Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “FUNDING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 973 records · Page 54

National Institute for Climatic Change Research Coastal Center

It is widely recognized that coastal environments are under particular threat due to changes associated with climate change. Accelerated sea-level rise, in some regions augmented by land subsidence, plus the possibility of a changing storm climate, renders low-lying coastal landscapes and their ecosystems vulnerable to future change. This is a pressing problem, because these ecosystems commonly rank as some of the most valuable on the planet. The objective of the NICCR Coastal Center was to support basic research that aims at reducing uncertainty about ecosystem changes during the next century, carried out along the U.S. coastlines. The NICCR Coastal Center has funded 20 projects nationwide (carried out at 27 institutions) that addressed numerous aspects of the problems outlined above. The research has led to a variety of new insights, a significant number of which published in elite scientific journals. It is anticipated that the dissemination of this work in the scientific literature will continue for several more years, given that a number of projects have only recently reached their end date. In addition, NICCR funds have been used to support research at Tulane University. The lion’s share of these funds has been invested in the development of unique facilities for experimental research in coastal ecosystems. This aspect of the work could have a lasting impact in the future.

54 ENVIRONMENTAL SCIENCES↗

Organizational Support for the 3rd Summer Institute on Complex Plasmas, July 30 – August 8, 2012

This grant provided partial funds for American graduate students to attend the 3rd Graduate Summer Institute on Complex Plasmas, which was held from July 30 to August 8, 2012 at Seton Hall University in South Orange, New Jersey. The Graduate Summer Institute is a topical series of instructional workshops held bi-annually on the emerging field of complex plasmas that is jointly organized through a collaboration between American and German-European Union plasmas researchers. This specialized program brings together many of the world's leading researchers in the specialized area of complex plasmas, who freely provide instructional lectures and tutorials on the most recent research and discoveries done in this branch of plasma science. The partial funds provided by this grant helped support the travel and accommodation expenses of the participating American students and tutorial instructors. Partial funds further supported the travel and accommodation of three renown American plasma researchers that provided educational tutorials to the thirty-eight participating students from the United States, Europe, and Asia. The organized program afforded a unique opportunity for the participating American graduate students to learn about and engage more deeply in an area of plasma science that is not studied in any of the graduate educational curriculums provided by universities in the United States of America. The educational experience offered by this program provided the necessary knowledge needed by future American plasma researchers to keep the national plasma research effort on the cutting-edge and keep the national plasma community as a global leader.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Field Work Proposal: PUBLIC OUTREACH EVENT FOR ACCELERATOR STEWARDSHIP TEST FACILITY PILOT PROGRAM

Jefferson Lab’s outreach efforts towards the goals of Accelerator Stewardship Test Facility Pilot Program consist of the lab’s efforts in three venues. The first venue, at the end of March is to meet with the members of Virginia Tech Corporate Research Center (VTCRC) (http://www.vtcrc.com/tenant-directory/) in Blacksburg, Virginia. Of the nearly 160 members, we expect that many engineering companies (including mechanical, electrical, bio, software) will be present. To this group, we will describe the capabilities of Jefferson Lab’s accelerator infrastructure. The description will include not only the facilities but also the intellectual expertise. No funding is requested for this effort. The second venue is to reach the industrial exhibitors at the 6th International Particle Accelerator Conference (IPAC’15). Jefferson Lab will host a booth at the conference to reach out to the >75 industrial exhibitors (https://www.jlab.org/conferences/ipac2015/SponsorsExhibitors.php) who represent a wide range of technologies. A number of these industries could benefit if they can access Jefferson Lab’s accelerator infrastructure. In addition to the booth, where written material will be available, we plan to arrange a session A/V presentation to the industry exhibitors. The booth will be hosted by Jefferson Lab’s Public Relations staff, assisted on a rotating basis by the lab’s scientists and engineers. The budget with IPAC’15 designations represents the request for funds for this effort. The third venue is the gathering of Southeastern Universities Research Association (SURA) university presidents. Here we plan to reach the research departments of the universities who can benefit by availing themselves to the infrastructure (material sciences, engineering, medical schools, material sciences, to name a few). Funding is requested to allow for attendance at the SURA Board Meeting. We are coordinating with DOE regarding these costs to raise the projected conference management cost ceiling in the Conference Management Tool.

99 GENERAL AND MISCELLANEOUS↗

Potosi Reservoir Modeling; History and Recommendations

As a part of a larger project co-funded by the United States Department of Energy (US DOE) to evaluate the potential of formations within the Cambro-Ordovician strata above the Mt. Simon as potential targets for carbon sequestration in the Illinois and Michigan Basins, the Illinois Clean Coal Institute (ICCI) requested Schlumberger to evaluate the potential injectivity and carbon dioxide (CO₂) plume size of the Cambrian Potosi Formation. The evaluation of this formation was accomplished using wireline data, core data, pressure data, and seismic data from two projects: the US DOE-funded Illinois Basin–Decatur Project being conducted by the Midwest Geological Sequestration Consortium in Macon County, Illinois, as well as data from the Illinois – Industrial Carbon Capture and Sequestration (IL-ICCS) project funded through the American Recovery and Reinvestment Act. In 2010, technical performance evaluations on the Cambrian Potosi Formation were performed through reservoir modeling. The data included formation tops from mud logs, well logs from the Verification Well 1 (VW1) and the Injection Well (CCS1), structural and stratigraphic formation from three dimensional (3D) seismic data, and field data from several waste water injection wells for the Potosi Formation. The intention was for two million tonnes per annum (MTPA) of CO₂ to be injected for 20 years into the Potosi Formation. In 2013, updated reservoir models for the Cambrian Potosi Formation were evaluated. The data included formation tops from mud logs, well logs from the CCS1, VW1, and Verification Well 2 (VW2) wells, structural and stratigraphic formation from a larger 3D seismic survey, and field data from several waste water injection wells for Potosi Formation. The objective is to simulate the injection of CO₂ at a rate 3.5 million tons per annum (3.2 million tonnes per annum [MTPA]) for 30 years 106 million tons (96 MT total) into the Potosi Formation. The Potosi geomodeling efforts have evolved from using data from a single well in 2010 to the inclusion of data from three wells in 2013 which largely leverage the porosity and permeability logs plus knowledge of lost circulation zones. The first Potosi model (Potosi Geobody Model 2010) attempted to use the available seismic inversion data to inform the geomodel and predict vugular zones in advance of drilling VW1. Lost circulation zones in VW1 came in as the geologists predicted. The model was not implemented in subsequent simulation work. To date, reservoir models used for flow simulation work have relied predominately on Gaussian distributed properties (porosity and permeability) and have employed a single injection well. Potosi Model 2013b incorporated the new VW2 logs, and exhibited an extra level of sophistication by delineating the vugular intervals. This method added further realism that likely represents the best reservoir approximation to date. Where the 2010 reservoir models were 10 by 10 mi (16 by 16 km) in area, the 2013 models were expanded in size to 30 by 30 mi (48 by 48 km). The latest reservoir simulations show that a minimum of four injectors might be required to meet target injection rates. Still, there is data that requires further scrutiny and modeling methodologies that require testing for the Potosi Formation. This work is currently ongoing, and the next phase of the reservoir modeling intends to implement valuable data like porosity derived from seismic inversion, seismically derived geobodies, or a combination of both to further define vugular zones and the porosity distribution within the Potosi Formation. Understanding the dual porosity, dual permeability character of the Potosi remains the greatest challenge in representing this formation. Further analysis of the FMI* fullbore formation microimager data may aid in assessing this uncertainty. The Potosi Formation is indeed an interesting formation, and recommendations to further characterize it are included in the following list: - Data acquisition to identify the vugs permeability, distribution, and interconnectivity could be considered to perform a more rigorous evaluation of the Potosi Formation injectivity and capacity. This could be achieved by performing an injection test on a vugular interval to determine the vugs permeability, and an interference test between wells to evaluate the local vugs extent and interconnectivity. - A thorough study of the available FMI data may reveal specifics on estimating the vug to matrix ratio. This estimate could be used to further condition the porosity distribution. Porosity logs alone might underestimate the formation’s porosity associated with vugs. Porosity mapping derived from the seismic inversion could also be used in the succeeding task to characterize the lateral porosity distribution within the reservoir. This could involve the geobody methodology previously attempted in 2010. With or without seismic inversion porosity mapping, it is worth exploring whether increased lateral heterogeneity plays a significant role in Potosi injectivity. Investigations on vugular, dolomitic outcrops suggest that there may be significantly greater lateral heterogeneity than what has been modeled here. - The FMI data also reveals the presence of and helps describe open fractures. The presence of fractures will further enhance the formation’s permeability. The task of leveraging this data in the geomodeling effort still remains. Under the best of circumstances, this data describing open fractures may be combined with seismic attributes to delineate fracture corridors. Fracture modeling would certainly add another layer of sophistication to the model. Its contribution and applicability remain to be explored. - Facies modeling within the Potosi has yet to be thoroughly addressed. The carbonates during the time of deposition are believed to be regionally extensive. However, it may be worth delineating the reservoir with other regional wells or modern day analogues to understand the extent of the Potosi. More specifically, the model could incorporate lateral changes or trends if deemed necessary to represent facies transition. - Currently there is no fracture gradient data available for the Potosi in the Decatur project area. The acquisition of the fracture pressure data could be considered to determine an appropriate maximum allowable bottomhole injection pressure. This would allow the evaluation of injectivity and the required number of wells in a more precise manner. - Special core analysis (SCAL) to determine the relative permeability and capillary pressure of the vugs and matrix could be considered to have a better estimation of the reservoir injectivity and plume extent. - Formation water sampling and analysis could be considered for the Potosi to estimate the water salinity and properties. A vertical flow performance evaluation could be considered for the succeeding task to determine the appropriate tubing size, the required injection tubing head pressure, and to investigate whether the corresponding well injection rate falls within the tubing erosional velocity limit. - A simulation using several injectors could also be considered to determine the required number of wells to achieve the injection target while taking into account the pressure interference.

Smith, Valerie↗

The Importance of Internal Development

The story of an ARPA-E awardee doesn’t necessarily end when ARPA-E funding runs out. Two ARPA-E awardees—Eagle Picher Technologies and Baldor Electric Company—have developed technologies to the point where internal stakeholders of their respective companies committed additional funds to help these technologies achieve success in the market. This video features remarks from ARPA-E Technology-to-Market Advisor Kacy Gerst and interviews with technologists at Eagle Picher and Baldor, who each tell the story of how they achieved buy-in from their internal leadership to further develop their ARPA-E-funded technologies.

25 ENERGY STORAGE↗

Crossing the Barriers: An Analysis of Land Access Barriers to Geothermal Development and Potential Improvement Scenarios

Developers have identified many non-technical barriers to geothermal power development, including access to land. Activities required for accessing land, such as environmental review and private and public leasing can take a considerable amount of time and can delay or prevent project development. This paper discusses the impacts to available geothermal resources and deployment caused by land access challenges, including tribal and cultural resources, environmentally sensitive areas, biological resources, land ownership, federal and state lease queues, and proximity to military installations. In this analysis, we identified challenges that have the potential to prevent development of identified and undiscovered hydrothermal geothermal resources. We found that an estimated 400 MW of identified geothermal resource potential and 4,000 MW of undiscovered geothermal resource potential were either unallowed for development or contained one or more significant barriers that could prevent development at the site. Potential improvement scenarios that could be employed to overcome these barriers include (1) providing continuous funding to the U.S. Forest Service (USFS) for processing geothermal leases and permit applications and (2) the creation of advanced environmental mitigation measures. The model results forecast that continuous funding to the USFS could result in deployment of an additional 80 MW of geothermal capacity by 2030 and 124 MW of geothermal capacity by 2050 when compared to the business-as-usual scenario. The creation of advanced environmental mitigation measures coupled with continuous funding to the USFS could result in deployment of an additional 97 MW of geothermal capacity by 2030 and 152 MW of geothermal capacity by 2050 when compared to the business-as-usual scenario. The small impact on potential deployment in these improvement scenarios suggests that these 4,400 MW have other barriers to development in addition to land access. In other words, simply making more resources available for development does not increase deployment; however, impacts to deployment could increase when coupled with other improvements (e.g., permitting, market and/or technology improvements).

15 GEOTHERMAL ENERGY↗

Cost benefit analysis for smart grid projects

The U.S. is unusual in that a definition of the term “smart grid” was written into legislation, appearing in the Energy Independence and Security Act (2007). When the recession called for stimulus spending and the American Recovery and Reinvestment Act (ARRA, 2009) was passed, a framework already existed for identification of smart grid projects. About $4.5B of the U.S. Department of Energy’s (U.S. DOE’s) $37B allocation from ARRA was directed to smart grid projects of two types, investment grants and demonstrations. Matching funds from other sources more than doubled the total value of ARRA-funded smart grid projects. The Smart Grid Investment Grant Program (SGIG) consumed all but $620M of the ARRA funds, which was available for the 32 projects in the Smart Grid Demonstration Program (SGDP, or demonstrations). Given the economic potential of these projects and the substantial investments required, there was keen interest in estimating the benefits of the projects (i.e., quantifying and monetizing the performance of smart grid technologies). Common method development and application, data collection, and analysis to calculate and publicize the benefits were central objectives of the program. For this purpose standard methods and a software tool, the Smart Grid Computational Tool (SGCT), were developed by U.S. DOE and a spreadsheet model was made freely available to grantees and other analysts. The methodology was intended to define smart grid technologies or assets, the mechanisms by which they generate functions, their impacts and, ultimately, their benefits. The SGCT and its application to the Demonstration Projects are described, and actual projects in Southern California and in China are selected to test and illustrate the tool. The usefulness of the methodology and tool for international analyses is then assessed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Wind Energy Accomplishments and Year-End Performance Report: Fiscal Year 2022

Four decades ago, construction was just beginning on experimental turbines at the National Wind Technology Center (NWTC). Today, the U.S. Department of Energy's (DOE's) National Renewable Energy Laboratory (NREL) facility is the centerpiece of the laboratory's Flatirons Campus, a world-class hub for renewable energy research. The nation's shift to 100% clean electricity by 2035 will require a mix of renewable energy sources and strategies - and together, wind and solar energy could account for 60% to 80% of that clean energy resource. In Fiscal Year (FY) 2022, NREL scientists, engineers, and analysts contributed to these visionary goals through their wind energy research. As wind innovations push into new areas, NREL continues to play a vital role in advancing technology and addressing deployment barriers in pursuit of more efficient, reliable, and predictable wind energy systems. FY 2022 wind research and development explored the potential for dramatic growth in land-based systems, the launch of the nation's first commercial-scale offshore installations, and transmission infrastructure buildout. Land-based wind energy is one of the most cost-effective electricity supply options - but utility-scale deployment will require up to 10 times the current number of turbines. An NREL plan addressed this need to accelerate U.S. wind technology rollout at distributed and utility scales. Another project conducted by NREL and the Pacific Northwest National Laboratory (PNNL) helps position the nation's first major offshore wind corridor for success. The WETO-funded Atlantic Offshore Wind Transmission Study is evaluating options for balancing electricity supply and demand, while supporting resilience of the grid and marine industries. WETO, NREL, and other partners are working to enable the enormous supply chain and workforce changes the U.S. wind energy industry will need to meet net-zero-carbon-emissions targets. As part of a seminal series of DOE-funded supply chain studies, NREL analysts reported on the trade-offs involved in manufacturing large volumes of wind technologies, while addressing cost, workforce, and logistics issues. All of this research is supported by NREL's outstanding research teams, tools, data, and facilities. A WETO-funded international wind energy field campaign, the American WAKE experimeNt (AWAKEN), has brought together experts from NREL, PNNL, and Sandia National Laboratories to create the world's most comprehensive set of high-resolution data on wind energy atmospheric phenomenon. This study could lead to more accurate predictions of losses from turbine-to-turbine wake interactions, eventually helping wind plants capture more energy and operators save millions of dollars. In addition, NREL researchers developed testing, modeling, and analysis tools to improve the security of power grids by identifying wind power plant dynamic stability problems. A new Stochastic Soaring Raptor Simulator (SSRS) protects golden eagles from turbine encounters by predicting flight paths. This report provides more detail on these top achievements and other accomplishments made by NREL and its partners during FY 2022 (between October 1, 2021, and September 30, 2022).

accomplishments↗

Development of a Data Platform for High-Temperature Gas-cooled Reactor (HTGR) Nuclear Energy University Program (NEUP) Thermal-Fluid Experiments

Since the U.S. Department of Energy (DOE)’s Office of Nuclear Energy (NE) initiated the Nuclear Energy University Program (NEUP) in 2009, a total of 30 NEUP projects focused on High-Temperature Gas-cooled Reactor (HTGR) thermal-fluid experiments were funded up to fiscal year (FY) 2021. This represents a total DOE investment of approximately $23M over the 12-year period, covering thermal fluid phenomena important to both pebble bed and prismatic HTGR designs. The NEUP projects have produced a large amount of high-quality experimental and computational data that were published in final project reports, journal articles, dissertations, and conference proceedings, but in most cases the actual data sets and supporting information such as facility and instrumentation descriptions were not publicly disseminated to the HTGR community. To the authors’ best knowledge, a data platform that organizes and summarizes these NEUP-funded projects for HTGR research does not currently exist. To improve access to this HTGR validation data and optimize the return on the significant investment made by DOE, the Advanced Reactor Technologies (ART) Gas-Cooled Reactor (GCR) program started a survey of completed and ongoing HTGR NEUP projects with the aim of developing a public-access data platform that can be used to retrieve computational fluid dynamics (CFD) and system code validation data and guide future NEUP investments. This paper summarizes the status of the current ART-GCR database, provides an overview of the NEUP-funded HTGR-related research projects from FY2009 to FY2021 and identify validation knowledge gaps still existing in HTGR thermal-fluid research.

42 ENGINEERING↗

2011 Mound Site Groundwater Plume Rebound Exercise and Follow-Up - 13440

The Mound Site facility near Miamisburg, Ohio, opened in 1948 to support early atomic weapons programs. It grew into a research, development, and production facility performing work in support of the U.S. Department of Energy (DOE) weapons and energy programs. The plant was in operation until 1995. During the course of operation, an onsite landfill was created. The landfill was located over a finger of a buried valley aquifer, which is a sole drinking water source for much of the Miami Valley. In the 1980's, volatile organic compounds (VOCs) were discovered in groundwater at the Mound site. The site was placed on the National Priorities List on November 21, 1989. DOE signed a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Federal Facility Agreement with the U.S. Environmental Protection Agency (EPA) and the Ohio Environmental Protection Agency. The agreement became effective in October 1990. The area that included the landfill was designated Operational Unit 1 (OU-1). In 1995, a Record of Decision was signed that called for the installation and operation of a pump and treatment (P and T) system in order to prevent the VOCs in OU-1 groundwater from being captured by the onsite water production wells. In addition to the P and T system, a soil vapor extraction (SVE) system was installed in 1997 to accelerate removal of VOCs from groundwater in the OU-1 area. The SVE system was successful in removing large amounts of VOCs and continued to operate until 2007, when the amount of VOCs removed became minimal. A rebound study was started in February 2003 to determine how the groundwater system and contaminants would respond to shutting down the P and T system. The rebound test was stopped in February 2004 because predetermined VOC threshold concentrations were exceeded down-gradient of the landfill. The P and T and SVE systems were restarted after the termination of the rebound test. In 2006, the remediation of the Mound site was completed and the site was declared to be protective of human health and the environment, as long as the institutional controls are observed. The institutional controls that apply to the OU-1 area include provisions that no soil be allowed to leave the site, no wells be installed for drinking water, and the site may be approved only for industrial use. The onsite landfill with the operating CERCLA remedy remained. However, the Mound Development Corporation lobbied Congress for funds to remediate the remaining onsite landfill to allow for property reuse. In 2007 DOE received funding from Congress to perform non-CERCLA removal actions at OU-1 to excavate the site sanitary landfill. In 2009, DOE received American Recovery and Reinvestment Act funding to complete the project. Excavation of the landfill occurred intermittently from 2006 through 2010 and the majority of the VOC source was removed; however, VOC levels near the P and T system remained greater than the EPA maximum contaminant levels (MCLs). Presently, groundwater is contained using two extraction wells to create a hydraulic barrier to prevent down-gradient migration of VOC-impacted groundwater. Since the primary contamination source has been removed, the feasibility of moving away from containment to a more passive remedy, namely monitored natural attenuation (MNA), is being considered. A second rebound study was started in June 2011. If contaminant and groundwater behavior met specific conditions during the study, MNA would be evaluated and considered as a viable alternative for the groundwater in the OU-1 area. From June through December 2011, the second rebound study evaluated the changes in VOC concentrations in groundwater when the P and T system was not in operation. As the study progressed, elevated concentrations of VOCs that exceeded predetermined trigger values were measured along the down-gradient boundary of the study area, and so the P and T system was restarted. It was determined that a discrete area with VOC concentrations greater than the MCLs was present in groundwater down-gradient of the extraction wells. The source was not identified, but the contamination was thought not to be caused by residually contaminated soil beneath the former landfill. The data collected so far supports the consideration of MNA as a viable alternative to hydraulic containment. Additional investigations are being performed to identify possible sources or pathways of VOCs in groundwater that may be contributing to the elevated VOC levels measured down-gradient of the extraction well system. Data from this additional investigation will be used to determine whether the VOCs detected down-gradient of the hydraulic boundary are the result of residual soil contamination, a previously unknown contribution of VOC-contaminated water entering the groundwater outside the capture zone of the extraction wells, or a pulse of VOC-contaminated groundwater from the OU-1 landfill that occurred during the rebound study. (authors)

54 ENVIRONMENTAL SCIENCES↗

Addressing an aging facility: improving reliability of the defense waste processing facility at the Savannah River Site - 15539

The High Level Waste program at the Savannah River Site significantly reduces environmental risks associated with the storage of radioactive waste from legacy efforts to separate fissionable nuclear material from irradiated targets and fuels. The Defense Waste Processing Facility treats and immobilizes High Level Waste into a durable borosilicate glass for safe, permanent storage. Construction of the facility began in 1983 and radioactive operations commenced in 1996. In an effort to support the disposition of radioactive waste and accelerate tank closure for the balance of the Savannah River Site mission, the Defense Waste Processing Facility recently underwent an extensive reliability review in 2013 to understand future needs as well as to address aging infrastructure. As a product of this review, a Performance Improvement Plan was developed to systematically address three major focus areas including, a) asset preservation, b) facility housekeeping, and 3) process improvements. Since issuance of the plan, significant progress has been made in each of these areas to improve the reliability and predictability of the Defense Waste Processing Facility. Providing consistent, constructive, and concise communications is vital in the face of a changing budgetary environment. The Savannah River Site case study provides an example of the U.S. Department of Energy - Savannah River (DOE-SR) and SRR partnering to inform stakeholders about cleanup progress at the site. DOE-SR and SRR periodically and consistently provide both annual written progress reports under the Federal Facility Agreement and quarterly written progress reports under the landfill permit to the government regulators. Through the Liquid Waste System Plans, DOE-SR and SRR constructively and concisely summarize both the significant progress made and explain how a changed budget can impact the goals moving forward. Furthermore, DOE-SR and SRR informs the community and general public about the Site's progress and future during Citizens Advisory Board meetings. In addition, through the new proposed model for complex-wide communications, stakeholders can better understand how budget constraints will affect them. The set-aside program would also encourage stakeholder participation and involvement in helping each state and site obtain extra funding through performance evaluations. Waste management organizations can benefit in a number of ways from an effective partnership approach to communicate with stakeholders about available funding. Keeping an open and honest dialogue with regulatory agencies can help preserve confidence, thus mitigating or completely avoiding costly and distracting fines and penalties. Informing the public not only promotes trust, but also spurs the public to exercise its right to demand more information and voice any concerns to elected or DOE officials. With this approach, DOE can receive better understanding and cooperation from stakeholders in a changing budgetary landscape. Furthermore, a set-aside competitive program would encourage efficiency and innovation that could lead to further cost savings for the government while providing extra funding for cleanup efforts. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Benefits of a Full Waste Cost Recovery Program - 16322

A full waste cost recovery program has been established at the INL in order to fund disposition of all newly-generated hazardous, radioactive, and mixed waste at the INL. Significant improvements have resulted from implementation of this program at the INL, and it is anticipated that others could benefit from using a similar approach. The INL Waste Management Program (WMP) administers two site-wide service centers that collect revenue from programs and projects in order to pay waste disposition costs. These service centers are administered separately due to their unique scope and functions. The combination of these service centers provides the INL with a fully functional cost recovery program for all newly generated waste. This cost recovery program ensures that funding is available for disposition of all waste types and that waste costs are paid for by the generating programs or facilities. The implementation of these service centers in Fiscal Year 2014 has resulting in several significant improvements in waste disposition, including a substantial increase in awareness and emphasis on waste minimization and segregation. The service centers have virtually eliminated funding shortfalls from projects that end and have not budgeted for dispositioning waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Port Hope Area Initiative - Community Based Concepts Become Reality - 16538

The Port Hope Area Initiative (PHAI) involves the cleanup of historic low-level radioactive waste (LLRW) resulting from radium and uranium processing by the former Crown Corporation, Eldorado Nuclear Limited, and its predecessor companies, during the period between 1932 and 1988. The PHAI, which is based on a legal agreement between the Government of Canada and the adjacent municipalities of Port Hope and Clarington in Ontario, Canada, comprises two separate community-initiated projects for the long-term management of the historic LLRW located in each of these municipalities. The Port Hope Project involves the cleanup of approximately 1.2 million cubic metres of historic LLRW from various sites within the urban area of Port Hope, the construction and operation of an engineered aboveground mound where the waste will be safely contained, and the long-term maintenance and monitoring of the new waste management facility. The waste is currently located in 13 large-scale sites and an estimated 375 small-scale sites within the community. In contrast, the Port Granby Project involves the relocation of approximately 450,000 cubic metres of historic LLRW from the existing waste site on the north shore of Lake Ontario in rural Clarington, to a new engineered aboveground mound to be built 700 metres north of the shoreline. The work also involves the restoration of the existing site and long-term maintenance and monitoring the new facility. The PHAI entered Phase 2 (construction) of a three-phase program in early 2012, when $1.28 billion (Canadian) in federal funding was announced by the Minister of Natural Resources Canada. The funding, together with regulatory approval from the Canadian Nuclear Safety Commission (CNSC), which granted 10-year waste management licences to both projects, have permitted the PHAI to move forward with construction and remediation. Waste water treatment plants based on best-available technologies have been constructed for each project to remove a wide range of contaminants from groundwater, surface water and leachate collected during construction and operation of the aboveground mounds. Each treatment process has been designed to ensure the quality of treated water being discharged into Lake Ontario meets or exceeds stringent regulatory requirements, resulting in the enhanced protection of the Great Lakes Basin ecosystem. In 2015, the contract to build the Port Granby long-term waste management facility and remediate the existing waste site was awarded, and the long-awaited facility development will soon begin. The use of a dedicated internal waste transportation route along, which the LLRW will be trucked from the existing site to the new facility, is a key component of the design to minimize the impact on the local, rural community. In Port Hope, the removal of contaminated soil within the site for the new long-term management facility commenced in the fall of 2015. Over the next several years, multiple contracts will be awarded for construction and operation of the new waste management facility and remediation of the large and small-scale sites. In short, the Port Hope and Port Granby community-based concepts have matured into tangible projects with appropriate regulatory approvals and federal funding in place. Ongoing communications with the two communities have resulted in a well-informed public that understands the work to be done and is eager to see their projects take shape and become reality. As Canada's largest environmental remediation and restoration undertaking, the PHAI has never been closer to fulfilling its vision - working with the local communities to fulfil Canada's commitment for the cleanup of historic waste in Port Hope and Port Granby to leave an honourable legacy for future generations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

National Plan for the Disposal of Existing and Future TRU Wastes - 18616

Now that the Waste Isolation Pilot Plant (WIPP) has re-opened, after being down for three years due to an accident the DOE National TRU Program has re-developed a plan for the disposal of existing and future TRU wastes. The National TRU Waste Management Plan (NTWMP) is an integrated plan to address the needs of DOE sites across the DOE Weapons Complex that create and store TRU waste, and is centered on the capability of WIPP to receive and dispose of TRU waste. The WIPP capability is planned as a weekly shipping rate and is defined by emplacement and receipt rate capabilities since WIPP is not permitted for long-term storage. And, shipping rates may be constrained by new WIPP Waste Acceptance Criteria (WAC) and future plans for repository configurations and disposal package capabilities over the next 30 years. Since WIPP is the only disposal system available to the DOE for TRU waste disposal, DOE has a newly projected life-cycle need for WIPP to remain open and available up to 2050. It is projected that the need for WIPP will continue up to the year 2050 for the disposition of the remaining legacy TRU inventories and for the disposal of TRU waste continuing to be generated at DOE's National Laboratories. In addition, there are several other potential new waste streams in which WIPP is being considered an alternative solution for their disposition. The NTWMP has been updated to reflect the short-term and long-term plans for TRU waste disposal at WIPP. The short-term plan is used by DOE for budget projection and integration purposes to facilitate and inform budget planning, both in DOE's Environmental Management (EM) and National Nuclear Security Administration (NNSA) organizations. Most legacy TRU waste (generated in the past and stored at DOE sites today) is owned and managed by EM. And, EM submits integrated budget requests for DOE sites, including the integration of resources for TRU waste management. NNSA and DOE's Office of Science (OS) funds TRU waste management as part of their mission funding and NNSA should eventually be the primary user of the WIPP resources as EM's legacy TRU waste is cleaned-up. Prior to the unexpected shutdown of WIPP in 2014, there was a small back-log of waste certified for WIPP disposal and shipments of TRU waste to WIPP were 'just-in-time' as waste was certified. After three years of WIPP being down, DOE sites have built significant back-logs of TRU waste to be certified for WIPP. That back-log built up to over 25,000 containers of TRU waste during that three-year period (Table 1). The backlog included both Contact-Handled (CH) TRU waste and Remote-Handled (RH) TRU waste, and even though WIPP re-opened in April of 2017, it is only open for TRU waste containers that can be stacked on disposal room floors. Plans for changing RH waste disposal packages and methods are in-the-works, but are not yet mature enough for significant planning. In addition, the WIPP underground facilities are now partially contaminated with radioactive particulate, which significantly reduces the WIPP operational efficiencies as compared to 2014. With a large back-log of waste ready for WIPP disposal and limited throughput for WIPP disposal rates, the focus of the NTWMP is to prioritize the selection of TRU wastes from the various sites based on WIPP waste emplacement rates and shipping rates to WIPP. Some TRU waste sites have a significant need to be top priority for shipments to WIPP, and that must be balanced with the need for all TRU waste sites to have some shipments to deplete their back-log of TRU wastes. Storage and management of TRU waste is very costly for DOE and many of those resources could be used to optimize the overall disposition of TRU waste and save DOE significant funding. In addition, the plan will show the possible transition of TRU Waste Management from primarily being an EM function to being an NNSA function in the coming years. As legacy TRU waste inventories are removed, and as NNSA mission-related TRU waste inventories are produced, DOE will be faced with deciding where the primary responsibility for TRU waste management should reside. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Challenges of Maintaining Institutional Controls: Maintenance of an Alternate Water Supply- A Case Study - 19583

The US Department of Energy (DOE) cofunded an alternate water-supply system (AWSS) with the Indian Health Service that was installed in the vicinity of the former uranium mill site near Riverton, Wyoming, as one of the institutional controls (ICs) at the site. The AWSS was constructed in 1998 to supply drinking water to residents within the IC boundary in lieu of drinking untreated groundwater that could potentially be impacted by the contaminated shallow aquifer. The AWSS derives water from three source wells that pump groundwater from the sandstones of the Wind River Formation to a 3.8 x 106 liter (1,000,000 gallon) storage tank. Water from the storage tank is distributed throughout the AWSS service area by approximately 18 kilometers (11 miles) of PVC pipeline. The AWSS currently serves 103 residential customers and 1 commercial customer. DOE and the Northern Arapaho tribe (owner of the AWSS) have partnered over the years to address numerous challenges with the AWSS that included engineering assessments, scientific investigations, sampling support, a hydrant flushing program, and funding. Challenges with the AWSS have included the following: (1) Transmission pipe installed during initial construction did not have a pressure rating high enough to account for system pressure surges. (2) AWSS appurtenances were initially installed without accounting for the effects of corrosive soils on metal components. (3) Natural radium from the Wind River Formation groundwater builds up in the AWSS transmission pipes to levels above the primary drinking water standard because of the lack of a flushing program, dead-end lines, and low system demand. A 2-year study showed that a unidirectional hydrant-flushing program will control the radium buildup. (4) Aging system components including hydrants, valves, and pumps are nearing their effective lifespan and are in need of replacement. (5) With the addition of large commercial customers, demand on the system has increased since the initial installation of the system, and future growth in the area will continue to increase demand. (6) Additional connections and integration of the AWSS with an areawide water system in the near future will require changes to the current flushing plan and add additional complexity regarding areas of responsibility. (7) A well-organized financial and administrative infrastructure is not in place, and additional revenue is needed to operate, maintain, and improve the AWSS. To be a viable IC, the AWSS will require management, maintenance, and upgrades to provide safe drinking water until groundwater meets drinking water standards. Responsibilities and funding for maintaining the AWSS as a viable IC are the focus of current discussions, and decisions regarding responsibilities and funding will be formalized in future cooperative agreements and memoranda of understanding with the owners. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Spent Nuclear Fuel Storage and Radioactive Waste Disposal in the United States: A Law and Policy Analysis - 20302

While Congress plays political football, spent nuclear fuel continues to sit in de facto interim nuclear waste storage sites throughout the country. This ad hoc approach - if it can even be called an approach - to nuclear waste management is in no one's best interests, because of financial, safety, environmental, and national security concerns with the status quo. Senate leadership had asserted that an up-or-down vote on the Yucca Mountain Project would take place in September or October 2019, but that did not occur. Rather, a conference bill was agreed to, and it provided that, although the nuclear program should receive some funding, funding was not made available for centralized interim storage ('CIS') or the Yucca Mountain Project. The President's FY2021 Budget Request does not contain any proposed funding for the Yucca Mountain Project ('the Project'). This paper will discuss the implications of that process, both for the Project itself and for the U.S. nuclear waste program more generally. In order to provide context for the current situation, this paper will begin by chronicling the history of U.S. nuclear waste management, from the passage of the Nuclear Waste Policy Act of 1982 and to the present day. It will discuss the roles of the U.S. Department of Energy, the Nuclear Regulatory Commission, federal and state political delegations, and the nuclear energy industry. The paper will then identify key themes that can be expected to affect the future of nuclear waste management in the United States. For example, it will consider whether development of additional CIS facilities is a viable short- to medium-term solution. CIS facilities may relieve immediate pressure at decommissioned or soon-to-be-decommissioned nuclear power plants; but with that pressure partially alleviated, support for building a long-term repository may be reduced. It will also discuss opposition by the State of New Mexico and others to the proposed New Mexico CIS project, based not only on siting concerns but also whether it might become a de facto repository, and whether the State of Texas and others may also be opposed, for similar reasons, to the proposed CIS facility in Texas. Additionally, the paper will examine consent-based siting and its implications for Nevada and other states that are potential hosts for spent nuclear fuel storage and disposal facilities. Further, if the Project is not a politically viable solution, the paper will examine whether it is now time for serious consideration of an alternate location for a permanent repository, as well as consideration of other options entirely, such as deep geologic disposal. The paper will conclude by looking ahead to the 2020 elections. It will describe the positions of candidates (particularly Presidential candidates) on spent nuclear fuel storage and disposal options, without advocating for any particular candidate or political party. Perhaps in 2020, we will at least see a start to a solution to the seemingly intractable problem of nuclear waste management in the United States. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Energy Technology Commercialization and Entrepreneurship: Insights From the U.S. Department of Energy's Office of Technology Transitions 2024 Energy Technology University Prize Faculty Track

The Energy Technology University Prize (EnergyTech UP) was established in 2022 with the goal of challenging student teams to develop impactful business plans for energy technologies of their choosing. EnergyTech UP is part of the The American Made Challenges program portfolio, funded by the U.S. Department of Energy. EnergyTech UP is specifically funded by the Department of Energy's Office of Technology Transfer (OTT) and is administrated by staff at the National Renewable Energy Laboratory (NREL). Since its inception, the annual prize has attracted applications from approximately 1,948 students across nearly every U.S. state and territory, awarding over $1 million in funds to student teams. In 2024, the prize expanded to include a Faculty Track, which invited faculty members from degree-granting institutions across the U.S. to design entrepreneurship-based curricula or educational activities. This new track aims to foster innovation in energy entrepreneurship education by leveraging the expertise of faculty to create robust, practical, and inclusive learning experiences. This report summarizes the themes, strategies and impacts identified in proposals from EnergyTech UP's inaugural Faculty Track. Our primary data for organizing insights are the Faculty Track applications themselves. This evaluation of 2024 EnergyTech UP Faculty Track applications aims to support future EnergyTech UP Faculty Track applicants as well as others who are interested in promoting, developing, and/or implementing educational activities that focus on energy commercialization and entrepreneurship at their institutions. By presenting insights from 2024 entries to the Faculty Track, we hope to contribute to a growing inventory of open-source curriculum development resources and provide materials to facilitate the growth of similar programs at a variety of collegiate institutions.

adoption readiness level↗

University Data Management Pilot Utilizing the Nuclear Research Data System

Background In 2022, the Office of Science and Technology Policy (OSTP) issued a memo that significantly reshaped the landscape of access to federally funded research. The memo mandated that all taxpayer-funded research be made available to the public without delay upon publication, without an embargo period, superseding the 2013 OSTP public access policy. This public access policy promotes transparency and the democratization of knowledge, ensuring that the fruits of scientific endeavors funded by federal agencies could be immediately accessed and built upon by scientists, educators, students, and the public at large. To implement the requirements of the OSTP guidance and DOE Public Access Plan, the Office of Nuclear Energy (NE) has implemented public access plan guidance and has identified several areas where better data management practices would further expand public access to important nuclear energy related scientific data, reports, and other technical products. Significant NE supported efforts are already underway for data management and public access to important nuclear energy related data.1 2 To address gaps in data management practices, and improve retention and accessibility of data, NE is actively exploring enhanced data management options utilizing its high-performance computing resources administered by its Nuclear Scientific User Facility Program. A newly piloted system, the Nuclear Research Data System (NRDS) acts as a portal for data collection and dissemination. Nuclear Energy University Program Research and Development Portfolio According to Web of Science, NEUP has produced 2,345 journal publication that have been cited more than 61,000 times3 and countless conference proceedings. These publications are publicly available through OSTI.gov and in the open literature. Additional scientific and technical products including project milestones that are not publications and NEUP project final reports are vetted through OSTI.gov and released once reviewed and approved by DOE. Since 2009, NEUP has awarded close to 1,000 different R&D projects in technical areas across the NE research programs. As of June 2023, 512 NEUP reports are publicly available on OSTI. The underlying data for projects is still held at universities, and data transfer, co-location, and dissemination has not occurred in a systematic way. NEUP data is currently accessible through myriad university-based data repositories, or through direct requests to PIs. The program identified this patchwork of repositories, or often lack of publicly available data, as a significant barrier to an organized, accessible, and comprehensive solution to sharing data with the larger nuclear energy community. Approach The goal of this pilot project is to establish a pathway to a consolidated long-term repository for NEUP project data. To accomplish this goal, the pilot strives to accomplish the following objectives: Establish data collection standards, including a standard set of required supplementary information to contextualize and support raw data files. Work with the HPC group collect and upload information and to modify the NRDS system, as needed, to support a standardized approach. Resolve potential barriers to successful roll out of an expanded data collection strategy, including modifying data management plan guidelines and establishing a document and data release process that accounts for potential intellectual property and/or export control concerns. Results Overall, the pilot was successful in collecting 8,982 raw and processes data files, 220 reports, 56 calibration files, and 5,931 other supplementary documents. Supplementary documents included experimental plans, methods, journal publications and conference proceedings, milestone reports, and final reports. Figure 2 shows the number of data sets and supplementary project information provided by each project. Projects has significantly different input, depending on experimental data produced and completeness of the datasets provided.

Data collection↗