Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “optimal scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 955 records · Page 53

Zero-Emission Transit Bus Needs Assessment

The transition to zero-emissions vehicles (ZEVs) in public transit has gained traction due to significant federal investments from the Bipartisan Infrastructure Law (BIL) and the Inflation Reduction Act (IRA). This needs assessment, commissioned by the Joint Office of Energy and Transportation and conducted by researchers at the Idaho National Laboratory, explores the current state of electrification in transit agencies, identifying barriers to implementation, potential funding sources, and operational considerations necessary for a successful transition. The assessment involved qualitative interviews with representatives from 19 transit service providers across diverse geographic regions. Key findings highlight the challenges related to bus facilities and operations, which require careful planning for charging infrastructure and maintenance capabilities to accommodate battery electric buses (BEBs) and hydrogen fuel cell buses (HFCBs). Agencies reported operational hurdles due to the shorter range of BEBs compared to diesel buses, necessitating revised scheduling and routing strategies. Despite these challenges, many agencies expressed optimism about their capacity to adapt. Funding availability emerged as a critical factor influencing the transition to ZEVs. While agencies welcomed increased financial support, particularly from the Low or No Emission Grant Program (Lo-No), concerns about the sustainability of this funding and the ongoing operational costs were prevalent. The need for a comprehensive funding inventory was underscored to ensure transit agencies are aware of all available resources. Technological constraints were significant barriers to ZEV adoption. The limited range of BEBs was frequently cited as a concern, leading to operational challenges and reliability issues. Agencies reported difficulties in sourcing replacement parts, which exacerbated downtime and maintenance challenges. Workforce development and training were identified as pivotal for a successful transition. Many agencies rely heavily on manufacturers for technician training, highlighting the need for scalable training programs that equip staff with the necessary skills to maintain electric powertrains effectively. This assessment offers actionable recommendations for the Joint Office, including enhancing outreach to transit agencies, developing resources for effective utility partnerships, and facilitating comprehensive training programs. Establishing a zero-emission bus evaluation program to track performance metrics such as cost, range, and reliability could provide valuable insights for transit agencies. The needs assessment provides a detailed examination of the challenges and opportunities facing transit agencies in their transition to zero-emissions bus fleets. By addressing these issues through targeted support, stakeholders can collaboratively work towards a cleaner, more sustainable public transportation system that benefits all communities.

33 - ADVANCED PROPULSION SYSTEMS↗

Preliminary design of a meteoroid/orbital debris shield system for a Mars mission spacecraft

A preliminary design of a spacecraft shield system to defeat meteoroids and orbital debris during a Mars mission is presented. The mission scenario is first defined in terms of stage times which include LEO, transit, low-Mars orbit, and Mars surface periods. The environment definitions for earth-orbital space debris, planetary meteoroids, and interplanetary meteoroids are next introduced. Shield system design approaches incorporate stochastic simulation, hydrocode analyses, hypervelocity impact testing, and optimization techniques. Structural design trades presented include spacecraft configuration, mission schedule, penetration risk, and total standoff distance between the bumper and wall.

Robinson, J. H.↗

Commercial Applications Multispectral Sensor System

NASA's Office of Commercial Programs is funding a multispectral sensor system to be used in the development of remote sensing applications. The Airborne Terrestrial Applications Sensor (ATLAS) is designed to provide versatility in acquiring spectral and spatial information. The ATLAS system will be a test bed for the development of specifications for airborne and spaceborne remote sensing instrumentation for dedicated applications. This objective requires spectral coverage from the visible through thermal infrared wavelengths, variable spatial resolution from 2-25 meters; high geometric and geo-location accuracy; on-board radiometric calibration; digital recording; and optimized performance for minimized cost, size, and weight. ATLAS is scheduled to be available in 3rd quarter 1992 for acquisition of data for applications such as environmental monitoring, facilities management, geographic information systems data base development, and mineral exploration.

Birk, Ronald J.↗

Data Understanding Applied to Optimization

The goal of this research is to explore and develop software for supporting visualization and data analysis of search and optimization. Optimization is an ever-present problem in science. The theory of NP-completeness implies that the problems can only be resolved by increasingly smarter problem specific knowledge, possibly for use in some general purpose algorithms. Visualization and data analysis offers an opportunity to accelerate our understanding of key computational bottlenecks in optimization and to automatically tune aspects of the computation for specific problems. We will prototype systems to demonstrate how data understanding can be successfully applied to problems characteristic of NASA's key science optimization tasks, such as central tasks for parallel processing, spacecraft scheduling, and data transmission from a remote satellite.

Buntine, Wray↗

NASA Fuse Cycle 1 Program A100. FUV Spectra of Evolved Late-K and M Stars: Mass Loss revisited and Stellar Activity

Program A100 was awarded 50 ksec of FUSE observing time. Targets alpha TrA (K3 II) and gamma Cru (N13 III) were originally assigned 25 ksec each, to be observed in the medium aperture. Once the in-flight performance and telescope alignment problems were known, the observations were reprogrammed to optimized the scientific return of the program. alpha TrA was scheduled for 25 ksec observations in both the medium and large apertures. The principle aim of this program was to measure the stellar FUV line and continuum emission, in order to estimate the photoionization radiation field and to determine the level of stellar activity through the fluxes in the collisionally excited high temperature diagnostics: C III 977A and O VI 1032,1038A doublet. The medium aperture observations were obtained successfully while the large aperture observations were thought by Johns Hopkins University (JHU)to be lost to satellite problems. There was insufficient signal-to noise in the medium aperture short wavelength SiC channels to do quantitative science. The long wavelength LiF spectra are of high signal-to-noise (SN) and show pronounced emission lines near lambdalambda1100 - 1140A. Emission had been observed at these wavelength in low resolution and low SN ORFEUS-SPAS 11 spectra obtained by Dupree & Brickhouse (1998 ApJ 500, L33), however, they were unable to identify these features. One of the first problems faced in the early FUSE mission was establishing a reliable wavelength scale, especially between the different channels. With the medium aperture data in hand we decided to identify the features and thereby establish an absolute wavelength scale for the channels where the emission occurred. We first established that the emission was fluorescent. and then we constructed a fluorescent line formation model for all neutrals. and singly ionized species with atomic numbers up to 28, and the H2 molecule. We used datasets of radiative rates and energy levels which were as complete as possible and available in an electronic format (millions of transitions). We found that most, but not all, emission was from Fe II pumped by H Lyalpha. This is not typical fluorescence, since the emission is shortward of the pumping transitions near 1215.6A.

Harper, Graham M.↗

FUV Spectra of Evolved Late-K and M Stars: Mass Loss Revisited and Stellar Activity

This is the final report for the FUSE Cycle 1 program A100: FUV Spectra of Evolved Late-K and M Stars: Mass Loss revisited and Stellar Activity. Targets alpha TrA (K3 II) and gamma Cru (M3 III) were originally assigned 25 ksec each, to be observed in the medium aperture. Once the in-flight performance and telescope alignment problems were known, the observations were reprogrammed to optimized the scientific return of the program. Alpha TrA was scheduled for 25 ksec observations in both the medium and large apertures. The principle aim of this program was to measure the stellar FUV line and continuum emission, in order to estimate the photoionization radiation field and to determine the level of stellar activity through the fluxes in the collisionally excited high temperature diagnostics: C III 977Angstroms and O VI 1032,1038Angstrom doublet. The medium aperture observations were obtained successfully while the large aperture observations were thought by Johns Hopkins University (JHU)to be lost to satellite problems. There was insufficient signal-to- noise in the medium aperture short wavelength Sic channels to do quantitative science.

Harper, Graham M.↗

Sleep, Circadian Rhythms, and Performance During Space Shuttle Missions

Sleep and circadian rhythms may be disturbed during spaceflight, and these disturbances can affect crewmembers' performance during waking hours. The mechanisms underlying sleep and circadian rhythm disturbances in space are not well understood, and effective countermeasures are not yet available. We investigated sleep, circadian rhythms, cognitive performance, and light-dark cycles in five astronauts prior to, during, and after the 16-day STS-90 mission and the IO-day STS-95 mission. The efficacy of low-dose, alternative-night, oral melatonin administration as a countermeasure for sleep disturbances was evaluated. During these missions, scheduled rest activity cycles were 20-35 minutes shorter than 24 hours. Light levels on the middeck and in the Spacelab were very low; whereas on the flight deck (which has several windows), they were highly variable. Circadian rhythm abnormalities were observed. During the second half of the missions, the rhythm of urinary cortisol appeared to be delayed relative to the sleep-wake schedule. Performance during wakefulness was impaired. Astronauts slept only about 6.5 hours per day, and subjective sleep quality was lower in space. No beneficial effects of melatonin (0.3 mg administered prior to sleep episodes on alternate nights) were observed. A surprising finding was a marked increase in rapid eye movement (REM) sleep upon return to Earth. We conclude that these Space Shuttle missions were associated with circadian rhythm disturbances, sleep loss, decrements in neurobehavioral performance, and alterations in REM sleep homeostasis. Shorter than 24-hour rest-activity schedules and exposure to light-dark cycles inadequate for optimal circadian synchronization may have contributed to these disturbances.

Neri, David F.↗

SOFIA'S Challenge: Scheduling Airborne Astronomy Observations

The Stratospheric Observatory for Infrared Astronomy (SOFIA) is NASA's next generation airborne astronomical observatory, and will commence operations in 2005. The facility consists of a 747-SP modified to accommodate a 2.5 meter telescope. SOFIA is expected to fly an average of 140 science flights per year over its 20 year lifetime. Depending on the nature of the instrument used during flight, 5-15 observations per flight are expected. The SOFIA telescope is mounted aft of the wings on the port side of the aircraft and is articulated through a range of 20deg to 60deg of elevation. The telescope has minimal lateral flexibility; thus, the aircraft must turn constantly to maintain the telescope's focus on an object during observations. A significant problem in future SOFIA operations is that of scheduling flights in support of observations. Investigators are expected to propose small numbers of observations, and many observations must be grouped together to make up single flights. Flight planning for the previous generation airborne observatory, the Kuiper Airborne Observatory (KAO), was done by hand; planners had to choose takeoff time, observations to perform, and decide on setup-actions (called "dead-legs") to position the aircraft prior to observing. This task frequently required between 6-8 hours to plan one flight The scope of the flight planning problem for supporting GI observations with the anticipated flight rate for SOFIA makes the manual approach for flight planning daunting. In response, we have designed an Automated Flight Planner (AFP) that accepts as input a set of requested observations, designated flight days, weather predictions and fuel limitations, and searches automatically for high-quality flight plans that satisfy all relevant aircraft and astronomer specified constraints. The AFP can generate one candidate flight plan in 5-10 minutes, of computation time, a feat beyond the capabilities of human flight planners. The rate at which the AFP can generate flights enables humans to assess and analyze complex tradeoffs between fuel consumption, estimated science quality and the percentage of scheduled observations. Due to the changing nature of SOFIA scheduling problems, this functionality will play a crucial role in optimizing science and minimizing costs during operations. In the full paper, we will summarize the technical challenges that have been met in order to build this system. These include: design of the search algorithm, design of appropriate heuristics and approximations, and reduction in the size of the search space. We will also describe technical challenges that are currently being addressed, including the extension of the existing approach to handle new solution criteria. Finally, we will describe a variety of cultural challenges that the astronomical community must address in order to successfully use SOFIA, and describe how the AFT can be used to address some of these challenges. Specifically, many of the intended science users are accustomed to using ground-based or space-based observatories; we will identify some differences that arise due to the nature of airborne observatories, and how the AFT can be extended to provide useful services to ease these cultural differences.

Frank, Jeremy↗

A Near-Term, High-Confidence Heavy Lift Launch Vehicle

The use of well understood, legacy elements of the Space Shuttle system could yield a near-term, high-confidence Heavy Lift Launch Vehicle that offers significant performance, reliability, schedule, risk, cost, and work force transition benefits. A side-mount Shuttle-Derived Vehicle (SDV) concept has been defined that has major improvements over previous Shuttle-C concepts. This SDV is shown to carry crew plus large logistics payloads to the ISS, support an operationally efficient and cost effective program of lunar exploration, and offer the potential to support commercial launch operations. This paper provides the latest data and estimates on the configurations, performance, concept of operations, reliability and safety, development schedule, risks, costs, and work force transition opportunities for this optimized side-mount SDV concept. The results presented in this paper have been based on established models and fully validated analysis tools used by the Space Shuttle Program, and are consistent with similar analysis tools commonly used throughout the aerospace industry. While these results serve as a factual basis for comparisons with other launch system architectures, no such comparisons are presented in this paper. The authors welcome comparisons between this optimized SDV and other Heavy Lift Launch Vehicle concepts.

Rothschild, William J.↗

Science Operations with the James Webb Space Telescope

The James Webb Space Telescope (JWST) will be a powerful space observatory whose four science instruments will deliver rich imaging and multiplexed spectroscopic datasets to the astronomical and planetary science communities. The ground segment for JWST, now being designed and built, will carry out JWST's science operations. The ground segment includes: (1) software that the scientific community will use to propose and specify new observations; (2) software that will schedule both science and calibration observations in a way that optimizes observing efficiency while managing the accumulation of momentum; (3) the infrastructure to regularly measure and maintain the telescope's wavefront; (4) orbit determination, ranging, and tracking; (5) communication via the Deep Space Network to command the observatory and retrieve scientific data; (6) onboard scripts that execute each observing program in an event-driven fashion, with occasional interruptions for targets of opportunity or time-critical observations; and (7) a system that processes and calibrates the data into science ready products, automatically recalibrates when calibrations improve, and archives the data for timely access by the principal investigator and later worldwide access by the scientific community. This ground system builds on experience from operating the Hubble Space Telescope, while solving challenges that are unique to the James Webb Space Telescope. In this paper, we describe the elements of the JWST ground system, how it will work operationally from the perspective of the observatory itself, and how a typical user will interact with the system to turn his/her idea into scientific discovery.

Rigby, Jane↗

Prototyping Operational Autonomy for Space Traffic Management

Current state of the art in Space Traffic Management (STM) relies on a handful of providers for surveillance and collision prediction, and manual coordination between operators. Neither is scalable to support the expected 10x increase in spacecraft population in less than 10 years, nor does it support automated manuever planning. We present a software prototype of an STM architecture based on open Application Programming Interfaces (APIs), drawing on previous work by NASA to develop an architecture for low-altitude Unmanned Aerial System Traffic Management. The STM architecture is designed to provide structure to the interactions between spacecraft operators, various regulatory bodies, and service suppliers, while maintaining flexibility of these interactions and the ability for new market participants to enter easily. Autonomy is an indispensable part of the proposed architecture in enabling efficient data sharing, coordination between STM participants and safe flight operations. Examples of autonomy within STM include syncing multiple non-authoritative catalogs of resident space objects, or determining which spacecraft maneuvers when preventing impending conjunctions between multiple spacecraft. The STM prototype is based on modern micro-service architecture adhering to OpenAPI standards and deployed in industry standard Docker containers, facilitating easy communication between different participants or services. The system architecture is designed to facilitate adding and replacing services with minimal disruption. We have implemented some example participant services (e.g. a space situational awareness provider/SSA, a conjunction assessment supplier/CAS, an automated maneuver advisor/AMA) within the prototype. Different services, with creative algorithms folded into then, can fulfil similar functional roles within the STM architecture by flexibly connecting to it using pre-defined APIs and data models, thereby lowering the barrier to entry of new players in the STM marketplace. We demonstrate the STM prototype on a multiple conjunction scenario with multiple maneuverable spacecraft, where an example CAS and AMA can recommend optimal maneuvers to the spacecraft operators, based on a predefined reward function. Such tools can intelligently search the space of potential collision avoidance maneuvers with varying parameters like lead time and propellant usage, optimize a customized reward function, and be implemented as a scheduling service within the STM architecture. The case study shows an example of autonomous maneuver planning is possible using the API-based framework. As satellite populations and predicted conjunctions increase, an STM architecture can facilitate seamless information exchange related to collision prediction and mitigation among various service applications on different platforms and servers. The availability of such an STM network also opens up new research topics on satellite maneuver planning, scheduling and negotiation across disjoint entities.

space traffic management↗

Characterization of International Space Station Crew Members' Workload Contributing to Fatigue, Sleep Disruption and Circadian De-synchronization

The focus of this paper is to characterize how the International Space Station (ISS) crewmembers’ workload may be contributing to sleep loss, circadian misalignment and fatigue. Both sleep quantity and subjective sleep quality are reduced in ISS crewmembers (Barger, Flynn-Evans, Kubey, Walsh, Ronda, Wang, Wright, & Czeisler, 2014). Evidence indicates that the use of hypnotic drugs does not appear to promote extended sleep duration. Because sleep is often driven by psychosocial as well as somatic attributes, traditional therapies may only partially moderate the problem for some individuals. Accordingly, searching for additional abatement tactics is a sensible plan. Scientific studies have shown that sleep can be disrupted from work-related stressors. On the ISS, to optimize their time, the crewmembers follow prescribed, ambitious and rigorous schedules with shared deadlines. Here it will be argued that these human capital leveraging techniques may be undermining the astronaut’s sleep, which could negatively impact performance. Along with half of the Earth-bound working population (Paoli & Merllié, 2001), ISS crewmembers may not be adequately recovering from their workload. This paper begins with a characterization of the working conditions of ISS crewmembers, describes the development of rigorous schedules and portrays a typical workday. Terrestrially-based research is compiled to describe how full and partial sleep deprivation affect physical and cognitive performance and how ISS work characteristics may disrupt sleep and subsequent performance. The literature points toward potential solutions to astronaut fatigue that is related to their workload. Finally, throughout the text, evidence is provided from semi-structured interviews, biographies and textual databases to support the argument that astronaut workload is contributing to their sleep loss and fatigue and that research, development and mitigation strategies should focus on enhancing the restorative process.

fatigue↗

Connectivity-Enhanced Route Selection and Adaptive Control for the Chevrolet Volt: Preprint

The National Renewable Energy Laboratory and General Motors evaluated connectivity-enabled efficiency enhancements for the Chevrolet Volt. A high-level model was developed to predict vehicle fuel and electricity consumption based on driving characteristics and vehicle state inputs. These techniques were leveraged to optimize energy efficiency via green routing and intelligent control mode scheduling, which were evaluated using prospective driving routes between tens of thousands of real-world origin/destination pairs. The overall energy savings potential of green routing and intelligent mode scheduling was estimated at 5% and 3% respectively. These represent substantial opportunities considering that they only require software adjustments to implement.

33 ADVANCED PROPULSION SYSTEMS↗

In-service Inspection of Radioactive Waste Tanks at the Savannah River Site – 15410

Liquid radioactive wastes from the Savannah River Site (SRS) separation process are stored in large underground carbon steel tanks. The high level wastes are processed in several of the tanks and then transferred by piping to other site facilities for further processing before they are stabilized in a vitrified or grout waste form. Based on waste removal and processing schedules, many of the tanks will be required to be in service for times exceeding the initial intended life. Until the waste is removed from storage, transferred, and processed, the materials and structures of the tanks must maintain a confinement function by providing a barrier to the environment and by maintaining acceptable structural stability during design basis events, which include loadings from both normal service and abnormal (e.g., earthquake) conditions. A structural integrity program is in place to maintain the structural and leak integrity functions of these waste tanks throughout their intended service life. In-service inspection (ISI) is an essential element of a comprehensive structural integrity program for the waste tanks at the Savannah River Site (SRS). The ISI program was developed to determine the degree of degradation the waste tanks have experienced due to service conditions. As a result of the inspections, an assessment can be made of the effectiveness of corrosion controls for the waste chemistry, which precludes accelerated localized and general corrosion of the waste tanks. Ultrasonic inspections (UT) are performed to detect and quantify the degree of general wall thinning, pitting and cracking as a measure of tank degradation. The results from these inspections through 2013, for the 27 Type III/IIIA tanks, indicate no reportable in-service corrosion degradation in the primary tank (i.e., general, pitting, or cracking). The average wall thickness for all tanks remains above the manufactured nominal thickness minus 0.25 millimeter and the largest pit identified is approximately 1.70 millimeter deep (i.e., less than 10% through-wall). Improvements to the inspection program were recently instituted to provide additional confidence in the degradation rates. Thickness measurements from a single vertical strip along the accessible height of the primary tank have been used as a baseline to compare historical measurements. Changes in wall thickness and pit depths along this vertical strip are utilized to estimate the rate of corrosion degradation. An independent review of the ISI program methodology, results, and path forward was held in August 2009. The review recommended statistical sampling of the tanks to improve the confidence of the single strip inspection program. The statistical sampling plan required that SRS increase the amount of area scanned per tank. Therefore, in addition to the baseline vertical strip that is obtained for historical comparisons, four additional randomly selected vertical strips are inspected. To date, a total of 104 independent vertical strips along the height of the primary tank have been completed. A statistical analysis of the data indicates that at this coverage level there is a 99.5% confidence level that one of the worst 5% of all the vertical strips was inspected. That is, there is a relatively high likelihood that the SRS inspection program has covered one of the most corroded areas of any of the Type III/IIIA waste tanks. These data further support the conclusion that there are no significant indications of wall thinning or pitting. Random sampling will continue to increase the confidence that one of the worst 5% has been inspected. In order to obtain the additional vertical strips, and minimize budget and schedule impacts, data collection speed for the UT system was optimized. Prior to 2009, the system collected data at a rate of 32 square centimeters per minute. The scan rate was increased to 129 - 160 square centimeters per minute by increasing the scanner step and pixel sizes in the data acquisition set-up. Laboratory testing was utilized to optimize the scan index/pixel size such that the requirements for wall thinning and pit detection were still maintained. SRS continues to evaluate improvements to ultrasonic equipment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Systems and methods for tensor scheduling

A technique for efficient scheduling of operations in a program for parallelized execution thereof using a multi-processor runtime environment having two or more processors includes constraining the type or number of loop optimization transforms that may be explored such that memory and processing capacity available for the scheduling task are not exceeded, while facilitating a tradeoff between memory locality, parallelization, and/or data communication between memory modules of the multi-processor runtime environment.

Meister, Benoit J.↗

In-service inspection of radioactive waste tanks at the Savannah River Site - 15410

Liquid radioactive wastes from the Savannah River Site (SRS) separation process are stored in large underground carbon steel tanks. The high level wastes are processed in several of the tanks and then transferred by piping to other site facilities for further processing before they are stabilized in a vitrified or grout waste form. Based on waste removal and processing schedules, many of the tanks, will be required to be in service for times exceeding the initial intended life. Until the waste is removed from storage, transferred, and processed, the materials and structures of the tanks must maintain a confinement function by providing a barrier to the environment and by maintaining acceptable structural stability during design basis events, which include loadings from both normal service and abnormal (e.g., earthquake) conditions. A structural integrity program is in place to maintain the structural and leak integrity functions of these waste tanks throughout their intended service life. In-service inspection (ISI) is an essential element of a comprehensive structural integrity program for the waste tanks at the Savannah River Site (SRS). The ISI program was developed to determine the degree of degradation the waste tanks have experienced due to service conditions. As a result of the inspections, an assessment can be made of the effectiveness of corrosion controls for the waste chemistry, which precludes accelerated localized and general corrosion of the waste tanks. Ultrasonic inspections (UT) are performed to detect and quantify the degree of general wall thinning, pitting and cracking as a measure of tank degradation. The results from these inspections through 2013, for the 27 Type III/IIIA tanks, indicate no reportable in-service corrosion degradation in the primary tank (i.e., general, pitting, or cracking). The average wall thickness for all tanks remains above the manufactured nominal thickness minus 0.25 millimeter and the largest pit identified is approximately 1.70 millimeter deep (i.e., less than 10% through-wall). Improvements to the inspection program were recently instituted to provide additional confidence in the degradation rates. Thickness measurements from a single vertical strip along the accessible height of the primary tank have been used as a baseline to compare historical measurements. Changes in wall thickness and pit depths along this vertical strip are utilized to estimate the rate of corrosion degradation. An independent review of the ISI program methodology, results, and path forward was held in August 2009. The review recommended statistical sampling of the tanks to improve the confidence of the single strip inspection program. The statistical sampling plan required that SRS increase the amount of area scanned per tank. Therefore, in addition to the baseline vertical strip that is obtained for historical comparisons, four additional randomly selected vertical strips are inspected. To date, a total of 104 independent vertical strips along the height of the primary tank have been completed. A statistical analysis of the data indicates that at this coverage level there is a 99.5% confidence level that one of the worst 5% of all the vertical strips was inspected. That is, there is a relatively high likelihood that the SRS inspection program has covered one of the most corroded areas of any of the Type III/IIIA waste tanks. These data further support the conclusion that there are no significant indications of wall thinning or pitting. Random sampling will continue to increase the confidence that one of the worst 5% has been inspected. In order to obtain the additional vertical strips, and minimize budget and schedule impacts, data collection speed for the UT system was optimized. Prior to 2009, the system collected data at a rate of 32 square centimeters per minute. The scan rate was increased to 129 - 160 square centimeters per minute by increasing the scanner step and pixel sizes in the data acquisition set-up. Laboratory testing was utilized to optimize the scan index/pixel size such that the requirements for wall thinning and pit detection were still maintained. SRS continues to evaluate improvements to ultrasonic equipment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Comparison of Techniques for Scheduling Fleets of Earth-Observing Satellites

Earth observing satellite (EOS) scheduling is a complex real-world domain representative of a broad class of over-subscription scheduling problems. Over-subscription problems are those where requests for a facility exceed its capacity. These problems arise in a wide variety of NASA and terrestrial domains and are .XI important class of scheduling problems because such facilities often represent large capital investments. We have run experiments comparing multiple variants of the genetic algorithm, hill climbing, simulated annealing, squeaky wheel optimization and iterated sampling on two variants of a realistically-sized model of the EOS scheduling problem. These are implemented as permutation-based methods; methods that search in the space of priority orderings of observation requests and evaluate each permutation by using it to drive a greedy scheduler. Simulated annealing performs best and random mutation operators outperform our squeaky (more intelligent) operator. Furthermore, taking smaller steps towards the end of the search improves performance.

Globus, Al↗

Optimizing Data Locality for Fork/Join Programs Using Constrained Work Stealing

We present an approach to improving data locality across different phases of fork/join programs scheduled using work stealing. The approach consists of: (1) user-specified and automated approaches to constructing a steal tree, the schedule of steal operations and (2) constrained work stealing algorithms that constrain the actions of the scheduler to mirror a given steal tree. These are combined to construct work stealing schedules that maximize data locality across computation phases while ensuring load balance within each phase. These algorithms are also used to demonstrate dynamic coarsening, an optimization to improve spatial locality and sequential overheads by combining many finer-grained tasks into coarser tasks while ensuring sufficient concurrency for locality-optimized load balance. Implementation and evaluation in Cilk demonstrate performance improvements of up to 2.5x on 80 cores. We also demonstrate that dynamic coarsening can combine the performance benefits of coarse task specification with the adaptability of finer tasks.

cilk↗