Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “work management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 955 records · Page 53

Automating Testing of DUNE Electronics via a Finite State Machine

The Deep Underground Neutrino Experiment (DUNE) is a flagship international collaboration designed to study neutrinos tiny, nearly massless particles that may hold answers to fundamental questions about the Universe. Fermilab s Robotic Test Stand (RTS) plays a critical role in ensuring the quality of approximately 50,000 Application-Specific Integrated Circuit (ASIC) chips that will be used in DUNE s massive liquid argon detectors. These electronics will be inside the cryostat; therefore, they will need to have a high yield of working chips and low noise. To improve the automation and reliability of the RTS, this project focused on designing and implementing a Python-based finite state machine (FSM) to manage chip handling workflows. The FSM was developed as a modular software framework to coordinate robotic arm movements, manage chip tray positions, and monitor system states during testing. Key features include robust error handling routines, a pause/resume system for safe mid-cycle interruptions, and a simulation mode for iterative testing without hardware dependencies. The system was designed to prepare for seamless integration with RTS hardware components such as the robotic arm and vision system. This integration will streamline collaboration and enable efficient deployment of updates across the six total institutions performing testing. The outcomes of this internship contribute to Fermilab s mission to advance high-energy physics and support the DOE s national goals by directly improving the testing of equipment to be used in DUNE. The project also provided valuable experience in software design and contributing to the success of DUNE.

Kang, Caleb [William Rainey Harper Coll.]↗

Environmental Impact Assessment of Lithium Recovery from Geothermal Brines in the SS-KGRA: An Overview

There is increasing interest in securing a reliable, domestic source of lithium in the United States to support an electrified grid and energy secure future. The Salton Sea Known Geothermal Resource Area (SS-KGRA) has garnered attention for this purpose due to the abundance of lithium in brines brought to the surface for geothermal energy production in this region. Geothermal production from this field is already expected to grow from the current 400 MWe to 920 MWe in the next 3-4 years with a potential total geothermal capacity in the region estimated at nearly 2,950 MWe. With this growth, there is potential for construction and operation of new direct lithium recovery and processing facilities to meet domestic demands for lithium. In this work, we estimate the potential impact of geothermal expansion and lithium extraction in the SS-KGRA on water use, direct air emissions from facilities, and solid waste production and management.

Busse, MM↗

Reassessing the Origins and Contemporary Relevance of ck Acceptability Parameters: Evolving Perspectives on Similarity

“Sensitivity and Uncertainty Analyses Applied to Criticality Safety Validation,” introduces sensitivity and uncertainty methods to address challenges in defining and extending areas of applicability for criticality safety validation. These areas are traditionally defined by the bounds or limits on key parameters, but establishing valid ranges and managing complex parameter variations remain challenging. NUREG/CR-6655 introduces ck and other integral indices, as well as concepts such as the completeness of benchmark coverage, to better quantify system similarities. The work proposed herein seeks to evaluate these foundational concepts to ensure that the bounds remain effective in guiding the assessment of similarity and applicability in modern applications. The concept of completeness, along with other parameters envisioned within the framework, serves as an example of the foundational ideas that have been established, though their effectiveness in practice may not be fully understood. Advancements in scripting tools, coupled with the speed and efficiency of modern computing and statistical models, now allow for faster and more thorough assessments than previously possible. These advancements also enable the identification of trends within the data, which could provide additional insight into system behavior and further broaden the scope of previously performed benchmarks. By leveraging these capabilities, we will revisit and expand the scope of these foundational methods to determine whether the necessary elements for robust similarity evaluation are already embedded, partially realized, or remain untapped.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Methods and Tools To Assess Robustness of Nuclear Plant Outages

Refueling outages are one of the most challenging phases in a nuclear power plant (NPP) operating cycle. Refueling outages are extremely costly for an NPP due to the large amount of required resources and because of lost revenue due to plant being off the grid. Outage durations have steadily decreased across the industry over that last few decades primarily due to improved planning and coordination, but there are still many plants that struggle to meet the performance metrics accomplished by other utilities. Schedule resilience is one of the issues. NPP outages require scheduling thousands of activities within 30 days on average. Despite detailed planning, once the outage starts, numerous emergent issues typically appear along with schedule delays requiring continuous replanning and adjustment. When schedule disruption occurs during an outage, plant staff make urgent efforts to recover but are often not able to maintain the planned outage duration. These outage delays can cost a utility several million dollars per day. Tools that could help outage schedulers create a more resilient schedule and allow them to optimally reschedule emergent work could significantly reduce outage delays. One key aspect of creating a resilient schedule is to have accurate estimates for activity duration. Another important outage scheduling capability is the ability to schedule emergent work with minimal disruption. This paper focuses on developing tools and methods to support NPPs with outage schedule optimization and it describes the initial development of tools to support outage management that leverage computational and machine learning methods.

97 - MATHEMATICS AND COMPUTING↗

Automating Testing of DUNE Electronics via a Finite State Machine

The Deep Underground Neutrino Experiment (DUNE) is a flagship international collaboration designed to study neutrinos—tiny, nearly massless particles that may hold answers to fundamental questions about the Universe. Fermilab’s Robotic Test Stand (RTS) plays a critical role in ensuring the quality of approximately 50,000 Application-Specific Integrated Circuit (ASIC) chips that will be used in DUNE’s massive liquid argon detectors. These electronics will be inside the cryostat; therefore, they will need to have a high yield of working chips and low noise. To improve the automation and reliability of the RTS, this project focused on designing and implementing a Python-based finite state machine (FSM) to manage chip handling workflows. The FSM was developed as a modular software framework to coordinate robotic arm movements, manage chip tray positions, and monitor system states during testing. Key features include robust error handling routines, a pause/resume system for safe mid-cycle interruptions, and a simulation mode for iterative testing without hardware dependencies. The system was designed to prepare for seamless integration with RTS hardware components such as the robotic arm and vision system. This integration will streamline collaboration and enable efficient deployment of updates across the six institutions performing testing. The outcomes of this internship contribute to Fermilab’s mission to advance high-energy physics and support the DOE’s national goals by directly improving the testing of equipment to be used in DUNE. The project also provided valuable experience in software design and contributing to the success of DUNE.

Kang, Caleb [Fermilab]↗

Prioritizing Nuclear Materials for SAM-3 Neutron Irradiation Campaign: Structural and Cladding Materials Candidates

This report outlines a framework for selecting structural and cladding materials for the Nuclear Science User Facilities (NSUF) SAM-3 neutron irradiation campaign to support the advancement of nuclear energy technologies. The document begins with an introduction that provides background context, highlights the motivations for launching a new irradiation campaign, and defines the overall objectives. The core of the report describes the design considerations for the irradiation campaign, including capsule configurations, irradiation temperature ranges, and target dose levels (defined by displacements per atom, or dpa). The material recommendation was guided by the Specimen Identification and Prioritization (SIP) Working Group, a multidisciplinary team of experts representing national laboratories, academia, industry, federal government and agency. This group played a central role in identifying candidate materials, evaluating technical justifications, and ensuring alignment with boarder programmatic goals. A detailed set of criteria for material prioritization is then presented, taking into account reactor relevance, performance gaps, advanced manufacturing methods, and emerging material classes. Based on the input of SIP working group, specific materials were selected and justified for inclusion in the irradiation campaign by the NSUF leadership and its U.S. Department of Energy (DOE)-Office of Nuclear Energy (NE) management. The final section provides recommended capsule designs, summarizing critical parameters such as material type, fabrication method, sample geometry, irradiation conditions, and specimen quantities. This report serves as a foundation for executing a focused and high-impact neutron irradiation campaign aimed at addressing key materials challenges for both existing and advanced nuclear reactors.

36 - MATERIALS SCIENCE↗

User-Focused Tools to Enhance IT/OT Cyber Resilience within the Power Grid

The power grid is undergoing several changes that are increasing its complexity as nexuses between electric-gas, transmission-distribution, and energy-communications continue to become increasingly critical. This system is heavily dependent on communication infrastructure and controls, and it relies on humans in operational technology (OT) and information technology (IT) roles to manage the increasing breadth, depth, and speed of data. Many technical challenges have presented themselves and will need to be addressed to provide reliable grid operations. With increased reliance on distributed controls and communication infrastructure, cybersecurity becomes an inherent requirement. When considering current cyber-physical security solutions for the power grid, one can notice a clear divide between information technology and operation technology networks. However, in real-life applications, these networks are interdependent. This work presents results of interviews with key utility cybersecurity personnel, analyzes the results, and makes recommendations towards solution of existing technical and operational challenges realized. Existing workflows are presented, wireframe interviews are discussed, and tool requirements are described. The existence of easy-to-implement solutions, based on existing energy management systems, highlight the potential for real-life applications.

cybersecurity, resilience, user-centered design, p↗

Experimental and computational study of the microporous layer and hydrophobic treatment in the gas diffusion layer of a proton exchange membrane fuel cell

Enabling fuel cell operation at high current density is critical for developing competitive alternative power system to replace internal combustion engine. However, liquid water management continues to be a challenge for high humidity or high current density operation. Water condensation in the porous media hinders efficient oxygen transport to the catalyst layer, which in turns, reduces fuel cell performance. To improve water management capability, the gas diffusion layer is often impregnated with Polytetrafluoroethylene (PTFE) and coated with a thin microporous layer, which have shown to improve fuel cell performance, especially under wet conditions. However, the fundamental mechanism that drives the performance enhancement is still not well understood. In this work, the effects of PTFE impregnation and MPL were studied using both experimental and computational techniques. Both limiting current and polarization tests under dry and wet operating condition are conducted to study the oxygen transport resistance and fuel cell performance. In addition, a 2-D, two-phase, multi-physics PEMFC model is developed to simulate performance and gain a fundamental understanding of local water saturation and oxygen concentration. The combined results show that 5 wt% PTFE impregnation with MPL significantly enhances liquid water management, which enables higher current density operation of a fuel cell.

25 ENERGY STORAGE↗

Reimagining How Flood Warnings Can Inform Decision‐Making and Community Actions

Society faces increasingly severe flood hazards, intensifying demand for flood early warning systems (FEWS) that deliver accurate and actionable information. However, most existing FEWS remain prediction‐centric, treating decision‐making as a downstream consumer of hazard forecasts while offering limited support for uncertainty interpretation, risk communication, and real‐world response. This Perspective presents a vision and blueprint for a novel inland FEWS‐decision‐making (FEWS‐DM) framework that repositions decision‐making as an equal partner in the forecasting process—not a passive recipient of its outputs. The framework is built on three tightly coupled, co‐evolving thrusts: Physical Science (T1), which advances flood prediction with quantified uncertainty informed by decision relevance; Human Science (T2), which incorporates psychology, behavior, and cultural and institutional context; and Decision Science (T3), which unifies physical predictions and human factors through principled, utility‐based decision support with end‐to‐end uncertainty management. Rather than treating T1 as a solved problem, FEWS‐DM recognizes that forecast development itself must be shaped by decision needs through continuous bidirectional feedback. We identify key scientific, behavioral, and operational challenges limiting such integration and discuss the enabling role of AI, while emphasizing human‐centered design and community feedback as essential for building trust and improving flood risk management.

54 ENVIRONMENTAL SCIENCES↗

Fabrication and Testing of DOE Standard Canister Closure Leak Test Assembly

DOE manages over 300 types of SNF, most of which are located at the INL site. “Road-ready dry storage” is a management concept where SNF is packaged into dry, sealed canisters, which are then placed in on-site storage in anticipation of later removal. The Idaho Cleanup Project and INL are collaborating on the Road-Ready Capability Demonstration Project, which will develop and demonstrate the designs, technology, processes, and regulatory framework for packaging DOE SNF for road-ready dry storage. In support of establishing a large-scale road-ready dry storage program at the INL site, the demonstration will package a select amount of DOE-managed SNF into DOE Standard Canisters. The closure process for the DOE Standard Canisters will include fuel and basket loading, welding, inspection, leak testing, and if needed, repair. As a follow-up to previous discussion on the design of the DOE Closure Leak Test Assembly, this report describes recent fabrication and testing efforts performed at INL. DOE Standard Canisters are sealed by two sequential gas tungsten arc welds. Both are performed by remotely operated and semi-autonomous welding systems. The first weld is a circumferential pipe weld that completes assembly of the canister body and lid assembly. The second and final closure weld connects the vent plug to the vent port with an identical butt joint to the circumferential pipe weld. After the second weld is performed on the vent port, these welds are helium leak tested using an inside-out technique. In addition to the commercially available vacuum and leak detector systems, the DOE Standard Canister Closure Leak Test Assembly was designed for both remote and manual operation. This report describes fabrication and performance testing associated with the inside-out technique. INL staff designed and tested systems to accomplish these tasks. Hardware fabrication occurred at INL facilities. Forthcoming work includes design optimization, integration to existing systems, and implementation to packaging demonstration operations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Direct ink writing of shear exfoliated two-dimensional nanomaterial- elastomeric multifunctional nanocomposite

Direct ink writing (DIW) of polymer nanocomposites with high loadings of two-dimensional (2D) nanofillers (graphene and hexagonal boron nitride (hBN)) is challenging because of potential clogging, use of hazardous solvents, and agglomeration. Here, in this work, a shear exfoliation and sieving method to prepare DIW ink with high loading of nanofillers produced from low-cost bulk layered materials such as graphite and bulk hBN powder for successful DIW printing without the use of any solvents, binders, or plasticizers. The single-step exfoliation technique resulted in a composite with substantial layer reduction along the c-axis, as confirmed by SEM, TEM, XRD, and Raman analysis. Incorporating exfoliated graphene (40 wt%) increased viscosity by ∼6 orders of magnitude due to enhanced particle–matrix interactions, leading to pronounced yield stress behavior and a yield stress of approximately 1598 Pa, which enabled excellent shape retention during extrusion. Using the DIW technique, porous structures such as desalination membranes, self-sensing bone scaffolds, thermal management coating, and serpentine strain sensors were fabricated. When tested in a direct contact membrane distillation setup, the fabricated membrane demonstrated a promising permeate flux of 21.85 Lm −2 h −1 and a salt rejection of 74.3 %. The fabricated serpentine sensor exhibited stable signal variations under cyclic tensile loading, with a working range of 0–200 % strain and a maximum gauge factor of 43,735. A cell culture test using the printed bone scaffold demonstrated promising cell attachment and proliferation. The DIW printed hBN nanocomposite exhibited reversible shape change under heat, demonstrating potential 4D printing capability and efficient thermal management when exposed to high heat or flame.

Desalination↗

Expedited Walkdowns and Preparation of Cost Estimates for Decontamination and Demolition of Excess Facilities - 20335

Lawrence Livermore National Security, LLC (LLNS) is the prime contractor responsible for managing and operating Lawrence Livermore National Laboratory (LLNL). The mission of the LLNL is to strengthen security of the United States through development and application of world-class science and technology to enhance the nation's defense, reduce the global threat from terrorism and weapons of mass destruction, and respond with vision, quality, integrity, and technical excellence to scientific issues of national importance. To accomplish its mission, LLNL must plan and manage its campus space and facilities to optimize use of its relatively small one-square-mile footprint. LLNL currently has numerous excess facilities that require decontamination and demolition (D and D). The LLNL Legacy Facility Program is responsible for stewardship and risk reduction programs to effectively manage these excess assets at LLNL. The Legacy Facility Program identified 10 excess facilities at LLNL that were candidates for demolition based on risks from further degradation of the facilities, potential exposure to hazardous materials, or need for removal to make way for new program facilities. The buildings range from a structure built in 1943 to serve as a US Navy drill hall during World War II, to a facility that provided neutrons to study material properties for the fusion energy program. The National Nuclear Security Administration (NNSA) appropriated FY19 funding for the development of Class 3 estimates for these 10 excess facilities that would be used to develop a Program Management Plan for funding consideration. Class 3 estimates are not conceptual, nor overly detailed, but adequate to be used for budget and appropriation purposes. Using existing strategic sourcing agreements, LLNL was able to organize a team of senior subject matter experts (SMEs) with diverse technical backgrounds across the Department of Energy (DOE) Complex to complete extensive process knowledge (PK) reviews and walk-downs of each excess facility and to deliver accurate and complete estimates under an expedited schedule (i.e., within eight weeks). To facilitate the expedited schedule, LLNL was fully prepared for the arrival of the JGMS team, which consisted of the following companies: J.G. Management Systems, Inc. (JGMS); Strata-G, LLC; and Michael Baker International. LLNL provided background and PK information on the excess facilities, pictures, supporting historical documentation, and radiological survey history as well as escorted access to the facilities. The JGMS team has previous experience supporting Program Management Plans for excess facilities at the Y-12 National Security Complex. The team mobilized to LLNL and performed the facility walk-downs from January 22-25, 2019. Using a methodical evaluation process, expertise, and experience, the team was able to deliver walk-down draft reports and estimates to LLNL before their February 8, 2019 deadline. LLNL then in turn reviewed, completed the estimates by adding waste management costs and other LLNL costs, and delivered the estimates to NNSA by February 15, 2019. The completed final reports, including draft D and D estimates, were delivered to LLNL before their March 6, 2019 deadline. The work was successfully completed ahead of the expedited schedule required by LLNL, resulting in a commendation from the client. This paper describes how the partnership and collaboration as a fully integrated team comprised of the prime contractor, LLNS, and the JGMS team successfully met the needs of the US government, resulting in the performance of expedited site walk-downs, the development of summary evaluation reports, and the preparation of draft Class 3 estimates and preliminary schedules for the D and D of 10 excess facilities at LLNL. The efforts of the team will enable the D and D of the first excess facility in the 2020-2021 time frame. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

University Coalition for Fossil Fuel Energy Research

Following a nationwide open competition, the University Coalition for Fossil Energy Research (UCFER) was established in October 2015 through a cooperative agreement between Penn State and the Department of Energy (DOE) National Energy Technology Laboratory (NETL). Penn State lead UCFER with the objective of advancing basic and applied research for clean and low-carbon energy based on fossil fuels in support of the DOE’s mission. UCFER focused on research that improves the efficiency of production and use of fossil energy resources, while minimizing the environmental impacts and reducing greenhouse gas emissions. Penn State lead a team of nine universities (Massachusetts Institute of Technology, The Pennsylvania State University, Princeton University, Texas A&M University, University of Kentucky, University of Southern California, The University of Tulsa, University of Wyoming, and Virginia Polytechnic and State University) during the competition stage, adding seven more universities in 2017 (Carnegie Mellon University, Louisiana State University, The Ohio State University, University of North Dakota, University of Pittsburgh, University of Utah, and West Virginia University). This Coalition exhibited a wide geographical distribution across the U.S. bringing a wide variety of fossil energy expertise. This national university alliance was a major collaborative effort with NETL to address specific topics of R&D in NETL’s mission area, which involved one or more of NETL’s five core competencies (Geologic and Environmental Systems, Materials Engineering and Manufacturing, Energy Conversion Engineering, Systems Engineering and Analysis, and Computational Science and Engineering). The first five to six months of the project was the definitization stage. During this period, Penn State worked closely with NETL to finalize the Coalition organizational structure and By- Laws, prepare a statement of substantial involvement and a statement of project objectives, and develop operations and membership plans. A major component of this stage included preparing an execution plan to solicit research, evaluate proposals, recommend selected projects to NETL, and award projects. In addition, a plan was prepared to monitor projects, review projects, disseminate knowledge from research projects and develop an online system for Coalition research portfolio management. This included developing a website and several databases. The first of six rounds of solicitations started in mid-2016. Projects from the sixth solicitation started February 1, 2021, and ended January 31, 2023. Projects that were selected represented twelve technology lines. Approximately $16.6 million in funding was available for the six solicitations. Most of the funding was provided by DOE, Office of Fossil Energy (DOEFE) with the DOE Fuel Cells Technologies Office (DOE-FCTO) providing funding for a few projects. Coalition universities submitted 259 proposals in response to the solicitations, requesting approximately $67.0 million in funding, and forty-three projects were selected. However, one project withdrew after the principal investigator left the university. The management of the Coalition projects was a major activity by Penn State. Managing the Coalition projects consisted of monitoring the projects, reviewing the projects through annual technical review meetings, disseminating knowledge from the research projects, and developing an online system for Coalition research portfolio management. Penn State’s OMT monitored projects to ensure that all milestones (technical, schedule, budget) were met, expenditures were allowable, cost share (when applicable) were reported, and all technical reports were submitted. The OMT also posted the technical reports electronically on a secure members-only website for access and review by the Coalition members. Disseminating knowledge from the research projects was done through a website, newsletters, various meetings, conferences, journal articles, publicity/press releases, and project summaries that were prepared after each project was completed. Penn State kept NETL apprised of UCFER progress through quarterly reports (thirtyone were submitted by Penn State), verbal and written communications, yearly updates at the annual technical review meetings, and cost accrual reports. The UCFER project had a significant impacty. The UCFER program established the first national university alliance in fossil energy research with a major collaboration effort with DOE NETL that addressed specific topics in NETL’s research and development mission areas. It generated inter-university collaborations, which was another program interest. Twenty-two out of 259 proposals contained collaborations (≈8.5%) and three of forty-two funded projects involved inter-university collaborations (≈7.0%). The forty-two funded projects provided support at fourteen universities involving 269 personnel. Research was conducted by 106 faculty, 115 graduate and undergraduate students, forty-six research staff and post-doctoral scholars, and two visiting scholars. Students and post-doctoral scholars were also on-site at NETL through CRADAs. In addition, non-Coalition participants included six universities and sixteen companies and national laboratories. The non-Coalition participants were involved as subcontractors, providers of cost share, performed unpaid consultation and sample analysis, served as advisory board members, or were providers of samples and materials for testing. UCFER also produced visibility in that fifty-six refereed journal articles were published, fifty-seven conference papers and twenty-three posters were prepared, 190 presentations were given, eight patent applications were filed, two books/book chapters were written, and ten software codes were developed. Collaboration between NETL and the individual projects was a major requirement for all funded projects. This included NETL staff time to support collaboration, consultation, technical guidance, sample preparation and analysis, internships at NETL, on-site testing and equipment usage by Coalition participants at NETL, co-mentoring students, and coauthoring journal articles and conference papers. Collaboration was impacted by COVID-19 in that not all on-site activities could be performed. NETL personnel were coauthors on eight of the conference papers (fourteen percent of the conference papers that were prepared) and seventeen of the journal articles (thirty percent of the journal articles that were prepared). A website was developed for an online proposal solicitation and review process and to provide exposure to UCFER. A website analysis highlighted the large amount of member and general public interest in UCFER by interpreting access statistics from March 2016 through June 2023. Visitors to the site originated from many different organizations, businesses, and countries. The website provided a means to disseminate information to both the general public and the UCFER members and was successfully used for outreach activities. In addition, NETL required that RFP release, proposal submission, and proposal reviews all be performed online. Penn State successfully developed these capabilities in a secure section of the website, which were used throughout the UCFER project. It is recognized that each project had its technical successes. In addition, highlighted successes were compiled and summarized from the research projects. Information was requested from the PIs of completed projects. In addition, Penn State’s Operations Management Team reviewed subcontract reports to identify project successes. Examples of information requested from PIs included (not all-inclusive): new projects that have been funded as a result of UCFER funding; new commercial products; establishment of a new center; new patent; new software; best paper awards; highly-cited work; and graduate student successes. A total of forty-eight highlighted successes were reported.

01 COAL, LIGNITE, AND PEAT↗

Innovative mercury treatment technology options for the liquid waste system at the Savannah River Site: scoping studies

The Savannah River Site (SRS) Liquid Waste System (LWS) contains liquids, salts and sludges that are currently being processed into final wasteforms for disposition, specifically, waste glass for sludges, solids and liquids containing high levels of radioactivity, and saltstone grout for low activity decontaminated liquid solutions. The LWS also contains approximately 60,000 kg of mercury present in the following physical and chemical forms, specifically: a) ionic inorganic mercury, organomercury (e.g., methylmercury), and other minor components found in LWS fluids b) mercury solids such as oxides, hydroxides, amalgams sulfides and sorbed mercury, c) accumulations of dense liquid elemental mercury, and d) vapor phase elemental and organomercury mercury found in tank headspace gas and in evaporators. An effective and proactive management strategy of the mercury present in the LWS is needed to support processing of LWS wastes into glass and saltstone. Sustainable processing of the LAWS to completion requires mercury removal from the LWS at a rate of approximately 2,900 kg/yr. This removal can be accomplished through existing mercury treatment systems or newly implemented LWS “purge points”. The chemical speciation of mercury has emerged as the key factor that controls mercury behavior in the LWS. For example, past studies demonstrated that mercury speciation is adversely impacting the performance of existing removal systems so that significant levels of mercury are recycled from the Defense Waste Processing Facility (DWPF) back to the tank farm. Consequently, mercury concentrations have slowly increased in the LWS tank fluids over time. The presence of organo-mercury has also been identified as the cause of increased mercury leaching from saltstone. In response to these challenges, the Department of Energy (DOE) Office of Environmental Management (EM-TD) Technology Development Program has supported a series of scoping studies predicated on manipulating or controlling mercury speciation and mercury behaviors within the constraints of LWS waste chemistry and safety conditions. The intent of these studies was to rapidly triage potential technology options and develop a technically based go / no go recommendation for further work. This composite report presents the results of three scoping studies: 1) advanced photooxidation processes, 2) chemical reduction, and 3) mercury getters.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A step towards the final frontier: Lessons learned from acceptance testing of the first HPE/Cray EX 3000 system at ORNL

Summary In this article, we summarize the deployment of the Air Force Weather (AFW) HPC11 system at Oak Ridge National Laboratory (ORNL) including the process followed to successfully complete acceptance testing of the system. HPC11 is the first HPE/Cray EX 3000 system that has been successfully released to its user community in a federal facility. HPC11 consists of two identical 800‐node supercomputers, Fawbush and Miller, with access to two independent and identical lustre parallel file systems. HPC11 is equipped with Slingshot 10 interconnect technology and relies on the HPE Performance Cluster Manager software for system configuration. ORNL has a clearly defined acceptance testing process used to ensure that every new system deployed can provide the necessary capabilities to support user workloads. We worked closely with HPE and AFW to develop a set of tests that used the United Kingdom's Meteorological Office's Unified Model and 4‐dimensional variational data assimilation. We also included benchmarks and applications from the Oak Ridge Leadership Computing Facility portfolio to fully exercise the HPE/Cray programming environment and evaluate the functionality and performance of the system. Acceptance testing of HPC11 required parallel execution of each element on Fawbush and Miller. In addition, careful coordination was needed to ensure successful acceptance of the newly deployed lustre file systems alongside the compute resources. In this work, we present test results from specific system components and provide an overview of the issues identified, challenges encountered, and the lessons learned along the way.

Melesse Vergara, Verónica G.↗

Simulating dispatchable grid services provided by flexible building loads: State of the art and needed building energy modeling improvements

End-use electrical loads in residential and commercial buildings are evolving into flexible and cost-effective resources to improve electric grid reliability, reduce costs, and support increased hosting of distributed renewable generation. This article reviews the simulation of utility services delivered by buildings for the purpose of electric grid operational modeling. We consider services delivered to (1) the high-voltage bulk power system through the coordinated action of many, distributed building loads working together, and (2) targeted support provided to the operation of low-voltage electric distribution grids. Although an exhaustive exploration is not possible, we emphasize the ancillary services and voltage management buildings can provide and summarize the gaps in our ability to simulate them with traditional building energy modeling (BEM) tools, suggesting pathways for future research and development.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Poly(diallylmethylammonium) proton conducting membranes with high ionic conductivity at intermediate temperatures

High temperature proton exchange membrane fuel cells are being lately investigated because of their high energy efficiency, their superior heat/water management, CO tolerance, and electrode reaction kinetics. To further advance this technology, the polymer membrane portfolio and performance should be improved for intermediate or high temperature operation (>100 °C). In this work we present new poly(diallylmethylammonium) proton conducting membranes with high ionic conductivity at 120 °C. First, new protic ionic liquids, hereafter called DAMAH + X - , were synthesized leading to diallylmethylammonium monomers with different counter-anions. By radical cyclopolymerization through thermal and photoinitiation mechanisms, self-standing protic polymeric membranes of poly(diallylmethylammonium X - ) were obtained. Membranes showed good thermal stability (>250 °C) and mechanical properties without the need of additives such as (protic) ionic liquids, solvents or inorganic charges. Great attention was paid to understand the effect of the different counter-anions on the membrane properties. As a general trend, fluorinated anions coming from strong acids confer high ionic conductivity and allow to reduce the hygroscopic properties on the protic polymeric membranes. Proton structural and dynamical stability at different temperatures and humidification conditions were investigated by Neutron Scattering (QENS and NR). The optimized poly(diallylmethylammonium X - ) shows similar ionic conductivity values than Nafion 212 under varying relative humidity conditions at 80 °C. Furthermore, it shows a high ionic conductivity value of 1.9 × 10 -3 Scm -1 at 120 °C under dry conditions.

08 HYDROGEN↗