Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “program administration”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 955 records · Page 53

Cooperative Collision Avoidance Step 1 - Technology Demonstration Flight Test Report. Revision 1

The National Aeronautics and Space Administration (NASA) Access 5 Project Office sponsored a cooperative collision avoidance flight demonstration program for unmanned aircraft systems (UAS). This flight test was accomplished between September 21st and September 27th 2005 from the Mojave Airport, Mojave, California. The objective of these flights was to collect data for the Access 5 Cooperative Collision Avoidance (CCA) Work Package simulation effort, i.e., to gather data under select conditions to allow validation of the CCA simulation. Subsequent simulation to be verified were: Demonstrate the ability to detect cooperative traffic and provide situational awareness to the ROA pilot; Demonstrate the ability to track the detected cooperative traffic and provide position information to the ROA pilot; Demonstrate the ability to determine collision potential with detected cooperative traffic and provide notification to the ROA pilot; Demonstrate that the CCA subsystem provides information in sufficient time for the ROA pilot to initiate an evasive maneuver to avoid collision; Demonstrate an evasive maneuver that avoids collision with the threat aircraft; and lastly, Demonstrate the ability to assess the adequacy of the maneuver and determine that the collision potential has been avoided. The Scaled Composites, LLC Proteus Optionally Piloted Vehicle (OPV) was chosen as the test platform. Proteus was manned by two on-board pilots but was also capable of being controlled from an Air Vehicle Control Station (AVCS) located on the ground. For this demonstration, Proteus was equipped with cooperative collision sensors and the required hardware and software to place the data on the downlink. Prior to the flight phase, a detailed set of flight test scenarios were developed to address the flight test objectives. Two cooperative collision avoidance sensors were utilized for detecting aircraft in the evaluation: Traffic Alert and Collision Avoidance System-II (TCAS-II) and Automatic Dependent Surveillance Broadcast (ADS-B). A single intruder aircraft was used during all the flight testing, a NASA Gulfstream III (G-III). During the course of the testing, six geometrically different near-collision scenarios were evaluated. These six scenarios were each tested using various combinations of sensors and collision avoidance software. Of the 54 planned test points 49 were accomplished successfully. Proteus flew a total of 21.5 hours during the testing and the G-III flew 19.8 hours. The testing fully achieved all flight test objectives. The Flight IPT performed an analysis to determine the accuracy of the simulation model used to predict the location of the host aircraft downstream during an avoidance maneuver. The data collected by this flight program was delivered to the Access 5 Cooperative Collision Avoidance (CCA) Work Package Team who was responsible for reporting on their analysis of this flight data.

Trongale, Nicholas A.↗

ALH84001: The Key to Unlocking Secrets About Mars-15 Years and Counting

From the December 27, 1984 discovery of ALH84001, and its subsequent identification as a sample of Mars in 1993, mystery and debate has surrounded the meteorite [1]. With the realization that the ALH84001 sample was a orthopyroxenite and one of the oldest SNC meteorites (approx.4.09 Ga) [2] available to study, important and critical information about the Martian hydrosphere and atmosphere along with the early history and evolution of the planet could be obtained by studying the unique carbonate globules (approx.3.9 Ga) in the sample [3]. The initial work showed the carbonate globules were deposited within fractures and cracks in the host-orthopyroxene by low-temperature aqueous fluids [4]. Ideas that the carbonates were formed at temperatures [5] approaching 800 C were ruled out by later experiments [6]. The 1996 announcement by McKay et al. [7] that ALH84001 contained features which could be interpreted as having a biogenic origin generated considerable excitement and criticism. The NASA Administrator Dan Golden said the 1996 ALH84001 announcement saved NASAs Mars planetary exploration program and injected $6 billion dollars over five years into the scientific research and analysis efforts [8]. All of the original four lines of evidence for possible biogenic features within ALH84001 offered by McKay et al. have withstood the test of time. Criticism has been directed at the interpretation of the 1996 analytical data. Research has expanded to other SNC meteorites. Despite the numerous attacks on the ideas, the debate continues after 15 years. The 2009 paper by Thomas-Keprta et al. [9] on the origins of a suite of magnetites within the ALH84001 has offered strong arguments that some of the magnetites can only be formed by biogenic processes and not from thermal decomposition or shock events which happened to the meteorite. NASA s Astrobiology Institute was formed from the foundation laid by the ALH84001 hypothesis of finding life beyond the Earth. The strong astrobiology outreach programs have expanded because of the work done on the Martian meteorites. De-spite the criticism on the biogenic-like features in ALH84001, the meteorite has opened a window into the early history of Mars. Clearly low-temperature fluids have left their signatures within the ALH84001 meteorite and subsequent cratering events on Mars have been recorded on observable features within the meteorite. The 15 years of detailed study on ALH84001 and its unique carbonate globules have clearly shown formational and secondary processes at work on Mars. Now we need a well-documented Mars sample return mission.

Gibson, Everett K.↗

Train Like an Astronaut Educational Outreach

In an effort to reduce the incidence of childhood obesity, the National Aeronautics and Space Administration (NASA), capitalizing on the theme of human spaceflight developed two educational outreach programs for children ages 8-12. To motivate young "fit explorers," the Train Like an Astronaut National (TLA) program and the Mission X: Train Like an Astronaut International Fitness Challenge (MX) were created. Based on the astronauts' physical training, these programs consist of activities developed by educators and experts in the areas of space life sciences and fitness. These Activities address components of physical fitness. The educational content hopes to promote students to pursue careers in science, technology, engineering, and math (STEM) fields. At the national level, in partnership with First Lady Michelle Obama's Let?s Move! Initiative, the TLA program consists of 10 physical and 2 educational activities. The program encourages families, schools, and communities to work collaboratively in order to reinforce in children and their families the importance of healthy lifestyle habits In contrast, the MX challenge is a cooperative outreach program involving numerous space agencies and other international partner institutions. During the six-week period, teams of students from around the world are challenged to improve their physical fitness and collectively accumulate points by completing 18 core activities. During the 2011 pilot year, a t otal of 137 teams and more than 4,000 students from 12 countries participated in the event. MX will be implemented within 24 countries during the 2012 challenge. It is projected that 7,000 children will "train like an astronaut".

Garcia, Yamil L.↗

Navigating the Obstacles in Science Education for School Outreach

This paper gives an overview of the education outreach initiatives that the authors have personally been involved with, their successes and shortcomings are discussed with ways to overcome the difficulties encountered. Recommendations are given on how to navigate the obstacles. Industry professionals, college professors and even church groups participate in education outreach initiatives. For a successful experience, one has to navigate through various phases of the process. The strategy is to convince stakeholders that there is value in doing the outreach activity, form a partnership with the school, circumnavigate the security and administrative procedures, and finally deliver the material to the students. Successful education outreach programs have well-defined objectives, roles and expectations. Success depends on the level of commitment of all parties involved. Taking a look at individual programs, focusing on their shortcomings and best practices, this paper serves as a compilation of useful ideas for effective science and math education outreach. Navigation techniques mentioned in this paper systematically address each obstacle encountered, making solid recommendations for the future. One of the biggest challenges is showing the direct benefits of the outreach activity to stakeholders, so they can see how they profit from sacrificing their workers as outreach mentors.

Rincon, Diana↗

Pair-Wise Trajectory Management-Oceanic (PTM-O)

This document describes the Pair-wise Trajectory Management-Oceanic (PTM-O) Concept of Operations (ConOps). Pair-wise Trajectory Management (PTM) is a concept that includes airborne and ground-based capabilities designed to enable and to benefit from, airborne pair-wise distance-monitoring capability. PTM includes the capabilities needed for the controller to issue a PTM clearance that resolves a conflict for a specific pair of aircraft. PTM avionics include the capabilities needed for the flight crew to manage their trajectory relative to specific designated aircraft. Pair-wise Trajectory Management PTM-Oceanic (PTM-O) is a regional specific application of the PTM concept. PTM is sponsored by the National Aeronautics and Space Administration (NASA) Concept and Technology Development Project (part of NASA's Airspace Systems Program). The goal of PTM is to use enhanced and distributed communications and surveillance along with airborne tools to permit reduced separation standards for given aircraft pairs, thereby increasing the capacity and efficiency of aircraft operations at a given altitude or volume of airspace.

Jones, Kenneth M.↗

Air Traffic Management Technology Demostration Phase 1 (ATD) Interval Management for Near-Term Operations Validation of Acceptability (IM-NOVA) Experiment

The Interval Management for Near-term Operations Validation of Acceptability (IM-NOVA) experiment was conducted at the National Aeronautics and Space Administration (NASA) Langley Research Center (LaRC) in support of the NASA Airspace Systems Program's Air Traffic Management Technology Demonstration-1 (ATD-1). ATD-1 is intended to showcase an integrated set of technologies that provide an efficient arrival solution for managing aircraft using Next Generation Air Transportation System (NextGen) surveillance, navigation, procedures, and automation for both airborne and ground-based systems. The goal of the IMNOVA experiment was to assess if procedures outlined by the ATD-1 Concept of Operations were acceptable to and feasible for use by flight crews in a voice communications environment when used with a minimum set of Flight Deck-based Interval Management (FIM) equipment and a prototype crew interface. To investigate an integrated arrival solution using ground-based air traffic control tools and aircraft Automatic Dependent Surveillance-Broadcast (ADS-B) tools, the LaRC FIM system and the Traffic Management Advisor with Terminal Metering and Controller Managed Spacing tools developed at the NASA Ames Research Center (ARC) were integrated into LaRC's Air Traffic Operations Laboratory (ATOL). Data were collected from 10 crews of current 757/767 pilots asked to fly a high-fidelity, fixed-based simulator during scenarios conducted within an airspace environment modeled on the Dallas-Fort Worth (DFW) Terminal Radar Approach Control area. The aircraft simulator was equipped with the Airborne Spacing for Terminal Area Routes (ASTAR) algorithm and a FIM crew interface consisting of electronic flight bags and ADS-B guidance displays. Researchers used "pseudo-pilot" stations to control 24 simulated aircraft that provided multiple air traffic flows into the DFW International Airport, and recently retired DFW air traffic controllers served as confederate Center, Feeder, Final, and Tower controllers. Analyses of qualitative data revealed that the procedures used by flight crews to receive and execute interval management (IM) clearances in a voice communications environment were logical, easy to follow, did not contain any missing or extraneous steps, and required the use of an acceptable workload level. The majority of the pilot participants found the IM concept, in addition to the proposed FIM crew procedures, to be acceptable and indicated that the ATD-1 procedures could be successfully executed in a nearterm NextGen environment. Analyses of quantitative data revealed that the proposed procedures were feasible for use by flight crews in a voice communications environment. The delivery accuracy at the achieve-by point was within +/-5 sec, and the delivery precision was less than 5 sec. Furthermore, FIM speed commands occurred at a rate of less than one per minute, and pilots found the frequency of the speed commands to be acceptable at all times throughout the experiment scenarios.

Kibler, Jennifer L.↗

ASTAR Flight Test: Overview and Spacing Results

The purpose of the NASA Langley Airborne Spacing for Terminal Arrival Routes (ASTAR) research aboard the Boeing ecoDemonstrator aircraft was to demonstrate the use of NASA's ASTAR algorithm using contemporary tools of the Federal Aviation Administration's Next Generation Air Transportation System (NEXTGEN). EcoDemonstrator is a Boeing test program which utilizes advanced experimental equipment to accelerate the science of aerospace and environmentally friendly technologies. The ASTAR Flight Test provided a proof-of-concept flight demonstration that exercised an algorithmic-based application in an actual aircraft. The test aircraft conducted Interval Management operations to provide time-based spacing off a target aircraft in non-simulator wind conditions. Work was conducted as a joint effort between NASA and Boeing to integrate ASTAR in a Boeing supplied B787 test aircraft while using a T-38 aircraft as the target. This demonstration was also used to identify operational risks to future flight trials for the NASA Air Traffic Management Technology Demonstration expected in 2017.

Roper, Roy D.↗

GN&C Sequencing for Orion Rendezvous, Proximity Operations, and Docking

As part of the Artemis program to return humans to the lunar surface, the National Aeronautics and Space Administration is planning to use the Orion Multi- Purpose Crew Vehicle to transport crew to a small orbital platform called Gate- way in cislunar space. To facilitate this activity, Orion is required to perform Rendezvous, Proximity Operations, and Docking (RPOD) with both the Gate- way and the launch vehicle upper stage. The Orion spacecraft uses sequencing in the form of Phases, Segments, Activities, and Modes (PSAM) to configure Guidance, Navigation, & Control (GN&C) software during each portion of the mission. Significant updates to Orion PSAM definitions are required for RPOD. This paper describes the process of defining these new sequencing elements, implementing them in prototype flight software, and testing them in an integrated simulation environment. First, requirements are specified to determine the nominal and off-nominal sequencing behavior necessary to complete the mission. These requirements also specify which software functions should be fully autonomous and which functions require manual interactions from crew or ground operators. Next, the RPOD concept of operations is defined with detailed events listed in a mission timeline. Third, a state machine diagram is developed to show all PSAM states, including all possible transitions between them. After this, the PSAM states and transitions are entered into a sequencing software emulator and parameter values and modes are defined for GN&C software elements. Finally, the PSAM architecture is tested within an integrated simulation environment by connecting it with prototypes of relevant GN&C flight software elements and with detailed vehicle models. After the sequencing design has been finalized and tested, it is implemented in flight software.

Schulte, Peter Z.↗

Paving the Way: The Influence of Early Research and Development Programs on Apollo, Saturn, and Legacy System Development

As we celebrate the 50th anniversary of the first successful human landings on the surface of the Moon in 1969, it is insightful to review the many historic accomplishments that contributed to this astounding human achievement. While the Apollo Program officially began following the charge by United States President John F. Kennedy in 1961, much of the foundation for Apollo was already underway with early research and development that began as early as the close of the second World War. Innovations and key decisions prior to the formal initiation of the Apollo Program, and even prior to the formation of the National Aeronautics and Space Administration (NASA), enabled the relatively rapid development of the Saturn V rocket, the Apollo capsule, and the Lunar Lander systems needed to achieve the goal of landing humans on the Moon and returning them safely to Earth by the close of the 1960s.

Cockrell, Charles E., Jr.↗

New Technologies From NASA's FireSense Technology Program

NASA Wildland Fire Initiative - NASA’s Wildland Fire Initiative, is a NASA-wide effort focused on delivering NASA’s unique science and technological capabilities to operational agencies, striving towards measurable improvements in US wildland fire management. - The initiative involves the Science Mission Directorate (SMD), Aeronautics Research Mission Directorate (ARMD), the Space Technology Mission Directorate (STMD), including the Small Business Innovative Research (SBIR) program. - NASA works with interagency partners such as the National Oceanic and Atmospheric Administration (NOAA), the U.S. Department of Agriculture Forest Service (USFS), the California Department of Forestry and Fire Protection, the National Interagency Fire Center, and commercial partners.

FireSense↗

A systems engineering initiative for NASA's space communications

In addition to but separate from the Red and Blue Teams commissioned by the NASA Administrator, NASA's Associate Administrator for Space Communications commissioned a Blue Team to review the Office of Space Communications (Code O) Core Program and determine how the program could be conducted faster, better, and cheaper, without compromising safety. Since there was no corresponding Red Team for the Code O Blue Team, the Blue Team assumed a Red Team independent attitude and challenged the status quo. The Blue Team process and results are summarized. The Associate Administrator for Space Communications subsequently convened a special management session to discuss the significance and implications of the Blue Team's report and to lay the groundwork and teamwork for the next steps, including the transition from engineering systems to systems engineering. The methodology and progress toward realizing the Code O Family vision and accomplishing the systems engineering initiative for NASA's space communications are presented.

Hornstein, Rhoda S.↗

International solar-terrestrial physics program: A plan for the core spaceflight missions

This brochure has been prepared by NASA on behalf of the European Space Agency (ESA), the Institute of Space and Astronautical Science (Japan) (ISAS), and the U.S. National Aeronautics and Space Administration (NASA) to describe the scope of the science problems to be investigated and the mission plan for the core International Solar-Terrestrial Physics (ISTP) Program. This information is intended to stimulate discussions and plans for the comprehensive worldwide ISTP Program. The plan for the study of the solar - terrestrial system is included. The Sun, geospace, and Sun-Earth interaction is discussed as is solar dynamics and the origins of solar winds.

Source record↗

Area South of K7-516, SWMU 100 Operations, Maintenance, and Monitoring Report Kennedy Space Center, Florida

This Operations, Maintenance, and Monitoring Report documents groundwater interim measure activities from March 30, 2019 through December 31, 2019 at the Area South of K7-516 site located at Kennedy Space Center (KSC), Florida. An air sparge (AS) system consisting of 16 AS wells was installed along the Barge Canal in 2012 to be protective of the Outstanding Florida Waters (OFW). The AS system was expanded in 2015 by installing 40 AS wells to remediate the hot spot (HS) area. Additional expansion activities were performed in 2018 through the installation of eight additional AS wells along the Barge Canal. Currently 24 OFW and 40 HS AS wells are in operation. This report includes performance monitoring events for the OFW and HS areas, along with an annual Interim Groundwater Monitoring (IGWM) event in the Western Area. The 516S site has been designated Solid Waste Management Unit 100 under KSC’s Resource Conservation and Recovery Act Corrective Action program. This document was prepared by Tetra Tech, Inc., for the National Aeronautics and Space Administration under Indefinite Delivery Indefinite Quantity Contract 80KSC019D0011/80KSC019F0068. The OFW and HS AS systems are meeting the performance criteria and IM objectives of preventing contaminant migration and remediating groundwater within the treatment zone. Team consensus was reached to continue operation of the combined OFW and HS AS systems (Meeting Minute 2002-M02, Decisions 2002-D06, D09 and D04). Team consensus was also reached to continue semi-annual OFW performance monitoring and annual monitoring for the IGWM Western Area for the same wells sampled during 2019 events. In the eastern area, MW13, MW14, and MW15 will be reduced from semi-annual to annual frequency. For the HS Area, team consensus was reached to continue the current annual/biennial monitoring program (Meeting Minute 2002-M02, Decisions 2002-D02, D03, D05, D07 and D08).

Patrice L. Lehocky↗

From Here to There - Bird's Eye Perspective on Grant Lifecycle and Administration

“What gets measured gets done ”or “measure it to manage it”. The statements have become matter of fact. However, measurement (and even metrics) alone cannot fully communicate an organization’s story without the point of accountability. As a dynamic org, we must measure what is necessary, using the appropriate lenses to analyze the most relevant information that allows robust decision-making. A key function of Program Planning and Control (PP&C) is to assist HRP in the development of such strategy that ensures the proper execution of program research goals. With introspection of the Technical Officer role as defined by 2 CFR(i.e., Part 200, Part 1800)and subsequent governance under the NASA Grant and Cooperative Agreement Manual (GCAM), we’ve realized an obvious disconnect among Principal Investigator’s (PI),technical communication with the elements and some of the administrative/fiduciary requirements that should run parallel to the science work. This find has introduced new program risks as evidenced through incomplete deliverables or other less-than-successful requirements through the lifecycle for work we fund. One solution the Grants Technical Officer proposes is for PP&C to share in the communication with stakeholders of grants administration much earlier in the award process in attempt to reduce programmatic risks; particularly in data, reporting and performance management. As such, the planned IWS 2022 session will focus on(plenary) topics that include (1) definition of the grant lifecycle, (2) anatomy of a grant(NF1687 the award document), and (3)performance measurement/post-award monitoring. As HH&P pursues its strategic objectives to evolve the directorate into a data rich and knowledge rich organization, it has become increasingly important to develop the multiple levels of insight across the program to ensure data and other reporting(qualitative/quantitative), alongside proper administration. And the desired outcome is to make certain HRP meets/exceeds the accountability standard that our research information is received, maintained and accessible in posterity.

Lucy D Barnes-Moten↗

Defining a Mechanism of Educational Interface Between NASA Life Sciences the Nation's Students

Harnessing our greatest national resource, as represented by the nation's students, will require a thoughtful, well developed and administered program that includes precise, executable strategies and valid evaluation tools. Responding to a national education outreach priority, the National Aeronautics and Space Administration's Life and Biomedical Sciences and Applications Division has initiated a process or organizing and implementing various strategies through a steering committee that includes representatives from Headquarters and three field centers with major Life Sciences programs. The mandate of the Life Sciences Education Outreach Steering Committee is to develop ways of communicating space life science issues to America's students through the nation's teachers by curriculum enhancement and direct participation in the education process with an emphasis in the primary and secondary schools. Metrics are also developed for each individually defined process so that the mechanis can be continuously refined and improved.

Chamberland, D.↗

Research Infrastructure Challenges for Graduate Programs in STEM Disciplines at Minority Institutions

It is much more challenging to perform experimental research functions at many minority institutions, because of lack of adequate research infrastructure. This is especially true if one wishes to initiate and implement masters and doctoral degree program in physics. In the present paper, an attempt is made to discuss the various hurdles encountered by the authors in the establishment of Master's and Doctoral degree programs in physics at one of the HBCUs (Historically Black Colleges and Universities). The department got no special or necessary treatment and faculty members are asked to teach as much course work as any other undergraduate department on the campus. It was very hard to convince university administration that giving less teaching load to research producing department faculty, shall culminate in abundant funding for the future years. This scenario created an extra heavy pressure on the faculty to continue the program. Some of the challenges included the resistance of some faculty and administrators to change, lack of sufficient release time for research producing faculty, and potential variation in funding or support with changes in the state education budget proration or members of the administration. In spite of the indirect cost recovery, very little infrastructure facilities was provided and the federal funding agencies did not want to interfere in the administration of the university. Various issues of recruiting and mentoring minority students, retention in the STEM disciplines as well as research infrastructure challenges at an HBCU university are presented.

Aggarwal, M. D.↗

Gateway Program Safety and Mission Assurance Integration - The Future of Safe Deep Space Human Exploration

As a foundational element of the National Aeronautics and Space Administration (NASA) Artemis Campaign, the Gateway is an incrementally built cislunar spacecraft that will serve as a platform for deep space human exploration, science, and technology demonstration. The Gateway will be a unifying catalyst for partners around the world to establish sustained deep space scientific investigations, lunar surface access, and missions to Mars. As human exploration moves farther from Earth, spacecraft designs must optimize mass and volume while minimizing human and spacecraft risk. To accomplish this, the Gateway Program Safety and Mission Assurance (S&MA) office develops, implements, and ensures compliance with requirements, in concert with the accurate characterization and transparent communication of residual hazard risks, for integrated safety, reliability and maintainability, and quality assurance. This paper will detail the evolution of the Gateway Program S&MA integration functions, and provide its current status and lessons learned for future human spaceflight programs.

Helen Vaccaro↗