste minimization, recycling, stormwater management, groundwater restoration, and SLAC's chemical management system (CMS) were continued during the year. The following are amongst SLAC's environmental accomplishments for 2009. Hazardous materials field verifications of 36 buildings identified a number of materials that could be removed from inventory due to lack of need or age of the material. In all, 124 chemical containers were removed from inventory. SLAC's chemical purchase approval process was reconfigured to allow for more effective control over purchase of highly toxic materials. One hundred percent of SLAC's purchased desktops, laptops, and monitors were either Silver or Gold level Electronic Product Environmental Assessment Tool (EPEAT) certified in fiscal year (FY) 2009. SLAC continues to make progress on achieving the sustainability goals of EOs 13423 and 13514, which include, but are not limited to reductions in the use of water, energy, and fuel, building to green standards and reductions in greenhouse gas (GHG) emissions. In 2009, no radiological incidents occurred that increased radiation levels or released radioactivity to the environment. In addition to managing its radioactive wastes safely and responsibly, SLAC worked to reduce the amount of waste generated. During calendar year (CY) 2009, SLAC shipped 1324 cubic feet of low-level radioactive waste, legacy waste accounted for 40 percent of the volume, to appropriate treatment and disposal facilities for low-level radioactive waste. Moreover, SLAC continued its efforts in the inventory reduction of materials no longer needed for its mission: returned 28 sealed sources to the manufacturer, transferred additional 3 sources to Los Alamos National Laboratory, and disposed of 636 kilograms of depleted uranium tiles. In 2009, the SLAC Environmental Restoration Program personnel continued work on site characterization and evaluation of remedial alternatives at four sites with volatile organic compounds in groundwater and several areas with polychlorinated biphenyls and low concentrations of lead in soil. SLAC is regulated under a site cleanup requirements order (board order) issued by the California Regional Water Quality Control Board (RWQCB), San Francisco Bay Region on October 19, 2009, for the investigation and remediation of impacted soil and groundwater at SLAC. Risk-based preliminary cleanup goals for impacted soil and groundwater have been established for SLAC, and the remedial efforts are being designed to meet these established goals.

Source record↗

Greenhouse gas emissions reduction strategies that maximize portfolio-wide life cycle cost reduction, resilience, and environmental justice benefits

While strategies to achieve net-zero emissions at an individual site are well understood, new analysis methods are required for organizations seeking to achieve net-zero across multiple facilities, each with concurrent priority goals. At a portfolio level, distinct locations present varied challenges that cannot be addressed through singular solutions, and competing goals can take precedence with the assumption that net-zero emissions strategies deter from energy resilience and cost savings, therefore negatively impacting nearby communities. This study tests these assumptions by analyzing 16 diverse sites (varying in size, climate, and energy use) to identify strategies that reduce emissions and assess the impact these strategies have on life cycle costs, resilience, and communities with environmental justice concerns. Methods were developed to approximate missing information essential to net-zero evaluation. Established methods were augmented to evaluate life cycle costs, resilience, and environmental justice impacts across a set of strategies and accommodate the multi-criteria analyses. Potential benefits from identified strategies were quantified using site characteristics and a set of corresponding metrics. The net-zero analysis found that 11 sites could use on-site strategies to eliminate all but 2% of emissions generated. The remaining emissions can be offset, for instance through sequestration, executed at the portfolio scale. On-site carbon-free energy was found to reduce 51% of emissions across all sites; efficiency reduced 19% of emissions; sequestration 16%; procured carbon-free energy 15%; fuel switching 1.6%; and fleet electrification 1.3%. Building electrification, however, increased emissions by 4.4%. Different strategies also provide cost, resilience, and/or environmental justice benefits—the degree to which varies with individual site conditions. The findings indicate an advantage to considering the strategies as a comprehensive set, which leads to co-benefits, both in the ability to achieve net-zero goals and in advancing other goals. The results present the case for comprehensive advanced planning at the portfolio level to prioritize investments that will balance the minimization of emissions and life cycle cost with the maximization of resilience and environmental justice benefits. The novel methods for evaluation and integration, valuation of benefits, and consideration at the portfolio scale allow organizations to select investments that simultaneously address multiple key priorities.

Net-Zero Emissions↗

Risk Inequality and the Food-Energy-Water (FEW) Nexus: A Study of 43 City Adaptation Plans

Goals aimed at adapting to climate change in sustainable and just ways are embedded in global agreements such as the Sustainable Development Goals and the New Urban Agenda. However, largely unexamined, are the ways that narrative understandings conveyed in adaptation plans consider and attempt to address inequality in climate risk to urban populations and FEW-systems. In this paper, we examine whether and how adaptation plans from C40 member cities address inequality in risk, by planning actions to reduce hazard exposure or tackling the drivers of social vulnerability. C40 is a network of 94 of the world's cities fostering policies to address climate change. We apply a mixed methods approach, including a discourse analysis and meta-analysis of adaptation plans. The discourse analysis helps to unpack framings of urban equity issues as they relate to policy actions, and the meta-analysis seeks to quantitatively investigate patterns of framing and policy across adaptation plans. Our findings suggest that FEW-nexus thinking is not yet embedded in narrative understandings of risk and planned adaptation actions, within the adaptation plans we studied. In the city adaptation plans we analyzed, we found multiple frames coexisting behind the broader adaptation visions (e.g., risk and resilience). Rather than converging, issues, and principles such as those of equality, coexist with economic issues in an imbalance of incongruent political movements and priorities. Techno-infrastructural and economic investments and concerns tend to take precedence over concerns and interests for inequality in climate risks. We discuss some of the institutional factors explaining this. Knowledge integration, for instance, is constrained by the existence of a plurality of sectors, levels of government, power, values, and ways of understanding and managing climate risk. We also suggest that the relatively low importance of equality considerations in the adaptation plans will likely limit the capacity of cities to support broader goals such as those of the New Urban Agenda and the Sustainable Development Goals.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Achieving Integrated Daylighting and Electric Lighting Systems: Current State of the Art and Needed Research

This paper presents the results of a multi-disciplinary scoping study, the goals of which were to see the seamless integration and application of light in buildings, regardless of source, that is purposely modulated to illuminate surfaces and designed in a way that is comfortable, healthy, pleasing, cost effective, and energy efficient. The scoping study was performed in order to set the stage for transforming the design and realization of lighting systems integration (daylight and electric). This, in turn, will support achieving the the U.S. Department of Energy’s (DOE) Building Technologies Office (BTO) long-term energy savings goals. Holistic lighting systems of the future should include components that are adaptable to change, resilient to disruption, and robust. The system of codes, standards, guidelines, and contracts employed to design and implement lighting systems should be structured to help them to flourish, rather than being barriers to realization. Finally, the research thrusts and mechanisms should be engaged with these goals in mind. While integrated lighting systems may reduce lighting energy use in buildings, a broader web of non-energy impacts affecting occupant’s overall health, comfort, and satisfaction may also guide technology investment goals when the entire lighting systems lifecycle is considered. Daylighting systems are separated from electric lighting systems, and both are characteristically detached from other systems such as safety, security, communications, and information systems. Being disconnected from the inputs and outputs of other building systems precludes the ability to acquire and utilize information about occupation, status of systems, and interior and exterior environmental conditions. The outcome of this separation is that the standard building is not fulfilling the potential for creating dynamic and holistic lighting for building occupants.

Davis, Robert G.↗

Prospects for Cherenkov Telescope Array Observations of the Young Supernova Remnant RX J1713.7−3946

We perform simulations for future Cherenkov Telescope Array (CTA) observations of RX J1713.7−3946, a young supernova remnant (SNR) and one of the brightest sources ever discovered in very high energy (VHE) gamma rays. Special attention is paid to exploring possible spatial (anti)correlations of gamma rays with emission at other wavelengths, in particular X-rays and CO/H i emission. We present a series of simulated images of RX J1713.7−3946 for CTA based on a set of observationally motivated models for the gamma-ray emission. In these models, VHE gamma rays produced by high-energy electrons are assumed to trace the nonthermal X-ray emission observed by XMM-Newton , whereas those originating from relativistic protons delineate the local gas distributions. The local atomic and molecular gas distributions are deduced by the NANTEN team from CO and H i observations. Our primary goal is to show how one can distinguish the emission mechanism(s) of the gamma rays (i.e., hadronic versus leptonic, or a mixture of the two) through information provided by their spatial distribution, spectra, and time variation. This work is the first attempt to quantitatively evaluate the capabilities of CTA to achieve various proposed scientific goals by observing this important cosmic particle accelerator.

79 ASTRONOMY AND ASTROPHYSICS↗

Experimental clean combustor program, phase 1

A program of screening three low emission combustors for conventional takeoff and landing, by testing and analyzing thirty-two configurations is presented. Configurations were tested that met the emission goals at idle operating conditions for carbon monoxide and for unburned hydrocarbons (emission index values of 20 and 4, respectively). Configurations were also tested that met a smoke number goal of 15 at sea-level take-off conditions. None of the configurations met the goal for oxides of nitrogen emissions at sea-level take-off conditions. The best configurations demonstrated oxide of nitrogen emission levels that were approximately 61 percent lower than those produced by the JT9D-7 engine, but these levels were still approximately 24 percent above the goal of an emission index level of 10. Additional combustor performance characteristics, including lean blowout, exit temperature pattern factor and radial profile, pressure loss, altitude stability, and altitude relight characteristics were documented. The results indicate the need for significant improvement in the altitude stability and relight characteristics. In addition to the basic program for current aircraft engine combustors, seventeen combustor configurations were evaluated for advanced supersonic technology applications. The configurations were tested at cruise conditions, and a conceptual design was evolved.

Roberts, R.↗

Experimental clean combustor program, phase 3

A two-stage vortex burning and mixing combustor and associated fuel system components were successfully tested at steady state and transient operating conditions. The combustor exceeded the program goals for all three emissions species, with oxides of nitrogen 10 percent below the goal, carbon monoxide 26 percent below the goal, and total unburned hydrocarbons 75 percent below the goal. Relative to the JT9D-7 combustor, the oxides of nitrogen were reduced by 58 percent, carbon monoxide emissions were reduced by 69 percent, and total unburned hydrocarbons were reduced by 9 percent. The combustor efficiency and exit temperature profiles were comparable to those of production combustor. Acceleration and starting characteristics were deficient relative to the production engine.

Roberts, R.↗

Lean, premixed, prevaporized fuel combustor conceptual design study

Four combustor concepts, designed for the energy efficient engine, utilize variable geometry or other flow modulation techniques to control the equivalence ratio of the initial burning zone. Lean conditions are maintained at high power to control oxides of nitrogen while near stoichometric conditions are maintained at low power for low CO and THC emissions. Each concept was analyzed and ranked for its potential in meeting the goals of the program. Although the primary goal of the program is a low level of nitric oxide emissions at stratospheric cruise conditions, both the ground level EPA emission standards and combustor performance and operational requirements typical of advanced subsonic aircraft engines are retained as goals as well. Based on the analytical projections made, two of the concepts offer the potential of achieving the emission goals; however, the projected operational characteristics and reliability of any concept to perform satisfactorily over an entire aircraft flight envelope would require extensive experimental substantiation before engine adaptation can be considered.

Fiorentino, A. J.↗

Conceptual design study of an improved automotive gas turbine powertrain

Automotive gas turbine concepts with significant technological advantages over the spark ignition (SI) engine were assessed. Possible design concepts were rated with respect to fuel economy and near-term application. A program plan which outlines the development of the improved gas turbine (IGT) concept that best met the goals and objectives of the study identifies the research and development work needed to meet the goal of entering a production engineering phase by 1983. The fuel economy goal is to show at least a 20% improvement over a conventional 1976 SI engine/vehicle system. On the basis of achieving the fuel economy goal, of overall suitability to mechanical design, and of automotive mass production cost, the powertrain selected was a single-shaft engine with a radial turbine and a continuously variable transmission (CVT). Design turbine inlet temperature was 1150 C. Reflecting near-term technology, the turbine rotor would be made of an advanced superalloy, and the transmission would be a hydromechanical CVT. With successful progress in long-lead R&D in ceramic technology and the belt-drive CVT, the turbine inlet temperature would be 1350 C to achieve near-maximum fuel economy.

Wagner, C. E.↗

Pollution reduction technology program small jet aircraft engines, phase 3

A series of Model TFE731-2 engine tests were conducted with the Concept 2 variable geometry airblast fuel injector combustion system installed. The engine was tested to: (1) establish the emission levels over the selected points which comprise the Environmental Protection Agency Landing-Takeoff Cycle; (2) determine engine performance with the combustion system; and (3) evaulate the engine acceleration/deceleration characteristics. The hydrocarbon (HC), carbon monoxide (CO), and smoke goals were met. Oxides of nitrogen (NOx) were above the goal for the same configuration that met the other pollutant goals. The engine and combustor performance, as well as acceleration/deceleration characteristics, were acceptable. The Concept 3 staged combustor system was refined from earlier phase development and subjected to further rig refinement testing. The concept met all of the emissions goals.

Bruce, T. W.↗