Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “waste management system”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 955 records · Page 53

Overview of Wendelstein 7-X high-performance operation

The Wendelstein 7-X (W7-X) stellarator has completed two consecutive experimental campaigns OP 2.2 (Sep.-Dec. 2024) and OP 2.3 (Feb.-May 2025) under a new operational strategy enabling more than one year of uninterrupted device availability. This approach, supported by exceptionally high subsystem reliability, allowed sustained high-efficiency plasma operations with up to 80–100 discharges per day across a broad range of magnetic configurations. Several key technical upgrades-most notably the first operation of a 1.5 MW class steady-state gyrotron, a new steady-state pellet injector, and advanced real-time feedback control systems significantly enhanced heating, fueling, and plasma control capabilities. Together, these improvements enabled major advances in long-pulse performance, high-β operation, and confinement optimization. Long-pulse discharges achieved 1.8 GJ of injected energy under fully detached divertor conditions, while reduced-field scenarios facilitated record volume-averaged β values approaching 3%. High-performance plasmas with centrally peaked density profiles, created via neutral beam injection (NBI) or sustained pellet fueling, demonstrated strongly reduced turbulent transport and stellarator-record fusion triple products. Complementary studies of power exhaust and divertor heat loads revealed the role of scrape-off-layer drift physics in shaping strike-line patterns under attached conditions. Together, the results from OP 2.2 and OP 2.3 significantly expand the operational space of W7-X and strengthen its role as a leading platform for steady-state stellarator research and reactor-relevant plasma scenarios.

Wendelstein 7-X↗

Tank Waste LDR Organics Data Summary for Sample-and-Send (Rev.1A)

The presence of organic chemicals regulated under the Resource Conservation and Recovery Act (RCRA) Land Disposal Restrictions (LDR) adds complexity to treating and disposing of the low activity fraction of Hanford tank waste if a low temperature treatment method such as grouting is used (SRNL-STI-2020-00228). The complexity arises from the fact that the baseline vitrification method is considered by the Washington State Department of Ecology (Ecology) as providing adequate thermal treatment for organics; a status not automatically extended to a lowtemperature process, such as solidifying the waste in a cementitious waste form. In addition, the Environmental Protection Agency (EPA) LDR program is intended to ensure that wastes are properly treated prior to disposal. Proper treatment makes hazardous waste less harmful to groundwater by reducing the mobility and/or toxicity of the hazardous constituents in the waste. EPA guidance indicates that stabilization/solidification of waste for organics could be considered impermissible dilution under the LDR dilution prohibition. In addition, waste storage activities at Hanford have required transferring and blending waste within the tank system and these activities have potentially altered the concentrations of the hazardous constituents. The LDR dilution prohibition found in 40 Code of Federal Regulations (CFR) 268.3 states that “… no generator, transporter, handler, or owner or operator of a treatment, storage, or disposal facility shall in any way dilute a restricted waste or the residual from treatment of a restricted waste as a substitute for adequate treatment …”. Hence, if LAW is to be treated using low temperature stabilization (such as cementation), then it is important to demonstrate both how past storage activities have contributed to the removal (by vacuum evaporation), or destruction (by in situ decomposition) of the LDR organics and how future retrieval and waste feed preparation will contribute to their removal (by filtration and ion exchange). Demonstrating these processes helps validate that cementation without additional organic treatment does not necessarily represent impermissible dilution. To aid in implementing cementitious solidification of Low Activity Waste (LAW), WRPS has been developing a regulatory and processing LDR treatment variance strategy termed “Sampleand-Send” that relies, in part, on demonstrating that in situ decomposition reactions along with historic evaporation of tank waste has destroyed or removed most of the LDR organics possibly associated with Hanford Tank Waste (SRNL-STI-2020-00582, SRNL-STI-2021-00453, SRNL-STI-2022-00391). Under the Sample-and-Send concept, Hanford tank waste would be retrieved, processed through a Tank-Side Cesium Removal-like system, and staged as a candidate feed that would then be sampled to confirm the waste acceptance criteria is met for solidification in an LAW cementitious treatment facility. If it can be shown that LDR organics are at concentrations below the waste acceptance criteria (WAC) for cementitious stabilization and have been sufficiently removed (by historic evaporation or by filtration and ion exchange during Cs removal), destroyed (by historic in situ decomposition), or are not soluble in LAW above the WAC then additional organic treatment is not needed prior to creating a cementitious final waste form and the concept of Sample-and-Send would be proposed to establish a non-rulemaking site-specific treatment variance using the specified method of treatment “STABL” to remove sampling requirements of the waste form after treatment. Waste not meeting the WAC could either be routed to the Hanford Waste Treatment and Immobilization Plant for LAW vitrification, or further processed by evaporation or chemical oxidation before solidifying in a cementitious waste form. A key component in implementing the Sample-and-Send strategy is identifying which of the 207 LDR organic compounds associated with the RCRA Part A permit application waste codes for the Double Shell Tanks (DSTs) and Single Shell Tanks (SSTs) and any applicable Underlying Hazardous Constituents (UHCs) from 40 CFR 268.48 should be considered as potentially present and thus subject to regulation. In addition, it is also necessary to understand the solubility volatility, and reactivity of these compounds in LAW to identify which of the potentially present LDR organic compounds are not soluble above regulatory levels or are likely to have been removed by historic evaporation or destroyed by in situ decomposition reactions. If there are potentially present LDR organic compounds that have not been removed or destroyed and are soluble above regulatorily significant concentrations then a treatability variance may be needed for these species to eliminate any concerns pertaining to impermissible dilution. The spreadsheet accompanying this calculation report contains the data and logic computations needed to screen the list of 207 LDR organics associated with Hanford tank waste to identify those potentially present and to indicate which compounds may need to be included in a treatability variance.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Improved Model For Determining Salinity Recharge Time for Deep Borehole Disposal - 20405

In a previous publication (K. P. Travis, D. Burley and F. G. F. Gibb, WM2017 Conference, Phoenix Arizona paper no. 17480) we introduced a numerical model to estimate the time it would take for a pressure perturbation to subside following its creation from the construction of a deep geological borehole in water-saturated rock. The model was based on the notion of a point source of momentum - a solution of the time-dependent pressure-diffusion equation. Using the model, we estimated that it would take on the order of 10 k years for physical equilibrium to become re-established following the sinking of a 5 km borehole in granite. The significance of such a model is that it places an upper bound on the lifetime required of a borehole sealing system - a necessary input to a borehole post-closure safety case assessment. No engineered sealing system has ever been devised which is capable of retaining its sealing properties for 10 half-lives of long-lived radioisotopes in spent fuel or high-level waste. One of the key advantages of disposing of nuclear waste via Deep Borehole Disposal (DBD) is the natural sealing provided by density stratified groundwater. Upon sinking of a borehole, and subsequent filling with fresh water, brine or drilling mud, this natural barrier may be temporarily damaged. Over time, fresh brine from the far-field will flow towards or away from the hole (driven by a pressure gradient) and will eventually re-establish the original salinity gradient. It follows that the engineered seals need last only as long as the time required for this salinity gradient to reset itself. One of the limitations of our previous model was the use of a static boundary condition on the borehole wall. The model used a boundary pressure which varied quadratically with depth (arising from differences between the pressure of a column of fresh water in the borehole and that of a column of brine in the host rock). However as brine replaces fresh water in the borehole (driven by a pressure gradient), the boundary function must change with time. We now introduce an improved model which takes this time dependent boundary condition into account. The model also takes into account the time taken for a mixture of brine and fresh water to re-establish chemical equilibrium through the process of diffusion. The paper contains the mathematical details of our new iterative model as well as results showing the time taken to reach steady state, and concentration profiles for the components of the brine-filled borehole as a function of time together with a discussion on the implications of the results for developing a post-closure safety assessment for DBD. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization of Tank 9H Salt Dissolution Batch 2B in Support of Tank Closure Cesium Removal (TCCR) 1A Batch 2 Preparations

Savannah River Mission Completion (SRMC) is currently preparing the second batch of material to be processed through the Tank Closure Cesium Removal (TCCR) 1A system. The feed for TCCR 1A consists of dissolved saltcake from Tank 9H. The second batch of salt to make up processing Batch 2 (Batch 2B) has recently been dissolved in Tank 9H and transferred to Tank 10H where it was composited with the first part of the batch (Batch 2A) in preparation for processing through the TCCR 1A unit. Savannah River National Laboratory (SRNL) received samples from the recent batch (2B) of dissolved salt for characterization. Two samples from Batch 2B were received for characterization, a surface sample and a variable depth sample (VDS). Neither sample contained significant solids, although the VDS appeared slightly cloudy as compared to the surface sample. The sodium concentrations of both the surface and VDS filtrate samples were approximately 5.8 M, and the 137 Cs activity was 9.8E+07 dpm/mL in the surface sample and 9.5E+07 dpm/mL in the VDS. The total Cs concentrations were 2.5 mg/L and 2.4 mg/L in the surface sample and VDS, respectively, using the gamma activity and the Cs isotopic ratios determined by ICP-MS. The alpha activity was below the detection limit in both samples. Nitrate was the dominant anion present, and the samples were primarily concentrated sodium nitrate solutions with hydroxide, nitrite, and carbonate present at 0.1 – 0.2 M. In general, the Batch 2B samples were more dilute than the previously characterized Batch 2A samples.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Spent Crystalline Silicotitanate Storage Study

Washington River Protection Solutions is working to support initial production of immobilized low-activity waste (LAW) by feeding Hanford tank supernate from tank farms to the Hanford Waste Treatment and Immobilization Plant (WTP) LAW Facility. This goal incorporates the design of a Tank-Side Cesium Removal (TSCR) system, which filters tank waste supernate to remove suspended solids and then removes Cs by processing it through crystalline silicotitanate (CST) ion exchange media manufactured by Honeywell UOP, LLC. The 137 Cs-depleted product is intended to be sent to the WTP for vitrification. The Cs-loaded CST columns will be stored indefinitely, with a goal of eventual CST removal and treatment. Thus, the spent CST needs to be recoverable. The testing described herein looks to potential upset process conditions where CST storage may be required before various rinse steps are completed. This study evaluated upset conditions at three sequential processing steps envisioned for TSCR (feed, 0.1 M NaOH rinse, water rinse), and in-column drying with compressed air (normal end step) to assess impacts on the nature of the CST bed. Testing was conducted at the small scale (12-mL bed volume); simulated AP-105 tank waste was used as the feed. Following process disruption, the CST bed was dried in place at 70 °C. Post-dried CST bed physical properties (angle of repose, penetration depth, particle morphological changes) were measured to evaluate how CST moved and flowed. The testing is intended to provide a preliminary assessment of issues that may arise from desiccation of CST with the indicated salt solutions in place. Since these were small-scale tests, the processing conditions will not match full scale conditions exactly; however, the tests do provide insight into the impact of stopping processing at an earlier step than normal. Except for the feed that was dried in-place, all other process stop-conditions showed the CST bed flowed well after drying. At this small scale, CST beds would not present an issue for retrievability. The feed that was dried in place had solidified into a rock-hard monolith with no movement possible. Samples had to be chipped from the surface.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of Cold Spraying Mild-Steel Powder onto Mild-Steel Substrate for Development of Waste Tank Repair System - 20515

Infrastructure for nuclear waste storage and processing (e.g., waste tanks, transfer pipelines, evaporators) at the U.S. Department of Energy (DOE) Hanford Site has been in service well beyond its original design life. Past corrosion control methods at Hanford for waste tanks have not been fully successful, as evidenced by leaks forming in tank AY-102, the first double-shell tank (DST) constructed, and significant degradation detected in the primary tanks of AP-102 and AY-101. Failure of infrastructure components can pose a significant risk to the environment, worker safety, and project schedules. Therefore, remotely deployable methods for repairing and extending the service life of the existing tank waste infrastructure are needed. Cold spray has been identified as a potential technique for performing in situ repairs and material buildup for life extension of waste storage and processing infrastructure. Cold-spray repair methods and technology are well-established and are used extensively by industry and the military for making repairs using dissimilar materials. Pacific Northwest National Laboratory is evaluating the process of making repairs using mild-steel powder applied to a mild-steel substrate to minimize the galvanic corrosion potential. This paper presents the initial results for a feasibility ('go/no-go') assessment as to whether low-density deposits with sound metallurgic bonds, to build-back steel plate material, can be achieved using existing commercial cold-spray equipment. An assessment of steel-on-steel deposit is necessary to determine if cold spray is a viable candidate for DST carbon steel plate restoration/repair and thus DST service life extension. Powder properties and preparation requirements have been investigated and operating conditions and parameters for depositing a cold-spray buildup of mild steel on a mild-steel substrate have been determined. Soundness of metallurgic bonding as a function of the operating parameters exercised and results from applying cold spray to lay a deposit over simulated small-diameter flaws in 1/2-inch mild-steel plate are presented. Application of in situ cold-spray repair to the DOE complex has the potential to reduce cost and schedule impacts associated with component failures and the need to procure and construct replacement infrastructure. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overview of Upcoming Process Improvement Efforts at the Saltstone Facilities at the Savannah River Site - 20474

The Saltstone Facilities at the Savannah River Site (SRS) process and dispose of low activity salt solution waste generated by other liquid waste facilities. Today in the Liquid Waste System (LWS), approximately 125 million liters of salt waste remain to be processed. The Saltstone Production Facility (SPF) receives the decontaminated salt waste, which is mixed with dry feeds consisting of cement, fly ash and slag to produce the saltstone. The mixed slurry is pumped to the Saltstone Disposal Units (SDUs) for safe disposal in the Saltstone Disposal Facility (SDF). To support continuous Salt Waste Processing Facility (SWPF) operations at annual processing volumes many times higher than present, significant modifications are required to ensure that the SPF has the capacity to support the throughput of salt waste. These changes include several infrastructure upgrades that are being worked through the Enhanced Low Activity Waste Disposal (ELAWD) project. In addition to infrastructure upgrades, Savannah River Remediation (SRR), the Savannah River Site's Liquid Waste Contractor for the U.S. Department of Energy, has identified a flowsheet improvement opportunity of implementing a cement-free saltstone formulation to eliminate cement from the current three component formulation. This two-component formulation would simplify the procurement, transport, off-loading, and storage of the premix materials, and increase the storage capacity for the individual components. This flowsheet, when implemented, will reduce operational risk and improve throughput necessary to achieve disposal rates necessary for SWPF operations. Research has been completed to confirm the feasibility of this formulation, with the new cement-free flowsheet expected to be implemented in the next few years. Improvements have also been identified downstream of the SPF to increase SDU utilization. Specifically, a concentrated effort has taken place to raise the fill height in SDU 6 to the full disposal height, 13 meters, to maximize the usage of each SDU in support of the liquid waste disposal mission. This improvement has been made through additional thermal modeling and improved process understanding to create a SDU flammability model and control strategy more representative of facility operations. This work will allow for the completion of construction and operational readiness for SDU 7 while filling SDU 6 to ensure there is no lapse in available space once SWPF starts up. A summary of these improvements as they relate to increased throughput will be provided along with associated status. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Opportunities to Implement Solutions to Achieve Remedial Action Objectives in Consideration of Stakeholder Interests - 20365

A case study in the implementation of a soils excavation and removal project conducted at a Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS) vicinity property; an active commercial business, in a densely populated area, with significant operational, technical and, logistical constraints that were expected to limit areas that could be remediated. The United States Army Corps of Engineers-led (USACE) team successfully navigated complex overlapping stakeholder interests to achieve a more efficient and complete removal of contaminated soils and debris while minimizing unnecessary excess costs to the Government. This paper centers on FUSRAP activities at the FMSS vicinity property located at 149-151 Maywood Avenue, Maywood, Bergen County, New Jersey. For most of its FUSRAP history, this ∼109,000 square meter (27-acre) property housed a now-demolished ∼26,000 square meter (6.5-acre) warehouse operated by Sears Logistics Services, a unit of the Sears Roebuck Company (Figure 2). Sears ended its property lease and vacated the warehouse in December 2016. Given that long history and for the purposes of this paper, the property will be referred to as the 'Sears property' or simply 'the property.' The Sears property is approximately 109,000 square meters (27-acres) and is currently zoned for commercial use. The property is bound to the north and northwest by 100 West Hunter Avenue (the Stepan Company), to the northeast by 205 Maywood Avenue, to the east by Maywood Avenue, to the south by 23 West Howcroft Road, and to the west by businesses on NJ Route 17 and the NJ Route 17 roadway. Until December 2016, the property housed a warehouse and distribution center operated by Sears Logistical Services. On-site structures were demolished by the property owner in 2017. The warehouse covered the north section of the property along the Stepan Company property line. A railroad spur from the adjacent property now known as the Maywood Interim Storage Site (MISS) ended at the northeast corner of the warehouse. Wetlands were located east of the warehouse; the rest of the property was covered with paved parking lots and grassed areas. During remediation at the property, opportunities frequently arose where the project team was able to coordinate effectively with stakeholders to sequence remediation activities to facilitate removal of otherwise inaccessible soils and identify opportunities for materials reuse when supported by residual radiological and chemical levels. Some specific opportunities include: - remediating individual truck loading dock bays to maintain tenant operations; - working along a busy highway and in a utility corridor containing a 30-inch high pressure gas main; - remediating Lodi Brook and associated wetlands requiring bypass pumping and other diversionary structures to maintain local community stormwater drainage; - protecting during remediation and supporting access to facilitate tenant/owner maintenance of critical fire protection and water supply system service lines buried in contaminated soils and necessary for safe warehouse operations; and - coordinating with stakeholders to ensure non-radiological contaminants of concern for the site (unaffiliated with FUSRAP) were addressed by the responsible party in a manner that maximized benefit to all parties while supporting an efficient overall site remediation program. Once the property was vacant and the warehouse structure and radiologically non-impacted above-grade structures were demolished, the project identified an opportunity to significantly reduce the volume of waste associated with the foundation of the former warehouse, a foundation suspected of being partially constructed in radiologically contaminated soils. The project developed and implemented supplemental radiological verification survey and sampling strategies based on radiological cross-contamination risk potential with process flow-charts and screening-level based decision points; a program that classified saw-cut sections of concrete based on observed residual surface radioactivity conditions using a combination of gamma sensitive sodium-iodide scans and beta sensitive Geiger-Muller direct measurements. The proposed approach was reviewed with stakeholders with feedback, including consideration of applicable State of New Jersey Site Remediation Program criteria and guidance before implementation. Once classified, additional sampling was performed at frequencies driven by screening. The sampling methods, stockpile sampling frequencies, criteria and, approach to data evaluation were developed in consideration of existing site cleanup standards, regional background ranges, State of New Jersey radiological remediation program guidance, and specific stakeholder input With the property remediation and survey efforts nearly completed, it is relevant to examine retrospectively the objectives, assumptions and limitations in the remedial design (i.e., what was planned) versus what was able to be accomplished through effective teaming. Benefits to other environmental remediation site programs include better understanding of how to work effectively with stakeholders to achieve win-win outcomes, and approaches to site remediation, waste minimization and materials reuse that were successful in their overall outcomes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An approach for spent nuclear fuel containment integrity verification using gas tagging

Verification of containment integrity is required for spent nuclear fuel (SNF) managed by the commercial nuclear industry and U.S. Department of Energy (DOE), especially after extended storage. Certain SNF storage systems, such as the DOE road-ready dry storage system, hold several packaged containments within a welded over-canister. These packaged containments are called Department of Energy Standard Canisters (DOESCs). DOESC leakage identification is challenging because their containment boundary cannot be accessed for testing and their contents (i.e., SNF and fill gas) are often similar. There are concerns that this could result in costly characterization and repackaging operations of DOE road-ready dry storage systems if compromised DOESCs are suspected. Here, to address these concerns, this paper presents an approach for applying a gas tagging process using xenon to uniquely identify compromised inaccessible containments following extended storage. The containments considered for this application are seven DOESCs, each packaged within a single over-canister. Two different SNF loading configurations from the Advanced Test Reactor and Fort Saint Vrain nuclear power plant are considered. These configurations are used to represent research reactor aluminum-clad spent nuclear fuel (ASNF) and TRi-structural ISOtropic (TRISO) SNF types. Results for this application show that for ASNF and TRISO type fuels for which the selected fuels are representative, the volume of taggant required at loading is determined primarily by the lower detection limit and leak rate of taggant from a compromised DOESC, rather than the amount of fission-generated xenon in the loaded fuel. While the application presented is suited for larger leaks, smaller leaks could be detected by modifying certain design parameters. This gas tagging approach can also be applied to other DOE containments and advanced reactor SNF storage systems.

07 - ISOTOPES AND RADIATION SOURCES↗

Modeling DOE Standard Canister Configurations with Updated Surface Chemistry

Road-ready and final disposition packaging configurations for the advanced test reactor (ATR) fuel currently specifies storage within helium backfilled DOE sealed standard canisters. The aluminum cladding of the ATR fuel contains an oxyhydroxide layer of boehmite/bayerite that generates hydrogen when subjected to irradiation. Understanding the effect of this hydrogen buildup over time to important for long term storage considerations. Previous modeling efforts have built a coupled CFD-chemical model to simulate the temperature gas phase concentrations within the DOE sealed standard canisters. These models have coupled the temperature conditions to both the gas phase radiolysis chemistry and the surface chemistry associated with the oxyhydroxide layer. Continued experimental work has identified trends for aluminum surrogate samples with oxyhydroxide layers for tests done at higher dose rates. At low initial doses a fast generation rate of hydrogen occurs which starts to roll over to a lower generation rate as the total dose applied in increased. A previous study created a small-scale chemical model was built to replicate a mini-canister surrogate system at SRNL as well as for the smaller capsule tests performed at INL. The previous iteration of the model utilized step function for its G-values for the hydrogen generation over a 200-year period. This model makes an update to the surface chemistry to account for theorized surface chemistry reactions allowing for oxygen to remain bounded to the oxyhydroxide layer. As additional experiments continue, the kinetic fits may be adjusted to adapt to new data. Three canister configurations are modeled – the base 18-inch, 15-foot DOR standard canister with 30 ATR fuel elements, an 18-inch, 10-foot DOE standard canister with 32 ATR fuel elements and a 24-inch, 10-foot DOE standard canister with 40 ATR fuel elements. In previous reports, the primary sensitivity of the canister conditions was identified as the decay heat of the fuel and the dried condition of the fuel. Only these parameters are studied in the report. For the nominal case with dried fuel, the hydrogen generation is only about 2%, so it is even less than the flammability limit if it were exposed to oxygen. For the densely packed 18-inch case the total hydrogen concentration is only around 4% with the nominal decay heat. For the densely packed 24-inch case the total hydrogen concentration is only 2.5%, roughly 20% higher than the original packing design, and still under flammability conditions if exposed to oxygen.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results from the last DD and DT JET campaigns in the framework of the EUROfusion Tokamak Exploitation Work Package activity

JET, the only tokamak capable of operating with deuterium–tritium (D–T) fuel (since TFTR was shutdown in 1999), has provided essential experimental data to support ITER and DEMO design and operation. Within the EUROfusion Tokamak Exploitation Work Package, JET completed its final campaigns (2022–2023), culminating in the third D–T campaign (DTE3). These experiments addressed key challenges in plasma scenarios, exhaust control, and tritium management under reactor-relevant conditions. Significant progress was achieved in demonstrating ITER-like integrated scenarios with impurity seeding, achieving partial divertor detachment and high confinement ($H_{98}(y,2)$ ≈ 0.85) at 3 MA in D–T plasmas. Advanced exhaust regimes such as quasi-continuous exhaust (QCE) and X-point radiator (XPR) were successfully achieved first in D–D and then extended to D–T operation, confirming their relevance for mixed isotope operation. Operational milestones included a new world record of 69 MJ fusion energy in tritium-rich hybrid plasmas and long-pulse H-mode operation up to 60 s, contributing with unique data to the CICLOP database. Physics studies focused on peeling-limited pedestals in support of ITER and improved understanding of edge stability and impurity screening in metallic environments. Extensive usage of the shattered pellet injector (SPI) on JET provided critical information for the design of the ITER disruption mitigation system (DMS). Real-time control systems for D/T ratio control and plasma exhaust were deployed and demonstrated in D–D and D–T, while energetic particle physics investigations unfolded the role of fast ions in turbulence suppression mechanisms. Comprehensive tritium retention studies using gas balance method, post-mortem analysis, and ITER-relevant laser induced desorption spectroscopy (LIDS) diagnostics provided essential input for tritium accountancy strategies. These results are validating the ITER operational concepts, inform DEMO design, and deliver critical experience in nuclear operation and scenario integration.

disruptions↗

Evaluation of Station Performance of the Idaho National Laboratory Seismic Monitoring Network Using Network Detection Thresholds

The Idaho National Laboratory (INL) Seismic Monitoring Network is located in eastern Idaho and monitors a portion of the intermountain seismic belt. It has been in place for 50 yr and has undergone several major changes, the most recent of which has been the transition to the Antelope real‐time acquisition system and the implementation of automatic phase picking algorithms to aid in analysis. This study discusses the efforts to evaluate the performance of the INL seismic monitoring network (and other surrounding stations) using the new real‐time acquisition system. The method outlined by Wilson et al. (2021) is used to develop an empirical relationship between the observability of local earthquakes as a function of magnitude and distance. This relationship is used to produce detection thresholds for Pwaves for all stations of interest. The INL seismic network has two main goals: monitor tectonic‐and volcanic‐related events and measure ground motions for input into seismic hazard analysis. Because of these two overall objectives, several seismic stations have been installed near critical facilities and, therefore, are not as quiet as stations that are used primarily for earthquake detection. This is reflected in their detection thresholds, which are much smaller for stations away from facilities. This study shows that the INL Seismic Monitoring Network is able to detect earthquakes near INL facilities with M L > 1.2, with redundancies built in to ensure this sensitivity even if data became unavailable from some stations. This study also shows “holes” in the monitoring network where the detection of smaller earthquakes is highly dependent on sparsely placed seismic stations. In conclusion, the results of this study will be used to govern plans for expansion of earthquake monitoring in Idaho and the surrounding region and to fine‐tune the detection thresholds for individual stations.

58 - GEOSCIENCES↗

Corrosion Testing of Refractory inContact with Molten Glasses Designed for Waste Vitrification - VSL Touchpoint Matrix Glasses

It is known that the predictive life of the refractory ceramic liner of nuclear waste glass melters is conservative, as demonstrated by performance of these materials such as in the Defense Waste Processing Facility (DWPF). The motivation for this task is to maximize the useful life of the melters that will be operated at the Waste Treatment and Immobilization Plant (WTP), which will in turn minimize procurement and disposal costs and melter outage times, as well as to identify maximum loadings in the waste glass of those species that corrode melter components. This task was initiated jointly with Pacific Northwest National Laboratory (PNNL) with the objective to develop a methodology and model to enable more accurate prediction of refractory service life under prototypic conditions from laboratory-scale material corrosion tests. Refractory corrosion is generally reported as physical material loss, measured in units of distance (e.g., inch) or as physical material loss rate, measured in units of distance per time (e.g., inch/day). In post-operational melters, the refractory corrosion is measured directly, sometimes reported as corrosion depth. Crucible tests are used in the laboratory to accelerate the refractory corrosion to facilitate a meaningful measurement in a commensurate amount of time. Crucible tests are particularly useful in understanding refractory corrosion across a large glass composition space, where operational testing would be prohibitive. Some of the critical parameters that are known to influence refractory corrosion by molten glass in a crucible test are temperature, system redox, molten salt phases, glass chemistry, and test duration. The majority of data collected for Monofrax® K-3 (hereafter referred to as K-3) corrosion is from crucible tests, but a small amount comes directly from scaled and production melters. Crucible test data has been collected under varying conditions, whereas data collected from operational melters is relatively fewer and represents conditions specific to the melter campaign. The result is that the published data can be grouped and analyzed in multiple ways, not all of which are readily comparable. The Standard Test Method for Isothermal Corrosion Resistance of Refractories to Molten Glass (ASTM C621) outlines the general guidelines used across industry. That method describes a sealed, static test in which the surface area of the refractory coupon and the volume of glass are fixed. A significant portion of the crucible data pertaining to nuclear waste glasses has been collected in a modified configuration; the most notable differences being the surface area of the refractory coupon to volume of the glass and use of a method for bubbling the melt. To our knowledge, the influence of those parameters on the refractory corrosion has not been quantified. In this work, it was determined that static tests and bubbled tests would be performed. Savannah River National Laboratory (SRNL) was tasked with setting up and performing static testing while PNNL was tasked with setting up and performing bubbled testing. Initial activities were performed to establish laboratory methods that reproduce data comparable to existing data sets of K-3 refractory corrosion by low activity waste (LAW) and high-level waste (HLW) glass compositions. Later activities were focused on refining the test parameters to establish a standard test practice to be used between Laboratories and collecting additional data to be used in the enhanced waste glass model development. This document serves primarily to convey the refractory loss measurement results from corrosion testing of K-3 refractory with waste glass compositions developed for use in the WTP melters. The data will be used in the enhanced property/composition models being developed for waste glass vitrification and melter operations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

On the Road to Achieving Safety Excellence at the Idaho Cleanup Project: The Initial Challenges, Solutions, and Positive Results of Striving to be the Best and Safest in the DOE Complex - 20518

When Fluor Idaho, LLC (Fluor Idaho) assumed the Idaho Cleanup Project Core contract (ICP Core) in mid-2016, it inherited the successful multi-faceted, employee-owned safety programs of two prior contractors supporting cleanup operations at the Idaho National Laboratory Site. Fluor Idaho incorporated the best of both safety programs along with Fluor Corporate's 106-year legacy of safety initiatives and successes. Fluor Idaho integrated the separate programs and cultures under a One Fluor approach - one project, one mission, One Fluor. Job changes, management changes, and procedures, processes, and system changes presented multiple challenges. Those challenges combined with the severe Winter of 2016/2017 resulted in numerous slips, trips, and falls first aids and reportable injuries. The road to safety excellence started off bumpy and stayed that way for some time. Since then, Fluor Idaho has successfully implemented several key initiatives including employee engagement; management engagement and time in the field; communications improvements; safety culture sustainment; injury/illness prevention; organizational learning; and DOE Voluntary Protection Program (VPP) readiness and preparation. Management became more engaged by making more workplace visits and increasing their supervision of 'life critical work' or complex activities. Additional training became mandatory for first-line supervisors and front-line workers. Most recently, Fluor Idaho increased its injury and illness prevention initiatives extensively. In the last year, things have turned around in a dramatic way. This shift is directly attributable to the significant number of initiatives launched in late 2017 and 2018. These initiatives addressed safety performance in the five key areas of the DOE VPP and promoted sustainability of the company's safety culture. The five key areas are: management leadership, employee involvement, work-site analysis, hazard prevention and control, and safety and health training. Employees and managers alike recommitted to making safety the highest value. The result of this laser-like focus on safety and accident and injury prevention is that injuries and first aids are a fraction of what they were. During FY 2019, employees worked more than 4.2 million hours without a serious injury or lost work-day and 1 million hours without a recordable injury. Fluor Idaho is proud of its safety trend. The company invested significant resources in improving its safety record, and that investment is paying off. Other contractors in the DOE Complex can learn and benefit from this discussion of the challenges Fluor Idaho faced, as well as its innovative safety initiatives that are producing results that are being recognized by our U.S. Department of Energy (DOE) customer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Update on Full-Scale Retrieval and Transfer System Testing for Pneumatic Conveyance of High-Level Calcine Waste - 20241

The Idaho National Laboratory processed spent nuclear fuel from 1953 to 1994. The process used solvent extraction to separate uranium, resulting in a liquid waste. A calcination process was used to convert the liquid waste to a high-level radioactive solid powder, referred to as calcine. The calcine is stored in stainless steel bins contained within concrete vaults called the Calcined Solids Storage Facilities. There are a total of seven CSSFs. The Calcine Retrieval Project is tasked with retrieving the calcine from the bins of CSSF 1 and pneumatically transferring it to the bins of CSSF 6. CSSF 1 was constructed to be a final calcine repository with no forethought of retrieval. It represents the greatest technical hurdle to calcine extraction of all the CSSFs. The challenges inherent with accessing the calcine, safely extracting it, and securely transporting it are copious and complex. Once the calcine is removed from CSSF1, that facility may be closed, reducing the footprint of waste storage at the INL. The same process for removing Calcine from CSSF1 may then be utilized to remove the calcine from the remaining CSSFs for final treatment and transport to a long-term storage facility. To overcome these inherent challenges with accessing CSSF 1 and extracting the calcine in a timely manner, a full-scale integrated mockup has been constructed. The mockup includes a full-size model of a concentric group of bins from CSSF 1 and a storage vessel representing CSSF 6. All essential elements of the transport design are represented in the Mockup, including motive and makeup air supply (air compressor), a replica of the CSSF6 cyclone, pre-filter, HEPA filter, vacuum pump, and retrieval control devices. Construction on the Mockup was completed in 2018 and testing began in February 2019. It has already proven very beneficial to the CRP. Experience in running the Mockup have aided in the development of retrieval and transport methodologies and the selection of process parameter values. It has also uncovered some unforeseen technological challenges and will continue to be valuable to the testing team as these hurdles are overcome and the process is proven effective. Operations personnel have also benefitted from its use as a training tool and will continue to use the Mockup as a simulator to reproduce problems encountered during extraction and transfer of Calcine from CSSF 1. The knowledge gained during this process will also be of continued benefit as future work is done to remove various types of calcine from the remaining CSSFs. The methodology of safe and secure transfer of radioactive material may be of benefit to others throughout the U.S. Department of Energy complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

HBU R and D Cask Transportation Options - 20436

The TN-32B HBU Demonstration Cask was successfully loaded in November 2017 with 32 high burnup (HBU) fuel assemblies at Dominion's North Anna Nuclear Plant and is collecting thermal data as intended. The first two phases of this very successful project sponsored by DOE and EPRI was designed to collect thermal data of HBU fuel to support extended storage. The next phase of the project requires the cask be licensed for transportation so the cask can be relocated to a site (to be determined by DOE) to facilitate long term monitoring and additional research on the fuel. This is a unique challenge given the constraints that exist for this particular bolted metal cask. The TN-32B cask is a 234,288 lb. (storage configuration) dry storage system that was selected for this project and it was modified to provide thermal data and the ability to collect gas samples after loading. Several major issues must be addressed to obtain the transport license including protecting the seven lid penetrations that were made to allow for the insertion of the thermocouples into the selected fuel assemblies after the cask was loaded. In order to protect the integrity of the research, the payload must remain as is. Therefore, the cask system must be placed into the transportation configuration without rewetting the fuel, replacing the lid and without removing the thermocouple instrumentation that is currently installed. A critical portion of the design and engineering that was performed in the first two phases of the project was to ensure that future transportation of the cask was integrated into the approach. Efforts were made to accommodate requirements such as containment boundary leakage testing, installation of impact limiter brackets and lid bolts suitable for transportation. Due to the science requirements of the project, the fuel selected was intended to yield the highest payload temperatures permitted to provide the greatest value for the researchers. This resulted in higher than usual external dose rates and surface temperatures that warranted performing as much preparatory work prior to cask loading to ensure ALARA and personnel safety to the greatest extent practical rather than working on a loaded cask. In addition to the work performed prior to cask load, there are remaining challenges such as protecting the modified lid, design and fabrication of impact limiters that accommodate the modified cask lid and preserving the thermocouple connections for continued monitoring. The project team is currently performing the necessary calculations, engineering, and design to support the licensing as required by the US NRC. Pre-application meetings have been held to inform the regulator of the planned technical approach to ensure compliance with the applicable regulations. The current plan is to obtain the transportation C of C by the end of 2021. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Risk Model for EM Decision Support Toolsets

The Government Office of Accountability (GAO) has published several reports identifying the need for the Department of Energy (DOE) Office of Environmental Management (EM) to address mounting costs for DoE's cleanup program. DOEEM could greatly benefit from independent decision tool-sets/models that would allow them to evaluate options and inform business decision at the enterprise level considering site-specific life cycle costs and system plans. Program goals: Develop a tool-set that enables EM to independently evaluate alternatives, assess outcomes from different contracting strategies, and inform critical decisions for the enterprise. Project goals: Adaption of a Risk Model for integration with complimentary tool-sets for project level decision making. Operational Events: Discrete event model that evaluates operational variables (e.g. capacity, throughput, maintenance constraints) and identify bottlenecks. Identifying and Bounding Project Risk: Identify risks that impact confidence in meeting goals (e.g. production). Life cycle Cost: Evaluate impacts of staffing levels, inventory, and capital investments on life cycle costs. Methods and approach: Monte Carlo Analysis is being executed to generate results: Input derives from Risk Register Data; Tied to Projected and Target Schedules; Incorporates float duration within the model. Assumes associated risk mitigation actions being completed within a timeline of five fiscal years. Metrics include: Confidence in Meeting Production Goal; Confidence in Safety Standards; Confidence in Continuous Operation; Other Metrics can be added as appropriate regarding specific site needs. The adapted risk model can be used as a stand alone decision tool or can be integrated complementary tool-sets (i.e. process and cost models) for project-specific decisions. These support tool-sets can then be integrated with others for site- and complex- level evaluations. Future work includes designing an adaptable and modular framework that would allow integration of multiple tool-sets for holistic and/or targeted evaluation of alternative strategies for decision making that could lead to risk and cost reduction across the enterprise.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Success Using A Granular-Activated Carbon Filtration Swab to Rehabilitate Westbay{sup R} Multi-level Groundwater Monitoring Wells at the INL - 20544

In November 2015, tetrachloroethylene (PCE) was discovered in groundwater samples collected from a Westbay{sup R} multi-level groundwater monitoring well at the Idaho National Laboratory (INL).a Subsequent investigation determined that PCE was not present in the groundwater. The detected PCE was instead due to inadvertent contamination of the internal tubing fluid in the Westbay well-monitoring system, which is isolated from the surrounding groundwater. Further investigation showed that three of the 11 Westbay wells at the INL contained PCE-contaminated tubing fluid at concentrations above the U.S. Environmental Protection Agency's maximum contaminant level for drinking water (5 μg/L). Loose sediment at the bottom of some Westbay wells was also found to contain PCE; the three wells were then identified for rehabilitation as part of the INL well maintenance program. The unique construction of the Westbay wells - i.e., the small diameter (5.72 cm [2.25 in.]) and the depths of the tubing fluid ranging from 144.8 to 419 m (475 to 1,376 ft) below ground surface - posed unique challenges to the rehabilitation. Because the tubing fluid provides structural integrity, the fluid cannot be removed and then replaced without damaging the integrity of the Westbay well. Additionally, the small diameter of the systems and the associated depths limit the availability of equipment that can be used for the rehabilitation. After an evaluation of potential methods, it was determined that the use of an in-well, custom-fabricated, granular-activated-carbon filtration swab deployed via a wire line would provide the safest and most cost-effective method for rehabilitation. Westbay well rehabilitation started at well MIDDLE-2051 in late June 2018 and paused in December 2018 for the season. The PCE concentration in the tubing fluid at MIDDLE-2051 was initially reduced to a maximum concentration of 3.81 μg/L from a maximum of 642 μg/L, while the concentration of PCE in the sediment had been reduced from 5,360 to 2,270 μg/kg. Sampling was performed at MIDDLE-2051 again in August 2019, and the tubing fluid increased to a maximum concentration of 45.4 μg/L, while the concentration in the sediment decreased further to 1,890 μg/kg due to desorption of PCE from the sediment to the tubing fluid. Rehabilitation resumed at well MIDDLE-2050A in late August 2019, and the PCE concentration in the tubing fluid had been reduced to a maximum concentration of 19.0 μg/L. Although the method has been shown to be time-consuming, it has proven to be effective and safe for personnel performing the work and to the integrity of the well. Future sample data results at all wells will help determine an estimated completion of the rehabilitation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗