Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Early Test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 973 records · Page 54

Setups for eliminating static charge of the ATLAS18 strip sensors

Abstract Construction of the new all-silicon Inner Tracker (ITk), developed by the ATLAS collaboration to beable to track charged particles produced at the High-Luminosity LHC, started in 2020 and is expected tocontinue till 2028. The ITk detector will include 18,000 highly segmented and radiation hard n+-in-psilicon strip sensors (ATLAS18), which are being manufactured by Hamamatsu Photonics. Mechanical and electrical characteristics of produced sensors are measured upon their delivery at several institutes participating in a complex Quality Control (QC) program. The QC tests performed on each individual sensor check the overall integrity and quality of the sensor.During the QC testing of ATLAS18 strip sensors, an increased number of sensors thatfailed the electrical tests was observed. In particular, IV measurements indicated an early breakdown,while large areas containing several tens or hundreds of neighbouring strips with low interstrip isolationwere identified by the Full strip tests, and leakage current instabilities were measured in a long-term leakage current stability setup. Moreover, a high surface electrostatic charge reaching a level of several hundreds of volts per inch was measured on a large number of sensors and on the plastic sheets, whichmechanically protect these sensors in their paper envelopes. Accumulated data indicates a clearcorrelation between observed electrical failures and the sensor charge-up.To mitigate the above-described issues, the QC testing sites significantly modified the sensor handlingprocedures and introduced sensor recovery techniques based on irradiation of the sensor surface with UVlight or application of intensive flows of ionized gas. In this presentation, we will describe the setupsimplemented by the QC testing sites to treat silicon strip sensors affected by static charge andevaluate the effectiveness of these setups in terms of improvement of the sensor performance.

Instruments & Instrumentation↗

Aerojet - Attitude Control Engines

All the engines were both qualification and acceptance tested at Marquardt s facilities. After we won the Apollo Program contract, we went off and built two vacuum test facilities, which simulated altitude continuous firing for as long as we wanted to run an engine. They would run days and days with the same capability we had on steam ejection. We did all of the testing in both for the qualification and the acceptance test. One of them was a large ball, which was an eighteen-foot diameter sphere, evacuated again with a big steam ejector system that could be used for system testing; that s where we did the Lunar Excursion Module testing. We put the whole cluster in there and tested the entire cluster at the simulated altitude conditions. The lowest altitude we tested at - typically an acceptance test - was 105,000 feet simulated altitude. The big ball - because people were interested in what they called goop formation, which is an unburned hydrazine product migrating to cold surfaces on different parts of spacecraft - was built to address those kinds of issues. We ran long-life tests in a simulated space environment with the entire inside of the test cell around the test article, liquid nitrogen cooled, so it could act as getter for any of the exhaust products. That particular facility could pull down to about 350,000 feet (atmosphere) equivalent altitude, which was pushing pretty close to the thermodynamic triple point of the MMH. It was a good test facility. Those facilities are no longer there. When the guys at Marquardt sold the company to what eventually became part of Aerojet, all those test facilities were cut off at the roots. I think they have a movie studio there at this point. That part of it is truly not recoverable, but it did some excellent high-altitude, space-equivalent testing at the time. Surprisingly, we had very few problems while testing in the San Fernando Valley. In the early 1960s, nobody had ever seen dinitrogen tetroxide (N2O4), so that wasn't too big a deal. We really did only make small, red clouds. In all the hundreds of thousands of tests and probably well over one million firings that I was around that place for, in all that thirty-something years, we had a total of one serious injury associated with rocket engine testing and propellants. Because we were trying to figure out what propellants would really be good, we tried all of the fun stuff like the carbon tetrafluoride, chlorine pentafluoride, and pure fluorine. The materials knowledge wasn't all that great at the time. On one test, the fluorine we had didn't react well with the copper they were using for tubing, and it managed to cause another unscheduled disassembly of the facility. It was very serious. It's like one of those Korean War stories. The technician happened to be walking past the test facility when it decided to blow itself up. A piece of copper tubing pierced one cheek and came out the other. That was the only serious accident in all of the engines handled in all those years. Now, we did have a problem with the EPA later because they figured out what the brown clouds were about. We built a whole bunch of exhaust mitigation scrubbers to take care of engine testing in the daytime. In general, we operated the big shuttle (RCS) engine, the 870- pounder at nominal conditions; they scrubbed the effluents pretty well. If you operated that same 870-pound force engine at a level where you get a lot of excess oxidizer, yeah, there s a brown cloud. But, you know, it doesn't show up well in the dark. They did do some of that. But, that s gone; it was addressed one way or another. RELEASED -

Pfeifer, Gerald R.↗

Current Status and Plans for Test and Deployment of the First NASA SLR System

Over the last decade the Space Geodesy Project has been progressing toward the development and deployment of NASA’s next generation network of geodetic stations ( https://space-geodesy.nasa.gov ). The Satellite Laser Ranging (SLR) part of this effort is called Space Geodesy Satellite Laser Ranging (SGSLR). Significant progress has been made in the development of SGSLR’s nine subsystems, and many of these subsystems are completed or are nearing completion. The next major step will be the Integration and Testing (I&T) of all subsystems into the first SGSLR system which will start before the end of 2022. Verification testing (collocation) with NASA’s legacy operational SLR system, MOBLAS-7, is planned for early 2024. The first SGSLR system is being developed for Kartverket, also known as the Norwegian Mapping Authority (NMA). The system will be installed at Ny-Ålesund in Svalbard, Norway. The planned start of operations is early 2025. This presentation will give the current status of development, the testing and deployment plans, and the future of NASA’s SGSLR global network.

Satellite Laser Ranging↗

Space Shuttle orbital flight test

This paper will review current plans for the overall Orbital Flight Test Program. Discussion will include vehicle configurations, flight test progression logic, schedules, payloads, and anticipated placards on early operational missions. STS-1 flight plan will be covered in some detail; also, the functional organization and procedures planned to conduct the test program will be reviewed.

Slayton, D. K.↗

THERMAL MODELING OF HANFORD LEAD CANISTER’S HEATER BENCH TESTS

A computational fluid dynamics (CFD) model was built to simulate planned testing of heater assemblies for the Hanford Lead Canister (HLC) project. The HLC is a canister storage system that will contain heaters to simulate the decay heat of nuclear material and provide the canister storage system with environmental conditions equivalent to the operating conditions on a dry storage pad. The HLC will be equipped with long-term data collection and monitoring systems to provide an early warning of corrosion, pitting, cracking, or other signs of canister degradation that might threaten the integrity of the containment boundary over the potentially long term of dry storage. An important part of the HLC development is to confirm the function and ability of the electric heater assemblies that were specially designed to provide heating similar to the decay heat of nuclear material contained within the canister storage system. Heater bench testing is planned for early 2022 in a test configuration that does not include the canister. The goal of the bench testing is to verify that the heaters can replicate the decay heat of a canister with nuclear material and to validate the thermal models, which are critical to understanding the HLC’s thermal environment, including the local air flow within the canister storage system. Testing of the heater assemblies inside the canister system are planned in the future to validate canister level thermal models, and rigorous pre-deployment testing of the complete HLC cask and canister system is intended to be completed before the HLC is deployed in the 2025-2026 timeframe. This study presents the pre-test temperature predictions of the bench testing. A description of the heater assemblies and planned bench testing is presented. The model was developed with the commercial CFD code STAR-CCM+. An uncertainty analysis was run with the CFD model to determine the uncertainty in the temperature predictions and provide a range over which the predicted temperatures are expected to vary. The uncertainty analysis was performed by coupling STAR-CCM+ with the software Dakota, which provides advanced parametric analyses, including quantification of margins and uncertainty with computational models. This work is expected to provide insight into SNF canister behavior.

Suffield, Sarah R.↗

Component Modeling, Co-Optimization, and Trade-Space Evaluation (FY2021 Annual Progress Report)

This project is intended to support the development of new traction drive systems that meet the targets of 100 kW/L for power electronics and 50 kW/L for electric machines with reliable operation to 300,000 miles. To meet these goals, new designs must be identified that make use of state-of-the-art and next-generation electronic materials and design methods. Designs must exploit synergies between components, for example converters designed for high-frequency switching using wide band gap devices and ceramic capacitors. This project includes: (1) a survey of available technologies; (2) the development of design tools that consider the converter volume and performance; (3) exercising the design software to evaluate performance gaps and predict the impact of certain technologies and design approaches, i.e. GaN semiconductors, ceramic capacitors, and select topologies; and (4) building and testing hardware prototypes to validate models and concepts. Early instantiations of the design tools enable co-optimization of the power module and passive elements and provide some design guidance; later instantiations will enable the co-optimization of inverter and machine. Prototype testing begins with evaluation of simpler conversion topologies (i.e. the half-bridge boost converter) and progresses with fabrication of prototype inverter drives.

33 ADVANCED PROPULSION SYSTEMS↗

Sub-Scale Testing and Development of the J-2X Fuel Turbopump Inducer

In the early stages of the J-2X upper stage engine program, various inducer configurations proposed for use in the fuel turbopump (FTP) were tested in water. The primary objectives of this test effort were twofold. First, to obtain a more comprehensive data set than that which existed in the Pratt & Whitney Rocketdyne (PWR) historical archives from the original J-2S program, and second, to supplement that data set with information regarding the cavitation induced vibrations for both the historical J-2S configuration as well as those tested for the J-2X program. The J-2X FTP inducer, which actually consists of an inducer stage mechanically attached to a kicker stage, underwent 4 primary iterations utilizing sub-scaled test articles manufactured and tested in PWR's Engineering Development Laboratory (EDL). The kicker remained unchanged throughout the test series. The four inducer configurations tested retained many of the basic design features of the J-2S inducer, but also included variations on leading edge blade thickness and blade angle distribution, primarily aimed at improving suction performance at higher flow coefficients. From these data sets, the effects of the tested design variables on hydrodynamic performance and cavitation instabilities were discerned. A limited comparison of impact to the inducer efficiency was determined as well.

Sargent, Scott R.↗

LM2500+ Brush Seal Case Study

The LM2500+ industrial aeroderivative gas turbine, a 25% enhanced power derivative of the LM2500 gas turbine, recently completed its development test program during the period 5/96 - 10/96. Early in the engine program a Quality Function Deployment (QFD) process was used to determine customer needs for this project.The feedback obtained from the QFD process showed without doubt that gas turbine customers now emphasize product reliability and availability at the top of their needs. One area of development on the LM2500+ was to investigate the use of a brush seal as a means to reduce undesirable turbine cooling leakages within the turbine mid frame in order to enhance part life. This presentation presents a case study on the factors that went into evaluating a brush seal during engine test, test results, and the ultimate decision not to implement the brush seal for cost and other reasons.

Haaser, Fred G.↗

EMI / EMC Design for Class D Payloads (Resource Prospector / NIRVSS)

EMI/EMC techniques are applied to a Class D instrument (NIRVSS) to achieve low noise performance and reduce risk of EMI/EMC testing failures and/or issues during system integration and test. Basic techniques are not terribly expensive or complex, but do require close coordination between electrical and mechanical staff early in the design process. Low-cost methods to test subsystems on the bench without renting an EMI chamber are discussed. This method was applied to the NIRVSS instrument and achieved improvements up to 59dB on conducted emissions measurements between hardware revisions.

low noise↗

The George C. Marshall Space Flight Center's 14 X 14-Inch Trisonic Wind Tunnel: A Historical Perspective

A history of the National Aeronautics and Space Administration (NASA) George C. Marshall Space Flight Center's (MSFC) 14 x 14-Inch Trisonic Wind Tunnel is presented. Its early and continuing role in the United States space program is shown through highlights of the tunnel's history and the major programs tested in the tunnel over the past 40 years. The 14-Inch Tunnel has its beginning with the Army in the late 1950's under the Army Ballistic Missile Agency (ABMA). Such programs as the Redstone, Jupiter, Pershing, and early Saturn were tested in the 14-Inch Tunnel in the late 1950's. America's first launch vehicle, the Jupiter C, was designed and developed using the 14-Inch Wind Tunnel. Under NASA, the 14-Inch Wind Tunnel has made large contributions to the Saturn, Space Transportation System, and future launch vehicle programs such as Shuttle-C and the National Launch System. A technical description of the tunnel is presented for background information on the type and capabilities of the 14-Inch Wind Tunnel. The report concludes in stating: the 14-Inch Wind Tunnel as in speed of sound; transonic, at or near the speed of sound the past, will continue to play a large but unseen role in he development of America's space program.

A. Springer↗

Dual Glovebox Thermal Vacuum Chamber: Testing Capabilities for Spacesuit Arms and Gloves

The development of Extravehicular Activity (EVA) suits and hand mobility EVA tasks are complex, high risk, and difficult to test in a simulated space environment. During the early assembly of the International Space Station, the Crew and Thermal Systems Division at NASA JSC was tasked to design a chamber that could use two Extravehicular Mobility Unit (EMU) arms in a simulated space environment versus testing with a full suit. The Dual Glove Box (DGB) Chamber was built and served to help develop EVA tools and operations to assist with Return to Flight for the Space Shuttle after the Columbia accident. With the recent development of the Exploration Extravehicular Mobility Unit (xEMU) and new commercial suits through the Extravehicular Activities Services (xEVAS) contract, the DGB can support the need to do suit component testing at thermal extremes and EVA operations without the cost of full suit testing. The DGB can simulate realistic delta pressures, vacuum down to 10^-5 Torr with roughing and cryogenic pumps, and a wide range of shroud temperatures achieved via a combination of Liquid Nitrogen (LN2), conditioned Gaseous Nitrogen (GN2), Infrared (IR) lamps, and heater plates. Recent developmental work has verified operational status of the chamber and expanded the capabilities of the DGB to include thermal contact testing of suit gloves through the development of 2 temperature-controlled grab bars. This paper will discuss the history and capabilities of the DGB, and the chamber’s future role in the development of new spacesuit systems.

Extravehicular Activity (EVA) suits↗

Broad Compatibility Study of Polymeric Materials with Ionic Silver Biocide, Part I

NASA is considering ionic silver as a residual biocide for use in potable water systems being planned for future exploration spacecraft. Compatibility of the biocide with the system’s wetted-materials of construction remains a challenge. Due to the relatively inert nature of plastics, their use in varied water system applications may offer unique opportunities to address many biocide compatibility issues. A 2020 ICES paper described a “Stage 1” assessment of several polymeric materials, in which coupons having a 2 cm 1 surface to volume ratio were exposed to solutions of 400 parts per billion (ppb) aqueous silver fluoride (AgF) for one week. In this current paper, additional Stage 1 test results are presented for select epoxies and lubricants applied on silver-inert substrates. The coupon exposure studies were also expanded to a duration of 5 weeks for the “well-behaved” Stage 1 plastics previously reported: those exhibiting silver losses above 10% and less than 50%. For this type of Stage 2 testing, silver biocide solution samples are taken from three separate (and not previously-sampled) coupon containers after 3 days, and 2, 3, 4, and 5 weeks of exposure. "Very well-behaved" Stage 1 plastics will be tested in the same manner over one year, with longer sample intervals; early-period results are included here. In addition, for select materials, the coupons were “aged” by refilling test containers with fresh AgF and observing the respective silver uptake over similar Stage 2 test durations. For all test series, Inductively Coupled Plasma Mass Spectrometry (ICP-MS) and ion-selective electrode (ISE) analyses were used to determine total and ionic silver (Ag+) concentrations, respectively. Additional sample analyses for Stage 2 tests includes total organic carbon (TOC), pH, conductivity, and oxidation-reduction potential (ORP). Ultimately, these early compatibility studies will be used to guide future material selections for developing silver biocide-compatible spacecraft water systems.

Silver Biocide↗

Ongoing nickel-hydrogen energy storage device testing at George C. Marshall Space Flight Center

The primary objective of the testing is to characterize Ni-H2 cells for successful integration into the electrical power system (EPS) of the Hubble Space Telescope (HST). A broad spectrum of Ni-H2 design technology is encompassed by the testing configurations; tests include cells with dates of manufacture as early as 1976. The database includes cells of varied storage times, capacity, plate design, stack design, terminal configuration, pressure vessel thickness, separator material, potassium hydroxide (KOH) concentration, and thermal control. Currently, 196 Ni-H2 cells are being tested, grouped as follows: 12 RNH-35-3, 14 RNH-30-1, 22 HST cells (1 battery, flight spare lot), 132 HST cells (6 batteries, test modules 1 and 2, called TM1 and TM2), 12 HST cells (3 four-cell packs, TM1, TM2, flight spare module FSM), and 4 HST cells (engineering lot). In addition to the characterization and life testing, an extensive thermal vacuum and purge test was conducted in November 1989 and February 1990 using the HST FSM (3 batteries composed of 69 HST cells from the flight spare lot) to help verify thermal design. A report is presented of the progress, significant findings, and future objectives of the testing.

Lowery, John E.↗

Dynamic Ground Effects Simulation Using OVERFLOW-D

This presentation is broken into 5 logical sections. The Background Information section describes the technical issues being address by this study. The Approach section describes the organization of the contract effort which was laid out as the most effective means of quantifying, with validated methods, the magnitude of dynamic ground effects for the TCA (Technology Concept Aircraft) configuration. The Validation Case section describes the analysis of the XB-70 configuration in both static and dynamic ground effect, with comparisons to wind tunnel and flight test data. The TCA Analysis section then describes the application of the same codes and methodologies to the TCA in both static and dynamic ground effect. Comparisons are made between the static and dynamic, as well as to early static data from a recent wind tunnel test on the TCA configuration. Finally, the work to date is summarized and the future direction of this study is outlined.

Dwyer, Bill↗

Ares I-X Flight Evaluation Tasks in Support of Ares I Development

NASA s Constellation Program successfully launched the Ares I-X Flight Test Vehicle on October 28, 2009. The Ares I-X flight was a development flight test that offered a unique opportunity for early engineering data to impact the design and development of the Ares I crew launch vehicle. As the primary customer for flight data from the Ares I-X mission, the Ares Projects Office established a set of 33 flight evaluation tasks to correlate fight results with prospective design assumptions and models. Included within these tasks were direct comparisons of flight data with pre-flight predictions and post-flight assessments utilizing models and modeling techniques being applied to design and develop Ares I. A discussion of the similarities and differences in those comparisons and the need for discipline-level model updates based upon those comparisons form the substance of this paper. The benefits of development flight testing were made evident by implementing these tasks that used Ares I-X data to partially validate tools and methodologies in technical disciplines that will ultimately influence the design and development of Ares I and future launch vehicles. The areas in which partial validation from the flight test was most significant included flight control system algorithms to predict liftoff clearance, ascent, and stage separation; structural models from rollout to separation; thermal models that have been updated based on these data; pyroshock attenuation; and the ability to predict complex flow fields during time-varying conditions including plume interactions.

Huebner, Lawrence D.↗

ARIES Oxide Production Program Monthly Report – April 2014

A summary of the accomplishments, milestones, financial summary, project performance and issues facing the Oxide Production Program for the end of April 2014 is presented in this Executive Summary. PF-4 and ARIES operations remain paused in order to resolve issues and perform an extent-of-condition review for Criticality Safety and Conduct of Operations. On April 28th, Jeff Yarbrough issued a memorandum updating status on the “pause” of PF-4 programmatic operations. He reported that 150 of the procedures that control programmatic operations in PF-4 have successfully resumed. These 150 procedures represent about ½ of the total that will enable us to meet FY14 programmatic commitments. No formal letter of direction will be provided to LANS via the NNSA Field Office contracting officer to address the direction relative to shipments, analytical chemistry sampling and guidance for financial adjustments in FY14 and FY15. LANS will provide a revised plan based on the funding profile included in the President’s Budget Request for the remainder of FY14 and FY15 to include revised FY14 milestones and proposed FY15 milestones. The ARIES Pit Cutter project met the NNSA milestone (Complete Design of Simple Pit Disassembly Equipment [ARIES Pit Cutter] – Due 8/15/14) by completing the fabrication design on 4/3/14, well in advance of the 8/15/14 due date. The project team has started procurement of long-lead items in preparation of the prototype fabrication and cold testing. The fabrication is scheduled to complete in FY14 and the cold testing will begin in FY14 and complete in early FY15. LANL and PNNL met on April 14 to discuss the path forward for PNNL criticality support to the program. The consensus was that PNNL resources can be effectively applied to the generation of detailed CSEs to support the program independent of the current ESS strategy. FY15 program planning is underway. The team is working on planning/drafting the work packages and developing the schedule under the assumption that operations will begin October 1, 2014. A planning schedule has been finalized and the team is meeting regularly to discuss details at the work package and WBS levels. The FY15 PMP is also in the process of being updated. The goal is to have all the drafts reviewed/approved and finalized prior to the start of the FY. MQ personnel have completed ADPSM Management Assessment: Evaluate Quality Roles and Responsibility Agreements between ADPSM and LANL Technical Support Organizations (PFITS 2011-1943). Two findings and four opportunities for improvement were reported. The robotic lathe controller upgrade has entered the construction phase of the project. The controller cabling IWD pre-job meeting was completed. The initial robotic lathe functional test was completed. The existing controller power supply disconnect is scheduled for early May. The NDA Cage project team received notification on 3/28/14 to restart the NDA cage project. Since then the team have been busy with activities that include assigning a planner, getting the construction work package ready for construction and getting the USQ completed. The electrical services installation for the new welding skid for the Inner Can Welder was completed. A gas bottle rack, used to support welding operations, will be installed in early May. The Outer Can Welder design is complete and the IWD is in development to execute construction. Installation materials have been ordered. Work continues on the MD-2 preliminary design. The project engineer is performing a technical evaluation of the Project Management Plan that was submitted by the design agent in response to the LANL Request for Proposal. If all requirements have been captured, LANL procurement will develop a contract and give the design agent notice to proceed on the preliminary design. Estimated completion is scheduled for September 2014. The design for the TA-55 Bldg. 314 warehouse was issued at 90% complete and has begun the last review process. A constructability review is scheduled for early May. The Project Manager has been working with the LANL estimating group to get the class 3 estimate for review. The Oxide Production Cage Upgrade project has kicked-off efforts on the 30% design. Requirements documentation has been drafted. The floor space was walked-down with other project managers and stakeholders and the boundaries were agreed upon.

ARIES↗

Monitoring cognitive function and need with the automated neuropsychological assessment metrics in Decompression Sickness (DCS) research

Hypobaric decompression sickness (DCS) research presents the medical monitor with the difficult task of assessing the onset and progression of DCS largely on the basis of subjective symptoms. Even with the introduction of precordial Doppler ultrasound techniques for the detection of venous gas emboli (VGE), correct prediction of DCS can be made only about 65 percent of the time according to data from the Armstrong Laboratory's (AL's) hypobaric DCS database. An AL research protocol concerned with exercise and its effects on denitrogenation efficiency includes implementation of a performance assessment test battery to evaluate cognitive functioning during a 4-h simulated 30,000 ft (9144 m) exposure. Information gained from such a test battery may assist the medical monitor in identifying early signs of DCS and subtle neurologic dysfunction related to cases of asymptomatic, but advanced, DCS. This presentation concerns the selection and integration of a test battery and the timely graphic display of subject test results for the principal investigator and medical monitor. A subset of the Automated Neuropsychological Assessment Metrics (ANAM) developed through the Office of Military Performance Assessment Technology (OMPAT) was selected. The ANAM software provides a library of simple tests designed for precise measurement of processing efficiency in a variety of cognitive domains. For our application and time constraints, two tests requiring high levels of cognitive processing and memory were chosen along with one test requiring fine psychomotor performance. Accuracy, speed, and processing throughout variables as well as RMS error were collected. An automated mood survey provided 'state' information on six scales including anger, happiness, fear, depression, activity, and fatigue. An integrated and interactive LOTUS 1-2-3 macro was developed to import and display past and present task performance and mood-change information.

Nesthus, Thomas E.↗

Utilization of the Differential Die-Away Self-Interrogation Technique for Characterization and Verification of Spent Nuclear Fuel

New nondestructive assay techniques are sought to better characterize spent nuclear fuel. One of the NDA instruments selected for possible deployment is differential die-away self-interrogation (DDSI). The proposed DDSI approach for spent fuel assembly assay utilizes primarily the spontaneous fission and (α, n) neutrons in the assemblies as an internal interrogating radiation source. The neutrons released in spontaneous fission or (α,n) reactions are thermalized in the surrounding water and induce fission in fissile isotopes, thereby creating a measurable signal from isotopes of interest that would be otherwise difficult to measure. The DDSI instrument employs neutron coincidence counting with 3He tubes and list-mode-based data acquisition to allow for production of Rossi-alpha distributions (RADs) in post-processing. The list-mode approach to data collection and subsequent construction of RADs has expanded the analytical possibilities, as will be demonstrated throughout this thesis. One of the primary advantages is that the measured signal in the form of a RAD can be analyzed in its entirety including determination of die-away times in different time domains. This capability led to the development of the early die-away method, a novel leakage multiplication determination method which is tested throughout the thesis on different sources in simulation space and fresh fuel experiments. The early die-away method is a robust, accurate, improved method of determining multiplication without the need for knowledge of the (α,n) source term. The DDSI technique and instrument are presented along with the many novel capabilities enabled by and discovered through RAD analysis. Among the new capabilities presented are the early die-away method, total plutonium content determination, and highly sensitive missing pin detection. Simulation of hundreds of different spent and fresh fuel assemblies were used to develop the analysis algorithms and the techniques were tested on a variety of spontaneous fission-driven fresh fuel assemblies at Los Alamos National Laboratory and the BeRP ball at the Nevada National Security Site. The development of the new, improved analysis and characterization methods with the DDSI instrument makes it a viable technique for implementation in a facility to meet material control and safeguards needs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗