Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DECOMMISSIONING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 973 records · Page 54

Groundwater Transport of Organic Compounds in Old Salvage Yard, Oak Ridge, TN - 12089

In 1950's and early 1960's during production of nuclear weapons at the US Department of Energy Y-12 National Security Complex in Oak Ridge TN, volatile organic compounds (VOCs) as well as heavy metals, nitrates, and radionuclides were released to the environment. Field investigations revealed that much of this contamination is still present in soil, bedrock, and groundwater. Operational buildings and old disposal facilities at the site have been identified as major sources of contamination. The Old Salvage Yard (OSY) on the western side of the site has long been characterized as the major source of VOC contamination in soil and groundwater. In order to analyze the fate and transport of VOC contamination- including tetrachloroethene (PCE), 1,2- dichloroethene (1,2-DCE), cis-1,2-dichloroethene (cis-1,2-DCE) and vinyl chloride (VC) - in groundwater and soil at the vicinity of OSY, an integrated surface and subsurface flow and transport model has been developed for the Y-12 NSC using the hydrodynamic and transport numerical package, MIKE-SHE. Hydrogeological characteristics of the site such as hydraulic conductivity, and transport parameters such as partitioning coefficients were varied in an effort to delineate subsurface flow and transport pathways, potential downstream impacts on Upper East Fork Poplar Creek, and the potential risk to industrial workers involved in related Decontamination and Decommissioning (D and D) activities. The simulation results were compared with the analytical modeling results previously performed by McLane Environmental Inc. using SESOIL-AT123D. Specific simulations have been performed to investigate the effect of possible remedial action (removing the contaminated surface soil layers) on the fate and transport of VOCs. The results of the MIKE-SHE reported here can be considered as an upper limit for the predicted concentrations. Based on MIKE-SHE results, PCE, 1,2 DCE, cis-1,2-DCE, and VC are sources in soil with potential to equal or exceed industrial groundwater hazard and risk levels at the vicinity of OSY. VOC contaminants in soil and groundwater will decay below industrial groundwater risk and hazard levels within approximately 20 years. Excavation of surface soil layers at the site will considerably reduce the concentration of VOCs in groundwater and the possibility of migration of VOCs to surface waters. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Commissioning and Operation of a Robotic Arm for Waste Retrieval at Trawsfynydd NPP, North Wales - 12091

Trawsfynydd is one of the UK's first generation Magnox nuclear power plants. It started operation in 1965 and ceased generation in 1991. Before the site can enter the 'care and maintenance' phase a number of wet and dry waste stores around the site must be emptied and their contents made safe. Wet wastes include sludges and resins produced during the operating life of the NPP. The sludges and resins are stored in a number of different tanks that vary significantly in terms of size, shape, internal features and access. A dexterous long reach manipulator arm has been designed and built to facilitate tank clearance. Commissioning of the arm was carried out in parallel with Factory Acceptance Testing (FAT) at the manufacturer's site in Colorado, USA. In addition to basic functional testing this work included a full range of task based testing to ensure that the arm, tools, control system and support equipment were thoroughly exercised in representative conditions. Trawsfynydd is one of the lead sites in the UK's program for nuclear plant decommissioning. As such the lessons learned, both in terms of technology and process, will be applicable across the remainder of the fleet. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Management of Disused Radioactive Sealed Sources in the Slovak Republic - 12100

After splitting-up the Czechoslovak Federation in 1993, the system of management of institutional radioactive waste, where disused sources represent its significant part, had had to build from beginning, since all corresponding activities had remained in the Czech part of the Federation. The paper presents the development of legislative and institutional framework of the disused radioactive sealed source management, development of the national inventory and development of management practices. According the Governmental decision (1994), the management of disused sealed sources and institutional radioactive waste at whole was based on maximal utilization of facilities inside nuclear facilities, particularly in the NPP A1 (shut down in the past, currently under decommissioning). This approach has been recently changing by Governmental decision (2009) to construct 'non-nuclear facility' - central storage for remained disused sealed sources collected from the places of use, where they were stored in some cases for tens of years. The approaches to siting and construction of this storage facility will be presented, as well as the current approaches to solution of the disused radioactive sources final disposal. Environmental impact assessment process in regard to the given facility/activity is slowly drawing to a close. The final statement of the Ministry of Environment can be expected in January or February 2012, probably recommending option 1 as preferred [6]. According to the Slovak legislation, the final statement has a status of recommendation for ongoing processes leading to the siting license. Very recently, in December 2012, Government of the Slovak republic decided to postpone putting the facility into operation by the end of June, 2014. (author)

07 ISOTOPE AND RADIATION SOURCES↗

Treatability Variance for Containerised Liquids in Mixed Debris Waste - 12101

The TRU Waste Processing Center (TWPC) is a Department of Energy facility whose mission is to receive and process for appropriate disposal legacy Contact Handled (CH) and Remote Handled (RH) waste, including debris waste stored at various DOE Oak Ridge facilities. Acceptable Knowledge (AK) prepared for the waste characterizes the waste as mixed waste, meaning it is both radioactive and regulated under the Resource Conservation and Recovery Act (RCRA). The AK also indicates that a number of the debris waste packages contain small amounts of containerised liquids. The documentation indicates liquid wastes generated in routine lab operations were typically collected for potential recovery of valuable isotopes. However, during activities associated with decontamination and decommissioning (D and D), some containers with small amounts of liquids were placed into the waste containers with debris waste. Many of these containers now hold from 2.5 milliliters (ml) to 237 ml of liquid; a few contain larger volumes. At least some of these containers were likely empty at the time of generation, but documentation of this condition is lacking. Since WIPP compliant AK is developed on a waste stream basis, rather than an individual container basis, and includes every potential RCRA hazardous constituent within the waste stream, it is insufficient for the purpose of characterizing individual containers of liquid. Debris waste is defined in 40 CFR 268.2(g) as 'solid material exceeding a 60 mm particle size that is intended for disposal and that is: a manufactured object; or plant or animal matter; or natural geologic material'. The definition further states that intact containers of hazardous waste that are not ruptured and that retain at least 75% of their original volume are not debris. The prescribed treatment is removal of intact containers from the debris waste, and treatment of their contents to meet specific Land Disposal Restrictions (LDR) standards. This is true for containers with incidental amounts of liquids, even if the liquid is less than 50% of the total waste volume. Under the proposed variance, all free or containerised liquids (up to 3.8 liters(L)) found in the debris would be treated and returned in solid form to the debris waste stream from which they originated. The waste would then be macro-encapsulated. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

D and D Knowledge Management Information Tool - 2012 - 12106

Deactivation and decommissioning (D and D) work is a high priority activity across the Department of Energy (DOE) complex. Subject matter specialists (SMS) associated with the different ALARA (As-Low-As-Reasonably-Achievable) Centers, DOE sites, Energy Facility Contractors Group (EFCOG) and the D and D community have gained extensive knowledge and experience over the years in the cleanup of the legacy waste from the Manhattan Project. To prevent the D and D knowledge and expertise from being lost over time from the evolving and aging workforce, DOE and the Applied Research Center (ARC) at Florida International University (FIU) proposed to capture and maintain this valuable information in a universally available and easily usable system. D and D KM-IT provides single point access to all D and D related activities through its knowledge base. It is a community driven system. D and D KM-IT makes D and D knowledge available to the people who need it at the time they need it and in a readily usable format. It uses the World Wide Web as the primary source for content in addition to information collected from subject matter specialists and the D and D community. It brings information in real time through web based custom search processes and its dynamic knowledge repository. Future developments include developing a document library, providing D and D information access on mobile devices for the Technology module and Hotline, and coordinating multiple subject matter specialists to support the Hotline. The goal is to deploy a high-end sophisticated and secured system to serve as a single large knowledge base for all the D and D activities. The system consolidates a large amount of information available on the web and presents it to users in the simplest way possible. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implementing Stakeholders' Access to Expertise: Experimenting on Nuclear Installations' Safety Cases - 12160

In 2009 and 2010, the Institute for Nuclear Safety and Radiation Protection (IRSN) led two pilot actions dealing with nuclear installations' safety cases. One concerned the periodical review of the French 900 MWe nuclear reactors, the other concerned the decommissioning of a workshop located on the site of Areva's La Hague fuel-reprocessing plant site in Northwestern France. The purpose of both these programs was to test ways for IRSN and a small number of stakeholders (Non-Governmental Organizations (NGOs) members, local elected officials, etc.) to engage in technical discussions. The discussions were intended to enable the stakeholders to review future applications and provide valuable input. The test cases confirmed there is a definite challenge in successfully opening a meaningful dialogue to discuss technical issues, in particular the fact that most expertise reports were not public and the conflict that exists between the contrary demands of transparency and confidentiality of information. The test case also confirmed there are ways to further improvement of stakeholders' involvement. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

K-25 D and D Challenges - 12170

Decontamination and decommissioning (D and D) of the K-25 former gaseous diffusion plant provides lessons learned applicable to other D and D projects in the DOE Complex. The 175,000- square-meter, 1.6-kilometer-long building is contaminated with highly enriched uranium (HEU), Tc-99, trace quantities of other fission products, asbestos, PCBs, and other hazardous wastes. Safety challenges include deteriorated electrical systems, significant structural degradation, and criticality and exposure risks. The project completely revised the D and D approach after a worker fell through an operating floor and was seriously injured. For protection from deteriorated building conditions, the project reduced the number of workers in the facility, limited their hours in the building, and installed nets and barriers to protect them from falls through weakened floors and from falling material. The new plan involved removing high-risk components, removing motors and compressors, and demolishing the building from the outside with heavy equipment with most of the piping and components inside the building during demolition. The team provided temporary electrical power; reconfigured the criticality alarm system; upgraded security; performed sampling and analysis to locate and characterize HEU deposits and Tc-99; and, to establish 'criticality incredible' conditions, conducted a nondestructive assay program and injected foam into equipment and piping as a contamination fixative. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Plant Decontamination as a Precondition of the Remote Dismantling Concept of the Karlsruhe Vitrification Plant VEK - 12206

Vitrification of the high-active liquid waste concentrates (HAWC) was a major milestone in the WAK decommissioning project (StiWAK). From September 2009 to June 2010, about 56 m{sup 3} of HAWC were vitrified at the Karlsruhe vitrification facility (VEK) and filled into 123 canisters. HAWC vitrification was followed by an extensive rinsing and shutdown program, in the course of which both the VEK process installations and the facilities for the storage and evaporation of high-active fission product solutions (LAVA) are prepared specifically for dismantling. Finally the rinsing programme leads to an overall reduction of the remaining contamination in the installations by a factor of approx. 5 - 10. The amount of liquids arisen from this program has been vitrified and another 17 canisters have been filled. In total, 140 canisters were packed into 5 CASTOR casks that were already transported to the Zwischenlager Nord (interim store North) of EWN GmbH (ZLN) in the mid of February 2011. The melter of the VEK was already shut down in the late November 2010. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

On-site Destruction of Radioactive Oily Wastes Using Adsorption Coupled with Electrochemical Regeneration - 12221

Arvia{sup R}, working with Magnox Ltd, has developed the technology of adsorption coupled with electrochemical regeneration for the degradation of orphan radioactive oil wastes. The process results in the complete destruction of the organic phase where the radioactivity is transferred to liquid and solid secondary wastes that can then be processed using existing authorised on-site waste-treatment facilities.. Following on from successful laboratory and pilot scale trials, a full scale, site based demonstrator unit was commissioned at the Magnox Trawsfynydd decommissioning site to destroy 10 l of LLW and ILW radioactive oils. Over 99% of the emulsified oil was removed and destroyed with the majority of activity (80 - 90%) being transferred to the aqueous phase. Secondary wastes were disposed of via existing routes with the majority being disposed of via the sites active effluent treatment plant. The regeneration energy required to destroy a litre of oil was 42.5 kWh/l oil. This on-site treatment approach eliminates the risks and cost associated with transporting the active waste oils off site for incineration or other treatment. The Arvia{sup R} process of adsorption coupled with electrochemical regeneration has successfully demonstrated the removal and destruction of LLW and ILW radioactive oils on a nuclear site. Over 99.9% of the emulsified oil was removed, with the majority of the radioactive species transferred to the aqueous, supernate, phase (typically 80 - 90 %). The exception to this is Cs-137 which appears to be more evenly distributed, with 43% associated with the liquid phase and 33 % with the Nyex, the remainder associated with the electrode bed. The situation with Plutonium may be similar, but this requires confirmation, hence further work is underway to understand the full nature of the electrode bed radioactive burden and its distribution within the body of the electrodes. - Tritium gaseous discharges were negligible; hence no off-gas treatment before direct discharge to atmosphere is necessary. All secondary wastes were suitable for disposal using existing disposal routes, with the majority of the activity being successfully discharged as active water via the site active drains. - Oil destruction was achieved at a rate of 28.2 ml/hr using a regeneration energy of 42.5 kWh/l oil. The treatment of different active and non-active oils was achieved using the same operating parameters, providing strong evidence that the process is robust and will treat a wide range of oils, organic wastes and additives. - Currently the design of a plant capable of processing 1000 ml/hr is being established in discussion with Magnox Ltd. The plant will run automatically with little operator attention and so process between 5-8 m{sup 3} of ILW oil per annum. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remediation of Mercury Contaminated Soils at the Miramas Site - 12243

Beneficial 'new' use of the Miramas Site is the remediation objective for a former light isotope manufacturing facility. Remediation operations will remove contaminated soils and materials and deconstruct facilities. The remediation objective is faced with project challenges and regulatory requirements that dictate/influence the outcome. The operation consists of the remediation of approximately 100,000 cubic meters of soil and the decommissioning of facilities. The types and ranges of waste are the result of historical processing activities (chemical facilities, pyrotechnic components storage, mining component treatment and light isotope manufacturing activities). Mercury is the primary component of the waste, but metals and organic compounds are also possible waste components. A thermal desorption process is used to remove Mercury from the polluted soil while a biological treatment is considered to the organic nitrate compound removal. A focus is done on the technologies used to remediate the Mercury contaminated soil. After few months of operation, the first results confirm that the technology choices were relevant and the soil remediation project is a success. The first successful month of operation at an industrial scale demonstrate that the Thermal Desorption is an efficient and relevant process to remediate large quantity of mercury contaminated soils. The project is on cost and the mercury removal should be end by 2014. The scrubbing is a good way to limit the volume of material to be treated with the Thermal Desorption Unit. The biological treatment is a promising process for the organic nitrate compound removal and testing at a pilot scale will be done in 2012. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Multidisciplinary Paradigm and Approach to Protecting Human Health and the Environment, Society, and Stakeholders at Nuclear Facilities - 12244

As the Department of Energy (DOE) continues to remediate its lands, and to consider moving toward long-term stewardship and the development of energy parks on its industrial, remediated land, it is essential to adequately characterize the environment around such facilities to protect society, human health, and the environment. While DOE sites re considering several different land-use scenarios, all of them require adequate protection of the environment. Even if DOE lands are developed for energy parks that are mainly for industrializes sections of DOE lands that will not be remediated to residential standards, there is still the need to consider the protection of human health and the environment. We present an approach to characterization and establishment of teams that will gather the information, and integrate that information for a full range of stakeholders from technical personnel, to public policy makers, and that public. Such information is needed to establish baselines, site new energy facilities in energy parks, protect existing nuclear facilities and nuclear wastes, improve the basis for emergency planning, devise suitable monitoring schemes to ensure continued protection, provide data to track local and regional response changes, and for mitigation, remediation and decommissioning planning. We suggest that there are five categories of information or data needs, including 1) geophysical, sources, fate and transport, 2) biological systems, 3) human health, 4) stakeholder and environmental justice, and 5) societal, economic, and political. These informational needs are more expansive than the traditional site characterization, but encompass a suite of physical, biological, and societal needs to protect all aspects of human health and the environment, not just physical health. We suggest a Site Committee be established that oversees technical teams for each of the major informational categories, with appropriate representation among teams and with a broad involvement of a range of governmental personnel, natural and social scientists, Native Americans, environmental justice communities, and other stakeholders. Such informational teams (and Oversight Committee) would report to a DOE-designated authority or Citizen's Advisory Board. Although designed for nuclear facilities and energy parks on DOE lands, the templates and information teams can be adapted for other hazardous facilities, such as a mercury storage facility at Oak Ridge. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Monitoring the Long-Term Safety Performance of a Repository for Used Nuclear Fuel - 12294

The nuclear waste management programs of several nations include plans for the design, construction and operation of deep geological repositories. Some of these programs have initiated the licensing process for their repository designs. Monitoring strategies and systems are at different levels of development in each program and there is common ground with respect to the ultimate goal of the monitoring function. In this context, the primary functions of a monitoring system are considered to be the verification of safety performance and making available information that may be required for implementation of future decisions such as the timing of repository decommissioning and closure or the possible retrieval of waste containers. This study examines some of the relevant issues and outlines a conceptual monitoring system for further study and development during implementation of Adaptive Phased Management, the method selected by the Government of Canada for long-term management of used nuclear fuel. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cold Trap Dismantling and Sodium Removal at a Fast Breeder Reactor - 12327

The first German prototype Fast Breeder Nuclear Reactor (KNK) is currently being dismantled after being the only operating Fast Breeder-type reactor in Germany. As this reactor type used sodium as a coolant in its primary and secondary circuit, seven cold traps containing various amounts of partially activated sodium needed to be disposed of as part of the dismantling. The resulting combined difficulties of radioactive contamination and high chemical reactivity were handled by treating the cold traps differently depending on their size and the amount of sodium contained inside. Six small cold traps were processed onsite by cutting them up into small parts using a band saw under a protective atmosphere. The sodium was then converted to sodium hydroxide by using water. The remaining large cold trap could not be handled in the same way due to its dimensions (2.9 m x 1.1 m) and the declared amount of sodium inside (1,700 kg). It was therefore manually dismantled inside a large box filled with a protective atmosphere, while the resulting pieces were packaged for later burning in a special facility. The experiences gained by KNK during this process may be advantageous for future dismantling projects in similar sodium-cooled reactors worldwide. The dismantling of a prototype fast breeder reactor provides the challenge not only to dismantle radioactive materials but also to handle sodium-contaminated or sodium-containing components. The treatment of sodium requires additional equipment and installations to ensure a safe handling. Since it is not permitted to bring sodium into a repository, all sodium has to be neutralized either through a controlled reaction with water or by incinerating. The resulting components can be disposed of as normal radioactive waste with no further conditions. The handling of sodium needs skilled and experienced workers to minimize the inherent risks. And the example of the disposal of the large KNK cold trap shows the interaction with others and also foreign decommissioning projects can provide solutions with were unknown before. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Liquor Activity Reduction (LAR) Programme - 12397

Waste material from the reprocessing of irradiated fuel has been stored under water for several decades leading to the water becoming highly radioactive. As a critical enabler to the decommissioning strategy for the Sellafield site, the Liquor Activity Reduction (LAR) programme has been established to provide a processing route for this highly radioactive liquor. This paper reviews the progress that has been made since the start of routine LAR transfer cycles (July 2010) and follows on from the earlier paper presented at WM2011. The paper focuses on the learning from the first full year of routine LAR transfer cycles and the application of this learning to the wider strategies for the treatment of further radioactive liquid effluents on the Sellafield site. During this period over 100,000 Curies of radioactivity has been safely removed and treated. The past year has witnessed the very successful introduction of the LAR programme. This has lead to hazard reduction at MSSS and demonstration that the SIXEP facility can meet the significantly increased challenge that the LAR programme represents. Part of the success has been the ability to predict and deliver a realistic production schedule with the availability of the MSSS, EDT and SIXEP facilities being central to this. Most importantly, the LAR programme has been successful in bringing together key stakeholders to deliver this work while integrating with the existing, day to day, demands of the Sellafield site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Simple Waste Solutions for Complex Facilities - 12433

The buildings in the 300 Area, including several Category 3 nuclear facilities are undergoing deactivation, decommissioning, decontamination and demolition (D4) by Washington Closure Hanford (WCH) as part of the River Corridor Closure Contract (RCCC). The D4 process has generated a wide variety of low-level radioactive and low-level radioactive mixed waste as well as TRU. The Hanford Site-wide Transportation Safety Document (TSD) has been successfully utilized to transport waste streams that otherwise would not be able to be shipped. The TSD accomplished this by establishing a comprehensive set of onsite transportation and packaging performance standards and risk-based standards. The requirements and standards presented are equivalent to DOT and NRC standards (10 CFR 71). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Italian Activities in the Field of Nuclear Waste Management - 12439

The Italian situation in the field of nuclear waste management is characterized by a relative small quantity of wastes, as a consequence of the giving up of energy production by nuclear generation in 1986. Notwithstanding this situation, Italy is a unique case study since the country needs to undertake the final decommissioning of four shut-down NPPs (size 100-200 MWe), each one different from the others. Therefore all the regulatory, technical, and financial actions are needed in the same way as if there was actual nuclear generation. Furthermore, the various non-power generating applications of nuclear energy still require management, a legal framework, a regulatory body, an industrial structure, and technical know-how. Notwithstanding the absence of energy production from nuclear sources, the country has the burden of radioactive waste management from the previous nuclear operations, which obliges it to implement at first a robust legislative framework, then to explore all the complex procedures to achieve the localization of the national interim storage facility, not excluding the chance to have a European regional facility for geologic disposal, under the clauses of the Council Directive of 19 July 2011 'Establishing a Community Framework for the Responsible and Safe Management of Radioactive Waste'. Then, as far as industrial, medical and R and D aspects, the improvement of the legislative picture, the creation of a regulatory body, is a good start for the future, to achieve the best efficiency of the Italian system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overview and History of DOE's Hanford Site - 12502

Hanford's DOE offices are responsible for one of the largest nuclear cleanup efforts in the world, cleaning up the legacy of nearly five decades of nuclear weapons production. Nowhere in the DOE Complex is cleanup more challenging than at the Hanford Site in southeastern Washington. Hanford cleanup entails remediation of hundreds of large complex hazardous waste sites; disposition of nine production reactors and the preservation of one as a National Historic Landmark; demolition of hundreds of contaminated facilities including five enormous process canyons; remediation of billions of gallons of contaminated groundwater; disposition of millions of tons of low-level, mixed low-level, and transuranic waste; disposition of significant quantities of special nuclear material; storage and ultimate disposition of irradiated nuclear fuel; remediation of contamination deep in the soil that could impact groundwater; decontamination and decommissioning of hundreds of buildings and structures; and treatment of 56 million gallons of radioactive waste in 177 large underground tanks through the construction of a first-of-its-kind Waste Treatment Plant. Cleanup of the Hanford Site is a complex and challenging undertaking. The DOE Richland Operations Office has a vision and a strategy for completing Hanford's cleanup including the transition to post-cleanup activities. Information on the strategy is outlined in the Hanford Site Completion Framework. The framework describes three major components of cleanup - River Corridor, Central Plateau, and Tank Waste. It provides the context for individual cleanup actions by describing the key challenges and approaches for the decisions needed to complete cleanup. The U.S. Department of Energy (DOE), as regulated by the U.S. Environmental Protection Agency (EPA) and Washington State Department of Ecology (Ecology), is implementing a strategy to achieve final cleanup decisions for the River Corridor portion of the Hanford Site. The DOE Richland Operations Office (RL) and DOE Office of River Protection (ORP) have prepared this document to describe the strategy and to begin developing the approach for making cleanup decisions for the remainder of the Hanford Site. DOE's intent is that the Completion Framework document will facilitate dialogue among the Tri-Parties and with Hanford's diverse interest groups, including Tribal Nations, State of Oregon, Hanford Advisory Board, Natural Resource Trustees, and the public. Future cleanup decisions will be enhanced by an improved understanding of the challenges facing cleanup and a common understanding of the goals and approaches for cleanup completion. The overarching goals for cleanup are sevenfold. - Goal 1: Protect the Columbia River. - Goal 2: Restore groundwater to its beneficial use to protect human health, the environment, and the Columbia River. - Goal 3: Clean up River Corridor waste sites and facilities to: Protect groundwater and the Columbia River. Shrink the active cleanup footprint to the Central Plateau, and support anticipated future uses of the land. - Goal 4: Clean up Central Plateau waste sites, tank farms, and facilities to: Protect groundwater. Minimize the footprint of areas requiring long-term waste management activities. Support anticipated future uses of the land. - Goal 5: Safely manage and transfer legacy materials scheduled for off-site disposition including special nuclear material (including plutonium), spent nuclear fuel, transuranic waste, and immobilized high-level waste. - Goal 6: Consolidate waste treatment, storage, and disposal operations on the Central Plateau. - Goal 7: Develop and implement institutional controls and long-term stewardship activities that protect human health, the environment, and Hanford's unique cultural, historical and ecological resources after cleanup activities are completed. These goals embody more than 20 years of dialogue among the Tri-Party Agencies, Tribal Nations, State of Oregon, stakeholders, and the public. They carry forward key values captured in forums such as the Hanford Future Site Uses Working Group, Tank Waste Task Force, Hanford Summits, and Hanford Advisory Board Exposure Scenario Workshops, as well as more than 200 advice letters issued by the Hanford Advisory Board (http://www.hanford.gov/page.cfm/hab). These goals help guide all aspects of Hanford Site cleanup. Cleanup activities at various areas of the site support the achievement of one or more of these goals. These goals help set priorities to apply resources and sequence cleanup efforts for the greatest benefit. These goals reflect DOE's recognition that the Columbia River is a critical resource for the people and ecology of the Pacific Northwest. The 50-mile stretch of the river known as the Hanford Reach is home to the last free-flowing section of the river in the U.S. As one of the largest rivers in North America, its waters support a multitude of uses that are vital to the economic and environmental well being of the region and it is particularly important in sustaining the culture of Native Americans. Cleanup actions must protect this river. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Making a Lasting Impression: Recovery Act Reporting At Hanford - 12528

The award of American Recovery and Reinvestment Act funding came with an unprecedented request for transparency to showcase to the American public how the stimulus funding was being put to work to achieve the goals put forth by the U.S. Government. At the U.S. Department of Energy Hanford Site, this request manifested in a contract requirement to provide weekly narrative, photos and video to highlight Recovery Act-funded projects. For DOE contractor CH2M HILL Plateau Remediation Company (CH2M HILL), the largest recipient of Hanford's funding, the reporting mechanism evolved into a communications tool for documenting the highly technical cleanup, then effectively sharing that story with the DOE and its varying stakeholder audiences. The report set the groundwork for building a streaming narrative of week-by-week progress. With the end of the Recovery Act, CH2M HILL is applying lessons learned from this stringent, transparent reporting process to its long-term reporting and communications of the progress being made in nuclear decommissioning at Hanford. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗