Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “timeline”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 955 records · Page 53

Spitzer Space Telescope mission design

This paper gives a description of the mission design, launch, orbit, and navigation results for the Spitzer space telescope mission. The Spitzer telescope was launched by the Delta II Heavy launch vehicle into a heliocentric Earth trailing orbit. This orbit is flown for the first time and will be used by several future astronomical missions such as Kepler, SIM, and LISA. This paper describes the launch strategy for a winter versus a summer launch and how it affects communications. It also describes how the solar orbit affects the design and operations of the Observatory. It describes the actual launch timeline, launch vehicle flight performance, and the long term behavior of the as flown orbit. It also provides the orbit knowledge from in-flight navigation data.

Mission Design↗

Radioisotope Power Systems for In-situ Exploration of Titan and Venus

This viewgraph presentation reviews the timeline for the robotic in situ investigation of Titan and Venus, and the use of radioisotope power systems in this exploration. The atmospheric and surface conditions of both sites are reviewed. The presentation also examines the conceptual design of the Venus Mobile Explorer and the Titan orbiter and in situ explorer. After this the presentation reviews the radioisotope power systems for each of the vehicles, with some explanation of the different requirements based on the vastly different environments that they would be investigating

mission concepts↗

Development of In Situ Instruments for Planetary Exploration - Unique Challenges in Design, Development, and Execution

A viewgraph presentation describing in situ instruments for NASA missions is shown. The topics include: 1) In Situ Instrumentation; 2) Planetary Extremes; 3) Mars Surface Environment; 4) Lunar Precursor Mission Environment; 5) Europa Surface Analogue; 6) Other Parameters; 7) Space In Situ Instrumentation still in its Infancy; 8) Needed Capabilities For In Situ Science; 9) Framework For Putting The Pieces Together; 10) The Wild World of Astrobiology; 11) Timeline; 12) Example: MOD; 13) In Situ Sample Analysis Laboratories are more complex; 14) technologies In Situ Sample Analysis Requires Integration of Many Emerging Advanced Concepts; 15) Supporting technologies for In Situ Laboratories; 16) Micro-laboratory example; 17) In Situ Instrument Classes; and 18) Key for Analytical Instrument:Sample Preparation.

In Situ Instrumentation↗

Advanced Technologies for Future Spacecraft Cockpits and Space-based Control Centers

The National Aeronautics and Space Administration (NASA) is embarking on a new era of Space Exploration, aimed at sending crewed spacecraft beyond Low Earth Orbit (LEO), in medium and long duration missions to the Lunar surface, Mars and beyond. The challenges of such missions are significant and will require new technologies and paradigms in vehicle design and mission operations. Current roles and responsibilities of spacecraft systems, crew and the flight control team, for example, may not be sustainable when real-time support is not assured due to distance-induced communication lags, radio blackouts, equipment failures, or other unexpected factors. Therefore, technologies and applications that enable greater Systems and Mission Management capabilities on-board the space-based system will be necessary to reduce the dependency on real-time critical Earth-based support. The focus of this paper is in such technologies that will be required to bring advance Systems and Mission Management capabilities to space-based environments where the crew will be required to manage both the systems performance and mission execution without dependence on the ground. We refer to this concept as autonomy. Environments that require high levels of autonomy include the cockpits of future spacecraft such as the Mars Exploration Vehicle, and space-based control centers such as a Lunar Base Command and Control Center. Furthermore, this paper will evaluate the requirements, available technology, and roadmap to enable full operational implementation of onboard System Health Management, Mission Planning/re-planning, Autonomous Task/Command Execution, and Human Computer Interface applications. The technology topics covered by the paper include enabling technology to perform Intelligent Caution and Warning, where the systems provides directly actionable data for human understanding and response to failures, task automation applications that automate nominal and Off-nominal task execution based on human input or integrated health state-derived conditions. Shifting from Systems to Mission Management functions, we discuss the role of automated planning applications (tactical planning) on-board, which receive data from the other cockpit automation systems and evaluate the mission plan against the dynamic systems and mission states and events, to provide the crew with capabilities that enable them to understand, change, and manage the timeline of their mission. Lastly, we discuss the role of advanced human interface technologies that organize and provide the system md mission information to the crew in ways that maximize their situational awareness and ability to provide oversight and control of aLl the automated data and functions.

Garcia-Galan, Carlos↗

Potential SSP Perfluorooctanoic Acid Related Fluoropolymer Materials Obsolescence

The Shuttle Environmental Assurance Initiative (SEA) has identified a potential for the Space Shuttle Program (SSP) to incur materials obsolescence issues due to agreements between the fluoro-chemical industry and the United States Environmental Protection Agency (USEPA) to participate in a Global Stewardship Program for perfluorooctanoic acid (PFOA). This presentation will include discussions of the chemistry, regulatory drivers, affected types of fluoropolymer and fluoroelastomer products, timeline for reformulations, and methodology for addressing the issue. It will cover the coordination of assessment efforts with the International Space Station and Head Quarters Air Force Space Command, along with some examples of impacted materials. The presentation is directed at all members of the international aerospace community concerned with identifying potential environmentally driven materials obsolescence issues.

Segars, Matt G.↗

NASA In-Situ Resource Utilization Project-and Seals Challenges

A viewgraph presentation on NASA's In-Situ Resource Utilization Project and Seals Challenges is shown. The topics include: 1) What Are Space Resources?; 2) Space Resource Utilization for Exploration; 3) ISRU Enables Affordable, Sustainable & Flexible Exploration; 4) Propellant from the Moon Could Revolutionize Space Transportation; 5) NASA ISRU Capability Roadmap Study, 2005; 6) Timeline for ISRU Capability Implementation; 7) Lunar ISRU Implementation Approach; 8) ISRU Technical-to-Mission Capability Roadmap; 9) ISRU Resources & Products of Interest; and 10) Challenging Seals Requirements for ISRU.

Sacksteder, Kurt↗

An Airborne Communications Roadmap for the U.S. Federal Air Marshal Service: Overview and Status

Following the events of September 11, 2001, the responsibilities, operations and numbers of the U.S. Federal Air Marshal Service (FAMS) wer e greatly expanded. With this expansion, new critical research and te chnology needs were identified, including the need for air to ground telecommunications capabilities. To address this need, the FAMS has cr eated a working group to develop, deploy and enhance aviation communi cations with respect to security and law enforcement. This paper presents the working group's progress to date in generating a FAMS air-gro und communications roadmap identifying expected communications servic es, technology maturity, and technology gaps over a timeline. The paper includes a communications preliminary requirements summary and syst em performance characteristics needed to meet identified operational needs. The system engineering process utilized is presented beginning with the identification of users, their operational needs and relevant constraints. The operational needs are translated to desired airbor ne communications services. System technical performance requirements associated with the identified services are summarized. In addition, notional communications architectures addressing the requirements are presented. Finally, future plans to identify and assess potential ca ndidate systems and their associated technical architectures, gaps and barriers to implementation are discussed. The paper addresses the cu rrent, near term (within 5 years) and far term (10 years) timeframes for such an airborne communications system.

Martzaklis, Konstantinos S.↗

Mars Science Laboratory Overview and MSL EDL Challenges

An overview of Mars Science Laboratory (MSL) Entry, Descent and Landing (EDL) challenges is presented. The topics include: 1) MSL Project Overview; 2) Mars Science Laboratory Top Level Schedule (Single Launch); 3) EDL Challenges; 4) MSL Surface System; 5) Mars Rover Wheel Family Tree; 6) Gusev Comparisons; 7) Mars Surface Accessibility; 8) Atlas V 401 Launch Performance; 9) Parachute Deployment Altitude Variation with Time of Year and Latitude; 10) Dust Storms and Winds; 11) Nominal MSL EDL Timeline; and 12) Specific EDL Challenges.

Umland, Jeffrey W.↗

Overview of the Phoenix Entry, Descent and Landing System

A viewgraph presentation on the entry, descent and landing system of Phoenix is shown. The topics include: 1) Phoenix Mission Goals; 2) Payload; 3) Aeroshell/Entry Comparison; 4) Entry Trajectory Comparison; 5) Phoenix EDL Timeline; 6) Hypersonic Phase; 7) Parachute Phase; 8) Terminal Descent Phase; and 9) EDL Communications.

Grover, Rob↗

Mars Science Laboratory: Entry, Descent, and Landing System Performance

In 2010, the Mars Science Laboratory (MSL) mission will pioneer the next generation of robotic Entry, Descent, and Landing (EDL) systems, by delivering the largest and most capable rover to date to the surface of Mars. To do so, MSL will fly a guided lifting entry at a lift-to-drag ratio in excess of that ever flown at Mars, deploy the largest parachute ever at Mars, and perform a novel Sky Crane maneuver. Through improved altitude capability, increased latitude coverage, and more accurate payload delivery, MSL is allowing the science community to consider the exploration of previously inaccessible regions of the planet. The MSL EDL system is a new EDL architecture based on Viking heritage technologies and designed to meet the challenges of landing increasing massive payloads on Mars. In accordance with level-1 requirements, the MSL EDL system is being designed to land an 850 kg rover to altitudes as high as 1 km above the Mars Orbiter Laser Altimeter defined areoid within 10 km of the desired landing site. Accordingly, MSL will enter the largest entry mass, fly the largest 70 degree sphere-cone aeroshell, generate the largest hypersonic lift-to-drag ratio, and deploy the largest Disk-Gap-Band supersonic parachute of any previous mission to Mars. Major EDL events include a hypersonic guided entry, supersonic parachute deploy and inflation, subsonic heatshield jettison, terminal descent sensor acquisition, powered descent initiation, sky crane terminal descent, rover touchdown detection, and descent stage flyaway. Key performance metrics, derived from level-1 requirements and tracked by the EDL design team to indicate performance capability and timeline margins, include altitude and range at parachute deploy, time on radar, and propellant use. The MSL EDL system, which will continue to develop over the next three years, will enable a notable extension in the advancement of Mars surface science by delivering more science capability than ever before to the surface of Mars. This paper describes the current MSL EDL system performance as predicted by end-to-end EDL simulations, highlights the sensitivity of this baseline performance to several key environmental assumptions, and discusses some of the challenges faced in delivering such an unprecedented rover payload to the surface of Mars.

Way, David W.↗

Fire Fighting from High Altitude

A viewgraph presentation on high altitude fire fighting is shown. The topics include: 1) Yellowstone Fire - 1988; 2) 2006 Western States Fire Mission Over-View; 3) AMS-Wildfire Scanner; 4) October 24-25 Mission: Yosemite NP and NF; 5) October 24-25 Mission MODIS Overpass; 6) October 24-25 Mission Highlights; 7) October 28-29 Mission Esperanza Fire, California; 8) Response to the Esperanza Fire in Southern California -- Timeline Oct 27-29 2006; 9) October 28-29 Mission Esperanza Fire Altair Flight Routing; 10) October 28-29 Mission Esperanza Fire Altair Over-Flights; 11) October 28-29 Mission Highlights; 12) Results from the Esperanza Fire Response; 13) 2007 Western States Fire Mission; and 14) Western States UAS Fire Mission 2007

Cobleigh, Brent↗

Launching to the Moon, Mars, and Beyond

The U.S. Vision for Space Exploration, announced in 2004, calls on NASA to finish constructing the International Space Station, retire the Space Shuttle, and build the new spacecraft needed to return to the Moon and go on the Mars. By exploring space, America continues the tradition of great nations who mastered the Earth, air, and sea, and who then enjoyed the benefits of increased commerce and technological advances. The progress being made today is part of the next chapter in America's history of leadership in space. In order to reach the Moon and Mars within the planned timeline and also within the allowable budget, NASA is building upon the best of proven space transportation systems. Journeys to the Moon and Mars will require a variety of vehicles, including the Ares I Crew Launch Vehicle, the Ares V Cargo Launch Vehicle, the Orion Crew Exploration Vehicle, and the Lunar Surface Access Module. What America learns in reaching for the Moon will teach astronauts how to prepare for the first human footprints on Mars. While robotic science may reveal information about the nature of hydrogen on the Moon, it will most likely tale a human being with a rock hammer to find the real truth about the presence of water, a precious natural resource that opens many possibilities for explorers. In this way, the combination of astronauts using a variety of tools and machines provides a special synergy that will vastly improve our understanding of Earth's cosmic neighborhood.

Dumbacher, Daniel L.↗

Laboratory Reproduction and Failure Analysis of Cracked Orbiter Reaction Control System Niobium Thruster Injectors

A viewgraph presentation describing cracks and failure analysis of an orbiter reaction control system is shown. The topics include: 1) Endeavour STS-113 Landing; 2) RCS Thruster; 3) Thruster Cross-Section; 4) RCS Injector; 5) RCS Thruster, S/N 120l 6) Counterbore Cracks; 7) Relief Radius Cracks; 8) RCS Thruster Cracking History; 9) Thruster Manufacturing Timelines; 10) Laboratory Reproduction of Injector Cracking; 11) The Brownfield Specimen; 12) HF EtchantTests/Specimen Loading; 13) Specimen #3 HF + 600F; 14) Specimen #3 IG Fracture; 15) Specimen #5 HF + 600F; 16) Specimen #5 Popcorn ; 17) Specimen #5 Cleaned and Bent; 18) HF Exposure Test Matrix; 19) Krytox143AC Tests; 20) KrytoxTests/Specimen Loading; 21) Specimen #13 Krytox + 600F; and 22) KrytoxExposure Test Matrix.

Jacobs, Jeremy B.↗

Execution of the Spitzer In-orbit Checkout and Science Verification Plan

The Spitzer Space Telescope is an 85-cm telescope with three cryogenically cooled instruments. Following launch, the observatory was initialized and commissioned for science operations during the in-orbit checkout (IOC) and science verification (SV) phases, carried out over a total of 98.3 days. The execution of the IOC/SV mission plan progressively established Spitzer capabilities taking into consideration thermal, cryogenic, optical, pointing, communications, and operational designs and constraints. The plan was carried out with high efficiency, making effective use of cryogen-limited flight time. One key component to the success of the plan was the pre-launch allocation of schedule reserve in the timeline of IOC/SV activities, and how it was used in flight both to cover activity redesign and growth due to continually improving spacecraft and instrument knowledge, and to recover from anomalies. This paper describes the adaptive system design and evolution, implementation, and lessons learned from IOC/SV operations. It is hoped that this information will provide guidance to future missions with similar engineering challenges

operations↗

Propellant Gauging for Exploration

This paper presents a brief overview of propellant gauging needs and requirements in the context of lunar exploration missions defined by the Exploration Systems Architecture Study (ESAS) report. A timeline for the development and testing of gauging technologies, and a few key design review dates are presented. A lunar exploration mission scenario is discussed which aids in defining the propellant gauging needs. The fleet of new exploration vehicles includes the Ares I and Ares V launch vehicles, Earth Departure Stage (EDS), Lunar Surface Access Module (LSAM) ascent and descent stages, and the Orion Crew Exploration Vehicle (CEV). The liquid propellant choices are currently oxygen - hydrogen for the launch vehicles, the EDS, and LSAM descent module; oxygen - methane for LSAM ascent module; and monomethylhydrazine nitrogen tetroxide (MMH-NTO) for the CEV. Estimated tank sizes, temperatures, pressures, and storage durations are presented. A baseline propellant gauging system is proposed that is based on high Technology Readiness Level (TRL) gauging technologies. In order to be considered for use on the new exploration vehicles, any new gauging technologies will have to show a clear benefit over the baseline methods in terms of performance and/or cost.

Zimmerli, Gregory A.↗

Autonomous Payload Operations Onboard the International Space Station

Operating the International Space Station (ISS) involves many complex crew tended, ground operated and combined systems. Over the life of the ISS program, it has become evident that by having automated and autonomous systems on board, more can be accomplished and at the same time reduce the workload of the crew and ground operators. Engineers at the National Aeronautics and Space Administration's (NASA) Marshall Space Flight Center in Huntsville Alabama, working in collaboration with The Charles Stark Draper Laboratory have developed an autonomous software system that uses the Timeliner User Interface Language and expert logic to continuously monitor ISS payload systems, issue commands and signal ground operators as required. This paper describes the development history of the system, its concept of operation and components. The paper also discusses the testing process as well as the facilities used to develop the system. The paper concludes with a description of future enhancement plans for use on the ISS as well as potential applications to Lunar and Mars exploration systems.

Stetson, Howard K.↗

Visions for Space Exploration: ILS Issues and Approaches

This viewgraph presentation reviews some of the logistic issues that the Vision for Space Exploration will entail. There is a review of the vision and the timeline for the return to the moon that will lead to the first human exploration of Mars. The lessons learned from the International Space Station (ISS) and other such missions are also reviewed.

Watson, Kevin↗

The Apollo Medical Operations Project: Recommendations to Improve Crew Health and Performance for Future Exploration Missions and Lunar Surface Operations

Medical requirements for the future Crew Exploration Vehicle (CEV), Lunar Surface Access Module (LSAM), advanced Extravehicular Activity (EVA) suits and Lunar habitat are currently being developed. Crews returning to the lunar surface will construct the lunar habitat and conduct scientific research. Inherent in aggressive surface activities is the potential risk of injury to crewmembers. Physiological responses to and the operational environment of short forays during the Apollo lunar missions were studied and documented. Little is known about the operational environment in which crews will live and work and the hardware that will be used for long-duration lunar surface operations.Additional information is needed regarding productivity and the events that affect crew function such as a compressed timeline. The Space Medicine Division at the NASA Johnson Space Center (JSC) requested a study in December 2005 to identify Apollo mission issues relevant to medical operations that had impact to crew health and/or performance. The operationally oriented goals of this project were to develop or modify medical requirements for new exploration vehicles and habitats, create a centralized database for future access, and share relevant Apollo information with the multiple entities at NASA and abroad participating in the exploration effort.

Scheuring, Richard A.↗