Technical and cost factors that effect television reception from a sychronous satellite Final report
Technical and cost factors regarding effective television reception from synchronous satellite
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Technical and cost factors regarding effective television reception from synchronous satellite
Technical history of Project Mercury environmental control system
Technical description and systems engineering contractor data package for Voyager spacecraft
Appendices to NASA Thesaurus for indexing scientific and technical information - category term listing, hierarchical display, permuted index, and postable terms
Application of systems analysis to social factors by technical writers
Onboard checkout system technical problems
Technical report is presented on sodium and lithium cells using fused salt electrolytes. It includes a discussion of the thermally regenerative galvanic cell and the secondary bimetallic cell for storage of electricity.
Final technical summary report on fabrication, delivery, and installation of Saturn S-5 ground computer system
Technical analyses and computer programs in support of optimization of liquid hydrogen thermal protection systems for nuclear Mars spacecraft
Technical writers role and requirements for coverage of Earth Resources Survey Program
Distribution and evaluation of educational monographs and visual briefs in universities from NASA technical reports
Combined selective listing of NASA scientific and technical reports announced during 1968
Technical data and methods for design of remote manipulator for satellite repair and maintenance in orbit
Technical analysis of system for upper atmospheric sounding
Capabilities and utilization of NASA Scientific and Technical Information System
Technical problem solving model based on tape recorded protocols of engineers engaged in R and D project
Technical progress in program to develop integrated lightweight flexible silicon solar cell array
Technical information summary on Apollo 11 flight and total lunar mission