Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “time”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 955 records · Page 53

Response Time Analysis and Test of Protection System Instrument Channels for APR1400 and OPR1000

Safety limits are required to maintain the integrity of physical barriers designed to prevent the uncontrolled release of radioactive materials in nuclear power plants. The safety analysis establishes two critical constraints that include an analytical limit in terms of a measured or calculated variable, and a specific time after the analytical limit is reached to begin protective action. Keeping with the nuclear regulations and industry standards, satisfying these two requirements will ensure that the safety limit will not be exceeded during the design basis event, either an anticipated operational occurrence or a postulated accident. Various studies on the setpoint determination methodology for the safety-related instrumentation have been actively performed to ensure that the requirement of the analytical limit is satisfied. In particular, the protection setpoint methodology for the advanced power reactor 1400 (APP1400) and the optimized power reactor 1000 (OPR1000) has been recently developed to cover both the design basis event and the beyond design basis event. The developed setpoint methodology has also been quantitatively validated using specific computer programs and setpoint calculations. However, the safety of nuclear power plants cannot be fully guaranteed by satisfying the requirement of the analytical limit. In spite of the response time verification requirements of nuclear regulations and industry standards, it is hard to find the studies on the systematically integrated methodology regarding the response time evaluation. In cases of APR1400 and OPR1000, the response time analysis for the plant protection system is partially included in the setpoint calculation and the response time test is separately performed via the specific plant procedure. The test technique has a drawback which is the difficulty to demonstrate completeness of timing test. The analysis technique has also a demerit of resulting in extreme times that not actually possible. Thus, the establishment of the systematic response time evaluation methodology is needed to justify the conformance to the response time requirement used in the safety analysis. This paper proposes the response time evaluation methodology for APR1400 and OPR1000 using the combined analysis and test technique to confirm that the plant protection system can meet the analytical response time assumed in the safety analysis. In addition, the results of the quantitative evaluation performed for APR1400 and OPR1000 are presented in this paper. The proposed response time analysis technique consists of defining the response time requirement, determining the critical signal path for the trip parameter, allocating individual response time to each component on the signal path, and analyzing the total response time for the trip parameter, and demonstrates that the total analyzed response time does not exceed the response time requirement. The proposed response time test technique is composed of defining the response time requirement, determining the critical signal path for the trip parameter, determining the test method for each component on the signal path, performing the response time test, and demonstrates that the total test result does not exceed the response time requirement. The total response time should be tested in a single test that covers from the sensor to the final actuation device on the instrument channel. When the total channel is not tested in a single test, separate tests on groups of components or single components including the total instrument channel shall be combined to verify the total channel response. For APR1400 and OPR1000, the ramp test technique is used for the pressure and differential pressure transmitters and the step function testing technique is applied to the signal processing equipment and final actuation device. As a result, it can be demonstrated that the response time requirement is satisfied by the combined analysis and test technique. Therefore, the proposed methodology in this paper plays a crucial role in guaranteeing the safety of the nuclear power plants systematically satisfying one of two critical requirements from the safety analysis. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Assessment of Crew Time for Maintenance and Repair Activities for Lunar Surface Missions

NASA is currently evaluating different methods to predict how much time crewmembers will spend conducting repair and maintenance activities on future space missions. As mission scope and spacecraft architectures change, understanding how crew repair and maintenance timelines are impacted by mission operations and technology changes is vital for future mission planning. Past work has been done using historical International Space Station (ISS) data to accurately predict crew habitation and operation timelines, resulting in the development of NASA’s Exploration Crew Time Model (ECTM). However, understanding crew maintenance and repair requirements has posed a unique challenge due to the complexity of available datasets, the probabilistic nature of sub-system failures, and the impacts of reliability growth on failure rates. This paper presents a methodology to collect and condition empirical repair and maintenance time data from available datasets, to extrapolate from that data to estimate projected maintenance and repair times for a lunar Surface Habitat (SH), and to assess how uncertainty in repair time could impact utilization time on the lunar surface. NASA ISS maintenance and crew time data are logged into two central databases: the Maintenance Data Collection (MDC) and the Operations Planning Timeline Integration System (OPTimIS). Separately, each of these two datasets capture only portions of the complete set of data required to generate an accurate assessment of crew time spent on maintenance activities at a sub-system level. To create a more useful crew time estimate for maintenance timelines, the authors developed a methodology to capture relevant data from each set and combine and utilize that data by linking crew time requirements to specific components. The authors compare the failure logs in the MDC to crew activity logs pulled from OPTimIS and then process the data to estimate required repair time for each failure and repair event. The entire maintenance activity dataset is then categorized based on the class of failed component to ensure a significant sample size for each class and accurate crew time estimates for any components lacking relevant data. This resultant component repair time data can be used in the future to generate Mean Time to Repair (MTTR) estimates and confidence intervals for each class of component based on a probabilistic distribution of documented maintenance events. These improved MTTR values can then be applied to candidate element sub-system architectures, along with component Mean Time Between Failure (MTBF) data to generate distributions for potential required system crew repair time estimates for a given mission. The authors applied these modeling methods to a case study of a crewed mission to the planned SH and produced expected corrective maintenance crew time distributions. The results produced an expected corrective maintenance crew time at over 24 hours per mission, and a maintenance crew time distribution that reflects the importance of planning for sufficient maintenance requirements each mission. Repair time distributions can then be used to develop more accurate crew schedules and to assess potential available utilization time.

Crew Time↗

Evaluation of Open-Source Hard Real Time Software Packages

Reliable software is, at times, hard to find. No piece of software can be guaranteed to work in every situation that may arise during its use here at Glenn Research Center or in space. The job of the Software Assurance (SA) group in the Risk Management Office is to rigorously test the software in an effort to ensure it matches the contract specifications. In some cases the SA team also researches new alternatives for selected software packages. This testing and research is an integral part of the department of Safety and Mission Assurance. Real Time operation in reference to a computer system is a particular style of handing the timing and manner with which inputs and outputs are handled. A real time system executes these commands and appropriate processing within a defined timing constraint. Within this definition there are two other classifications of real time systems: hard and soft. A soft real time system is one in which if the particular timing constraints are not rigidly met there will be no critical results. On the other hand, a hard real time system is one in which if the timing constraints are not met the results could be catastrophic. An example of a soft real time system is a DVD decoder. If the particular piece of data from the input is not decoded and displayed to the screen at exactly the correct moment nothing critical will become of it, the user may not even notice it. However, a hard real time system is needed to control the timing of fuel injections or steering on the Space Shuttle; a delay of even a fraction of a second could be catastrophic in such a complex system. The current real time system employed by most NASA projects is Wind River's VxWorks operating system. This is a proprietary operating system that can be configured to work with many of NASA s needs and it provides very accurate and reliable hard real time performance. The down side is that since it is a proprietary operating system it is also costly to implement. The prospect of replacing this somewhat costly implementation is the focus of one of the SA group s current research projects. The explosion of open source software in the last ten years has led to the development of a multitude of software solutions which were once only produced by major corporations. The benefits of these open projects include faster release and bug patching cycles as well as inexpensive if not free software solutions. The main packages for hard real time solutions under Linux are Real Time Application Interface (RTAI) and two varieties of Real Time Linux (RTL), RTLFree and RTLPro. During my time here at NASA I have been testing various hard real time solutions operating as layers on the Linux Operating System. All testing is being run on an Intel SBC 2590 which is a common embedded hardware platform. The test plan was provided to me by the Software Assurance group at the start of my internship and my job has been to test the systems by developing and executing the test cases on the hardware. These tests are constructed so that the Software Assurance group can get hard test data for a comparison between the open source and proprietary implementations of hard real time solutions.

Mattei, Nicholas S.↗

Advances in time-scale algorithms

The term clock is usually used to refer to a device that counts a nearly periodic signal. A group of clocks, called an ensemble, is often used for time keeping in mission critical applications that cannot tolerate loss of time due to the failure of a single clock. The time generated by the ensemble of clocks is called a time scale. The question arises how to combine the times of the individual clocks to form the time scale. One might naively be tempted to suggest the expedient of averaging the times of the individual clocks, but a simple thought experiment demonstrates the inadequacy of this approach. Suppose a time scale is composed of two noiseless clocks having equal and opposite frequencies. The mean time scale has zero frequency. However if either clock fails, the time-scale frequency immediately changes to the frequency of the remaining clock. This performance is generally unacceptable and simple mean time scales are not used. First, previous time-scale developments are reviewed and then some new methods that result in enhanced performance are presented. The historical perspective is based upon several time scales: the AT1 and TA time scales of the National Institute of Standards and Technology (NIST), the A.1(MEAN) time scale of the US Naval observatory (USNO), the TAI time scale of the Bureau International des Poids et Measures (BIPM), and the KAS-1 time scale of the Naval Research laboratory (NRL). The new method was incorporated in the KAS-2 time scale recently developed by Timing Solutions Corporation. The goal is to present time-scale concepts in a nonmathematical form with as few equations as possible. Many other papers and texts discuss the details of the optimal estimation techniques that may be used to implement these concepts.

Stein, S. R.↗

Assessment of Crew Time for Maintenance and Repairs Activities for Lunar Surface Missions

NASA is currently evaluating different methods to predict how much time crewmembers will spend conducting repair and maintenance activities on future space missions. As mission scope and spacecraft architectures change, it will be necessary to understand how crew repair and maintenance timelines are impacted by mission operations and technology changes. Past work has been done using historical ISS data to accurately predict crew habitation and operation timelines, resulting in the development of NASA’s Exploration Crew Time Model (ECTM). However, understanding crew maintenance and repair requirements has posed a unique challenge due to the complexity of available datasets, the probabilistic nature of sub-system failures, and the impacts of reliability growth on failure rates. This paper presents a methodology to collect and condition empirical repair and maintenance time data from available data sets, to extrapolate from that data to estimate projected maintenance and repair times for a lunar Surface Habitat, and to assess how uncertainty in repair time could impact utilization time on the lunar surface. NASA International Space Station (ISS) maintenance and crew time data are logged into two central databases, the Maintenance Data Collection (MDC) and the Operations Planning Timeline Integration System (OPTimIS) respectively. Separately, each of these two datasets capture only portions of the complete set of data required to generate an accurate assessment of crew time spent on maintenance activities at a sub-system level. MDC provides a detailed catalog of failure events and an overview of the failure’s required maintenance and OPTimIS provides a description of crew activities and crew time durations dedicated to maintenance. To create a more useful crew time estimate for maintenance timelines, the authors developed a methodology to capture relevant data from each set and combine and utilize that data by linking crew time requirements to specific components. The authors compare the failure logs in the MDC to crew activity logs pulled from OPTimIS and then process the data to estimate required repair times for each failure event. Data is also classified by the outcome of each repair event, whether the failed component was replaced or whether it was repaired in place. The entire maintenance activity dataset is then categorized based on the class of failed component to allow for a statistically significant sample size for each class and to provide accurate crew time estimates for any components lacking relevant data. This resultant component repair time data can be used in the future to generate Mean Time To Repair (MTTR) estimates and confidence intervals for each class of component based on a probabilistic distribution of documented maintenance events. These improved MTTR values can then be applied to candidate element sub-system architectures, along with component Mean Time Between Failure (MTBF) data to generate distributions for potential required system crew repair time estimates for a given mission. Repair time distributions can then be used to develop more accurate crew schedules and to assess potential available utilization time.

Crew Time↗

Ecosystem carbon transit versus turnover times in response to climate warming and rising atmospheric CO 2 concentration

Ecosystem carbon (C) transit time is a critical diagnostic parameter to characterize land C sequestration. This parameter has different variants in the literature, including a commonly used turnover time. However, we know little about how different transit time and turnover time are in representing carbon cycling through multiple compartments under a non-steady state. In this study, we estimate both C turnover time as defined by the conventional stock over flux and mean C transit time as defined by the mean age of C mass leaving the system. We incorporate them into the Community Atmosphere Biosphere Land Exchange (CABLE) model to estimate C turnover time and transit time in response to climate warming and rising atmospheric [CO 2 ]. Modelling analysis shows that both C turnover time and transit time increase with climate warming but decrease with rising atmospheric [CO 2 ]. Warming increases C turnover time by 2.4 years and transit time by 11.8 years in 2100 relative to that at steady state in 1901. During the same period, rising atmospheric [CO 2 ] decreases C turnover time by 3.8 years and transit time by 5.5 years. Our analysis shows that 65 % of the increase in global mean C transit time with climate warming results from the depletion of fast-turnover C pool. The remaining 35 % increase results from accompanied changes in compartment C age structures. Similarly, the decrease in mean C transit time with rising atmospheric [CO 2 ] results approximately equally from replenishment of C into fast-turnover C pool and subsequent decrease in compartment C age structure. Greatly different from the transit time, the turnover time, which does not account for changes in either C age structure or composition of respired C, underestimated impacts of warming and rising atmospheric [CO 2 ] on C diagnostic time and potentially led to deviations in estimating land C sequestration in multi-compartmental ecosystems.

54 ENVIRONMENTAL SCIENCES↗

Effect of Surface Traffic Count on Taxi Time at Dallas-Fort Worth (DFW) International Airport

As the amount of air traffic increases over the years, most airports simply do not have the means of expanding to handle the intensified traffic on the surface that will ensue. Precise surveillance equipment and automation concepts, as well as advanced surface traffic algorithms are being developed to improve airport efficiency. These surface algorithms require inputs unique to each airport to ensure maximum efficiency, and minimal taxi delay. This study analyzes surface traffic at Dallas-Fort Worth International Airport (DFW) to determine the effect of the number of aircraft on the surface and the amount of stop and go situations they experience to the amount of additional taxi time encountered. If the surface capacity of an airport is known, minimal delay can be accomplished by limiting the number of taxiing aircraft to that capacity. This concept is related to highways, where traffic flow drastically decreases as more cars occupy the road. An attempt to minimize this effect on highways is seen with the use of metering lights at freeway on-ramps. Since the surface traffic at airports is highly regulated, and aircraft are less mobile on the ground, limiting the surface count to a certain number can greatly reduce the amount of additional taxi time encountered, as well as reduce hazardous emissions. This study will also find the regions of an airport that encounter the most additional taxi time when the number of aircraft in that area is increased. This could help surface traffic algorithms avoid congesting that area, or re-route aircraft to different runways when that area reaches its capacity. The relationship between the amount of stop and go situations an aircraft encounters and their effect on the taxi time of that aircraft will also be investigated. This will help to determine the effect of holding an aircraft on the taxiway as opposed to re-routing it. The lesser of the two should be used when developing surface traffic algorithms to further minimize the delay encountered. The fields investigated in this study include taxi time, the number of aircraft on the surface, the number of stop and go situations, and the time stopped for each aircraft. Taxi time is defined as spot to runway for departures, and runway to spot for arrivals. It does not include ramp area taxi time because the ramp area is controlled differently, and surface traffic schedulers do not currently incorporate them. Taxi time is found by finding the difference between take-off time (OFF) and spot crossing time for departures, and spot crossing time and landing time (ON) for arrivals. All surface data was either found directly using the Surface Operations Data Analysis and Adaptation (SODAA), a tool to analyze the Surface Management System (SMS) generated log files, or indirectly from SODAA using Matlab to derive values from SODAA data. The number of aircraft on the surface is found by looping through the ON times, OFF times, and spot times for each aircraft during a particular day. For each departure aircraft, surface counts are taken at its spot crossing and OFF time. The average of these two is used as the surface count for that aircraft. For arrivals, surface counts are taken at its ON time and its spot crossing time. The average of these two is used.

Kistler, Matthew Stephen↗

Spinor Field Nonlinearity and Space-Time Geometry

Within the scope of Bianchi type VI,VI0,V, III, I, LRSBI and FRW cosmological models we have studied the role of nonlinear spinor field on the evolution of the Universe and the spinor field itself. It was found that due to the presence of non-trivial non-diagonal components of the energy-momentum tensor of the spinor field in the anisotropic space-time, there occur some severe restrictions both on the metric functions and on the components of the spinor field. In this report we have considered a polynomial nonlinearity which is a function of invariants constructed from the bilinear spinor forms. It is found that in case of a Bianchi type-VI space-time, depending of the sign of self-coupling constants, the model allows either late time acceleration or oscillatory mode of evolution. In case of a Bianchi VI{sub 0} type space-time due to the specific behavior of the spinor field we have two different scenarios. In one case the invariants constructed from bilinear spinor forms become trivial, thus giving rise to a massless and linear spinor field Lagrangian. This case is equivalent to the vacuum solution of the Bianchi VI{sub 0} type space-time. The second case allows non-vanishing massive and nonlinear terms and depending on the sign of coupling constants gives rise to accelerating mode of expansion or the one that after obtaining some maximum value contracts and ends in big crunch, consequently generating space-time singularity. In case of a Bianchi type-V model there occur two possibilities. In one case we found that the metric functions are similar to each other. In this case the Universe expands with acceleration if the self-coupling constant is taken to be a positive one, whereas a negative coupling constant gives rise to a cyclic or periodic solution. In the second case the spinor mass and the spinor field nonlinearity vanish and the Universe expands linearly in time. In case of a Bianchi type-III model the space-time remains locally rotationally symmetric all the time, though the isotropy of space-time can be attained for a large proportionality constant. As far as evolution is concerned, depending on the sign of coupling constant the model allows both accelerated and oscillatory mode of expansion. A negative coupling constant leads to an oscillatory mode of expansion, whereas a positive coupling constant generates expanding Universe with late time acceleration. Both deceleration parameter and EoS parameter in this case vary with time and are in agreement with modern concept of space-time evolution. In case of a Bianchi type-I space-time the non-diagonal components lead to three different possibilities. In case of a full BI space-time we find that the spinor field nonlinearity and the massive term vanish, hence the spinor field Lagrangian becomes massless and linear. In two other cases the space-time evolves into either LRSBI or FRW Universe. If we consider a locally rotationally symmetric BI(LRSBI) model, neither the mass term nor the spinor field nonlinearity vanishes. In this case depending on the sign of coupling constant we have either late time accelerated mode of expansion or oscillatory mode of evolution. In this case for an expanding Universe we have asymptotical isotropization. Finally, in case of a FRW model neither the mass term nor the spinor field nonlinearity vanishes. Like in LRSBI case we have either late time acceleration or cyclic mode of evolution. These findings allow us to conclude that the spinor field is very sensitive to the gravitational one.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Land and Atmosphere Near-Real-Time Capability for Earth Observing System

The past decade has seen a rapid increase in availability and usage of near-real-time data from satellite sensors. The EOSDIS (Earth Observing System Data and Information System) was not originally designed to provide data with sufficiently low latency to satisfy the requirements for near-real-time users. The EOS (Earth Observing System) instruments aboard the Terra, Aqua and Aura satellites make global measurements daily, which are processed into higher-level 'standard' products within 8-40 hours of observation and then made available to users, primarily earth science researchers. However, applications users, operational agencies, and even researchers desire EOS products in near-real-time to support research and applications, including numerical weather and climate prediction and forecasting, monitoring of natural hazards, ecological/invasive species, agriculture, air quality, disaster relief and homeland security. These users often need data much sooner than routine science processing allows, usually within 3 hours, and are willing to trade science product quality for timely access. While Direct Broadcast provides more timely access to data, it does not provide global coverage. In 2002, a joint initiative between NASA (National Aeronautics and Space Administration), NOAA (National Oceanic and Atmospheric Administration), and the DOD (Department of Defense) was undertaken to provide data from EOS instruments in near-real-time. The NRTPE (Near Real Time Processing Effort) provided products within 3 hours of observation on a best-effort basis. As the popularity of these near-real-time products and applications grew, multiple near-real-time systems began to spring up such as the Rapid Response System. In recognizing the dependence of customers on this data and the need for highly reliable and timely data access, NASA's Earth Science Division sponsored the Earth Science Data and Information System Project (ESDIS)-led development of a new near-real-time system called LANCE (Land, Atmosphere Near-Real-Time Capability for EOS) in 2009. LANCE consists of special processing elements, co-located with selected EOSDIS data centers and processing facilities. A primary goal of LANCE is to bring multiple near-real-time systems under one umbrella, offering commonality in data access, quality control, and latency. LANCE now processes and distributes data from the Moderate Resolution Imaging Spectroradiometer (MODIS), Atmospheric Infrared Sounder (AIRS), Advanced Microwave Scanning Radiometer Earth Observing System (AMSR-E), Microwave Limb Sounder (MLS) and Ozone Monitoring Instrument (OMI) instruments within 3 hours of satellite observation. The Rapid Response System and the Fire Information for Resource Management System (FIRMS) capabilities will be incorporated into LANCE in 2011. LANCE maintains a central website to facilitate easy access to data and user services. LANCE products are extensively tested and compared with science products before being made available to users. Each element also plans to implement redundant network, power and server infrastructure to ensure high availability of data and services. Through the user registration system, users are informed of any data outages and when new products or services will be available for access. Building on a significant investment by NASA in developing science algorithms and products, LANCE creates products that have a demonstrated utility for applications requiring near-real-time data. From lower level data products such as calibrated geolocated radiances to higher-level products such as sea ice extent, snow cover, and cloud cover, users have integrated LANCE data into forecast models and decision support systems. The table above shows the current near-real-time product categories by instrument. The ESDIS Project continues to improve the LANCE system and use the experience gained through practice to seek adjustments to improve the quality and performance of the system. For example, anGC-compliant Web Map Service (WMS) will be added shortly that will allow users to download geo-referenced MODIS images for arbitrary bounding boxes. Further, an OGC-compliant Web Coverage Service (WCS) will be added later this year that will expedite user access to arbitrary data subsets or re-formatted products. AIRS images are now served through WMS and available in multiple formats (PNG, GeoTIFF, KMZ). NASA has established a LANCE User Working Group to steer the development of the system and create a forum for sharing ideas and experiences that are expected to further improve the LANCE capabilities. The LANCE system has proved a success by satisfying the growing needs of the applications and operational communities for land and atmosphere data in near-real-time. NASA's Earth Sciences Division was able to leverage existing science research capabilities to provide the near-real-time community with products and imagery that support monitoring of disasters in a timely manner.

Murphy, Kevin J.↗

Role of the BIPM in UTC Dissemination to the Real Time User

The generation and dissemination of International Atomic Time (TAI), and Coordinated Universal Time (UTC) are explicitly mentioned in the list of principal tasks of the Bureau International des Poids et Mesures (BIPM), that appears in the Compes Rendus of the the 18e Conference Generales des Poids et Measures, in 1987. These time scales are used as the ultimate reference in the most demanding scientific applications and must, therefore, be of the best metrological quality in terms of reliability, long term stability, and conformity of the scale interval with the second, the unit of time of the International System of Units. To meet these requirements, it is necessary that the readings of the atomic clocks, spread all over the world, that are used as basic timing data for TAI and UTC generation, must be combined in the most efficient way possible. In particular, to take full advantage of the quality of each contributing clock calls for observation of its performance over a sufficiently long time. At present, the computation period treats data in blocks covering two months. TAI and UTC are thus deferred-time scales that cannot be immediately available to real-time users. The BIPM can, nevertheless be of help to real-time users. The predictability of UTC is a fundamental attribute of the scale for institutions responsible for the dissemination of real-time time scales. It allows them to improve their local representations of UTC and, thus, implement a more thorough steering of the time scales diffused in real-time. With a view to improving the predicatbility of UTC, the BIPM examines in detail timing techniques and basic theories in order to propose alternative solutions for timing algorithms. This, coupled with a recent improvement of timing data, makes UTC more stable and thus, more predictable. At a more practical level, effort is being devoted to putting in place automatic procedures for reducing the time needed for data collection and treatment: monthly results are already available ten days earlier than before.

Quinn, T. J.↗

Performance and Commissioning of the BigBite Timing Hodoscope for Nucleon Form Factor Measurements at Jefferson Lab

The BigBite Timing Hodoscope detector is the primary subject of this thesis. The Super BigBite Spectrometer is a Jefferson Lab Hall A Collaboration project that has and will continue to measure nucleon electromagnetic form factors. This spectrometer includes the Timing Hodoscope which provides high resolution particle timing data for scattered electrons in the electron arm of BigBite. The Timing Hodoscope utilizes 90, 25 × 25 × 600 mm3 scintillator bars stacked on top of each other to form a single detector plane, and these bars are connected to 180 photo-multiplier tubes via light guides. Particles collide with the scintillating material creating a shower of optical photons and these particle events in the bars are collected to generate signals that are readout by the data acquisition (DAQ) electronics. NINO ASIC amplifier-discriminator cards output signals from the photo-multiplier tubes into analogue and logic signals, which are sent to analogue-to-digital (ADC) and time-to-digital (TDC) converter data acquisition readout modules. This data is then used for analysis of the detector. The focus of this thesis is the construction, commissioning, calibration, and performance of the BigBite Timing Hodoscope before and during the first of five nucleon electromagnetic form factor experiments at Jefferson Lab Hall A. Before the neutron magnetic form factor, G n M, experiment, cosmic ray data was collected during commissioning to confirm proper operation of the Timing Hodoscope electronics by observing the ADC and TDC data. Commissioning studies for charge normalization, gain matching, and other ADC and TDC detector data variables were performed before moving the detector into Hall A. Following installation in Hall A, several calibration studies were implemented to fine-tune the detector in preparation for use in the experiment. The calibration studies included analysis of timing cuts, TDC alignment, the time-walk effect, time difference offsets, and scintillator velocity corrections. Once the Timing Hodoscope was well-calibrated, data-taking during the experiment commenced and the beam-on-target data was used to characterize the Timing Hodoscope performance during the G n M experiment run-time. The performance analysis included studies observing energy deposit, cluster size, rates, accidentals, pile-up, tracking efficiency, position resolution, and time resolution. After application of physics cuts to ensure a data set comprised of particle tracks corresponding to elastic electrons, which is the main data of interest for measurement of G n M, the Timing Hodoscope is shown on average across all kinematic settings to have a >98% tracking efficiency, a position resolution of 4-6 cm in the non-dispersive plane and 1.5-2 cm in the dispersive plane, and a time resolution of 500-750 ps. These performance results are compared to a GEANT4 based performance simulation of the BigBite Timing Hodoscope for reference, showing to what degree the measured performance values match those taken from the simulation.

Marinaro, Ralph↗

Breeding latitude is associated with the timing of nesting and migration around the annual calendar among Purple Martin (Progne subis) populations

Timing is critical for species that migrate seasonally, as timing mismatches can lead to reduced reproductive success and population declines. We investigated the effect of breeding latitude on the migration timing of a long-distance migratory songbird (Purple Martin, Progne subis subis) by using light-level geolocators deployed across breeding sites between 26° and 53° latitude (n = 329). We used nesting data (1st egg dates; n=28,165) to explore latitudinal patterns in the timing of breeding. Using generalized linear mixed models (GLMMs) we found that breeding latitude was highly associated with timing around the calendar, explaining population-level timing across both spring and fall migration. Populations breeding at more northern latitudes migrated later in fall (mean days/degree latitude =2), in spring (mean days/degree latitude =3), and nested later (days/degree latitude = 3) than populations breeding at more southern latitudes. Generalized additive mixed models (GAMMs) revealed significant non-linearity between breeding latitude and spring and fall migration timing, and the timing of nesting. In spring, the most northern breeders (> 40 degrees N) were more synchronous in their timing, departing their nonbreeding sites and arriving earlier at their breeding sites relative to their breeding latitude. These most northern breeders also had similar nest timing and fall migration departure timing. Breeding latitude was also associated with seasonal partitioning of migratory and sedentary periods. The most northern breeders spent 10% more time on fall migration, 2% more at wintering grounds, 1% more on spring migration, and 13% less time at their breeding sites. Our results support the notion that selection for timing at breeding latitudes can have year-round effects on the timing of seasonal events in long-distance migratory songbirds. Future studies should examine whether these timing patterns associated with latitude limit phenotypic responses to climate change.

54 ENVIRONMENTAL SCIENCES↗