Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Estimation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 973 records · Page 54

Compressed Natural Gas Component Leak Frequency Estimation

The frequency of unintended releases in a compressed natural gas system is an important aspect of the system quantitative risk assessment. The frequencies for possible release scenarios, along with engineering models, are utilized to quantify the risks for compressed natural gas facilities. This report documents component leakage frequencies representative of compressed natural gas components that were estimated as a function of the normalized leak size. A Bayesian statistical method was used which results in leak frequency distributions for each component which represent variation and uncertainty in the leak frequency. The analysis shows that there is high uncertainty in the estimated leak frequencies due to sparsity in compressed natural gas data. These leak frequencies may still be useful in compressed natural gas system risk assessments, as long as this high uncertainty is acknowledged and considered appropriately.

03 NATURAL GAS↗

Estimating the Breakeven Cost of Delivered Electricity to Charge Class 8 Electric Tractors

As vehicle electrification expands from the light-duty sector to include larger commercial medium- and heavy-duty vehicles, businesses need to decide if electrification is appropriate for their fleets. A key factor in this decision will be the total cost of ownership for on-road electric Class 8 tractors compared to their combustion counterparts. This report examines the breakeven price of electricity for electric Class 8 tractor charging to address its importance in the total cost of ownership for the operation of an electrified fleet and to account for the inherent differences of higher-power charging. To understand the likely cost of delivered energy--in this report the breakeven price--to charge electric tractors, this study followed an analysis framework that considers a wide range of factors to estimate the breakeven price to charge at various station types. This requires an estimation of electric vehicle adoption trajectories and analysis of real-world fleet data to assess energy needs of heavy-duty electric tractors and to determine expected charging station demand over time. Station demand informs the level of electric vehicle supply equipment (EVSE) deployment that is necessary at each station type, as well as the site utilization and anticipated load profiles. Then, by accounting for a wide range of capital investments, operating costs, and other expenses, a breakeven price of energy is determined.

33 ADVANCED PROPULSION SYSTEMS↗

Chemical and Cement Components 2021 Inventory Estimates for Additional Panels National Environmental Policy Act Analysis

This standard analysis report provides the estimates for the chemical (oxyanions and complexing agents) and cement components with a data collection cut-off date of December 31, 2021. These estimates will be included in a response to an inventory data request developed for the U.S. Department of Energy (DOE) performance assessment (PA) for the National Environmental Policy Act (NEPA) analysis on additional panels for the Waste Isolation Pilot Plant (WIPP).

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Reliability Estimation for One-Shot Devices (Rev. 1)

We present an engineering-oriented summary of statistical methods for estimation of the reliability (or equivalently, failure probability) of one-shot devices such as explosive detonators and other weapon components. Estimates may be given as single points or intervals, based on pass/fail tests, margin analysis, computational models, expert judgment, or a combination of these. We focus on highly reliable devices for which few or no failures are expected to occur in testing.

42 ENGINEERING↗

The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure

With the support of DOE's Vehicle Technologies Office and the DOE/DOT Joint Office (JO), NREL has applied the EVI-X modeling suite to conduct a National Electric Vehicle Infrastructure Needs Assessment. This report considers a 2030 scenario in which 50% of light-duty sales are electric (including plug-in hybrids), resulting in an on-road stock of 33 million vehicles. We consider the needs of vehicles used for typical daily driving, drivers without access to residential charging, corridor charging supporting long-distance travel, and ride-hailing electrification. We find that a cumulative capital investment of $82 billion in public and private charging infrastructure will be necessary in our baseline scenario (approximately 3x greater than our estimate of planned investments to date). This result is framed as a conservative estimate as the assumed costs include charging equipment and installation but exclude the cost of grid upgrades and distributed energy resources.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Updated Economic Model for Estimation of GDP Losses in the MACCS Offsite Consequence Analysis Code RDEIM Model Report for MACCS v4.2

This report updates the Regional Disruption Economic Impact Model (RDEIM) GDP-based model described in Bixler et al. (2020) used in the MACCS accident consequence analysis code. MACCS is the U.S. Nuclear Regulatory Commission (NRC) used to perform probabilistic health and economic consequence assessments for atmospheric releases of radionuclides. It is also used by international organizations, both reactor owners and regulators. It is intended and most commonly used for hypothetical accidents that could potentially occur in the future rather than to evaluate past accidents or to provide emergency response during an ongoing accident. It is designed to support probabilistic risk and consequence analyses and is used by the NRC, U.S. nuclear licensees, the Department of Energy, and international vendors, licensees, and regulators. The update of the RDEIM model in version 4.2 expresses the national recovery calculation explicitly, rather than implicitly as in the previous version. The calculation of the total national GDP losses remains unchanged. However, anticipated gains from recovery are now allocated across all the GDP loss types – direct, indirect, and induced – whereas in version 4.1, all recovery gains were accounted for in the indirect loss type. To achieve this, we’ve introduced new methodology to streamline and simplify the calculation of all types of losses and recovery. In addition, RDEIM includes other kinds of losses, including tangible wealth. This includes loss of tangible assets (e.g., depreciation) and accident expenditures (e.g., decontamination). This document describes the updated RDEIM economic model and provides examples of loss and recovery calculation, results analysis, and presentation. Changes to the tangible cost calculation and accident expenditures are described in section 2.2. The updates to the RDEIM input-output (I-O) model are not expected to affect the final benchmark results Bixler et al. (2020), as the RDEIM calculation for the total national GDP losses remains unchanged. The reader is referred to the MACCS revision history for other cost modelling changes since version 4.0 that may affect the benchmark. RDEIM has its roots in a code developed by Sandia National Laboratories for the Department of Homeland Security to estimate short-term losses from natural and manmade accidents, called the Regional Economic Accounting analysis tool (REAcct). This model was adapted and modified for MACCS. It is based on I-O theory, which is widely used in economic modeling. It accounts for direct losses to a disrupted region affected by an accident, indirect losses to the national economy due to disruption of the supply chain, and induced losses from reduced spending by displaced workers. RDEIM differs from REAcct in in its treatment and estimation of indirect loss multipliers, elimination of double-counting associated with inter-industry trade in the affected area, and that it is intended to be used for extended periods that can occur from a major nuclear reactor accident, such as the one that occurred at the Fukushima Daiichi site in Japan. Most input-output models do not account for economic adaptation and recovery, and in this regard RDEIM differs from its parent, REAcct, because it allows for a user-definable national recovery period. Implementation of a recovery period was one of several recommendations made by an independent peer review panel to ensure that RDEIM is state-of-practice. For this and several other reasons, RDEIM differs from REAcct.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Subsurface Hydrogen Assessment, Storage, and Technology Acceleration (SHASTA) - Hydrogen Estimator for Logistical Planning (HELP) User’s Manual

This user’s manual describes version 1.0 of the SHASTA-HELP (Subsurface Hydrogen Assessment, Storage, and Technology Acceleration (SHASTA) - Hydrogen Estimator for Logistical Planning (HELP)) tool and provides instructions for use. The purpose of the SHASTA-HELP tool is to integrate the suite of tools developed by the SHASTA research team in a web-based framework for ease of access and more advanced, integrated analysis. This tool contains functionality for estimating the storage potential of pure and blended natural gas-hydrogen mixtures in various subsurface formations and is intended to be used for pre-characterization or site screening purposes. Detailed storage analysis should be conducted by full reservoir simulation models.

08 HYDROGEN↗

Comparing Automated Posterior Estimation Techniques for Modeling Strong Lenses In Ground-based Survey Data

Current and future ground-based cosmological surveys, such as the Dark Energy Survey (DES), and the Vera Rubin Observatory Legacy Survey of Space and Time (LSST), are predicted to discover thousands to tens of thousands of strong gravitational lenses. The large number of strong lenses discoverable in future surveys will make strong lensing a highly competitive and complementary cosmic probe. However, conventional lens modeling techniques are unable to scale up to the sheer number of lenses that will be discovered through upcoming surveys. Therefore, the use of automated lens analysis techniques is necessary. We demonstrate that machine learning methods can be used to automate the inference of informative model posteriors of strong lensing systems in ground-based surveys with credible uncertainty estimation. We present two Simulation-Based Inference (SBI) approaches for lens parameter estimation of galaxy-galaxy lenses. We demonstrate applications of Neural Posteriors Estima tors (NPEs) and Bayesian Neural Network (BNNs) to automate the inference of a 12-parameter lensing system for DES-like ground-based imaging data. We apply a suite of diagnostics (e.g., posterior coverage and SBC) to validate the performance of our methods. We find that NPEs outperform the BNN, producing posterior distributions that are for the most part both more accurate and more precise; in particular, several source-light model parameters are systematically biased in the BNN implementation.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Parameter estimation for incidence angle modifier models for photovoltaic modules

We present methods to estimate parameters for models for the incidence angle modifier for simulating irradiance on a photovoltaic array. The incidence angle modifier quantifies the fraction of direct irradiance that is reflected away at the array’s face, as a function of the direct irradiance’s angle of incidence. Parameters can be estimated from data and the fitting method can be used to convert between models. We show that the model conversion procedure results in models that produce similar annual insolation on a fixed plane.

14 SOLAR ENERGY↗

Write-up on the analytical formalism for DTL Synchrotron and Betatron frequencies estimates

Appendix A contains tables of the DTL tanks geometry, generated using PARMILA code with input parameters of initial and final energy, accelerating gradient, synchronouse phase, and using DTLfish code (part of the SUPERFISH/POISSON package of codes). Details of the design and generation od the DTL geometry will be presented in a separate report. After generation of the DTL geometry and initial beam dynamics simulations, the analytic estimates of the synchrotron and betatron oscillations, as well as presence of the parametric resonance of first order were done. In present report the analytic background of those estimates, as well as the results of these are presented.

43 PARTICLE ACCELERATORS↗

Cost and Performance Estimates for State-of-the-Art and Advanced 1×1 H-Class Natural Gas-Fired Power Plants

As an extension of NETL's Fossil Energy Baseline for Electricity Generating Units Volume 1: Coal and Natural Gas to Electricity (FEB Rev 4a, this study develops cost and performance estimates for analogous NGCC cases using a state-of-the-art 2023 vintage H-Class CT in a 1×1 configuration, where a single combustion turbine and heat recovery steam generator are coupled to a single steam turbine on a common shaft. These 1×1 H-Class cases are used to develop cost and performance estimates of X-Class 1×1 NGCC cases with advanced performance characteristics, analogous to NETL’s cost and performance projections report.

20 FOSSIL-FUELED POWER PLANTS↗

Predicting High Energy Arcing Fault Zones of Influence for Aluminum Using an Arc Flash Modeling Approach: Evaluation of a model bias, uncertainty, parameter sensitivity and zone of influence estimation

This report documents the development of an arc flash hazard model to calculate the incident energy and zone of influence from high energy arcing faults involving aluminum. The NRC has identified the potential for (HEAFs) involving aluminum to increase the damage zone beyond what is currently postulated in fire probabilistic risk assessment (PRA) methodologies. To estimate the hazard from HEAFs involving aluminum an arc flash model was developed. Differences between the initial model and nuclear power plant (NPP) fire PRA scenarios were identified. Modification of the initial model established from existing literature and test data was used to minimize these differences. The developed model was evaluated against NRC datasets to understand the model prediction and relative uncertainties. Finally, a range of fire PRA zone of influences (ZOI) were developed based on the developed model, target fragility estimates and update HEAF PRA methodology. The results were developed to support an NRC LIC-504 evaluation in tandem with other modeling efforts. The report documents the effort and provides a reference for any future advancements in arc flash modeling.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Estimating Lithium Fluxes from Produced Water: Marcellus Shale and Beyond

This talk summarizes the potential for critical minerals extraction from produced water and the current data constraints on making these evaluations. First, we present results from production simulations carried out using data from the Marcellus shale showing the lithium resource potential from this formation. Second, we broaden our estimations to show the critical mineral resource estimates from U.S. domestic shale operations. Lastly, we conclude with an overview of the NEWTS database and dashboard where we host the data used in our assessments.

Mackey, Justin↗

Tritium Production Estimates in EIC Cooling Water Systems

Annual tritium production in EIC cooling water has been estimated in one sextant cooling system from expected electron beam and proton beam losses in the tunnel. Beam losses and the secondary particles they produce are the only source within the RHIC Tunnel for producing radioactivity in cooling water, including tritium. The need to estimate tritium production supports decisions on whether cooling water systems are required to meet Suffolk County Article 12 requirements (e.g., double-walled piping, leak detection and containment, etc.). Results are extended to the remaining sextant cooling water systems because of the similarity in tunnel cooling water loads and system volumes.

43 PARTICLE ACCELERATORS↗

Comment on "An implementation of neural simulation-based inference for parameter estimation in ATLAS''

The paper titled "An implementation of neural simulation-based inference for parameter estimation in ATLAS" by the ATLAS collaboration (arXiv:2412.01600v1 [hep-ex]) describes the implementation of neural simulation-based inference for a measurement analysis performed by ATLAS. The uncertainties in the analysis arising from the finiteness of the simulated datasets are estimated using a novel double-bootstrapping technique described in that work. In the present comment, it is claimed and demonstrated, using a toy example, that the double-bootstrapping technique does not actually capture the aforementioned uncertainties.

43 PARTICLE ACCELERATORS↗

ICE Calculator 2.0: Final Report for Phase 1 of the National Initiative to Update the Interruption Cost Estimate (ICE) Calculator

In 2021, Berkeley Lab and Resource Innovations, Inc. launched the “ICE 2.0 Initiative” – a national study to refresh the underlying data and enhance the functionality of the ICE Calculator. The Initiative involves Berkeley Lab contracting with sponsoring utilities to administer identical, updated and comprehensive interruption cost surveys to statistically representative samples of each utility’s customers. Berkeley Lab and Resource Innovations then pool the survey results across the utilities and use them to update the analytical engines that drive the ICE Calculator. The ICE 2.0 Initiative is being conducted in phases. Each phase involves the administration of interruption cost surveys to the customers of sponsoring utilities, followed by an update to the ICE Calculator based on analysis of the pooled survey results. This report describes the activities and findings from Phase 1 of the ICE 2.0 Initiative. Phase 1 was sponsored by eight utilities: American Electric Power, Commonwealth Edison, Dominion Energy, Duke Energy, DTE Electric, Exelon, National Grid, and Puget Sound Energy. Phase 1 involved 11 customer interruption cost survey activities representing a total of 24 electricity distribution service territories, 23 of them located in the Eastern and Midwestern regions of the U.S. and one located in the Pacific Northwest. ICE 2.0 vs. 1.0 Comparison This memorandum compares customer power interruption costs estimated using the recently updated Interruption Cost Estimate (ICE) Calculator (“ICE 2.0”) to the original ICE Calculator (“ICE 1.0”). ICE 1.0 was developed in 2009 based on 15 independent power interruption cost surveys conducted by 10 electric utilities between 1989 and 2012. ICE 2.0 was developed in 2025 through a national initiative based on a consistent set of power interruption cost surveys and 11 surveying efforts conducted across 24 electric utility service territories between 2022 and 2024.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Standard Analysis Report INV-SAR-79, Revision 0 Chemical and Cement Components 2023 Inventory Estimates

This standard analysis report provides the estimates for the chemical (oxyanions and complexing agents) and cement components with a data collection cut-off date of December 31, 2023. These estimates will be included in a Performance Assessment Inventory Report developed for the U.S. Department of Energy (DOE) performance assessment (PA) for the 2026 Compliance Recertification Application (CRA).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Standard Analysis Report INV-SAR-81, Revision 0 Chemical and Cement Components 2023 Inventory Estimates for the Interim State Performance Assessment of the Waste Isolation Pilot Plant

This standard analysis report provides the estimates for the chemical (oxyanions and complexing agents) and cement components with a data collection cut-off date of December 31, 2023. These estimates will be included in a Performance Assessment Inventory Report developed for the U.S. Department of Energy (DOE) interim state repository configuration performance assessment (PA) for the 2026 Compliance Recertification Application (CRA).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗