At least 955 records · Page 53

Momentary Cessation: Improving Dynamic Performance and Modeling of Utility-Scale Inverter Based Resources During Grid Disturbances

Sandia National Laboratories worked with NERC staff to provide stakeholder guidance in responding to a May 2018 NERC alert regarding dynamic performance and modeling issues for utility-scale inverter-based resources. The NERC alert resulted from event analyses for grid disturbances that occurred in southern California in August 2016 and October 2017. Those disturbances revealed the use of momentary cessation of transmission connected inverter-based generation- a short time period when they ceased to inject current into the grid, counter to desired transmission operation. The event analyses concluded that, in many cases, the Western Interconnection system models used to determine planning and operating criteria do not reflect the actual behavior of solar plants, resulting in overly optimistic planning assessments and substandard operational responses. This technical report summarizes the gaps between the models and actual performance that were observed at those times, and the guidance that Sandia and NERC provided to owners of solar PV power plants, transmission planners, transmission operators and planning/reliability coordinators to modify existing models to reflect that actual performance

24 POWER TRANSMISSION AND DISTRIBUTION↗

3D high-fidelity automated neutronics guided optimization of fusion blanket designs

The compact Fusion Pilot Plant (FPP) is defined in the recent National Academies of Sciences, Engineering, and Medicine report as the next step of fusion energy demonstration with a $50$ MWe peak net electricity production, $Q_e$ greater than $1$, and at least $3$ hours of continuous operation. This fusion pilot plant will be a test bed enabling materials, designs, and fuel management assessment, and it will represent an engineering challenge because of its high-fusion power and compact design targets. Previous reactor data is limited to experiments operating in different design space ranges. Therefore, design iterations and assessments should rely on high-fidelity first-principle theoretical and computational models. The high-fidelity integrated modeling of the plasma is a fundamental part of fusion energy research. However, the whole device modeling is often neglected, utilizing low-fidelity, system-level analysis. Recently, the need for high-fidelity multi-physics modeling was recognized, resulting in a selection of integrated tools. Further, autonomous design optimization requires a streamlined framework that perturbs the design point, reruns the analysis, and examines the outputs. However, high-fidelity analysis requires complex geometry specification that is difficult to perturb. This work presents the parametric CAD generation tool TRACER and a new neutronic workflow. TRACER allows the perturbation of the geometry representation, creating geometry files ready for further analysis. The streamlined neutronic workflow allows efficient and accurate calculations. The two new tools coupled together were used to perform a 3D high-fidelity multi-objective, multi-input optimization of an "ARC Class" compact tokamak design. The workflow was driven by an optimization driver for full automation.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Quantifying the impact of climate change on erosion - 20397

The New York State Energy Research and Development Authority (NYSERDA) is the owner of the Western New York Nuclear Service Center (WNYNSC), a 1,351-ha (3,338-ac) site located approximately 48 km (30 mi) south of Buffalo, New York. In 1962, Nuclear Fuel Services, Inc. (NFS) entered into Agreements with the Atomic Energy Commission and New York State to construct the first commercial reprocessing plant of nuclear fuel in the United States. NFS, a private company, built and operated the spent fuel reprocessing plant and waste disposal facilities, processing 640 Mg (metric tons, or 705 short tons) of spent nuclear fuel from 1966 to 1972 under an Atomic Energy Commission license. Nuclear fuel reprocessing operations ended in 1972 and never reopened, leaving behind radioactive and chemical wastes. Erosion can play an important role in the fate and transport of waste at sites where disposal of long-lived waste is anticipated. The statistical characterization of key processes related to erosion is essential to the understanding of site stability through time. One of the key processes governing erosion is extreme precipitation and it is critical that trends in the distribution of extreme precipitation events through time be represented. The evidence of climate change is increasingly well documented and projected impacts on extreme precipitation events should be incorporated in performance assessment studies when relevant. Not evaluating future climate states in a performance assessment is contradictory to good modeling practice. Specifically, excluding climate change limits development of modeling information that could aid in effective decision making. The current climate literature provides both observational evidence and climate model projections of climate trends and/or climate change in the late 20. and early 21. centuries for North America and the northeast United States. In this work, this information was used to assess the impacts of potential changes in climate on erosion processes. The goal was to understand how projections of future climate relate to the performance of the WNYNSC through time. In the first stage of this work multi-temporal historical aerial images were analyzed in conjunction with orthophotography and Lidar data to develop probability distributions for variables representing important erosion processes. The information from these analyses was then used in conjunction with simulated data from the West Valley Erosion Working Group (EWG). Analysis of EWG simulations provides estimates for the change in erosion rates through time that is driven by changes in climate. The time-varying rates of erosion change were applied to the historical aerial imagery data in order to inform time-varying rates of erosion that are driven by changes in climate. Ultimately, this process resulted in the identification of locations for features like gully heads using both the Lidar dataset and projection of the estimated location from the historical aerial photo under consideration back to the Lidar dataset. The distance between the estimate of the location from the historical image and that of the Lidar dataset was the estimated distance the feature has moved. This distance was then divided by the number of years between the Lidar dataset and the year of the historical aerial image of interest to get a rate of movement through time. This was done for several dozen points on each historical aerial image. The analyses from the EWG were used to characterize the relative impact of climate change on the erosion rates. This relative impact was quantified by comparing the LEM based estimates of erosion that were derived using historical climate data with LEM based estimates of erosion that were derived using projections of future climate. The relative increase in the erosion rates was then applied to the historical estimates of erosion derived from the analysis of the historical aerial imagery. This approach was used since the LEM-based estimated of the historical erosion rates from the past century have a bias towards underestimating erosion. This underestimation is hypothesized to be a consequence of an inability of the LEMs to account for the impacts of land-use change (i.e. deforestation) which had been shown to significantly increase erosion in similar Northern hardwood forest ecosystems. In summary, gully head retreat rate and gully widening rate were characterized using statistical probability distributions from the historical aerial image analysis. Simulated data from the EWG was used to estimate the climatically-driven changes in erosion rates through time. The changes through time from the EWG were applied to the gully head retreat rate and gully widening rate characterized using the historical aerial image analysis. This information can be used to inform PPA models to project future risks from a given site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Operational Parameter Database for Molten Salt Thermal Energy Storage Tank Modeling

The second generation of concentrated solar power (CSP) plants is characterized by the use of a central receiver (either cavity or external), two molten nitrate salt tanks (60 wt.% NaNO 3 and 40 wt.% KNO 3 ), and a steam Rankine power-generation cycle connected through a primary heat exchanger. Molten salt thermal energy storage (TES) tanks have been widely deployed in commercial CSP plants worldwide and have been essential for increasing plant dispatchability and capacity factor, while also reducing the levelized cost of electricity (LCOE). These systems enable energy storage at the gigawatt-hour scale, typically providing 6 to 17 hours of storage duration. Despite being a commercial technology, the multiple failures observed after only a few months or years of operation in plants around the world demonstrate the technology's relative infancy and highlight the need for further research to improve its reliability. The National Laboratory of the Rockies (NLR), in collaboration with industry partners and academic and research institutions, has been leading multiple projects funded by the U.S. Department of Energy (DOE). These projects focus on addressing molten salt tank failures by improving tank design and welding fabrication practices, evaluating new alloys and weld fillers, and providing guidelines for tank commissioning and safe operation. In particular, this report presents modeling results on the effect of key tank operation parameters during 60 minutes of operation, including the mass flow rate and temperature of the salt inflow, tank salt inventory temperature, and inventory level for a representative molten salt tank design. These results form a database of tank operation behaviors that captures the effects of each specific parameter during charging, charging/discharging, and discharging processes.

14 SOLAR ENERGY↗

An Evaluation of The Dynamic Physical Security Risk Assessment Methodology for Fleet-Wide Applications

The requirements for U.S. nuclear power plants to maintain a large onsite physical security force contribute to their high operational costs. The cost of maintaining the current physical security posture is approximately 10% of the overall operation and maintenance budget for commercial nuclear power plants. The goal of the Light Water Reactor Sustainability (LWRS) program’s physical security pathway is to develop tools, methods, and technologies and provide the technical basis for an optimized physical security posture. The conservatisms built into current security postures may be analyzed and minimized to reduce security costs while still ensuring adequate security and operational safety. The research performed at Idaho National Laboratory within LWRS program’s physical security pathway has successfully developed a dynamic force-on-force modeling framework using various computer simulation tools and integrating them with the dynamic assessment Event Modeling Risk Assessment using Linked Diagrams (EMRALD) tool. This integrated process for physical security analysis is named Modeling and Analysis for Safety Security using Dynamic EMRALD Framework (MASS-DEF). This document provides an update on the progress in applying the MASS-DEF process to an operating commercial nuclear power plant as well as additional industry feedback regarding use of the tool for other physical security risk-informed topics. This report is only a summary of the progress and does not contain specific modeling results as those contain sensitive security information. Previous reports described how a user could integrate their plant-specific force-on-force models with the dynamic simulation tool EMRALD, model operator actions, and integrate with probabilistic risk assessment tools, such as CAFTA (Computer Aided Fault Tree Analysis System) or SAPHIRE (Systems Analysis Programs for Hands-on Integrated Reliability Evaluations), and with thermal-hydraulic tools, such as RELAP-5 or MAAP. Previous reports applied various combinations of available simulations codes with EMRALD using generic plant models to demonstrate how to perform the analysis. This report is an update the progress of applying the dynamic computational framework to an actual nuclear facility using their security scenarios and timelines. This report also provides an update to the procedural guidance for the MASS-DEF process and an overview of the generic models available for use by utilities. This report does not contain any plant’s sensitive information and/or safeguards information. This study’s purpose was to verify that the results achieved using generic models are similar to actual plant results and refine our guidance on the use of the framework. This assessment enables further analysis, such as what-if scenarios and staff-reduction evaluation, thereby optimizing physical security at plants.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Validating a Dynamic PWR Safety and Security Model?

Nuclear power plants (NPPs) are assessed for safety and security using separate models that cannot capture how an attacker's decisions and a plant's response unfold together in real time, leaving regulators and operators without a complete picture of true plant vulnerability. Traditional probabilistic risk assessment (PRA) methods treat adversarial events as fixed initiators with predetermined outcomes, and are structurally incapable of representing the time-dependent interplay between physical security events, safety system response, and operator mitigative actions. At Idaho National Laboratory (INL), I contributed to the development and validation of Modeling and Analysis for Safety and Security using the Dynamic EMRALD Framework (MASS-DEF). Where static PRA relies on event-tree logic that cannot evolve mid-scenario, MASS-DEF couples a time-dependent dynamic PRA tool EMRALD (Event Modeling Risk Assessment using Linked Diagrams) with attack simulation software, allowing attacker behavior, plant system states, and operator actions to interact across time. My work focused on validating a general Pressurized Water Reactor (PWR) model. I traced model logic against PWR plant to identified errors in logic and confirm accuracy. I then built and tested attack scenarios against a general PWR model to verify that the model produced expected outcomes across all logical pathways. I also contributed a section to a related technical paper applying the same EMRALD platform to radiation dose modeling. Results show that MASS-DEF can quantitatively demonstrate that many plants exceed their regulatory security thresholds. This demonstrated margin provides a technically defensible basis for reducing the number of guards without compromising regulatory compliance. Physical security costs represent roughly 10% of annual operating budgets, making such reductions directly meaningful to INL's mission of sustaining existing commercial NPPs. This internship strengthened my understanding of nuclear systems, probabilistic modeling, and technical writing, and has solidified my pursuit of a career at a national laboratory.

98 - NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL↗

Advanced Coating Compositions and Microstructures to Improve Uptime and Operational Flexibility in Cyclic, Low-Load Thermal Utility Plants

GE, the University of Tennessee, and Oak Ridge National Laboratory collaborated from 2020 to 2023 developing two key technologies for improving the viability of fuel switching and load following in thermal utility plants: a) cost-effective weld overlay compositions for boiler tubing b) cathodic arc coatings that deliver improvements in both erosion resistance and oxidation resistance in high temperature steam for HP turbine blades The team worked through a robust, logical project map to de-risk these two technologies and advance them from TRL 3 to TRL 6. For the cost-effective weld overlay, the team developed a ferritic filler material which was fabricated at a vendor for 18% the average market cost of Inconel 625 wire, had a corrosion rate 3x lower in conditions simulating a biomass-fired superheater and 10x lower in conditions simulating a coal-fired superheater, and was fabricated into prototype overlaid tubing that passed ASME requirements including transverse bending, dye penetrant inspection, and ASTM G-76 evaluation. For the cathodic arc coatings applied to steam turbine blades, the team developed a novel composition that was successfully transferred to a qualified vendor. The vendor was able to produce coated prototypes with 4x the as-deposited erosion resistance and 10.4x the post-steam-exposure erosion resistance of the TiN coating the vendor currently applies on GE steam turbine components, without significantly increasing process cost. These coated prototypes also passed a GE inspection and showed favorable performance in high temperature erosion, nanoindentation, sliding wear, scratch adhesion, and high cycle fatigue testing. If successfully deployed by GE, it is anticipated that the technologies will enable the following: • 25%-50% increase in time between outages for both boilers and HP turbines. • 50% decrease in cost for weld overlay on a per foot basis relative to todays NiCr alloys. • Adequate oxidation resistance and erosion for HP turbine inlet steam at >620°C and >220 bar. • No need for changes in component supply chain or any notable Capital Expenditures. 5 Decreasing component cost, increasing performance, and extending time between outages represent direct value propositions to GE and their customers. For the American consumer, these objectives translate into increased grid reliability (fewer unexpected outages), decreased Levelized Cost of Electricity, and improved environmental health (low-loading/load following to accelerate penetration of renewables). The results also have implications for wear resistant tooling, wire arc additive manufacturing, more durable components for syngas cleanup, and deployment of more efficient thermochemical pathways for carbon negative fuel production

09 BIOMASS FUELS↗

Gains in operational flexibility, safety margins, and cost efficiencies via integrated Plant Reload Optimization platform

The U.S. Department of Energy Light Water Reactor Sustainability Program Risk-Informed Systems Analysis Pathway Plant Reload Optimization Project aims to develop an integrated, comprehensive framework offering an all-in-one solution for reload evaluations with a special focus on optimizing core design. Optimizing the fuel loading pattern is one of the most important considerations in reducing the amount of new fuel used in the core. Due to thousands of possible core configuration options, finding optimal solutions is an unachievable task for a human. The Plant ReLoad Optimization platform, which supports artificial-intelligence-based reactor core designing, is now fully capable of handling realistic problems. The Plant ReLoad Optimization platform development project aims to build a reactor core design tool that includes reactor safety and fuel performance analyses and uses artificial intelligence to support the optimization of core design solutions. The NSGA-II (Non-dominated Sorting Genetic Algorithm II) optimizer was developed and tested within RAVEN (Risk Analysis and Virtual ENvironment) to handle many constraints by using an augmented objectives methodology. The demonstration was performed with constrained multiobjective optimization of a 17 × 17 pressurized-water reactor core loading patterns to minimize fuel cost and maximize fuel cycle length.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Optimization of the Post-Operational Phase on Two Belgian Multi-Unit Nuclear Power Plants: the Case of the Non-Fissile Irradiated Core Items - 20156

The current legal framework in Belgium foresees the progressive phase out of nuclear power between October 2022 (Doel 3) and December 2025 (Doel 2). Upon its definitive shutdown, each unit of the Tihange and Doel sites will enter a Post-Operational Phase (POP) and be prepared for its Decontamination and Decommissioning (D and D). Prior to obtaining the D and D license, the Operator Electrabel is legally required to remove any non-fissile irradiated core items stored in the deactivation pools. The non-fissile irradiated core items consist essentially of control rods, poison rods and source thimbles as well as thimble plugs and foreign materials irradiated during operation: - Their significant content in highly radiant radionuclides (up to 6 TBq of Co-60 per kg of irradiated material) renders all existing operational waste management processes inadequate due to insufficient biological shielding; - Their high concentrations in long-lived radionuclides call for their disposal in a geological repository for which no final design nor waste acceptance criteria are expected prior to 2050. Uncertainties in the Belgian energy supply and security, however, require the Operator to be prepared for a partial nuclear phase out, where one or more units would benefit from lifetime extension while the remaining units would undergo decommissioning. The present paper aims at presenting how Electrabel, in partnership with Tractebel, addressed this challenge by maximizing the use of synergies within the respective sites as well as between both sites themselves, all the while accounting for site specificities. The most recent results and state of progress of the project will be detailed and the first lessons learned will be shared. The project has been split in multiple tasks and phased as follows: - An inventory phase aimed at mapping the contents, origin, composition and history of the non-fissile irradiated core items; - A pre-characterization phase based on neutron activation models; - A waste sorting phase aimed at separating waste forms for which an evacuation route exists from those for which such route does not exist; - A feasibility phase aimed at exploring all possible scenarios for the management of non-fissile irradiated core items and identifying the optimal feasible solution for each site; - A preparation phase (currently ongoing), developing further the optimal solution and ensuring that back-up solutions are available for any foreseeable change of context (licensing issue, modification in the nuclear phase-out program, etc.) and initiating early contacts with potential subcontractors for segmentation works and cask manufacturers, as well as the Belgian regulatory body and waste management agency. This phase also foresees the investigation of destructive and non-destructive radiological measurements to support the detailed characterization of the waste forms; - A realization phase (future work). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Parametric analysis on optimized design of hybrid solar power plants

There is increasing interest in utility-scale solar power plants with storage which can flexibly dispatch renewable energy to the grid. However, plant design possesses many degrees of freedom and non-obvious trade-offs in performance. Software tools can estimate or optimize the performance of a specific plant configuration under market and weather conditions of interest; the associated cost parameters and operating assumptions strongly influence estimates of plant performance and decisions regarding optimal sizing. We employ the National Renewable Energy Laboratory's Hybrid Optimization and Performance Platform, which incorporates optimal dispatch when evaluating plant performance, and investigate the sensitivity to weather and market conditions, operating limitations, and the presence of a capacity-based incentive. We demonstrate changes in plant performance and optimal sizing with respect to these inputs and discuss implications. Here results show that PV-with-battery designs are more profitable under our assumptions, but that designs including a concentrated solar power (CSP) system produce significantly greater annual energy; and that CSP-with-thermal energy storage designs maximizing the benefit-to-cost ratio have an input-dependent linear relationship between the CSP field solar multiple and the hours of storage as the project budget varies.

14 SOLAR ENERGY↗

Development of Miniaturized High Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

A. Development of Miniaturized High Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

High-Temperature Multi-Process Sensor Development for a PC-Fired Unit

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Real-time sensor measurements to evaluate impacts of load cycling on high-temperature fire-side corrosion in a PC boiler

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

High-Temperature Multi-Process Sensor Development and Demonstration at Coalfired Power Plants

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Full-scale Demonstration of Multi-process Sensor at a Cycling PC-fired Boiler

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗