Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Cost optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 973 records · Page 54

Thrust-optimized blade design for wind turbines

A wind rotor is disclosed that produces energy optimally for a given thrust overturning moment. By designing rotors with suboptimal aerodynamic efficiency, they can have optimal thrust performance, which will reduce the substructure cost and/or enable greater energy capture for a given substructure.

17 WIND ENERGY↗

Optimizing Heat Recovery with Storage: Control Validation and Sensitivity Analysis of the Time-Independent Energy Recovery Plant Using Modelica

Heat recovery in large building central plants saves energy but traditionally requires simultaneous heating and cooling. The Time-Independent Energy Recovery (TIER) plant shifts this paradigm by integrating thermal energy storage (TES) to enable heat recovery regardless of concurrent demand, offering a highly efficient, space-saving solution to achieve California’s energy goals. However, its integration of heat recovery chillers, cooling-only chillers, cooling towers, and trim air-source heat pumps (ASHPs) creates growing control and sizing complexity. To overcome this, this study employs high-fidelity Modelica dynamic simulation to validate TIER control sequences and optimize equipment sizing. We translated the written Sequences of Operation into executable Control Description Language (CDL) to test logic against sub-hourly loads. This verification workflow successfully identified and resolved critical vulnerabilities, such as thermal storage freezing and equipment short-cycling, in a virtual environment prior to physical deployment. Then, the study analyzes TIER plant performance across three simulated building types in three locations, and a real building load profile, ensuring variety in heating and cooling loads, and simultaneity factors and explores sizing rules for the TES and ASHP capacity. The analysis shows that the TIER plant operates equipment efficiently leading to a plant SCOP of around 7.5 across all scenarios, higher than a traditional ASHP plant, and a viable pathway to de-risk complex system design and control through simulation to identify optimal designs that maximize energy efficiency, minimize operational costs, and ensure robust operation in varied environmental conditions, thereby facilitating the broader adoption of such a solution for large buildings.

Zanetti, Ettore↗

Optimal band selection for target detection with a LWIR multispectral imager

Multispectral imaging can offer many benefits in cost, complexity, resolution, size, weight, and power, relative to hyperspectral imaging. When designing a multispectral system, spectral bandpasses can be selected using optimization algorithms configured to maximally separate target detection scores between target and background regions. A hyperspectral image (HSI) can serve as the source of data from which band groupings can be tested for optimality. The output of an adaptive cosine estimator target detection algorithm is used in an objective function. Three optimization algorithms are compared: particle swarm, dual annealing, and differential evolution. A global optimum is also found using a brute force approach on the Livermore Computing Syrah supercomputer. Three materials are investigated: calcite, gypsum, and limestone. This is done for 3-, 4-, and 5-band systems. The data originate from a longwave infrared HSI of a material display board. The optimization algorithms were run 30 times for every scenario. Performance statistics (maximum, minimum, mean, standard deviation, and median) based on the separation values are given. Additional characterization was performed using receiver operator characteristic (ROC) curves and the area under the ROC curve. While good performance was obtained for the three optimization algorithms, the dual annealing algorithm produced the highest and most consistent detection separation scores on average.

47 OTHER INSTRUMENTATION↗

Multi-Source Machine Learning and Thermoplastics Enhanced Aerostructure Manufacturing (mTEAM)

RTX Technology Research Center (RTRC), together with Collins Aerospace (Collins) and Oak Ridge National Laboratory (ORNL) has developed an Artificial Intelligence (AI) / Machine Learning (ML) guided solution to advance the manufacturing and assembly of high performance and lightweight thermoplastic composite (TPC) aerospace products. The solution aims to lower risk, cost and lead time for induction heating based welding and consolidation processes for TPC structure. The cost and lead time of part and material specific process development for induction welding (IW) and induction consolidation will be reduced by replacing traditional empirical methods with optimization methods that merge AI/ML and physics-based process simulations and process experiments with sensing and controls. TPC-IW process development is empirical in nature, and uncertainties in material & process behavior exist near & far from the induction coil. Physics-based simulations can be leveraged directly for process optimization but can be too computationally expensive to run in high fidelity and real time to do robust process optimization. The key impact of successful TPC induction consolidation and welding is cost & lead time reduction for part & material specific consolidation and welding recipes. This is an enabler for more rapid deployment of TPC structures via joining assembly, which can reduce energy & cost intensive usage of autoclaves & ovens. The solution aimed to advance the U.S. Department of Energy’s interests in using thermoplastics and automation in composite manufacturing for improvement of products for existing markets via increased production speeds, reduced costs, and lowered use of energy. Welded TPC structures can offer significant weight & energy savings for high-value commercial aerospace & industrial applications compared to metal & thermoset composite structures assembled by mechanical fastening and/or adhesive bonding. The project was organized into two Budget Periods. Budget Period 1 (BP1) was 15 months and its goal was to perform ML process optimization framework development & deployment on lab-coupon aerostructure components. A Go/No-Go Review was performed at the end of BP1 to verify fulfilment of key tasks & milestones to justify a Go Decision to move into the next Budget Period. Budget Period 2 (BP2) was 12 months and its goal was the deployment of the ML framework for ML process optimization of pilot industrial scale aerostructure components. The overall project aim was to develop & demonstrate ML-enhanced modeling framework that learns process-property mapping from multiple data sources at different fidelities. During BP1, the team accomplished key tasks & milestones to demonstrate the concept of multi-source ML for TPC aerostructure consolidation and assembly. First, the team completed documentation of induction based TPC heating requirements including baseline metrics to compare measured results against. Next the team completed demonstration of data generation from physics-based simulations for ML surrogate model generation and demonstrated the integration of physics-based simulation data into multi-source AI/ML algorithms. In parallel, the team established the lab-coupon scale induction welding system and completed a process to label and reduce generated data from physics-based simulation and experiments for ML surrogate models to enable multi-source ML model training & testing. To complete BP1, the team integrated physics-based simulation data and experimental data into multi-source ML algorithms. This was based on the team completing ML deployment of the induction welding on a lab system at RTRC and AI/ML deployment on existing induction welding line at Collins. ORNL visited both Collins and RTRC sites to witness the TPC induction welding process. Then, ORNL designed and constructed a new version of their vision-based sensing system better adapted to acquire process signals of the TPC induction welding process for process anomaly and defect detection. In BP2, the team accomplished key tasks & milestones to scale up multi-source ML for TPC aerostructure consolidation and assembly from the lab-coupon scale to the pilot-industrial scale. In BP2, the team demonstrated real time anomaly & defect detection via experiments performed by ORNL & RTRC. The team completed ML-optimization heating trials for TPC induction consolidation at Collins, and the team confirmed pilot industrial scale experimental data from Collins was compatible with the developed ML pipeline from RTRC. The team completed sub-element scale ML process optimization demonstration at RTRC, where the team leveraged RTRC’s robotic TPC welding setup to de-risk the ML process optimization by performing ML analysis of recorded temperatures to account for complex part features. Then, the team applied its ML-derived control strategies and ML process optimization framework at Collins to the pilot-industrial scale on a demo skin-stiffener part representative of a nacelle aerostructure fan cowl section. The key innovation is the AI/ML framework enabling effective process development of high performance, lightweight, energy efficient TPCs for composite aircraft structures.

36 MATERIALS SCIENCE↗

Final Technical Report

The Department of Energy is interested in technologies that support the sustainable production of fuels, chemicals, and other bioproducts from plant biomass, to offset the nation’s reliance on fossil resources. The plant cell wall of energy crops provides the largest reservoir of raw materials for bioproducts. However, the widespread use of plant cell walls is hampered by their complexity and resistance to breakdown. To improve the productivity and cost-effectiveness of using energy crops to generate bioproducts, the fundamental problem of deconstructing plant cell walls must be addressed. This project developed and evaluated an innovative genetic modification technology to produce strategically designed enzymes that specifically accumulate in the plant cell wall. The resulting enzyme-engineered energy crops are expected to grow normally under natural conditions but break down more quickly and easily under high temperature during the production of biobased products. As such, this plant cell wall targeting enzyme engineering effort will reduce the cost of plant cell wall deconstruction and ultimately improve the economics of bioproducts. The overall objective of this project is to develop and evaluate the in-planta enzyme engineering technology to reduce lignocellulose deconstruction cost. The concept was first validated using tobacco plant, a model plant system that is typically used in lab testing for initial concept validation. Then the enzyme optimization was validated using switchgrass, the energy crop to be used to produce bioproducts. There are three specific objectives in this Phase I project: (1) validate the enzyme optimization concept using tobacco plant, a model plant system. (2) validate the enzyme optimization concept using switchgrass. (3) techno-economic analysis (TEA) for further scale-up application. By the end of this project, in-planta enzyme engineering was validated in both tobacco and switchgrass plants, with improved enzyme activity and saccharification efficiency. The in-planta enzyme engineering in Tabacco didn’t have a significant impact on plant growth and development. Transgenic tobacco plants with in-planta cellulose degrading enzymes showed higher biomass digestibility than wild type. Gene construction and transformation in switchgrass was much longer than expected, which delayed the research progress. Besides, in-planta engineering of lignin degrading enzyme is more challenging than cellulose degrading enzyme, in terms of expression detection. Expression of lignin degrading enzyme and cellulose degrading enzyme improved biomass yield and saccharification efficiency of switchgrass, respectively. It is promising to express both genes in switchgrass for optimized overall performance. According to the results of TEA, switchgrass biomass production cost is mainly attributed to by fertility and harvesting. Biomass production profit can increase up to 10-fold depending on biomass price. The PHA production profit is also sensitive to the biomass price. The proposed technology could potentially reduce the biomass deconstruction cost from 33% to 9% of PHA revenue, making the biomass-based PHA competitive to petroleum-based polymers even in case of relatively high biomass price of biomass. Therefore, cultivation of the genetically engineered self-deconstruction switchgrass for Polyhydroxyalkanoate (PHA) production could benefit switchgrass grower and PHA producer with attractive profits for both sectors. This new enzyme optimization approach will be beneficial for bioindustries that use energy crops as feedstocks. It will improve the economic viability of converting energy crops to renewable products that support a sustainable society and helps address the Nation’s long-term strategic needs for renewable products and reduction of reliance on fossil resources.

42 ENGINEERING↗

District EnErgy Planner (DEEP) v2

The District EnErgy Planner - DEEP is an Mixed Integer Linear Programming (MILP) optimization software tool to solve district energy system, technology configuration, operation strategies, and energy retail business schemes. DEEP takes user input energy demand on heating, cooling and electricity demand. Energy loss through pipeline is calculated for heating and cooling from central plants. The optimal system configuration to minimize the district energy system life cycle cost or minimize CO2 emission is calculated based on energy balance equations and various constraints. The recent update on DEEP include a feature of waste heat utilization energy balance based optimization to take into accounts of different temperature bands of heat into account to maximize system efficiency. Another feature is to optimize district energy retail by provide optimal pricing scheme for heating, cooling and electricity to end users to incorporate district to grid demand response.

Feng, Wei↗

Arctic Deployment of a Fully Integrated Self-Powered Drifting Buoy Harvesting Wave Energy via a Triboelectric Nanogenerator

The Arctic Ocean remains one of the most poorly sampled regions on Earth, where improved in situ environmental monitoring is vital for advancing oceanographic and atmospheric studies. However, data collection efforts are constrained by the short operational lifespans and high costs of conventional systems. Drifting buoys powered by pendulum-driven wave energy harvesters offer a cost-effective alternative, yet earlier designs have neither been optimized for real-world wave conditions nor validated in the Arctic. In this study, we develop a self-powered drifting buoy that integrates a pendulum-driven triboelectric nanogenerator (TENG) system with a mechanical motion rectifier, a high-gear-ratio transmission, and power management circuits. Through coupled buoy–pendulum dynamic simulations and laboratory testing using a motion simulator, we identify an optimal pendulum mass of 1.6 kg (12.7% of total buoy weight) that maximizes energy output while maintaining buoy stability. Laboratory experiments achieved average power outputs of 12.7 mW under Arctic-like wave and temperature conditions. The system was successfully deployed in the Bering Sea, where it generated 11 J of energy in 3.1 m waves, marking the first Arctic deployment of a TENG-based drifting buoy for sea surface temperature monitoring. This work establishes a cost-effective framework for designing self-powered Arctic monitoring platforms and advances the feasibility of long-term environmental observations in real Arctic waters.

marine enerby↗

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗

The transition from resistance to acceptance: Managing a marine invasive species in a changing world

Abstract Marine invasive species can transform coastal ecosystems, yet mitigating their effects can be difficult, and even impractical. Often, marine invasive species are managed at poorly matched spatial scales, and at the same time, rates of spread and establishment are increasing under climate change and can outpace resources available for population suppression. These circumstances challenge traditional conservation goals of maintaining a historic environmental state, especially for a species like the European green crab ( Carcinus maenas ), a formidable invader with few examples of successful long‐term removal programs. A management paradigm where decision alternatives include resisting or accepting a new ecological trajectory may be needed. We apply mathematical concepts from decision theory to develop a quantitative framework for navigating management decisions in this new resist‐accept paradigm. We develop a model of European green crab growth, removal and colonization, and we find optimal levels of removal effort that minimize both ecological change and removal cost. We establish a benchmark of colonization pressure at which green crab density becomes decoupled from a decision maker's actions, such that population control can no longer shape the invasion trajectory. For informing the decision boundary between resistance and acceptance, our results highlight that a decision maker's understanding of how removal cost scales with removal effort is more important than understanding the density‐impact relationship. We show that assuming stationary system dynamics can result in sub‐optimal levels of species removal effort, highlighting the importance of developing anticipatory management strategies by accounting for non‐stationary dynamics. Policy implications . For marine invasive species that can disperse across long distances and recolonize rapidly after removal, the focus of conservation policy should shift away from understanding how to resist change to understanding when to stop resisting change. Navigating this decision problem involves trade‐offs among competing objectives, highlighting the need for structured approaches to elicit objective weights that reflect the values of the decision maker. For natural resource managers facing possible ecosystem transformation, this decision framework can enable proactive and strategic decisions made under uncertainty in a changing world.

Keller, Abigail G. [Department of Environment Scie↗

A Comprehensive Approach towards Multi-Objective EMI Filter Design Optimization in High-Frequency SiC-Based Motor Drives

With rapid penetration of high-frequency, highdensity power electronics into the industry, controlling the system generated EMI becomes one of the major design challenges. Designing practical optimized EMI filters require simultaneous consideration of multiple aspects - including electromagnetic couplings, magnetic materials, practical component parasitics and their impacts at high-frequencies, and also the overall manufacturing costs. The multi-dimensional nature of the problem often results in overcompensated designs that hurt the system efficiency and power density. This paper focuses on a comprehensive design platform (developed in MATLAB) towards designing high-density, optimized, highly efficient EMI filters by analyzing the generated noise spectrum and evaluating a vast array of potential solutions before outputting an optimized filter solution. The proposed tool includes database-based component selection, optimal topology selection, multistage filter design, overall optimization for volume, mass, cost and total loss. The proposed filter has been thoroughly evaluated in a PSIM simulation environment emulating the hardware in CRD300DA12EXM3, a 300kW three-phase inverter from Wolfspeed with an RL load representing a motor drive application. Furthermore, a 20kHz switching frequency is chosen and impacts of the motor high-frequency characteristics on the generated EMI noise spectrum of the overall system have been analyzed.

42 ENGINEERING↗

A Topology Optimization Framework to Facilitate Adoption of Advanced District Thermal Energy Systems

Advanced district thermal energy systems, which circulate water at temperatures near ambient conditions, and facilitate the utilization of waste heat and renewable thermal sources, can lower the carbon-intensity of urban districts, advancing the U.N. Sustainable Development Goals. Optimization of the network topology — the selection of the best subset of buildings and the best network to connect them, to minimize life cycle cost — can increase adoption of these system in appropriate applications. The potential "solution space" of the topology optimization problem grows factorially with the number of buildings in the district, motivating the consideration of a design heuristic. In this study, a heuristic for the network selection was evaluated with an exhaustive search, for a prototypical four-building district. For the prototypical district considered, the heuristic was effective in selecting an optimal network topology. Additionally, it was found that, in this case, the selection of the subset of buildings was more influential on the life cycle cost than the selection of the network topology. This work is part of a larger effort to develop a topology optimization framework for district thermal energy systems, which is anticipated to address barriers to adoption of ambient-temperature systems.

28 EE - Advanced Manufacturing Office (EE-5A)↗

A geometric framework for momentum-based optimizers for low-rank training

Low-rank pre-training and fine-tuning have recently emerged as promising techniques for reducing the computational and storage costs of large neural networks. Training low-rank parameterizations typically relies on conventional optimizers such as heavy ball momentum methods or Adam. In this work, we identify and analyze potential difficulties that these training methods encounter when used to train low-rank parameterizations of weights. In particular, we show that classical momentum methods can struggle to converge to a local optimum due to the geometry of the underlying optimization landscape. To address this, we introduce novel training strategies derived from dynamical low-rank approximation, which explicitly account for the underlying geometric structure. Our approach leverages and combines tools from dynamical low-rank approximation and momentum-based optimization to design optimizers that respect the intrinsic geometry of the parameter space. We validate our methods through numerical experiments, demonstrating faster convergence, and stronger validation metrics at given parameter budgets.

Schotthoefer, Steffen [ORNL] (ORCID:00000002156965↗

Optimizing Sensor Count and Placement to Detect Bond Wire Lift-Offs and Surface Defects in High-Power IGBT Modules Using Low-Cost Piezo-Electric Resonators

This manuscript presents the most recent results and findings to identify bond wire lift-offs and surface defects in high-power isolated gate bipolar junction transistor (IGBT) modules. The authors of this manuscript formerly proposed a low-cost, piezoelectric resonator-based measurement unit to detect bond wire related degradation in larger IGBT modules. Since high-power IGBT modules are expensive, it was apparent that evaluating our proposed method by inducing controlled damage to fresh (new) IGBTs may not be cost-effective especially when multiple sets of data need to be captured by inducing damage to different levels. In order to overcome this limitation, IGBT bond wires have been mimicked using a 3D printed enclosure, a PCB, and copper wires with dimensions very closely resembling a real IGBT. Using this method, multiple test devices can be built at the cost of a real IGBT, and the proposed technique could be fine-tuned without damaging expensive, real IGBTs. Our recent findings can be used to determine real IGBT degradation and bond wire lift-offs using only two sensors, as opposed to six transducers used in the first iteration of the setup. In addition to optimizing the sensor count, we have also identified the best possible locations of these sensors by attempting multiple placements inside the IGBT casing.

condition monitoring↗

Cyber risk assessment and investment optimization using game theory and ML-based anomaly detection and mitigation for wide-area control in smart grids

The electric power grid is increasingly becoming susceptible to cyber attacks that exploit vulnerabilities in the smart grid control, information, and physical layers. Successful cyber attacks can have catastrophic impacts on the social and economic well-being of any nation all over the globe. It has, thus, become imperative to secure the smart grid against such adversarial actions to ensure stable, secure, and reliable operation of the grid. The existing research and industry practices prove to be inadequate in terms of providing pragmatic and effective defense methodologies and measures for long-term cybersecurity planning and real-time cybersecurity for grid operation. For example, existing works lack models that incorporate uncertain behavior of cyber-attackers and pragmatic defense measures for cyber risk assessment and cybersecurity investment optimization which often provide unreliable and strictly qualitative solutions to these problems. At the same time, with the growing number of cyber incidents in the grid, there still exists a need to develop attack-resilient algorithms for wide-area monitoring, protection, and control (WAMPAC) applications like the wide-area voltage control systems (WAVCS) for Flexible AC Transmissions Systems (FACTS) that lack in scalable and feasible solutions from the cybersecurity perspective. This dissertation proposes novel models and methodologies for: (1) Cybersecurity planning, and (2) Cybersecurity for system operation. The cybersecurity planning is achieved through cyber risk assessment and cybersecurity resource investment optimization for long-term cybersecurity of the grid using game theory and attack-defense trees. Cybersecurity for system operation consists of development of cyber anomaly detection and mitigation algorithms for flexible AC transmission system (FACTS) controller-based wide-area voltage control systems (WAVCS) using machine learning (ML), and software defined networking-based moving target defense network routing for achieving real-time cyber-physical security for grid operations. This is followed by hardware-in-the-loop (HIL) implementation and evaluation of these attack prevention, detection, and mitigation algorithms and methodologies showcasing their feasibility in a close to real-world environment. For cybersecurity planning, a novel approach involving a combination of game theory and attack defense trees (ADT) for optimal cybersecurity resource allocation in the smart grid is proposed. This methodology involves modeling of the cyber-physical smart grid substations as ADTs, defining attacker costs, defense costs, and attack probabilities for attack access points. Using game theoretical formulation, optimal defense strategies for the defender of the system to invest cybersecurity resources in the grid are obtained. Additionally, a game-theoretic framework is developed for quantitative cyber-physical risk assessment of the grid under a dynamically changing cyber threat space and uncertain behavior of cyber attackers which is further used to optimize investments in the smart grid's cybersecurity resources. The attacker, defender, and the smart grid system are modeled while incorporating attacker-stochasticity and federal guidelines for smart grid cybersecurity. This allows quantification of threat, vulnerabilities, and attack impact of the grid for quantitative risk assessment. The defender's budget to invest in the security resources in the grid is optimized based on the strategies leading to minimum system risk. The evaluation of the proposed solutions highlight the feasibility for practical implementation of these methodologies and algorithms in the smart grid, while taking the federal requirements and guidelines for smart grid security into consideration. For achieving cybersecurity for system operation, attack prevention, detection, and mitigation algorithms and methodologies are developed specifically for FACTS-based WAVCS. Anomaly detection and mitigation in the WAVCS are achieved using algorithms based on machine learning which involves offline training and testing of ML models with CPS datasets incorporating physics-based features that allow accurate distinction between system faults and cyber attacks. For attack prevention, a methodology based on software defined network (SDN)-based moving target defense (MTD) network routing is proposed that enables prevention of Denial of Service (DoS) type attacks on the smart grid communication system. Subsequently, these methodologies and algorithms are implemented and evaluated on an HIL testbed that allows for real-time attack prevention, detection, and mitigation of emulated cyber attacks on the WAVCS in a close to real-world environment. The results show highly accurate and efficient performance of the implemented algorithms and methodologies with the smart grid system operating within the NERC's system operation limits even in the presence of DoS and data integrity cyber attacks. This work opens up future research opportunities in other directions such as (1) Expanding cybersecurity planning methodologies to real-time cyber contingency analysis with different game formulations; and (2) Applying the cybersecurity for system operation algorithms to broader categories of wide-area control applications.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Reducing measurement costs by recycling the Hessian in adaptive variational quantum algorithms

Abstract Adaptive protocols enable the construction of more efficient state preparation circuits in variational quantum algorithms (VQAs) by utilizing data obtained from the quantum processor during the execution of the algorithm. This idea originated with Adaptive Derivative-Assembled Problem-Tailored variational quantum eigensolver (ADAPT-VQE), an algorithm that iteratively grows the state preparation circuit operator by operator, with each new operator accompanied by a new variational parameter, and where all parameters acquired thus far are optimized in each iteration. In ADAPT-VQE and other adaptive VQAs that followed it, it has been shown that initializing parameters to their optimal values from the previous iteration speeds up convergence and avoids shallow local traps in the parameter landscape. However, no other data from the optimization performed at one iteration is carried over to the next. In this work, we propose an improved quasi-Newton optimization protocol specifically tailored to adaptive VQAs. The distinctive feature in our proposal is that approximate second derivatives of the cost function are recycled across iterations in addition to optimal parameter values. We implement a quasi-Newton optimizer where an approximation to the inverse Hessian matrix is continuously built and grown across the iterations of an adaptive VQA. The resulting algorithm has the flavor of a continuous optimization where the dimension of the search space is augmented when the gradient norm falls below a given threshold. We show that this inter-optimization exchange of second-order information leads the approximate Hessian in the state of the optimizer to be consistently closer to the exact Hessian. As a result, our method achieves a superlinear convergence rate even in situations where the typical implementation of a quasi-Newton optimizer converges only linearly. Our protocol decreases the measurement costs in implementing adaptive VQAs on quantum hardware as well as the runtime of their classical simulation.

Ramôa, Mafalda (ORCID:0000000302187801)↗

Quantifying Uncertainty of Deep Reinforcement Learning Based Decision Making for Operations and Maintenance of Nuclear Power Plant

This paper summarizes research that integrates condition monitoring and prognostics with decision making for nuclear power plant operations and maintenance. As part of this research, we have developed an online asset management tool to help reduce life-cycle maintenance and repair costs. Using the latest advancements in condition monitoring, supply chain analytics, and deep reinforcement learning, we have created a predictive maintenance tool that can optimize the maintenance and spare-part management of a repairable nuclear system. To demonstrate these methods, preliminary studies were conducted on a simple, representative maintenance system undergoing a stochastic degradation process that requires repairs or replacement to continue operation. Through Monte Carlo simulations, we were able to reduce maintenance spending by approximately 50% compared to optimized, time-based maintenance strategies. Not only does the decision maker reduce the average life-cycle costs, it also minimizes the chance of high cost scenarios, lowering the variance of the expected cost distributions, and reducing overall financial risk. Furthermore, this work also studies the ability of the decision maker to handle various levels of noise from observation uncertainty. By introducing uncertainty into the decision-making process, we have quantified the robustness and resiliency of the decision maker, as well as identified necessary levels of observability to demonstrate cost effectiveness.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Designing a GIS-based supply chain for producing carinata-based sustainable aviation fuel in Georgia, USA

Carinata is a potential crop for sustainable aviation fuel (SAF) production in the southern USA. However, as a novel crop, the cost-effectiveness and environmental feasibility of carinata feedstock are unknown, and there are questions about the optimal supply chain configuration for carinata-based SAF production. This study aims to design a supply chain model for carinata-based SAF production by optimizing the location of farms and facilities (e.g. storage units, crushing mills, biorefineries) for a minimum transportation cost under a set of supply and demand conditions. An integrated mixed-integer linear programming (MILP) model was combined with geographical information system (GIS) analysis to design a spatially explicit supply chain configuration. The GIS-based network analysis considered all of the counties in Georgia to set the candidate locations of carinata farms and facilities, and determined minimum cost and emission routes between those counties and the airport using existing transportation networks and modes (e.g. road, rail and pipeline). The MILP model determined the final selection of the farms and the number of facilities and their locations over those minimum-cost routes. With this supply chain configuration, the minimum price of SAF was $\$$0.92 L –1 , which is $\$$0.44 higher than conventional aviation fuel (CAF). The associated carbon intensity of SAF was estimated at 940.7 g CO 2 e L –1 , a reduction of 66% relative to the carbon intensity of equivalent CAF. The study found that a carbon tax (or subsidy) of $\$$230.48 t CO 2 e –1 would be needed to overcome the cost differential with CAF and promote carinata-based SAF in Georgia.

09 BIOMASS FUELS↗

Cost-Performance Trade-off in thermoelectric air conditioning system with graded and constant material properties

Thermoelectric (TE) air cooling is a solid-state technology that has the potential to replace conventional vapor compression-based air conditioning. In this paper, we present a detailed system-level modeling for thermoelectric air conditioning system with position-dependent (graded) and constant material properties. Strategies for design optimization of the system are provided in terms of cost-performance trade-off. Realistic convection heat transfer at both sides of the system are taken into account in our modeling. Here, the effects of convection heat transfer coefficients, air flowrate, and thermoelectric material properties are investigated with varying key parameters such as TE leg thickness, module fill factor, and input current. Both constant material properties and graded properties are considered for the TE materials, and they are compared in terms of the degree of cooling, coefficient of performance (COP), and power consumption. For graded materials, we employ one-dimensional finite element methods to solve the coupled electrical and thermal current equations with arbitrary profile of material properties varying with position along the TE legs. We find that graded materials can enhance the degree of cooling, but only at the expense of COP, compared to the case of constant property materials. With constant material properties of ZT = 1 and relatively low electric current, the power consumption of TE coolers can be lower than those of conventional air conditioners at an equivalent cooling capacity. Considering additional advantages such as demand-flexible operation, low noise, and high scalability, thermoelectric cooling could be a competitive technology for future air conditioning applications.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗