Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “risk analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 955 records · Page 53

Risk-Informed External Hazards Analysis for Seismic and Flooding Phenomena for a Generic PWR

This report describes the activities performed during the FY2017 for the US-DOE Light Water Reactor Sustainability Risk-Informed Safety Margin Characterization (LWRS-RISMC), Industry Application #2. The scope of Industry Application #2 is to deliver a risk-informed external hazards safety analysis for a representative nuclear power plant. Following the advancements occurred during the previous FYs (toolkits identification, models development), FY2017 focused on: increasing the level of realism of the analysis; improving the tools and the coupling methodologies. In particular the following objectives were achieved: calculation of buildings pounding and their effects on components seismic fragility; development of a SAPHIRE code PRA models for 3-loops Westinghouse PWR; set-up of a methodology for performing static-dynamic PRA coupling between SAPHIRE and EMRALD codes; coupling RELAP5-3D/RAVEN for performing Best-Estimate Plus Uncertainty analysis and automatic limit surface search; and execute sample calculations for demonstrating the capabilities of the toolkit in performing a risk-informed external hazards safety analyses.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Risk Trade-Space Analysis for Safe Human Expeditions to Mars

We assessed the integrated safety, health, and performance risk to crews on long-duration missions, specifically to Mars. Using a systems approach rather than one focused on individual countermeasures, we examined the trade space around several such risks to identify high-potential risk mitigation strategies and characterize aspects of Mars mission architectures that could lower aggregated risk. Current Mars Design Reference missions would require durations well over two years and would increase crew exposure to radiation and microgravity well beyond ISS levels, likely resulting in significantly reduced performance beyond our current capability to mitigate that could jeopardize mission success. A “fast Mars transit” round-trip mission concept was studied using an innovative flight dynamics approach to quantify the minimum total mission energy required for a Mars transit with total mission duration less than 400 days. This approach holds promise for sending humans to Mars and returning them safely with acceptable, potentially mitigatable, exposure to microgravity and radiation using current or near-term technologies. The fast transit concept would also result in fewer time-driven vehicle failures and enable sustainable deployment of humans and infrastructure to Mars on a regular cadence, allowing steady exploration and colonization of Mars. Finally, we conclude that reliance on the Low Earth Orbit (LEO) mission operations paradigm – i.e., one of near-complete real-time dependence on experts at Mission Control to manage the combined state of the mission, vehicle, and crew – is high risk given the communication delays and limited resupply of any Mars mission, and this risk is not eliminated by the shorter missions durations of fast transit scenarios. Based on historical trends, it is highly likely that the crew will face a high-consequence problem of uncertain origin during Mars transit when ground support will be greatly reduced. While it may be possible to reduce anomaly rates through improved reliability analysis and testing, and to reduce anomaly impacts through added robustness, such mitigations address only known failure modes and known uncertainties. Therefore, a radical shift in the Human-Systems Integration Architecture (HSIA) that defines the operational paradigm, systems design, and human-systems interactions is required to improve the risk posture to an acceptable level regardless of mission duration.

Mars↗

An Integrated Risk Assessment Process for Digital Instrumentation and Control Upgrades of Nuclear Power Plants

Most of the existing nuclear power plants (NPPs) in the world rely on traditional analog instrumentation and control (I&C) systems for monitoring, control, and protection functions. With the industrial base largely moving to digital systems, the operation and maintenance of plants involves managing issues including lack of needed analog spare parts, increasing maintenance costs, and the loss of vendor support. Compared with existing analog I&C systems, digital I&C systems have significant functional advantages, such as reliable system performance in terms of accuracy and computational capability, high data handling and storage capabilities to fully measure and display operating conditions, and improved capabilities (e.g., fault tolerance, self-testing, signal validation, process system diagnostics). Therefore, the U.S. nuclear power industry has initiated the replacement of existing, aging analog systems with digital I&C technology, and is developing new designs for advanced plants using digital systems in integrated control rooms to provide modern control and protection systems. However, the qualification of digital I&C systems remains a challenge, especially the issue of software common cause failure (CCF), which has been difficult to address. A CCF is the malfunction of two or more plant components or functions due to a single failure source. CCFs have the potential to generate unanalyzed events or sequences that may not be bounded by previous plant accident analyses, therefore, to challenge the plant safety. Existing analyses on CCF in I&C systems are mainly focusing on hardware failures. With the application and upgrades of new digital I&C systems, software CCFs due to design flaws have become a potential threat to plant safety considering most redundancy designs are using the similar digital platforms or software in the operating and application systems. With complex multi-layer redundancy designs to meet the single failure criterion, these I&C safety systems are of a particular concern in the U.S. Nuclear Regulatory Commission (NRC) licensing procedures. Therefore, there is a need to develop an integrated risk assessment strategy with digital CCF and plant transient responses considered to assure the long-term safety and reliability of vital digital systems and reduce uncertainties in costs, time, and support integration of digital systems in the plant. The overall goal of this project is to deliver a strong technical basis to support effective, licensable, and secure digital I&C technologies for the digital upgrades to existing NPPs. To deal with the expensive licensing justifications from regulatory insights, this technical basis is instructive for nuclear vendors and utilities to effectively lower the costs associated with digital compliance and speed-up industry advances by: (1) defining an integrated risk-informed analysis process for digital I&C upgrades including hazard analysis, reliability analysis, and consequence analysis; (2) applying systematic and risk-informed tools to address CCFs and quantify responding failure probabilities for digital I&C technologies; (3) evaluating the impact of digital failures at the individual level, system level, and plant level; and (4) providing insights and suggestions on designs to manage the risks, thus to support the development, licensing, and deployment of advanced digital I&C technologies on NPPs. Upgrading digital I&C (safety and non-safety related) systems in existing NPPs within a cost-effective and regulatory acceptable way offers the foremost means of performance improvements and cost-reductions for existing NPPs. One key outcome of this project is to perform plant-specific risk assessment to provide a sustainable scientific support for enabling industry to balance the digital-related risks, costs, reliability, and safety.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Development of Improved Caprock Integrity and Risk Assessment Techniques. Final report for period Oct. 1, 2012 - Sept. 30, 2014

GeoMechanics Technologies has completed a geomechanical caprock integrity analysis and risk assessment study funded through the US Department of Energy. The project included: a detailed review of historical caprock integrity problems experienced in the natural gas storage industry; a theoretical description and documentation of caprock integrity issues; advanced coupled transport flow modelling and geomechanical simulation of three large-scale potential geologic sequestration sites to estimate geomechanical effects from CO₂ injection; development of a quantitative risk and decision analysis tool to assess caprock integrity risks; and, ultimately the development of recommendations and guidelines for caprock characterization and CO₂ injection operating practices. Historical data from gas storage operations and CO₂ sequestration projects suggest that leakage and containment incident risks are on the order of 10 -1 to 10 -2 , which is higher risk than some previous studies have suggested for CO₂. Geomechanical analysis, as described herein, can be applied to quantify risks and to provide operating guidelines to reduce risks. The risk assessment tool developed for this project has been applied to five areas: The Wilmington Graben offshore Southern California, Kevin Dome in Montana, the Louden Field in Illinois, the Sleipner CO₂ sequestration operation in the North Sea, and the In Salah CO₂ sequestration operation in North Africa. Of these five, the Wilmington Graben area represents the highest relative risk while the Kevin Dome area represents the lowest relative risk.

58 GEOSCIENCES↗

Analysis of the individual risk of altitude decompression sickness under repeated exposures

In a case-control study, researchers examined the risk of decompression sickness (DCS) in individual subjects with higher number of exposures. Of the 126 subjects, 42 showed one or more episodes of DCS. Examination of the exposure-DCS relationship by odds ratio showed a linear relationship. Stratification analysis showed that sex, tissue ratio, and the presence of Doppler microbubbles were cofounders of this risk. A higher number of exposures increased the risk of DCS in this analysis.

Kumar, K. Vasantha↗

Adult weight change and premenopausal breast cancer risk: A prospective pooled analysis of data from 628,463 women

Early-adulthood body size is strongly inversely associated with risk of premenopausal breast cancer. It is unclear whether subsequent changes in weight affect risk. We pooled individual-level data from 17 prospective studies to investigate the association of weight change with premenopausal breast cancer risk, considering strata of initial weight, timing of weight change, other breast cancer risk factors and breast cancer subtype. Hazard ratios (HR) and 95% confidence intervals (CI) were obtained using Cox regression. Among 628,463 women, 10,886 were diagnosed with breast cancer before menopause. Models adjusted for initial weight at ages 18–24 years and other breast cancer risk factors showed that weight gain from ages 18–24 to 35–44 or to 45–54 years was inversely associated with breast cancer overall (e.g., HR per 5 kg to ages 45–54: 0.96, 95% CI: 0.95–0.98) and with oestrogen-receptor(ER)-positive breast cancer (HR per 5 kg to ages 45–54: 0.96, 95% CI: 0.94–0.98). Weight gain from ages 25–34 was inversely associated with ER-positive breast cancer only and weight gain from ages 35–44 was not associated with risk. None of these weight gains were associated with ER-negative breast cancer. Weight loss was not consistently associated with overall or ER-specific risk after adjusting for initial weight. Weight increase from early-adulthood to ages 45–54 years is associated with a reduced premenopausal breast cancer risk independently of early-adulthood weight. Biological explanations are needed to account for these two separate factors.

60 APPLIED LIFE SCIENCES↗

Demonstration of Coupled Multievent Scenario at a Subject Nuclear Power Plant

This report discusses how to perform a coupled, seismic and flooding, multievent risk-informed analysis. Presented in the following sections are the need for multievent risk-informed analysis, the tools needed to perform the analysis, and an example of solving a demonstration problem.

54 ENVIRONMENTAL SCIENCES↗

Mars Exploration Rover Heat Shield Recontact Analysis

The twin Mars Exploration Rover missions landed successfully on Mars surface in January of 2004. Both missions used a parachute system to slow the rover s descent rate from supersonic to subsonic speeds. Shortly after parachute deployment, the heat shield, which protected the rover during the hypersonic entry phase of the mission, was jettisoned using push-off springs. Mission designers were concerned about the heat shield recontacting the lander after separation, so a separation analysis was conducted to quantify risks. This analysis was used to choose a proper heat shield ballast mass to ensure successful separation with low probability of recontact. This paper presents the details of such an analysis, its assumptions, and the results. During both landings, the radar was able to lock on to the heat shield, measuring its distance, as it descended away from the lander. This data is presented and is used to validate the heat shield separation/recontact analysis.

Raiszadeh, Behzad↗

An Integrated Approach to Risk Assessment for Concurrent Design

This paper describes an approach to risk assessment and analysis suited to the early phase, concurrent design of a space mission. The approach integrates an agile, multi-user risk collection tool, a more in-depth risk analysis tool, and repositories of risk information. A JPL developed tool, named RAP, is used for collecting expert opinions about risk from designers involved in the concurrent design of a space mission. Another in-house developed risk assessment tool, named DDP, is used for the analysis.

defect detection and prevention (DDP)↗

EC Transmission Line Risk Identification and Mitigation Analysis

The purpose of this document is to assist in evaluating and planning for the cost, schedule, and technical project risks associated with the delivery and operation of the EC (Electron cyclotron) transmission line system. In general, the major risks that are anticipated to be encountered during the project delivery phase associated with the implementation of the Procurement Arrangement for the EC transmission line system are associated with: (1) Undefined or changing requirements (e.g., functional or regulatory requirements); (2) Underperformance of prototype, first unit, or production components during testing; (3) Unavailability of qualified vendors for critical components Technical risks associated with the design and operation of the system are also identified.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An Approach to Dynamic Human Reliability Analysis Using the EMRALD Dynamic Risk Assessment Tool

There is a need for research into dynamic human reliability analysis (HRA) (i.e., simulation- or computation-based HRA), as many researchers have emphasized the importance of applying dynamic approaches to probabilistic safety assessments (PSAs). This study proposes the Procedure-based Investigation Method of EMRALD Risk Assessment – Human Reliability Analysis (PRIMERA-HRA), a dynamic HRA approach based on the Event Modeling Risk Assessment Using Linked Diagram (EMRALD) software developed by Idaho National Laboratory (INL). This study suggests how this software can be used to model human actions and evaluate error probabilities. The applicability of this approach is also be investigated in light of an extended loss of AC power (ELAP) scenario. This paper then discusses the major insights derived by comparing this dynamic HRA approach against the static one.

99 GENERAL AND MISCELLANEOUS↗

Application of Risk Assessment Tools in the Continuous Risk Management (CRM) Process

Marshall Space Flight Center (MSFC) of the National Aeronautics and Space Administration (NASA) is currently implementing the Continuous Risk Management (CRM) Program developed by the Carnegie Mellon University and recommended by NASA as the Risk Management (RM) implementation approach. The four most frequently used risk assessment tools in the center are: (a) Failure Modes and Effects Analysis (FMEA), Hazard Analysis (HA), Fault Tree Analysis (FTA), and Probabilistic Risk Analysis (PRA). There are some guidelines for selecting the type of risk assessment tools during the project formulation phase of a project, but there is not enough guidance as to how to apply these tools in the Continuous Risk Management process (CRM). But the ways the safety and risk assessment tools are used make a significant difference in the effectiveness in the risk management function. Decisions regarding, what events are to be included in the analysis, to what level of details should the analysis be continued, make significant difference in the effectiveness of risk management program. Tools of risk analysis also depends on the phase of a project e.g. at the initial phase of a project, when not much data are available on hardware, standard FMEA cannot be applied; instead a functional FMEA may be appropriate. This study attempted to provide some directives to alleviate the difficulty in applying FTA, PRA, and FMEA in the CRM process. Hazard Analysis was not included in the scope of the study due to the short duration of the summer research project.

Paul S. Ray↗

Lung Cancer in the Mayak Workers Cohort: Risk Estimation and Uncertainty Analysis

The workers at the Mayak nuclear facility near Ozyorsk, Russia are a primary source of information about exposure to radiation at low-dose rates, since they were subject to protracted exposures to external gamma rays and to internal exposures from plutonium inhalation. Here we re-examine lung cancer mortality rates and assess the effects of external gamma and internal plutonium exposures using recently developed Monte Carlo dosimetry systems. Using individual lagged mean annual lung doses computed from the dose realizations, we fit excess relative risk (ERR) models to the lung cancer mortality data for the Mayak Workers Cohort using risk-modeling software. We then used the corrected information matrix (CIM) approach to widen the confidence intervals of ERR by taking into account the uncertainty in doses represented by multiple realizations from the Monte Carlo dosimetry systems. Findings of this work revealed that there were 930 lung cancer deaths during follow-up. Plutonium lung doses (but not gamma doses) were generally higher in the new dosimetry systems than those used in the previous analysis. This led to a reduction in the risk per unit dose compared to prior estimates. The estimated ERR/Gy for external gamma-ray exposure was 0.19 (95% CI: 0.07 to 0.31) for both sexes combined, while the ERR/Gy for internal exposures based on mean plutonium doses were 3.5 (95% CI: 2.3 to 4.6) and 8.9 (95% CI: 3.4 to 14) for males and females at attained age 60. Accounting for uncertainty in dose had little effect on the confidence intervals for the ERR associated with gamma-ray exposure, but had a marked impact on confidence intervals, particularly the upper bounds, for the effect of plutonium exposure [adjusted 95% CIs: 1.5 to 8.9 for males and 2.7 to 28 for females]. In conclusion, lung cancer rates increased significantly with both external gamma-ray and internal plutonium exposures. Accounting for the effects of dose uncertainty markedly increased the width of the confidence intervals for the plutonium dose response but had little impact on the external gamma dose effect estimate. Adjusting risk estimate confidence intervals using CIM provides a solution to the important problem of dose uncertainty. This work demonstrates, for the first time, that it is possible and practical to use our recently developed CIM method to make such adjustments in a large cohort study.

uncertainty, radiation risk estimation, Mayak Prod↗

Long-Term Biochemical and Survival Outcome of 921 Patients Treated With I-125 Permanent Prostate Brachytherapy

Purpose: To assess long-term biochemical and survival outcome after permanent prostate brachytherapy (BT). Methods and Materials: Data on 921 patients, treated with permanent interstitial BT monotherapy between 1989 and 2004 for <=T2c Nx/0 Mx/0 prostate cancer were evaluated. All patients were treated with I-125 seeds (prescription dose 144 Gy). Eighty-five patients with a gland volume >=50cc received 6 months of antiandrogen therapy before treatment. Patients were classified into risk groups with 232 defined as low-, 369 intermediate-, and 320 high-risk disease. The median follow-up was 69 months (range, 4-186 months); mean age was 67 years. Results: Average 5- and 10-year biochemical no evidence of disease (bNED) rates were 79% and 57%. Average 10-year bNED rates by risk group were 88% for low-risk, 61% for intermediate-risk, and 30% for high-risk disease. The average 10-year overall and disease-specific survival rates were 59% and 82%. Ten-year overall and disease-specific survival rates by risk group were, respectively, 68% and 96% for low-risk, and 64% 87% for intermediate-risk, and 49% and 69% for high-risk disease. In multivariate Cox regression analysis, both risk group and treatment era were independent predictors of bNED and survival. Conclusions: These data on long-term survival continue to support the use of I-125 monotherapy for prostate cancer in low-risk patients and, in particular, demonstrate its efficacy in intermediate-risk patients.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Joint Non-Parametric Correction Estimator for Excess Relative Risk Regression in Survival Analysis with Exposure Measurement Error

Summary Observational epidemiological studies often confront the problem of estimating exposure–disease relationships when the exposure is not measured exactly. We investigate exposure measurement error in excess relative risk regression, which is a widely used model in radiation exposure effect research. In the study cohort, a surrogate variable is available for the true unobserved exposure variable. The surrogate variable satisfies a generalized version of the classical additive measurement error model, but it may or may not have repeated measurements. In addition, an instrumental variable is available for individuals in a subset of the whole cohort. We develop a non-parametric correction estimator by using data from the subcohort and further propose a joint non-parametric correction estimator using all observed data to adjust for exposure measurement error. An optimal linear combination estimator of the joint non-parametric correction and non-parametric correction is further developed. The estimators proposed are non-parametric, which are consistent without imposing a covariate or error distribution, and are robust to heteroscedastic errors. Finite sample performance is examined via a simulation study. We apply the developed methods to data from the Radiation Effects Research Foundation, in which chromosome aberration is used to adjust for the effects of radiation dose measurement error on the estimation of radiation dose responses.

Wang, Ching-Yun↗

Analysis of implant loss risk factors after simultaneous guided bone regeneration: A retrospective study of 5404 dental implants

Abstract Purpose The purpose was to analyze the risk factors for implant loss after simultaneous guided bone regeneration (GBR). Materials and Methods Patients who underwent implant placement with simultaneous GBR between January 2011 and December 2018 were screened for this study. The cumulative survival rate (CSR) was calculated using the life table method. Log‐rank test and Kaplan–Meier survival estimates were used to identify potential risk factors for implant loss. The association between the investigated variables and implant loss was determined using hazard ratios (HRs) obtained from a multivariate Cox regression analysis. Results A total of 3973 patients with 5404 implants were included in this study. The CSRs of the implants at 1, 5, and 10 years were 99.6%, 98.9%, and 98.7%, respectively. Male patient (HR = 2.94, 95% CI: 1.41–6.14), periodontitis (HR = 4.26, 95% CI: 2.05–9.86), tissue‐level implants (HR = 3.02, 95% CI: 1.30–6.98), narrow implants (HR = 2.71, 95% CI: 1.12–6.57), and implant length ≤10 mm (HR = 2.91, 95% CI: 1.41–6.02) significantly increased the risk of implant loss ( p < 0.05). The risk of implant loss was significantly higher in the maxillary posterior region (HR = 2.26, 95% CI: 1.04–4.90) than in the maxillary anterior region ( p < 0.05). Compared to Straumann, Nobel (HR = 4.07, 95% CI: 1.75–9.44) and other implant systems (HR = 14.23, 95% CI: 4.32–46.85) showed a significantly higher risk of implant loss ( p < 0.05). Conclusion Male patient, periodontitis, maxillary posterior region, Nobel implant system, other implant systems, tissue‐level implants, narrow implants, and implant length ≤10 mm were considered risk factors for implant loss after simultaneous GBR.

Shen, Xiaoting↗

Conceptual Model of Offshore Wind Environmental Risk Evaluation System

In this report we describe the development of the Environmental Risk Evaluation System (ERES), a risk-informed analytical process for estimating the environmental risks associated with the construction and operation of offshore wind energy generation projects. The development of ERES for offshore wind is closely allied to a concurrent process undertaken to examine environmental effects of marine and hydrokinetic (MHK) energy generation, although specific risk-relevant attributes will differ between the MHK and offshore wind domains. During FY10, a conceptual design of ERES for offshore wind will be developed. The offshore wind ERES mockup described in this report will provide a preview of the functionality of a fully developed risk evaluation system that will use risk assessment techniques to determine priority stressors on aquatic organisms and environments from specific technology aspects, identify key uncertainties underlying high-risk issues, compile a wide-range of data types in an innovative and flexible data organizing scheme, and inform planning and decision processes with a transparent and technically robust decision-support tool. A fully functional version of ERES for offshore wind will be developed in a subsequent phase of the project.

17 WIND ENERGY↗