Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Definition”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 973 records · Page 54

Satellite Power Systems (SPS) concept definition study, exhibit C. Volume 6: In-depth element investigation

Computer assisted design of a gallium arsenide solid state dc-to-RF converter with supportive fabrication data was investigated. Specific tasks performed include: computer program checkout; amplifier comparisons; computer design analysis of GaSa solar cells; and GaAs diode evaluation. Results obtained in the design and evaluation of transistors for the microwave space power system are presented.

Hanley, G.↗

Variable Cycle Engine Technology Program Planning and Definition Study

The variable stream control engine, VSCE-502B, was selected as the base engine, with the inverted flow engine concept selected as a backup. Critical component technologies were identified, and technology programs were formulated. Several engine configurations were defined on a preliminary basis to serve as demonstration vehicles for the various technologies. The different configurations present compromises in cost, technical risk, and technology return. Plans for possible variably cycle engine technology programs were formulated by synthesizing the technology requirements with the different demonstrator configurations.

Westmoreland, J. S.↗

Systems definition space-based power conversion systems

Potential space-located systems for the generation of electrical power for use on Earth are discussed and include: (1) systems producing electrical power from solar energy; (2) systems producing electrical power from nuclear reactors; and (3) systems for augmenting ground-based solar power plants by orbital sunlight reflectors. Systems (1) and (2) would utilize a microwave beam system to transmit their output to Earth. Configurations implementing these concepts were developed through an optimization process intended to yield the lowest cost for each. A complete program was developed for each concept, identifying required production rates, quantities of launches, required facilities, etc. Each program was costed in order to provide the electric power cost appropriate to each concept.

Source record↗

Satellite Power Systems (SPS) concept definition study, exhibit C. Volume 2, part 1: System engineering

Volume 2, Part 1, of a seven volume report is presented. Part 1 encompasses Satellite Power Systems (SPS) systems engineering aspects and is divided into three sections. The first section presents descriptions of the various candidate concepts considered and conclusions and recommendations for a preferred concept. The second section presents a summary of results of the various trade studies and analysis conducted during the course of the study. The third section describes the Photovoltaic Satellite Based Satellite Power System (SPS) Point Design as it was defined through studies performed during the period January 1977 through March 1979.

Hanley, G. M.↗

Concept definition for an extended duration orbiter ECLSS

Extending the seven-day Shuttle Orbiter baseline mission requires an evaluation of the Environmental Control and Life Support (ECLS) System in order to determine those changes necessary or desirable so that the Orbiter payload capability will not be seriously compromised. The ECLSS requirements and subsystem options for extended duration Orbiter missions are defined. Each major ECLS subsystem was examined, and potential methods of extending the mission capability were studied. The mission evaluated most extensively for this effort was a 30 day mission with a crew size of seven men. However, missions up to 90 days duration with crew sizes of three to ten men were also examined.

Brose, H.↗

Power Extension Package (PEP) system definition extension, orbital service module systems analysis study. Volume 1: Executive summary

An array deployment assembly, power regulation and control assembly, the necessary interface, and display and control equipment comprise the power extension package (PEP) which is designed to provide increased power and duration, as well as reduce fuel cell cryogen consumption during Spacelab missions. Compatible with all currently defined missions and payloads, PEP imposes minimal weight and volume penalties on sortie missions, and can be installed and removed as needed at the launch site within the normal Orbiter turnaround cycle. The technology on which it is based consists of a modified solar electric propulsion array, standard design regulator and control equipment, and a minimally modified Orbiter design. The requirements from which PEP was derived, and the system and its performance capabilities are described. Features of the recommended project are presented.

Source record↗

Power Extension Package (PEP) system definition extension, orbital service module systems analysis study. Volume 3: PEP analysis and tradeoffs

The objectives, conclusions, and approaches for accomplishing 19 specific design and analysis activities related to the installation of the power extension package (PEP) into the Orbiter cargo bay are described as well as those related to its deployment, extension, and retraction. The proposed cable handling system designed to transmit power from PEP to the Orbiter by way of the shuttle remote manipulator system is described and a preliminary specification for the gimbal assembly, solar array drive is included.

Source record↗

Power Extension Package (PEP) system definition extension, orbital service module systems analysis study. Volume 4: PEP functional specification

The functional, performance, design, and test requirements for the Orbiter power extension package and its associated ground support equipment are defined. Both government and nongovernment standards and specifications are cited for the following subsystems: electrical power, structural/mechanical, avionics, and thermal control. Quality control assurance provisions and preparation for delivery are also discussed.

Source record↗

Power Extension Package (PEP) system definition extension, orbital service module systems analysis study. Volume 5: PEP environmental specification

This specification establishes the natural and induced environments to which the power extension package may be exposed during ground operations and space operations with the shuttle system. Space induced environments are applicable at the Orbiter attach point interface location. All probable environments are systematically listed according to each ground and mission phase.

Source record↗

Power Extension Package (PEP) system definition extension, orbital service module systems analysis study. Volume 7: PEP logistics and training plan requirements

Recommendations for logistics activities and logistics planning are presented based on the assumption that a system prime contractor will perform logistics functions to support all program hardware and will implement a logistics system to include the planning and provision of products and services to assure cost effective coverage of the following: maintainability; maintenance; spares and supply support; fuels; pressurants and fluids; operations and maintenance documentation training; preservation, packaging and packing; transportation and handling; storage; and logistics management information reporting. The training courses, manpower, materials, and training aids required will be identified and implemented in a training program.

Source record↗

Power Extension Package (PEP) system definition extension, orbital service module systems analysis study. Volume 12: PEP data item descriptions

Contractor information requirements necessary to support the power extension package project of the space shuttle program are specified for the following categories of data: project management; configuration management; systems engineering and test; manufacturing; reliability, quality assurance and safety; logistics; training; and operations.

Source record↗