Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “probabilistic”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 955 records · Page 53

Station Blackout: A case study in the interaction of mechanistic and probabilistic safety analysis

The ability to better characterize and quantify safety margins is important to improved decision making about nuclear power plant design, operation, and plant life extension. As research and development (R&D) in the light-water reactor (LWR) Sustainability (LWRS) Program and other collaborative efforts yield new data, sensors, and improved scientific understanding of physical processes that govern the aging and degradation of plant SSCs needs and opportunities to better optimize plant safety and performance will become known. The purpose of the Risk Informed Safety Margin Characterization (RISMC) Pathway R&D is to support plant decisions for risk-informed margin management with the aim to improve economics, reliability, and sustain safety of current NPPs. In this paper, we describe the RISMC analysis process illustrating how mechanistic and probabilistic approaches are combined in order to estimate a safety margin. We use the scenario of a “station blackout” wherein offsite power and onsite power is lost, thereby causing a challenge to plant safety systems. We describe the RISMC approach, illustrate the station blackout modeling, and contrast this with traditional risk analysis modeling for this type of accident scenario.

97 MATHEMATICS AND COMPUTING↗

Comparison of a Traditional Probabilistic Risk Assessment Approach with Advanced Safety Analysis

As part of the Light Water Sustainability Program (LWRS) [1], the purpose of the Risk Informed Safety Margin Characterization (RISMC) [2] Pathway research and development (R&D) is to support plant decisions for risk-informed margin management with the aim to improve economics, reliability, and sustain safety of current NPPs. In this paper, we describe the RISMC analysis process illustrating how mechanistic and probabilistic approaches are combined in order to estimate a safety margin. We use the scenario of a “station blackout” (SBO) wherein offsite power and onsite power is lost, thereby causing a challenge to plant safety systems. We describe the RISMC approach, illustrate the station blackout modeling, and contrast this with traditional risk analysis modeling for this type of accident scenario. We also describe our approach we are using to represent advanced flooding analysis.

97 MATHEMATICS AND COMPUTING↗

Bayesian probabilistic model for life prediction and fault mode classification of solid state luminaires

A new method has been developed for assessment of the onset of degradation in solid state luminaires to classify failure mechanisms by using metrics beyond lumen degradation that are currently used for identification of failure. Luminous Flux output, Correlated Color Temperature Data on Philips LED Lamps has been gathered under 85°C/85%RH till lamp failure. Failure modes of the test population of the lamps have been studied to understand the failure mechanisms in 85°C/85%RH accelerated test. Results indicate that the dominant failure mechanism is the discoloration of the LED encapsulant inside the lamps which is the likely cause for the luminous flux degradation and the color shift. The acquired data has been used in conjunction with Bayesian Probabilistic Models to identify luminaires with onset of degradation much prior to failure through identification of decision boundaries between lamps with accrued damage and lamps beyond the failure threshold in the feature space. In addition luminaires with different failure modes have been classified separately from healthy pristine luminaires. The α-λ plots have been used to evaluate the robustness of the proposed methodology. Results show that the predicted degradation for the lamps tracks the true degradation observed during 85°C/85%RH during accelerated life test fairly closely within the ±20% confidence bounds. Correlation of model prediction with experimental results indicates that the presented methodology allows the early identification of the onset of failure much prior to development of complete failure distributions and can be used for assessing the damage state of SSLs in fairly large deployments. It is expected that, the new prediction technique will allow the development of failure distributions without testing till L70 life for the manifestation of failure.

Bayesian probability↗

Life Prediction and Classification of Failure Modes in Solid State Luminaires Using Bayesian Probabilistic Models

A new method has been developed for assessment of the onset of degradation in solid state luminaires to classify failure mechanisms by using metrics beyond lumen degradation that are currently used for identification of failure. Luminous Flux output, Correlated Color Temperature Data on Philips LED Lamps has been gathered under 85°C/85%RH till lamp failure. The acquired data has been used in conjunction with Bayesian Probabilistic Models to identify luminaires with onset of degradation much prior to failure through identification of decision boundaries between lamps with accrued damage and lamps beyond the failure threshold in the feature space. In addition luminaires with different failure modes have been classified separately from healthy pristine luminaires. It is expected that, the new test technique will allow the development of failure distributions without testing till L70 life for the manifestation of failure.

Lall, Pradeep↗

OVERVIEW OF THE SAPHIRE PROBABILISTIC RISK ANALYSIS SOFTWARE

The Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) is a software application developed for performing a complete probabilistic risk assessment (PRA) using a personal computer (PC) running the Microsoft Windows operating system. SAPHIRE Version 8 is funded by the U.S. Nuclear Regulatory Commission (NRC) and developed by the Idaho National Laboratory (INL). INL's primary role in this project is that of software developer and tester. However, INL also plays an important role in technology transfer by interfacing and supporting SAPHIRE users, who constitute a wide range of PRA practitioners from the NRC, national laboratories, the private sector, and foreign countries. In this paper, we provide an overview of the current technical capabilities found in SAPHIRE Version 8, including the user interface and enhanced solving algorithms.

97 MATHEMATICS AND COMPUTING↗

NONPARAMETRIC EMPIRICAL BAYES ESTIMATION THROUGH DECONVOLUTION IN PROBABILISTIC RISK ANALYSIS

The advent of Markov Chain Monte Carlo (MCMC) simulations and availability of open source software made full hierarchical Bayesian analysis tractable and a popular choice in parameter estimation for Probabilistic Risk Assessment (PRA). However, despite its theoretical attractiveness, the hierarchical Bayesian analysis is not without its problems. Two of the most prominent practical difficulties in applying hierarchical Bayes analysis in practice to analyze source-to-source variability, for example, is its sensitivity to the selection of the first-stage prior and dependence of the rate of convergence on the selection of the first-stage prior. The first-stage prior in hierarchical Bayesian analysis is usually assumed having a parametric form, often conjugate to the likelihood function (aleatory model). To facilitate convergence for hierarchical Bayes models, the first-stage prior is frequently set through empirical Bayes estimate, which can use available historical data to find the parameters of the first-stage prior. The paper discusses a new nonparametric empirical Bayes estimation and compare it to several well-known parametric estimates such as method of moments and maximum likelihood. The new nonparametric technique exploits the prior predictive distribution as integral equation and proceeds to solve it with respect to prior assuming the sampling data distribution and aleatory model are available. The discussion covers topics such as selection of aleatory model for future data, selection of regularization parameter, and density estimation for historical data. For comparison, the paper is using contrived as well as real-world data from utilities. Utilities data represent failure data with Poisson distribution used for aleatory model.

97 MATHEMATICS AND COMPUTING↗

Dependence in probabilistic modeling Dempster-Shafer theory and probability bounds analysis

This report summarizes methods to incorporate information (or lack of information) about inter-variable dependence into risk assessments that use Dempster-Shafer theory or probability bounds analysis to address epistemic and aleatory uncertainty. The report reviews techniques for simulating correlated variates for a given correlation measure and dependence model, computation of bounds on distribution functions under a specified dependence model, formulation of parametric and empirical dependence models, and bounding approaches that can be used when information about the intervariable dependence is incomplete. The report also reviews several of the most pervasive and dangerous myths among risk analysts about dependence in probabilistic models.

Ferson, Scott↗

DPP-PMRF: Rethinking Optimization for a Probabilistic Graphical Model Using Data-Parallel Primitives

We present a new parallel algorithm for probabilistic graphical model optimization. The algorithm relies on data-parallel primitives (DPPs), which provide portable performance over hardware architecture. We evaluate results on CPUs and GPUs for an image segmentation problem. Compared to a serial baseline, we observe runtime speedups of up to 13X (CPU) and 44X (GPU). We also compare our performance to a reference, OpenMP-based algorithm, and find speedups of up to 7X (CPU).

97 MATHEMATICS AND COMPUTING↗

ADAPTIVE SURROGATES WITHIN THE RAVEN FRAMEWORK FOR DYNAMIC PROBABILISTIC RISK ASSESSMENT ANALYSIS

The RAVEN code has been under development at the Idaho National Laboratory since 2012. Its main goal is to create a multi-purpose platform for the deploying of all the capabilities needed for Probabilistic Risk Assessment (PRA), Uncertainty Quantification (UQ), data mining analysis and optimization studies. RAVEN has demonstrated a good level of maturity in terms of state-of-art and advanced analysis methodologies. In the past year the RAVEN code has been released as open-source project and is available to download (raven.inl.gov) free of charge. The main subject of this paper is to present a new system within the RAVEN framework to drastically accelerate PRA and UQ analysis using acceleration schemes based on surrogate modeling. This system is based on the heavy usage of surrogate modeling and artificial intelligence algorithms, able to emulate the response of a physical system in closed domains (domains where the surrogate models have been constructed from). The aim of this paper is to show to the community how the employment of surrogate modeling techniques can be a viable solution for the current and future challenges in terms of PRA, UQ and Safety Margins characterizations. In addition, in this manuscript it is presented the construction of a RAVEN new entity named “HybridModel” that is aimed to switch between a high-fidelity code and its linked surrogate, accelerating the PRA and UQ processes without largely reducing the accuracy of the results of the analyses. All these new capabilities will be shown with an application example about a Station Black Out scenario for a prototypical Pressurized Water Reactor (modeled with RELAP5-3D).

97 MATHEMATICS AND COMPUTING↗

Data-Driven Preemptive Voltage Monitoring and Control Using Probabilistic Voltage Sensitivities: Preprint

Increased penetration of distributed variable re-newable generation may cause random voltage fluctuations and violations at multiple nodes. Traditional methods of voltage control typically involve reactionary responses of capacitor banks, tap changers, and recently even smart inverters. But due to the lack of foresight in voltage violations, these controls are ineffective to completely mitigate the issue. Therefore, new methods of predicting voltage violations subject to random power injection changes in the distribution network is needed, which can be used to guide optimal and dynamic methods of voltage control. This work lays the foundation for such preemptive voltage monitoring and control by proposing an analytical and sensor data-driven voltage sensitivity analysis method. Driven by stochastic data and forecasts, the method can be used to develop probabilistic voltage sensitivities and consequently to predict system nodes with high likelihood of voltage limit violations. The effectiveness of this method is tested on IEEE 69 node distribution system integrated with distributed solar. The results demonstrate the proposed method's ability to successfully predict nodes with high probability of voltage violations for a specific time series simulation. The results also demonstrate the ability to guide timely power injection control actions to mitigate future voltage violations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Probabilistic Assessment of High-Renewables Power Systems: Current Work and Future Directions

In a future with higher penetrations of variable and energy-limited resources, the dominant sources of resource adequacy risk begin to shift from (assumed) independent thermal unit outages to spatially- and temporally-correlated weather-driven phenomena. Traditional resource adequacy assessment and planning methods can be ill-suited to such scenarios. This presentation will highlight aspects of NREL's work in adapting and developing new probabilistic methods and tools in anticipation of the needs of the power system planning exercises of tomorrow.

17 WIND ENERGY↗

DEVELOPMENT OF ENSEMBLE-BASED PROBABILISTIC FLOOD MAPS FOR PROBABLE MAXIMUM FLOOD

The magnitude and frequency of hydro-meteorological extremes are expected to increase in a changing environment that threaten the security of US energy-water assets. This includes probable maximum precipitation (PMP) and probable maximum flood (PMF) which are used as hydraulic design standards for critical infrastructures such as major hydropower reservoirs and nuclear power plants. To assess the potential flood hazards due to PMP/PMF, an integrated high resolution process-based hydro-meteorologic modeling framework was utilized to develop ensemble-based probabilistic flood maps based on best-available historic observations and future climate projections. A graphical process unit accelerated 2-dimensional hydrodynamic model was used to simulate the surface inundation areas corresponding to a total of PMF hydrographs. These ensemble-based PMF maps were compared with flood maps obtained from the conventional deterministic PMP/PMF approach, revealing added information of conditional probability of flooding. Further, a relative sensitivity test was conducted to explore the effects of various factors in the framework such as meteorological forcings, antecedent hydrologic conditions, reservoir storage, and flood model input resolution and parameters. The proposed framework better illustrates the uncertainties associated with model inputs, parameterization and hydro-meteorological factors allowing more informed decision-making for future emergency preparation.

13 HYDRO ENERGY↗

Common-Cause Component Group Modeling Issues in Probabilistic Risk Assess

Common cause failures (CCFs) have been recognized as significant risk contributors in probabilistic risk assessments (PRAs) for commercial nuclear power plants (NPPs) since 1980s. A series of reports including those of United States Nuclear Regulatory Commission (NRC) regulations (NUREGs) have been published from late 1980s to early 2000s to provide guidelines for performing CCF event data analysis and modeling CCF in PRA. However, there are still some issues existed in CCF modeling and CCF parameter estimations. One of such issues is the modeling of multiple common-cause component group (CCCG) for the same component in a PRA model. This paper exams the CCCG definition and the requirements from the PRA standard, investigates the CCCG modeling practices and issues existing in PRAs, and presents systematic approaches and guidelines to model CCCG in PRA properly and consistently.

99 GENERAL AND MISCELLANEOUS↗

Modeling Smart Microgrids for the Developing World with Probabilistic Supply and Demand Inputs

Developing world microgrids often balance insufficient supply with growing, unpredictable demand. Deterministic and probabilistic simulators exist to model these microgrids, and each focuses on different technical aspects. With the addition of smart meters into microgrids, monitoring and control is now available at high granularity, which enriches microgrid planning and operation. This research is designing a new simulator to model smart microgrids with discrete probability distributions as supply and demand inputs. In our model, smart meters allow real-time power clipping for demand side management, effectively smoothing the system load curve as needed. To compare clipping schemes for grid operation and generation mixes for planning, we aggregate inputs by convolution then compute expected energy sold and probability of avoiding power cuts. The simulator plots these values for different combinations of power clipping threshold and number of customers clipped.

13 HYDRO ENERGY↗

Probabilistic wave parameters for WEC survival analysis at US Navy's Wave Energy Test Site in Hawaii.

The persistent and diversified wave conditions make the Navy's Wave Energy Test Site (WETS) at Marine Corps Base Hawaii, a suitable place for WEC testing. Hurricane waves, despite their infrequent occurrence, pose a challenge to the survivability of the devices. We utilized 252 hurricane scenarios within 200 km of WETS from downscaling simulations of a climate model and the third generation spectral model WaveWatch III to produce a range of severe wave conditions at WETS. The computed wave height presented as a function of annual exceedance probability enables a risk-based survival analysis of WECs. This study provides a proof-of-concept of the probabilistic approach and a baseline for analysis of hurricane wave conditions under the present and future climate projections.

16 TIDAL AND WAVE POWER↗

Probabilistic Risk Assessment Approach for the Versatile Test Reactor

A probabilistic risk assessment (PRA) has been initiated to assist with the design, authorization, and future operation of the Versatile Test Reactor (VTR). The PRA is a vital part of a larger risk-informed authorization approach and is being developed in accordance with two applicable standards.

Grabaskas, David↗

CSR in the Probabilistic Resource Adequacy Suite (PRAS): Fast Interregional Transmission Models for Renewable Integration Studies

NREL's Probabilistic Resource Adequacy Suite (PRAS) was developed for use in renewable integration studies, to assess the resource adequacy of large interconnected power systems with potentially significant interregional transfers of power. This presentation provides an overview of the tool and the methods it uses to solve multi-regional transmission and storage dispatch problems in a computationally-efficient manner.

composite system reliability↗

Probabilistic Risk Assessment of a Light Water Reactor Coupled with a High-Temperature Electrolysis Hydrogen Production Plant

This paper presents recent updates on the Level 1 Probabilistic Risk Assessment (PRA) of Light Water Reactors (LWRs) coupled with a hydrogen production plant. It provides the overview of past results on the PRA for Pressurized Water Reactors (PWRs) and Boiling Water Reactors (BWRs) coupled to a 1150 MW High Temperature Electrolysis Facility (HTEF), as well as the latest research results for a smaller 100 MW HTEF facility. Differences between the two HTEF designs are listed. Key differences include the amount and quality of diverted LWR steam, complexity of the Heat Extraction System (HES), and the electrical power source for the HTEF plant. A Failure Mode and Effect Analysis (FMEA) was conducted for the new HTEF design, and the LWR PRA models were modified in the SAPHIRE risk assessment tool to account for the newly identified risk contributors. These include the steam loss event at the HES system, the electrical overcurrent event at the HTEF facility and at the transmission line from the LWR plant, and the hydrogen detonation event at the HTEF facility. The coupling of LWRs with a 100 MW HTEF increases the frequency of several initiating events. For the reference PWR, the largest frequency increase is for the steam line break event at 5.5%. While for the reference BWR, the largest frequency increase is for the switchyard-related Loss of Offsite Power (LOOP) event at 0.11%. The overall plant risk increases by 6.56% and 0.03% for PWR and BWR reference plants respectively. It is found that these risk metrics satisfy the safety criteria of both 10 CFR 50.59 and Regulatory Guide 1.174 licensing pathways.

08 HYDROGEN↗