Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CONTRACTION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 973 records · Page 54

Phase II Characterization Survey of the USNS Bridge (T-AOE 10), Military Sealift Fleet Support Command, Naval Station, Norfolk, Virginia (Final Report)

In March 2011, the USNS Bridge was deployed off northeastern Honshu, Japan with the carrier USS Ronald Reagan to assist with relief efforts after the 2011 Tōhoku earthquake and tsunami. During that time, the Bridge was exposed to air-borne radioactive materials leaking from the damaged Fukushima I Nuclear Power Plant. The proximity of the Bridge to the air-borne impacted area resulted in the contamination of the ship’s air-handling systems and the associated components, as well as potential contamination of other ship surfaces due to either direct intake/deposition or inadvertent spread from crew/operational activities. Preliminary surveys in the weeks after the event confirmed low-level contamination within the heating, ventilation, and air conditioning (HVAC) ductwork and systems, and engine and other auxiliary air intake systems. Some partial decontamination was performed at that time. In response to the airborne contamination event, Military Sealift Fleet Support Command (MSFSC) contracted Oak Ridge Associated Universities (ORAU), under provisions of the Oak Ridge Institute for Science and Education (ORISE) contract, to assess the radiological condition of the Bridge. Phase I identified contamination within the CPS filters, ventilation systems, miscellaneous equipment, and other suspect locations that could not accessed at that time (ORAU 2011b). Because the Bridge was underway during the characterization, all the potentially impacted systems/spaces could not be investigated. As a result, MSFSC contracted with ORAU to perform Phase II of the characterization, specifically to survey systems/spaces previously inaccessible. During Phase II of the characterization, the ship was in port to perform routine maintenance operations, allowing access to the previously inaccessible systems/spaces.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Performance Improvement Strategy FY14-18: Create Our Future Strengthen the Core

This document presents the Los Alamos National Laboratory (LANL) Multiyear Strategy for Performance Improvement for FY14–FY18 in accordance with Clause H-3 Contractor Multiyear Strategy for Performance Improvement of the National Nuclear Security Administration (NNSA) Contract No. DE-AC52-06NA25396. “The Contractor shall develop a multiyear strategy that details (1) its planned efforts and expected accomplishments by year, to continuously improve its management and performance at the Laboratory, and (2) the planned efforts and contributions of its Parent Organization. “The multiyear strategy shall also address planned efforts to (1) enhance Contractor communications, cooperation and integration with the NNSA Weapons Complex, with emphasis on Lawrence Livermore National Laboratory; and, (2) contribute to overall NNSA Weapons Complex improvements in performance. The listing of the Contractor’s planned efforts and expected accomplishments from its offer in response to Solicitation No. DE-RP52-05NA25396 for FY2006 (June 1, 2006 – September 30, 2006, partial year) and FY2007 shall be addressed in the initial multiyear strategy. Subsequent annual updates shall be submitted to the Contracting Officer no later than May 15th of each year. Performance measures for these planned efforts and expected accomplishments may be considered for inclusion in the Contract’s Performance Evaluation Plan.”

99 GENERAL AND MISCELLANEOUS↗

Analysis of the Chinese Market for Building Energy Efficiency

China will account for about half of the new construction globally in the coming decade. Its floorspace doubled from 1996 to 2011, and Chinese rural buildings alone have as much floorspace as all of U.S. residential buildings. Building energy consumption has also grown, increasing by over 40% since 1990. To curb building energy demand, the Chinese government has launched a series of policies and programs. Combined, this growth in buildings and renovations, along with the policies to promote green buildings, are creating a large market for energy efficiency products and services. This report assesses the impact of China’s policies on building energy efficiency and on the market for energy efficiency in the future. The first chapter of this report introduces the trends in China, drawing on both historical analysis, and detailed modeling of the drivers behind changes in floorspace and building energy demand such as economic and population growth, urbanization, policy. The analysis describes the trends by region, building type and energy service. The second chapter discusses China’s policies to promote green buildings. China began developing building energy codes in the 1980s. Over time, the central government has increased the stringency of the code requirements and the extent of enforcement. The codes are mandatory in all new buildings and major renovations in China’s cities, and they have been a driving force behind the expansion of China’s markets for insulation, efficient windows, and other green building materials. China also has several other important policies to encourage efficient buildings, including the Three-Star Rating System (somewhat akin to LEED), financial incentives tied to efficiency, appliance standards, a phasing out of incandescent bulbs and promotion of efficient lighting, and several policies to encourage retrofits in existing buildings. In the third chapter, we take “deep dives” into the trends affecting key building components. This chapter examines insulation in walls and roofs; efficient windows and doors; heating, air conditioning and controls; and lighting. These markets have seen significant growth because of the strength of the construction sector but also the specific policies that require and promote efficient building components. At the same time, as requirements have become more stringent, there has been fierce competition, and quality has at time suffered, which in turn has created additional challenges. Next we examine existing buildings in chapter four. China has many Soviet-style, inefficient buildings built before stringent requirements for efficiency were more widely enforced. As a result, there are several specific market opportunities related to retrofits. These fall into two or three categories. First, China now has a code for retrofitting residential buildings in the north. Local governments have targets of the number of buildings they must retrofit each year, and they help finance the changes. The requirements focus on insulation, windows, and heat distribution. Second, the Chinese government recently decided to increase the scale of its retrofits of government and state-owned buildings. It hopes to achieve large scale changes through energy service contracts, which creates an opportunity for energy service companies. Third, there is also a small but growing trend to apply energy service contracts to large commercial and residential buildings. This report assesses the impacts of China’s policies on building energy efficiency. By examining the existing literature and interviewing stakeholders from the public, academic, and private sectors, the report seeks to offer an in-depth insights of the opportunities and barriers for major market segments related to building energy efficiency. The report also discusses trends in building energy use, policies promoting building energy efficiency, and energy performance contracting for public building retrofits.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Brief Summary on Formalizing Parallel Tensor Distributions, Redistributions, and Algorithm Derivations

Large-scale datasets in computational chemistry typically require distributed-memory parallel methods to perform a special operation known as tensor contraction. Tensors are multidimensional arrays, and a tensor contraction is akin to matrix multiplication with special types of permutations. Creating an efficient algorithm and optimized implementation in this domain is complex, tedious, and error-prone. To address this, we develop a notation to express data distributions so that we can apply use automated methods to find optimized implementations for tensor contractions. We consider the spin-adapted coupled cluster singles and doubles method from computational chemistry and use our methodology to produce an efficient implementation. Experiments per- formed on the IBM Blue Gene/Q and Cray XC30 demonstrate impact both improved performance and reduced memory consumption.

97 MATHEMATICS AND COMPUTING↗

The National Carbon Capture Center at the Power Systems Development Facility

The National Carbon Capture Center (NCCC) at the Power Systems Development Facility supports the Department of Energy (DOE) goal of promoting the United States’ energy security through reliable, clean, and affordable energy produced from coal. Work at the NCCC supports the development of new power technologies and the continued operation of conventional power plants under CO 2 emission constraints. The NCCC includes adaptable slipstreams that allow technology development of CO 2 capture concepts using coal-derived syngas and flue gas in industrial settings. Because of the ability to operate under a wide range of flow rates and process conditions, research at the NCCC can effectively evaluate technologies at various levels of maturity and accelerate their development path to commercialization. During its first contract period, from October 1, 2008, through December 30, 2014, the NCCC designed, constructed, and began operation of the Post-Combustion Carbon Capture Center (PC4). Testing of CO 2 capture technologies commenced in 2011, and through the end of the contract period, more than 25,000 hours of testing had been achieved, supporting a variety of technology developers. Technologies tested included advanced solvents, enzymes, membranes, sorbents, and associated systems. The NCCC continued operation of the existing gasification facilities, which have been in operation since 1996, to support the advancement of technologies for next-generation gasification processes and pre-combustion CO 2 capture. The gasification process operated for 13 test runs, supporting over 30,000 hours combined of both gasification and pre-combustion technology developer testing. Throughout the contract period, the NCCC incorporated numerous modifications to the facilities to accommodate technology developers and increase test capabilities. Preparations for further testing were ongoing to continue advancement of the most promising technologies for future power generation processes.

01 COAL, LIGNITE, AND PEAT↗

FutureGen 2.0 Oxy-combustion Large Scale Test – Final Report

The primary objectives of the FutureGen 2.0 CO 2 Oxy-Combustion Large Scale Test Project were to site, permit, design, construct, and commission, an oxy-combustion boiler, gas quality control system, air separation unit, and CO 2 compression and purification unit, together with the necessary supporting and interconnection utilities. The project was to demonstrate at commercial scale (168MWe gross) the capability to cleanly produce electricity through coal combustion at a retrofitted, existing coal-fired power plant; thereby, resulting in near-zeroemissions of all commonly regulated air emissions, as well as 90% CO 2 capture in steady-state operations. The project was to be fully integrated in terms of project management, capacity, capabilities, technical scope, cost, and schedule with the companion FutureGen 2.0 CO 2 Pipeline and Storage Project, a separate but complementary project whose objective was to safely transport, permanently store and monitor the CO 2 captured by the Oxy-combustion Power Plant Project. The FutureGen 2.0 Oxy-Combustion Large Scale Test Project successfully achieved all technical objectives inclusive of front-end-engineering and design, and advanced design required to accurately estimate and contract for the construction, commissioning, and start-up of a commercial-scale "ready to build" power plant using oxy-combustion technology, including full integration with the companion CO 2 Pipeline and Storage project. Ultimately the project did not proceed to construction due to insufficient time to complete necessary EPC contract negotiations and commercial financing prior to expiration of federal co-funding, which triggered a DOE decision to closeout its participation in the project. Through the work that was completed, valuable technical, commercial, and programmatic lessons were learned. This project has significantly advanced the development of near-zero emission technology and will be helpful to plotting the course of, and successfully executing future large demonstration projects. This Final Scientific and Technical Report describes the technology and engineering basis of the project, inclusive of process systems, performance, effluents and emissions, and controls. Further, the project cost estimate, schedule, and permitting requirements are presented, along with a project risk and opportunity assessment. Lessons-learned related to these elements are summarized in this report. Companion reports Oxy-combustion further document the accomplishments and learnings of the project, including: A.01 Project Management Report which describes what was done to coordinate the various participants, and to track their performance with regard to schedule and budget B.02 Lessons Learned - Technology Integration, Value Improvements, and Program Management, which describes the innovations and conclusions that we arrived upon during the development of the project, and makes recommendations for improvement of future projects of a similar nature . B.03 Project Economics, which details the capital and operation costs and their basis, and also illustrates the cost of power produced by the plant with certain sensitivities. B.04 Power Plant, Pipeline, and Injection Site Interfaces, which details the interfaces between the two FutureGen projects B.05 Contractual Mechanisms for Design, Construction, and Operation, which describes the major EPC, and Operations Contracts required to execute the project.

54 ENVIRONMENTAL SCIENCES↗

Ancillary Service Revenue Potential for Geothermal Generators in California

Achieving California’s 33% renewable generation goal will substantially increase uncertainty and variability in grid operations. Geothermal power plant operators could mitigate this variability and uncertainty by operating plants in a more flexible mode. Plant operators would be compensated for flexibility through payments for ancillary services such as frequency regulation, load following, and spinning reserve. This study explores economic incentives for geothermal plant operators to provide such flexibility. Historical and forecast ancillary service prices are compared to operator compensation for energy under firm contracts at fixed prices, which are higher than current or year 2020 projected market clearing prices for ancillary services in most hours of the year. Power purchase agreements recently executed by geothermal operators typically provide only energy payments at fixed energy prices and escalation rates. We postulate new contract structures that would allow a geothermal plant operator to switch from providing energy to providing ancillary services to the grid operator when it is advantageous to the plant operator to do so. Additional revenues would be earned through ancillary service payments. Estimates of these additional annual revenues a plant operator could realize are developed for a range of contract energy prices. The impacts of flexible operations on reservoir lifetimes and implications for project finance are also discussed.

15 GEOTHERMAL ENERGY↗

Ancillary Service Revenue Potential for Geothermal Generators in California FY15 Final Report

Achieving California’s 33% renewable generation goal will substantially increase uncertainty and variability in grid operations. Geothermal power plant operators could mitigate this variability and uncertainty by operating plants in a more flexible mode. Plant operators would be compensated for flexibility through payments for ancillary services such as frequency regulation, load following, and spinning reserve. This study explores economic incentives for geothermal plant operators to provide such flexibility. Historical and forecast ancillary service prices are compared to operator compensation for energy under firm contracts at fixed prices, which are higher than current or year 2020 projected market clearing prices for ancillary services in most hours of the year. Power purchase agreements recently executed by geothermal operators typically provide only energy payments at fixed energy prices and escalation rates. We postulate new contract structures that would allow a geothermal plant operator to switch from providing energy to providing ancillary services to the grid operator when it is advantageous to the plant operator to do so. Additional revenues would be earned through ancillary service payments. Estimates of these additional annual revenues a plant operator could realize are developed for a range of contract energy prices. The impacts of flexible operations on reservoir lifetimes and implications for project finance are also discussed.

15 GEOTHERMAL ENERGY↗

Combinatorial Platform for Discovery of Nanocrystal-Ink Based Earth Abundant Element PV with Efficiency Greater than 20% (Final Technical Report)

(1) We successfully developed an ultrasonic spray coating system that can be used to deposit thin chalcogenide films with composition gradients. 4 publications under the contract have been published with the instrument. The instrument was used to reveal the effects of intrinsic composition and examine the effects of 25 different dopant elements. Surprisingly, doping with most elements had little to no effect on the quasi- Fermi level splitting of bare films. A few elements were found to be detrimental including Fe, Co, and Ni. However, Li, Ge, and others were discovered to be beneficial. Ge and Li were explored in depth, and our best devices utilize lithium doping. (2) We developed a new model of absorption coefficients, that when combined with absolute intensity photoluminescence, yield the steady-state quasi-Fermi level splitting and a way to quantify the sub-bandgap absorption. This has resulted in 2 publications on the method, with another in preparation. This is a significant development that should impact other PV technologies. We have already received samples from 2 major PV companies to examine. Further, the model shows that tail states (potential fluctuations) in CZTSSe can only explain about 90 mV of loss in the open circuit voltage. (3) We found that lithium doping has several beneficial effects on CZTSSe. It improves the open-circuit voltage, short circuit current, fill factor, and shunt resistance. By using scanning Kelvin probe microscopy (SKPM) and conductive AFM (along with device measurements, DLPC, and XPS), we discovered that lithium acts to increase the p-type doping in both the grain and grain boundaries (GBs). The effect is stronger in the GBs and changes the direction of the electric field at the GB. In lithium doped devices, an electric field repels minority carrier electrons away from the GB. This resulted in a publication and the fabrication of 11.8% efficient devices from a DMSO-thiourea molecular ink. The mechanism of action is most likely due to the formation of Li Cu , which inhibits the formation of the donor defect Zn Cu . This reduces compensation and increases the net p-type doping. (4) By alloying with germanium, we have fabricated CZTGSSSe devices with the best open-circuit voltage (relative the maximum theoretical open-circuit voltage for the bandgap) for any kesterite solar cell. The Voc/Voc,max is 63%, compared to 58% for the record efficiency cell from hydrazine. The origin of the increased voltage efficiency appears to be related to the conduction band off-set and the suppression of a deep defect ($\sim$0.8 eV), most likely due to Cu Sn , but Sn Zn or Sn Cu are also possible. All milestones and go/no-go metrics were met with exception of the device efficiency milestone (15% then 20%). However, under the contract, hydrazine-free CZTSSe device efficiencies increased from 7.2% at the start of the contract to 11.8% upon completion.

14 SOLAR ENERGY↗

Combinatorial Platform for Discovery of Nanocrystal-Ink Based Earth Abundant Element PV with Efficiency Greater than 20%

(1) We successfully developed an ultrasonic spray coating system that can be used to deposit thin chalcogenide films with composition gradients. 4 publications under the contract have been published with the instrument. The instrument was used to reveal the effects of intrinsic composition and examine the effects of 25 different dopant elements. Surprisingly, doping with most elements had little to no effect on the quasi-Fermi level splitting of bare films. Ge and Li were explored in depth, and our best devices utilize lithium doping. (2) We developed a new model of absorption coefficients, that when combined with absolute intensity photoluminescence, yield the steady-state quasi-Fermi level splitting and a way to quantify the sub-bandgap absorption. This has resulted in 2 publications on the method, with another in preparation. This is a significant development that should impact other PV technologies. (3) We found that lithium doping has several beneficial effects on CZTSSe. It improves the open-circuit voltage, short circuit current, fill factor, and shunt resistance. By using scanning Kelvin probe microscopy (SKPM) and conductive AFM (along with device measurements, DLPC, and XPS), we discovered that lithium acts to increase the p-type doping in both the grain and grain boundaries (GBs). The effect is stronger in the GBs and changes the direction of the electric field at the GB. In lithium doped devices, an electric field repels minority carrier electrons away from the GB. This resulted in a publication and the fabrication of 11.8% efficient devices from a DMSO-thiourea molecular ink. The mechanism of action is most likely due to the formation of LiCu, which inhibits the formation of the donor defect ZnCu. This reduces compensation and increases the net p-type doping. (4) By alloying with germanium, we have fabricated CZTGSSe devices with the best open-circuit voltage (relative the maximum theoretical open-circuit voltage for the bandgap) for any kesterite solar cell. The Voc/Voc,max is 63%, compared to 58% for the record efficiency cell from hydrazine. The origin of the increased voltage efficiency appears to be related to the conduction band off-set and the suppression of a deep defect (~0.8 eV), most likely due to CuSn, but SnZn or SnCu are also possible. All milestones and go/no-go metrics were met with exception of the device efficiency milestone (15% then 20%). However, under the contract, hydrazine-free CZTSSe device efficiencies increased from 7.2% at the start of the contract to 11.8% upon completion.

14 SOLAR ENERGY↗

Financing Microgrids in the Federal Sector

Recent high-impact events such as hurricanes and wildfires highlight the need for energy system resilience. One potential impact of these events is the loss of utility grid power to federal sites, negatively affecting the ability to carry out their missions. Depending on the need to sustain critical functions, it may be important to continue operations during an outage of the electric grid, or at least have power restored quickly after the event. One approach to addressing this need is through a microgrid. Microgrids can provide a more reliable solution than the traditional approach of using a backup generator at individual buildings. A microgrid can enhance a site’s electrical power system during normal operations, as well as provide reliable backup power to critical loads when electric utility power is interrupted. Many times, certain components of a microgrid (and potentially the entire system) can be justified economically and paid for out of energy savings or avoided costs. In cases where savings can cover the project costs, one of several privately financed procurement mechanisms may be used to implement the project. Procurement options available to all federal agencies include utility energy services contracts (UESC), energy savings performance contracts (ESPC), and utility services contracts (USC); other mechanisms such as a power purchase agreement (PPA), enhanced use lease (EUL), and utility privatization (UP) may also be useful to agencies that have the authority to use them. Implementing a microgrid in a comprehensive effort that also includes energy efficiency can provide an important savings component, while reducing power requirements for critical loads, thus reducing the cost of the microgrid and associated distributed energy resources (DER). However, it can be difficult to achieve enough savings and avoided costs to cover the entire microgrid system, so leveraging these avoided costs in combination with appropriated funds may be necessary to implement the full project. When a site is deciding if a microgrid is the best solution, activities early in the process include identifying critical loads and existing DERs, conversations with the local electric utility, and implementation options that work best for the agency and site. This paper explores procurement options and agreements that may be useful to federal agencies interested in implementing microgrids at their sites. Microgrid complexities, implementation considerations, and suggestions to get started are also discussed. This information will be most useful to agencies when they are exploring electric energy system resilience options and/or considering different procurement options to meet their needs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

2021 Site Environmental Report (SER) for the Ernest Orlando Lawrence Berkeley National Laboratory (LBNL)

Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab) is a multiprogram scientific facility operated by the University of California (UC) for the U.S. Department of Energy (DOE). Berkeley Lab’s research is focused on the physical, biological, environmental, and computational sciences, with the objective of delivering scientific knowledge and discoveries pertinent to DOE’s mission. This annual report describes environmental protection activities and potential impacts resulting from operations conducted in calendar year 2021, unless otherwise indicated. The format and content of this report satisfy the requirements of both DOE Order 231.1B, Administrative Change 1 (Environment, Safety, and Health Reporting) (DOE, 2012) and the operating contract between UC and DOE (DOE Contract No. DE-AC02-05CH11231, also known as Contract 31).

54 ENVIRONMENTAL SCIENCES↗

Equipment Qualification Report Environmental Qualification of GNB Absolyte Valve Regulated Lead Acid (VRLA) 1600 Ah100G33 Battery Rack Assembly (24590-QL-POA-EDB0-00001-11-00002_00A)

Greenberry Environmental Qualification Report 550001.001-35.0.5 provides basis for assignment of qualified life for: GNB Absolyte Valve Regulated Lead Acid (VRLA) 1600 Ah 100G33 Battery Rack Assembly in accordance with the requirements specified 24590-WTP-3PS-G000-T0015 (Rev 2) and Environmental Qualification Plan 550001.001-35.0.1 (Rev. 3). The equipment qualification basis represents the most conservative capability of the equipment. The analysis performed for the qualification is not less conservative than the bounding environmental conditions detailed in contract documents issued to Greenberry in contract 24509-QL-POA-EDB0-00001 Rev.0. The qualified life of 10 years has been established based upon an end-condition objective of the equipment condition indicators that correlate to the ability of equipment to perform its safety function. The VRLA Battery Cell Assembly was aged by 10 years (minimum) in accordance with conditions specified by Bechtel Equipment Qualification Datasheet 24590-LAW-EUQ-UPE 00003 Rev. 3 and the process conditions specified by the Instrument Data Sheet 24590-LAW EUD-UPE-00009 Rev. 2. Greenberry Industrial has contracted with GNB Industrial Battery Co located at 4115 S Zero St, Fort Smith, AR 72908 to perform age conditioning, monitoring, and capacity testing in accordance with Environmental Qualification Plan 550001.001-35.0.1 Rev. 1. The required process at the stated conditions set by the parameters established by the plan were completed satisfactorily. The details of the of the test process observed by Greenberry is detailed in the attached Seismic Test Log 550001.001-7.0.3, including examples of the objective evidence collected during the qualification process.

54 ENVIRONMENTAL SCIENCES↗

Product Innovation to Increase Low-to-Moderate-Income Customers' Adoption of Community Solar PV

This study aims to comprehensively analyze community solar project preferences for consumers and suppliers by conducting three distinct analyses. First we analyze the predictors of community solar contract adoption to understand how individual priorities affect the probability of adoption. Using an original data set of survey responses from potential community solar customers, we analyzed the predictors of contract adoption by employing a weighted logit model. We find that individuals who were previously familiar with community solar projects were significantly more likely to adopt than those who were not familiar. Secondly, a survey of community solar developers and financiers identified industry perceived barriers to community solar access and inclusion. Thirdly, we gathered payment performance information from community solar initiatives to measure how financial risks are perceived and how they interact with customer demographics. Our study is beneficial to the public by providing insights into the drivers and barriers of community solar adoption and sheds light on the importance of understanding individual priorities in designing effective community solar policies. The community solar industry has changed significantly since the beginning of this project. The industry continues to grow at a rapid rate, with an additional 7 gigawatts expected to come online between 2022 and 2027. With federal pressure to meet climate goals, as the harms of climate change continue to impact everybody, legislators are looking to community solar as a method to achieving their states energy policy goals. These new policies that push for low-to-moderate inclusion, coupled with the increase in community solar capacity illustrate a new era for the community solar industry. A number of policies have arisen in the last few months that push for more inclusive practices including the groundbreaking Solar for All program run by the EPA. The research created a “best practice” contract that can then be used, in conjunction with the manuscript and validated study, to pitch the industry on a more inclusive community solar product.

14 SOLAR ENERGY↗

Summary of Analytical Services for the Hanford Site Radionuclide NESHAP Program

This document is a summary of the point source analytical requirements used to demonstrate compliance for the Department of Energy (DOE) Hanford Site operations with 40 Code of Federal Regulations (CFR) Part 61, “National Emission Standards for Hazardous Air Pollutants,” (NESHAP) Subpart H, “National Emission Standards for Emissions of Radionuclides Other Than Radon From Department of Energy Facilities,” and the Washington Administrative Code (WAC) 246-247, “Radiation Protection – Air Emissions.” This reference collects information from multiple source documents and is not intended to create, supersede, replace or over-ride any existing contractual, DOE, federal or state statutes, regulations, compliance agreements, orders, permits, licenses or other requirements. The requirement source document governs where any difference may exist. The Hanford Mission Integration Solutions (HMIS) Environmental organization has been contracted by DOE to manage and report data collected from the sampling and monitoring of radioactive air emissions point sources, colloquially called stacks. The Environmental organization coordinates the analyses and reporting of samples collected at various facilities across the Hanford Site. These facilities operate approximately 52 stacks that require sampling, monitoring or estimating radioactive air emissions. The stacks are operated by Bechtel National, Inc. (BNI), Central Plateau Cleanup Company (CPCCo), Hanford Tank Waste Operations & Closure (H2C), Hanford Laboratory Management and Integration (HLMI), and Pacific Northwest National Laboratory (PNNL). Stack samples from CPCCo, HLMI and H2C facilities are collected by the operating contractor staff, delivered to HMIS, and then shipped to an offsite contracted laboratory for analyses. The field and laboratory sample data uploaded into the Sample Management and Analytical Results Tracking (SMART) database are used to calculate sample volumes and concentrations. Sample concentrations are evaluated for compliance with federal and state regulations, permits, and license requirements. The SMART database also calculates total curies released for sampled point sources and stacks. Point source effluent concentrations and releases are published annually in publicly available reports. The BNI and PNNL operate several DOE-Hanford Field Office (HFO) stacks subject to the requirements of 40 CFR 61, Subpart H and WAC 246-247. The concentrations, curies released and dose modeling evaluation for these stacks are included in the DOE-HFO annual radionuclide NESHAP report. The sample collection, analyses and emissions estimates for these stacks are outside the scope of HMIS contracted responsibilities and not addressed further in this document.

54 ENVIRONMENTAL SCIENCES↗

Calcium Phosphate Constraints in HLW Glasses: Phosphate Liquidus Model

About 50 million gallons of high-level mixed waste is currently stored in underground tanks at the United States Department of Energy’s (DOE’s) Hanford site in the State of Washington. The Hanford Tank Waste Treatment and Immobilization Plant (WTP) will provide DOE’s Office of River Protection (ORP) with a means of treating this waste by vitrification for subsequent disposal. The tank waste will be separated into low- and high-activity waste fractions, which will then be vitrified respectively into Immobilized Low Activity Waste (ILAW) and Immobilized High Level Waste (IHLW) products. The ILAW product will be disposed in an engineered facility on the Hanford site while the IHLW product is designed for acceptance into a national geological disposal facility for high-level nuclear waste. The ILAW and IHLW products must meet a variety of requirements before they can be accepted for disposal. Glass property-composition models will be used to control the vitrification process at the WTP to ensure that the glass meets product quality and processability requirements. The quality and the validity ranges of the property-composition models and the supporting database will greatly influence waste treatment operations, including the waste loading that is achievable in the glass for each waste composition. The current baseline models for operation of the WTP were developed under the Bechtel National, Inc. (BNI) WTP contract. These models were based on LAW and HLW glass property data over a range of compositions that was guided primarily by the WTP contract and the set of tanks specified therein. The HLW testing was directed towards waste streams from the then-planned early feed tanks for the WTP (i.e., AZ-101, AZ-102, C-106/AY-102, and C-104/AY-101). These wastes are high in iron (AZ-101, AZ-102, and C-106/AY-102) or thorium (C-104/AY-101). While the baseline models may be adequate for commissioning of the facility and processing of the specified tanks, refinements and extensions or augmentations of these models will be required to process the balance of the tank waste inventory. The overall mission of the WTP will require the immobilization of tank waste compositions that are variously dominated by mixtures of aluminum, chromium, bismuth, iron, phosphorous, zirconium, and sulfur compounds as waste-loading-limiting components. Further, the WTP contract includes minimum waste loading requirements that are generally rather modest while loadings significantly higher than those in the current baseline are likely achievable. In order to achieve these higher waste loadings and to expand the applicable composition regions, new models will be needed to support the optimized operation of the WTP. Since the development of the baseline WTP models, ORP directed a program of work at the Vitreous State Laboratory (VSL) to examine various approaches for optimization of the performance of the WTP, including increasing the waste loadings in the LAW and HLW glass products. That work involved HLW rich in Al, Al+Na, Cr, Bi, S, Zr, Sr, P and Fe, in contrast to old baseline models that were based mostly on HLW tanks that were high in Fe, with one other that was also high in Th. Glass property data collected under the ORP program were compiled and combined with data collected to develop the WTP models. The combined databases have been used to update pre-existing HLW composition models or to develop new models for properties such as Product Consistency Test (PCT) responses, spinel crystallization (one-percent crystal fraction temperature, T 1% ), melt viscosity, melt electrical conductivity, nepheline formation upon slow cooling (i.e., Canister Centerline Cooling [CCC]), and Toxicity Characteristic Leach Procedure (TCLP) Cd response. While spinel is typically the most commonly occurring phase in HLW glasses, other phases can be limiting depending on the waste and glass composition. For example, various phosphate phases can become important as the phosphorus content increases. Lithium phosphate crystallization can impact PCT releases of HLW glasses, while calcium phosphate phases forming in the cold-cap can deleteriously impact feed processing in the melter. At present, however, no models exist that relate glass composition and crystallization of phosphate phases in general and calcium phosphate in particular. The present work was therefore directed towards the initial development of such models. Future work may be directed at studying amorphous phase separation in high phosphate HLW glasses. Within the River Protection Project, feed compositions are projected using the Hanford Tank Waste Operations Simulator (HTWOS), a dynamic computer model that tracks the waste through storage, retrieval, feed staging, and treatment processes. A review of the HTWOS data shows that WTP will process 4106 batches of HLW glass for the overall mission (System Plan Rev. 6, ORP-11242), each with its own waste feed and glass composition. Some of the projected HTWOS feed batches are expected to have relatively high concentrations of phosphorous compared to typical HLW streams. In the 4106 batches of HLW for the overall WTP mission P 2 O 5 varies from 0.59 wt% to 13.00 wt%, with 95 batches containing at least 10 wt% P 2 O 5 . Occurrences of phosphate crystals have commonly been noted in glasses with high bismuth and phosphorus contents. In addition, recently collected data from a set of statistically designed HLW matrix glasses prepared and characterized to support enhancement of the HLW glass property-composition models identified apatite in a number of glass samples. However, the current HLW model for crystallization (one-percent crystal fraction temperature) is applicable only to spinel crystallization in glasses. Previous projections of waste loadings and glass volume (such as those in System Plan Rev. 6, ORP-11242) have used preliminary constraints for calcium phosphate crystallization that are based on the limited available data. Additional data and improved constraints or, preferably, models that relate glass composition to crystallization of phosphate-containing phases, are therefore needed to support HLW vitrification at the WTP. The present study focuses on the development of such a model based on data from previously characterized glasses and a set of newly fabricated glasses.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2024

Energy Savings Performance Contracts (ESPCs) are a contractual mechanism that allow a federal agency to procure energy savings and facility improvements without upfront capital costs to reduce costs and enhance mission resiliency. ESPCs are covered under FAR Part 23.2, and 42 USC § 8287. Section 8287(a)(2)(A) of Title 42 of the U.S. Code requires that each energy savings performance contract (ESPC) undergo an annual energy audit, resulting in a separate audit report for every project. The objective of the present report is to compile and analyze all annual ESPC audit reports issued between October 1, 2023, and September 30, 2024, for projects awarded under Generations 1, 2, and 3 of DOE’s ESPC IDIQ contracts. During this period, 205 measurement and verification (M&V) reports were produced for 200 projects; the total number of reports exceeds the number of projects because some projects generated more than one report (for example, a few projects measure savings twice per year and produce two audit reports annually, each covering a different six-month period). By aggregating the results from these individual audits, the report determines the portfolio-wide realization rate of energy and cost savings for all active ESPC projects awarded under DOE’s IDIQ program.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Waste Treatment Plant Support Program: Summaries of Reports Produced During Fiscal Years 1999-2010

The Waste Treatment Plant (WTP) being built on the U.S. Department of Energy (DOE) Hanford Site will be the largest chemical processing plant in the United States. Bechtel National Inc. (BNI) is the designer and constructor for the WTP. The Pacific Northwest National Laboratory (PNNL) has provided significant research and testing support to the WTP. This report provides a summary of reports developed initially under PNNL’s “1831” use agreement and later PNNL’s “1830” prime contract with DOE in support of the WTP. In March 2001, PNNL under its “1831” use agreement entered into a contract with BNI to support their research and testing activities. However, PNNL support to the WTP predates BNI involvement. Prior to March 2001, PNNL supported British Nuclear Fuels Ltd. in its role as overall designer and constructor. In February 2007, execution of PNNL’s support to the WTP was moved under its “1830” prime contract with DOE.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗