Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ramping”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 955 records · Page 53

Cooperative Merging Speed Planning: A Vehicle-Dynamics-Free Method

Various cooperative merging control strategies at on-ramp have been proposed in the last decade. Approximated vehicle longitudinal motion models, e.g., kinematics model, have been broadly adopted for controller synthesis because of their simplicity. However, what appears problematic is that the models used for controller validation remain, in many cases, the same as the ones used for controller design. Indeed, actual vehicle dynamics contain rich behaviors that the simplified models cannot fully cover. In this paper, we first demonstrate that the actual vehicle speed can be dissimilar to the reference from a speed planner once vehicle dynamics is considered. Then, we propose two data-driven speed generators agnostic to vehicle dynamics. SUMO/Simulink joint simulations demonstrate that the proposed reference speed planners can successfully merge vehicles with distinct dynamics characteristics by following the desired sequence, speed, and intervehicle distance at the merging point while avoiding collisions.

Wang, Zejiang↗

Reliability and Lifetime Prediction Model of Sintered Silver Under High-Temperature Cycling

Although excellent reliability has been reported for sintered silver as a die-attach material under both thermal and power cycling loads in power electronics applications, the promise of this material as a large-area attachment at temperatures beyond 200 degrees C needs to be investigated. This paper presents insights into the thermomechanical behavior and reliability of sintered silver under extreme thermal cycling conditions. In this study, we bonded sintered silver samples and subjected it to a thermal cycling profile of -40 °C to 200 °C with high ramp rates. We periodically monitored samples under thermal cycling to detect the presence of any failure mechanisms using a scanning acoustic microscope. We also included 95Pb5Sn solder in the study to obtain reference data. Results show the occurrence of cracks in sintered silver followed by a rapid rate of crack growth that exceeded the failure criterion in just 50 cycles. The predominant failure mechanism we observed was adhesive failure. As a large-area attachment, solder exhibited a higher reliability than sintered silver but failed within 100 cycles. Finally, we performed thermomechanical modeling to compute strain energy density values and correlated these with the experimentally observed crack growth rates to formulate a lifetime prediction model for sintered silver.

30 DIRECT ENERGY CONVERSION↗

Traffic Control via Connected and Automated Vehicles (CAVs): An Open-Road Field Experiment with 100 CAVs

The CIRCLES project aims to reduce instabilities in traffic flow, which are naturally occurring phenomena due to human driving behavior. Also called “phantom jams” or “stop-and-go waves,” these instabilities are a significant source of wasted energy. Toward this goal, the CIRCLES project designed a control system, referred to as the MegaController by the CIRCLES team, that could be deployed in real traffic. Our field experiment, the MegaVanderTest (MVT), leveraged a heterogeneous fleet of 100 longitudinally controlled vehicles as Lagrangian traffic actuators, each of which ran a controller with the architecture described in this article. The MegaController is a hierarchical control architecture that consists of two main layers. The upper layer is called the Speed Planner and is a centralized optimal control algorithm. It assigns speed targets to the vehicles, conveyed through the LTE cellular network. The lower layer is a control layer, running on each vehicle. It performs local actuation by overriding the stock adaptive cruise controller, using the stock onboard sensors. The Speed Planner ingests live data feeds provided by third parties as well as data from our own control vehicles and uses both to perform the speed assignment. The architecture of the Speed Planner allows for the modular use of standard control techniques, such as optimal control, model predictive control (MPC), kernel methods, and others. The architecture of the local controller allows for the flexible implementation of local controllers. Corresponding techniques include deep reinforcement learning (RL), MPC, and explicit controllers. Depending on the vehicle architecture, all onboard sensing data can be accessed by the local controllers or only some. Likewise, control inputs vary across different automakers, with inputs ranging from torque or acceleration requests for some cars to electronic selection of adaptive cruise control (ACC) setpoints in others. The proposed architecture technically allows for the combination of all possible settings proposed previously, that is {Speed Planner algorithms} × {local Vehicle Controller algorithms} × {full or partial sensing} × {torque or speed control}. As a result, most configurations were tested throughout the ramp up to the MegaVandertest (MVT).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Future Industrial Demand: Large, Elastic, and Concentrated [Guest Editorial]

Here, the future industrial demand on the grid is expected to be large, price sensitive, and concentrated. Grid industrial demand increasingly encompasses a new customer type defined as a large flexible load (LFL). This LFL type defines customers with consumption that responds quickly to price or other incentives without interrupting their core business process, such cryptocurrency mining. This customer type can often ramp up and down quickly, which across an entire industry can mean gigawatts of power within a few minutes. In addition to these price-sensitive loads, significant growth is also anticipated in sectors like manufacturing, data centers, and electrification of transportation and buildings.

Mukherjee, Srijib [Oak Ridge National Laboratory (↗

Real-time Optimal Dispatch of Behind-the-Meter DERs for Secondary Frequency Regulation

Active distribution networks (ADNs) can provide grid services such as peak load shaving, loss reduction, VoltNar control, congestion management, and frequency regulation. The fast response of inverter-based distributed energy resources (DERs) and battery storage systems enables them to provide ramping support and frequency control. This paper proposes a real-time optimization approach for behind-the-meter DERs to participate in the secondary frequency regulation. The proposed approach determines optimal set-points of output power of DERs to respond to requests from system operators (SOs) in realtime to maintain the frequency of the system at the nominal value. To satisfy the real-time requirement for the secondary frequency control, the nonlinear AC power flow model is linearized considering power losses in the system to achieve both high computational speed and acceptable accuracy. The optimization problem is rerun in a closed loop manner until the mismatch between the requested power by the system operators and actual delivered power at the substation reaches an acceptable tolerance. Furthermore, the proposed approach is validated using modified versions of the IEEE 33-bus and IEEE 69-bus distribution systems. Although the contribution of a single distribution system in the frequency regulation may not be significant, stacked and coordinated contributions from several distribution systems can provide frequency regulation and other grid services at scale.

24 POWER TRANSMISSION AND DISTRIBUTION↗

How Can Probabilistic Solar Power Forecasts Be Used to Lower Costs and Improve Reliability in Power Spot Markets? A Review and Application to Flexiramp Requirements

Net load uncertainty in electricity spot markets is rapidly growing. There are five general approaches by which system operators and market participants can use probabilistic forecasts of wind, solar, and load to help manage this uncertainty. These include operator situation awareness, resource risk hedging, reserves procurement, definition of contingencies, and explicit stochastic optimization. We review these approaches, and then provide a case study in which a method for using probabilistic solar forecasts to define needs for reserves is developed and evaluated. The case study has three parts. First, we describe building blocks for enhancing the Watt-Sun solar forecasting system to produce probabilistic irradiance and power forecasts. Second, relationships between Watt-Sun forecasts for multiple sites in California and the system's need for flexible ramp capability (flexiramp) are defined by machine learning and statistical methods. Third, the performance of present methods to defining flexiramp requirements, which are not conditioned on weather and renewables forecasts, is compared with that of probabilistic solar forecast-based requirements, using a multi-timescale production costing model with an 1820-bus representation of the WECC power system. Significant potential savings in fuel and flexiramp procurement costs from using solar-informed reserve requirements are found.

14 SOLAR ENERGY↗

Data-Driven Load Diversity and Variability Modeling for Quasi-Static Time-Series Simulation on Distribution Feeders

This paper presents a data-driven load modeling methodology for distribution system quasi-static time-series (QSTS) simulation considering both diversity and variability characteristics of distribution loads. Based on our previous work in [1]-[2], a variability library and diversity library have been established based on the realistic high-resolution data collected from actual utility feeders. Given the load profile for the start-of-circuit load of a feeder, the loads on the feeder nodes can be modeled with both diversity and variability instead of being directly scaled from the substation load profile according to the distribution allocation factors. With diversified load models, the load-induced impact on the feeder operation characteristics, such as voltage ramp and regulator operations, can be better considered in QSTS simulation. The proposed modeling methodology has been tested on both the IEEE 123-bus feeder and an actual utility feeder model, and the simulation results have demonstrated the merits of deploying the proposed load modeling methodology.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Blackstart of Power Grids with Inverter-Based Resources

This paper presents the findings of our investigation into inverter-based resource-(IBR-) driven blackstart of electric grids. Four potential black-start configurations with different setups are presented. To evaluate the technical feasibility of IBR-driven black start in the four configurations, a behavioral model of inverters that mimics current-limited inverter operation is developed using variable resistors in the MATLAB Simulink/Simscape environment. The inverter model is connected to an induction motor through transformers and a transmission line to simulate its startup. Simulation results show that even with the limited current supply capability of inverters because of their physical constraints, IBRs can black-start a motor under certain conditions. Results also show that by using soft-start techniques, such as ramped supply voltage, inrush currents can be reduced, thereby expanding the conditions under which IBRs can provide black-start support. Simulation results with different scenarios lead to discussions and key takeaways that could be valuable for further IBR-driven black-start research.

41 EE - Solar Energy Technologies Office (EE-4S)↗

An Operational Resilience Metric to Evaluate Inertia and Inverter-based Generation on the Grid

In an effort to reduce carbon emissions and curtail the effects of climate change there has been considerable effort to increase the penetration of inverter-based renewable energy sources. The adoption of renewable generation over conventional inertia-based generation sources is forming considerable challenges for the operation and stability of the power system. The power system has been designed around generation units characterized by high inertia and primary frequency response (PFR), allowing them to respond to disturbances such as faults or generators tripping off line. In contrast, the modern inverter-based assets are characterized by no contribution to inertia and they typically provide stochastic generation at their maximum output, thus having no contribution to PFR during low-frequency disturbance events. Because of this, inertia in power systems is reducing, resulting in a faster rate of frequency change after a disturbance occurs. As more inverter-based generation units are added to the grid it is important to understand the stability of the system and the size of disturbance a system is capable of withstanding. This paper presents a resilience metric that evaluates the maximum size of disturbance a systems can withstand based on the system inertia and the primary frequency control of inverter and inertia-based generation. The results are shown visually and are based on the real-time operation of generation units and their characteristics such as latency, ramp rates, and energy constraints. It is demonstrated that the real-time positioning or bias of the generating units has an effect of the size of disturbance that a system can withstand, i.e. its resilience. It is expected that this type of analysis can help operators increase the resilience of power systems in the future.

13 HYDRO ENERGY↗

Small Hydropower Plant Response Improvement Using Energy Storage

Small hydropower plants contribute significantly to global power generation. However, due to limited storage, these can have low ramping capacity and poor load-frequency regulation. These can prevent small hydropower plants from being used in isolated grids as backup power to critical loads and rural areas. In this paper, a control architecture for frequency control is proposed that facilitates the use of energy storage to improve the response of standalone small hydropower plants. The frequency controller generates power commands using proportional control on frequency deviation and a user-defined power setpoint, and this incorporates with a current controller that facilitates power injection. The distinctive feature of the controller design is that it takes into account frequency thresholds and storage constraints to enable power injections, and it provides the capability to perform automated and manual recharge of the energy storage. Simulations using detailed nonlinear models demonstrate the improved performance of the hydropower with energy storage using the proposed controller. Automated and manual recharge and the impact of the energy storage constraints on the performance of the hydropower plant are demonstrated.

13 HYDRO ENERGY↗

A Novel Secondary Frequency Regulation with Optimal Priority Selection of AGC Contributions

Automatic generation control (AGC) is used to maintain acceptable frequencies during operation owing to fluctuations in load and variable resources. In conventional industry applications, the AGC signal is allocated to each generator according to the predispatched frequency regulation capacity or the order of economic efficiency. However, with the increasing integration of inverter-based resources (IBRs), the retirement of conventional synchronous generators (SGs) has posed new challenges to frequency control schemes because fewer of them are optional for AGC regulation. In this paper, we propose a novel model predictive control (MPC)-based frequency regulation model to reduce control cost and ensure stability, by considering different critical dynamic factors when optimally selecting the AGC units. The proposed control model – developed in a general form – comprehensively embeds characteristics such as generator ramping rates, reserve capacity, and operation cost. The model predictive control–based two-timescale AGC scheme enhances the capability of immunizing the power disturbance from types of resources by coordinating the control signals between faster IBRs and slower SGs. The case study’s proposed model is verified to be effective in synergistically enforcing different dynamic properties of AGC units into the frequency regulation scheme.

Jiang, Sufan [The University of North Carolina at ↗

Photovoltaic Inverter Momentary Cessation: Recovery Process is Key

Momentary cessation refers to an inverter control mode. When the inverter terminal voltage falls below (or exceeds) a certain level, the inverter ceases to output any current, but attempts to maintain (or quickly regain) phase-locked loop synchronization to allow for quick reinjection of current when the voltage recovers to a certain point. This paper presents a photovoltaic (PV) momentary cessation model developed in PSS/E. Simulations are presented for a high voltage transmission line fault contingency in the Hawaiian island of Oahu power system on a validated PSS/E model, modified to include a custom distributed PV inverter model, and different near-future distributed PV penetration levels. Simulations for the island power system include different penetration levels of PV, and different recovery times (ramp rates and delays) after momentary cessation. The results indicate that during low voltage events, such as faults, momentary cessation can produce severe under frequency events, causing significant load shed and shortly thereafter, in some cases, over frequency events that cause generation to trip offline. The problem is exacerbated with higher penetration levels of PV. If momentary cessation is used (as is typically the case for distribution-connected resources), the recovery process after momentary cessation should be carefully considered to minimize impacts to bulk power system stability.

14 SOLAR ENERGY↗

Reliable Power Rating of Perovskite PV Modules

As the perovskite technology is ramping up into commercialization, reliable and accurate power rating of large-size perovskite modules becomes a prominent aspect for its future deployment in the PV market. It is known that the performance calibration of perovskite PV devices is very challenging due to its complex dynamic response during a conventional current-voltage (IV) measurement. PV researchers have previously proposed several steady-state performance calibration methods to reliably extract PV efficiencies, but mostly focus on small area research-type cells. In this paper, we emphasize the importance of reliable performance calibration on large-size perovskite modules. Extending the NREL Cell and Module Performance (CMP) group's steady-state performance calibration protocol (i.e., Asymptotic P MAX Scan) for perovskite cells to modules, we justify the necessity of reporting steady-state efficiencies for perovskite cells and discuss the challenges of applying this protocol to modules. We also present our protocol for Maximum Power Point Tracking (MPPT), which is a technique often used for performance calibration of perovskite cells and modules, and show a comparison between MPPT and Asymptotic P MAX . Using MPPT we demonstrate the interplay between metastability and degradation in perovskite modules, and emphasize the necessity to develop preconditioning protocols for stabilizing these devices. Our aim is to promote development of consensus protocols for performance calibration of perovskite modules, and to advance their credible power ratings, which will be beneficial to the growth of perovskite technology in the PV market.

perovskite↗

Verification of Adaptive Protection in Hardware in the Loop for Coordination with Solar Variability

As inverter-based resources continue to be installed at all levels of the electric grid, the fixed protection schemes used at the distribution level will continue to be stressed until they no longer ensure the protection of the grid. Adaptive protection has been proposed as a solution with the ability to update the protection schemes in near real-time to ensure reliability and increase the resilience of the grid. However, weather variability poses a significant challenge to the ability of these methods to keep the selectivity and reliability of these schemes coordinated. If the ramp rates, due to solar variability, of the inverter-based resources change faster than the adaptive protection can issue new settings, the protection system could be uncoordinated, with the wrong device responding to a system fault. The proposed adaptive protection method ensures that due to solar variability, communication, and protection calculation latency, it can issu e coordinated protection settings promptly, in one minute or less. The hardware-in-the-loop results show the protection settings being issued and maintaining system coordination in under a minute.

Summers, Adam↗

WE-Validate: An Open-Source Framework For Wind Power Validation

Grid operators rely on historical weather time series at existing and planned wind power plants to make informed decisions when planning for a future power grid with very high penetration of renewable power. While synthetic wind power time series have been developed based on historical weather models, their validation with actual power production data remains complex due to variations in modeling practices and methodologies. This paper introduces the WE-Validate framework, originally designed for wind speed validation and now enhanced for wind power validation with a graphical user interface to support users with minimal programming experience. Validation of wind power with WE-Validate is based on robust metrics consisting of RMSE, centered RMSE, average bias, average percent bias, mean absolute error, mean absolute percent error, cross correlation, and calculation of ramping magnitude, rate, and duration. This paper showcases WE-Validate with validation of synthetically derived power for a wind plant in Washington state for one month in 2018. Validation of the synthetic power from two comparison data sets compared with observations shows both comparison series have strong correlation with observed across weekly and monthly aggregations while suffering from persistent negative bias. The suite of metrics within WE-Validate facilitates immediate insight into the utility of the comparison data sets through compression across multiple axes. This user-friendly, open-source tool can be extended beyond wind power, making it a valuable resource for system planners and operators in different domains.

Moncheur de Rieudotte, Malcolm P.↗

Reassembly and Test of High-Field Nb3Sn Dipole Demonstrator MDPCT1

In the framework of the U.S. Magnet Development Program (MDP), Fermilab has developed and tested a high-field Nb$_3$Sn dipole demonstrator MDPCT1 for a post-LHC Hadron Collider. The magnet was first assembled with a lower coil pre-load to minimize the risk of coil damage during assembly and test. In the first test the magnet reached its test goal producing a world record field of 14.1 T at 4.5 K. Next the magnet was reassembled with nominal pre-load to achieve its design field limit of 15 T. This paper describes the details of MDPCT1 inspection, design modifications and reassembly. The magnet quench performance, including training, ramp rate and temperature dependences in the temperature range of 1.9-4.5 K, is presented and discussed.

43 PARTICLE ACCELERATORS↗

Proof-of-Principle Design of a High-Field Overpass/Underpass Nb 3 Sn Dipole

A block coil geometry is appealing in the body of particle accelerator dipole or quadrupole magnets, but less so in the ends of conventional designs, because conductors near the midplane of the beam tube must be bent in the hard direction to cross over to the other side of the tube. In order to avoid damage to brittle conductors such as Nb 3 Sn or HTS, the bend must be very gradual, resulting in undesirably long magnet ends. An alternative design -"overpass/underpass" or "cloverleaf" - can ramp the conductor within a short length with bending only in the easy direction. Described here is a proof-of-principle design and analysis of an "overpass/underpass" coil geometry for a block coil dipole of 11 Tor more.

47 OTHER INSTRUMENTATION↗

Performance of a MQXF Nb 3 Sn Quadrupole Magnet Under Different Stress Level

In a dipole or in a quadrupole accelerator magnet, the displacement of the coil turns induced by the electromagnetic forces can cause quenches limiting the magnet performance. For this reason, an azimuthal preload is applied to avoid azimuthal movements of the coil up to the required operational current. However, several tests showed that accelerator magnets can operate with a partial preload, i.e. that coil unloading during the ramp does not prevent reaching higher currents. This issue is particularly relevant for Nb 3 Sn magnets, where the loads applied to the Nb3Sn filaments can reach the degradation limits of critical current. In order to investigate the impact of coil preload on the quench performance, the MQXFS6 short model quadrupole for the High Luminosity Upgrade was tested under an azimuthal preload at 80% of the short sample current, reaching 93% of short sample current at 1.9 K. The preload was then released to 60%, still showing ability to operate in the range of 80-85% of short sample current as required by HL-LHC project. With this lower preload, the ability of going above 90% of short sample was lost, and a significant training appeared above 85%. When the preload was restored to the original 80% value, the magnet reached with few quenches 95% of short sample (13.4 T peak field). Magnetic measurements confirm the larger movement of the coil in the case with lower preload, and agree with finite element simulations.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗