Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “operator”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 955 records · Page 53

State Machine Operation of Complex Systems

Operation of complex systems which depend on one or more other systems with many process variables often operate in more than one state. For each state there may be a variety of parameters of interest, and for each of these, one may require different alarm limits, different archiving needs, and have different critical parameters. Relying on operators to reliably change 10s-1000s of parameters for each system for each state is unreasonable. Not changing these parameters results in alarms being ignored or disabled, critical changes missed, and/or possible data archiving problems. To reliably manage the operation of complex systems, such as cryomodules (CMs), Fermilab is implementing state machines for each CM and an over-arching state machine for the PIP-II superconducting linac (SCL). The state machine transitions and operating parameters are stored/restored to/from a configuration database. Proper implementation of the state machines will not only ensure safe and reliable operation of the CMs, but will help ensure reliable data quality. A description of PIP-II SCL, details of the state machines, and lessons learned from limited use of the state machines in recent CM testing will be discussed.

43 PARTICLE ACCELERATORS↗

Demand Response in Bangalore: Implications for Electricity System Operations

Recent Greening the Grid studies for India highlight the benefits of flexible resources for integrating variable renewable energy onto India’s electricity system. India’s ambitious renewable energy targets, which are particularly focused on renewable resource states such as Karnataka, will face fewer challenges when combined with new planning and operational strategies and technologies. This report explores one such strategy - demand response - by which the system operator shifts load throughout a day to minimize system wide production costs. To explore this strategy, we added demand response resources to Karnataka’s electricity system in a production cost model of India, using load shifting potential analyzed by Lawrence Berkeley National Labs. We then investigated the impacts of increasing demand response capacity under several renewable resource scenarios. Our results show the addition of demand response enables fuel shifting from high-marginal-cost and emissions-intensive subcritical coal and diesel generation to zero-marginal-cost and emissions-free renewable generation. Accordingly, the value that demand response provides to the system increases as the renewable penetration increases. In addition to reducing production costs and emissions, demand response reduces the time that thermal generators spend at their minimum output levels, which typically represents a less efficient and costlier operational state. Agricultural load shifting provides greater value to the system than residential, commercial, or industrial loads. Agricultural demand response is more flexible than other sectors because it is not exposed to subdaily operational constraints and it can operate for more hours per day without impacting customer satisfaction. Further, the first increment of demand response that is added to a system provides the greatest value; further additions provide additional benefits but have a decreasing impact. The insights we discuss could be leveraged by system planners and operators in other jurisdictions, particularly those facing significant renewable energy penetrations, to develop their own demand response programs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Electric Power Grid and Natural Gas Network Operations and Coordination

In this report, we present findings from three studies related to the coordination of natural gas and electricity system operations. We first propose and demonstrate a modeling platform for examining the interdependence of natural gas and electricity networks based on a direct current unit-commitment and economic dispatch model for the power system and a transient hydraulic gas model for the gas system. We use this platform to analyze the value of day-ahead coordination of power and natural gas network operations and to show the importance of considering gas system constraints when analyzing power systems operation with high penetration of gas generators and variable renewable energy sources. In the second study, we utilize our modeling platform to consider the U.S. Federal Energy Regulatory Commission (FERC) Order 809, issued in 2015 to improve day-ahead and intraday coordination of power and gas systems. Finally, in the third study we expand our modeling platform to focus on market-based coordination of electricity and natural gas system operations for a real system, namely a subset of the power and gas networks in the Front Range region of Colorado. We use real system data to evaluate the benefits of coordination operations under different conditions, including different levels of renewable penetration and the use of time-variant, shaped flow nominations. Our results indicate that coordination at various timescales can contribute to a reduction in curtailed gas in high-stress periods (such as those with large ramps in gas offtakes) and a reduction in energy consumption of gas compressor stations. We find that intraday coordination can reduce total power system production costs and natural gas deliverability constraints, yielding cost and reliability benefits. We observe these benefits for the test system as well as in the Colorado case study, where we find that coordination and shaped flows may provide additional value for systems with high penetration of variable renewable energy. Together, these three studies demonstrate a pathway for integrated gas and electricity grid modeling and for studying the benefits of coordinated operations of these increasingly interdependent energy systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Evaluating Utility-Scale PV-Battery Hybrids in an Operational Model for the Bulk Power System

Systems that combine solar photovoltaic and battery energy storage technologies (PV-BES) are increasingly being proposed and deployed on the bulk power system. The operations and value of PV-BES systems have been extensively studied from the project developer's perspective through analyses that maximize plant-level revenue. However, PV-BES hybrids' operational characteristics are seldom studied from the perspective of bulk power system operators, who seek to optimize the performance of a suite of generation and storage assets that are connected via the transmission network. This work presents modeling approaches for representing and evaluating PV-BES hybrids in a model that optimizes operations across the bulk power system. Its novel contributions include demonstrating a technique to modify a unit commitment and dispatch model to represent the operational synergies of PV-BES hybrids. In particular, we describe the challenges and an approach for representing so-called DC-coupled PV-BES - which utilize a single bi-directional inverter - as a dispatchable resource in a commercial, production cost model (PCM), PLEXOS. We demonstrate this technique in a PCM study of the Los Angeles Department of Water and Power (LADWP) test system, by replacing existing PV and battery generators on the test system with our PV-BES hybrids. We then pursue scenario analysis that is designed to isolate the various drivers of operational strategies for DC-coupled PV-BES hybrids, including the nature of coupling, PV penetration on the system, and varying inverter loading ratios (or degrees of over-sizing of the PV field). Results from the analysis include utilization profiles for the PV DC energy across available pathways, dispatch profiles for the battery component, and the hybrid technologies' impacts on system-wide production costs. The approach presented in this paper can be used in any PCM that is looking to study PV-BES hybrids as a resource in different power system configurations and services.

14 SOLAR ENERGY↗

US Department of Energy, Office of Science High Performance Computing Facility Operational Assessment 2021: Oak Ridge Leadership Computing Facility

Oak Ridge National Laboratory’s (ORNL’s) Leadership Computing Facility (OLCF) continues to surpass its operational target goals of supporting users; delivering fast, reliable computational ecosystems; creating innovative solutions for high-performance computing (HPC) needs; contributing to the community to build the next generation HPC workforce, and managing risks, safety, and security associated with operating some of the most powerful computers in the world. The results can be seen in the cutting-edge science conducted by users and the praise from the research community. Calendar year (CY) 2021 saw continued excellence in research supported by the OLCF’s leadership-class computing resources, including Summit (the nation’s most powerful supercomputer), the global scratch file system Alpine, the Scalable Protected Infrastructure (SPI), the Exploratory Visualization Environment for Research in Science and Technology (EVEREST), and the archival mass-storage resource High-Performance Storage System (HPSS). While maintaining access and exceptional user support for Summit, the OLCF continued to make progress on the installation and deployment of Frontier, which will be the nation’s first exascale system when it comes online at the start of CY 2023. Users have already begun running and optimizing scientific codes on Crusher, the OLCF test and development system equipped with Frontier’s architecture. Throughout the year, the OLCF maintained a strong culture of operational excellence, including risk management, workplace safety, and cybersecurity. The OLCF’s rigorous risk management strategy anticipated and mitigated risks, and at this time there are no high-priority operational risks. Similarly, ORNL and the OLCF were committed to operating under the US Department of Energy’s (DOE’s) safety regulations that ensure a safe workplace. Technical staff tracked and monitored existing threats and vulnerabilities within the OLCF while continually developing tools and practices to enhance operations without increasing the facility’s risk. CY 2021 was filled with outstanding results and accomplishments, including a very high rating from users on overall satisfaction for the eighth consecutive year; a tremendous number of node hours delivered to 1,671 researchers on Summit; and the successful delivery of the allocation split of roughly 60%, 20%, and 20% of core-hours offered for the Innovative and Novel Computational Impact on Theory and Experiment (INCITE), Advanced Scientific Computing Research Leadership Computing Challenge (ALCC), and Director’s Discretionary (DD) programs, respectively (Section 2). COVID-19 research remained a focus in 2021, and the ALCC and DD programs allocated over 1 million Summit hours to the COVID-19 High Performance Computing Consortium. These accomplishments, coupled with the high utilization rates (i.e., overall and capability usage), represent the fulfillment of the promise of leadership class machines: efficient facilitation of leadership-class computational applications.

97 MATHEMATICS AND COMPUTING↗

The Hidden Flexibility of the Natural Gas Network for Electric Power Operations: A Case Study of a Near-Miss Winter Event

The U.S. power sector has become increasingly reliant on gas pipeline networks to deliver fuel to natural gas power plants. In addition to supplying relatively low-cost fuel, gas networks offer generators flexibility in their operations through the ability to deliver fuel when needed by using gas storage facilities or linepack if the gas network is at an operating point below its design capacity. However, disruptions or stress events on the gas network - like those occurring in the Northeast and Texas in recent years - can result in limitations on gas availability to generators at times when generation is in short supply. Here we examine a period of stress that occurred in the winter of 2022 in the Western United States. Using data on the region's natural gas pipeline network and electric generators, we build an integrated gas and electric model that closely replicates the actual dispatch of the period. We then evaluate the implications of removing flexibility employed by the gas network operator, which during that period curtailed scheduled gas deliveries to other parties to increase deliveries to natural gas power plants, which requested more gas than initially forecasted. We find that without the flexibility supplied by the gas network operator, there would have been curtailment of gas generation due to gas offtake constraints, requiring the power system operator to redispatch relying on more expensive generation or to potentially shed load. A sensitivity exploring a wind drought further exacerbates the strain, illustrating the potential challenge of managing gas and grid interactions as systems move to higher shares of variable renewable electricity. Based on this example, we discuss potential coordination strategies between the two system operators to ensure that the power system can successfully utilize and rely on the flexibility offered by natural gas networks.

03 NATURAL GAS↗

Hybrid Power Plants: Status of Operating and Proposed Plants, 2023 Edition [Slides]

Improving battery technology and the growth of variable renewable generation are driving a surge of interest in “hybrid” power plants that combine, for example, wind or solar generating capacity with co-located batteries. While most of the current interest involves pairing photovoltaic (PV) plants with batteries, other types of hybrid or co-located plants with wide-ranging configurations have been part of the U.S. electricity mix for decades. This annually updated briefing tracks and maps existing hybrid or co-located plants across the United States while also synthesizing data from power purchase agreements (PPAs) and generation interconnection queues to shed light on near- and long-term development pipelines. The scope includes “co-located hybrids” that pair two or more resources (e.g., multiple types of generation and/or generation with storage) that are operated largely independently behind a single point of interconnection, and “full hybrids” that also feature coordinated operations of the co-located resources. The focus is on plants with one megawatt (MW) or more of capacity; smaller (often behind-the-meter) projects are also increasingly common, but are not included in this data synthesis. Key findings from the latest briefing include: -At the end of 2022, there were 374 hybrid plants (>1 MW) operating across the United States (+25% compared to the end of 2021), totaling nearly 41 GW of generating capacity (+15%) and 5.4 GW/15.2 GWh of energy storage (+69%/+88%). PV+storage plants are by far the most common, dominating in terms of plant number (213), storage capacity (4.0 GW/12.5 GWh), storage:generator capacity ratio (49%), and storage duration (3.1 hours). But there are nearly twenty other hybrid plant configurations as well, including several different fossil hybrid categories (each dominated by the fossil component) as well as wind+storage, wind+PV, wind+PV+storage, geothermal+PV, and others. -Last year was another strong year for PV+storage hybrids in particular: 59 of the 62 hybrids added in 2022 were PV+storage. As of the end of 2022, there was roughly as much storage capacity operating within PV+storage hybrid plants as in standalone storage plants (~4 GW each). In storage energy terms, however, PV+storage edged out standalone storage by ~2 GWh (12.5 GWh vs. 10.4 GWh, respectively). -Interconnection queue data show continued strong developer interest in hybridization. At the close of 2022, there were 51% more hybrid plants—representing 59% more generating capacity—in interconnection queues across the United States than there were at the end of 2021. Solar dominates these proposed plants as well: at the close of 2022, there were 457 GW of solar capacity proposed as a hybrid (representing ~48% of all solar capacity in the queues), most typically pairing PV with battery storage. At the same time, there were 24 GW of wind capacity proposed as a hybrid (representing ~8% of all wind capacity in the queues), again most-often pairing wind with storage. Meanwhile, more than half of all storage in the queues is estimated to be part of a hybrid plant. While many of the plants proposed in the queues will not ultimately reach commercial operations, the depth of interest in hybrid plants—especially PV+storage—is notable, particularly in certain regions. For example, in CAISO, 97% of all solar capacity and 45% of all wind capacity in the queues is proposed as a hybrid. -The report also surveys power purchase agreement (PPA) price data from a sample of operating and proposed PV+storage plants. Though PV+storage PPA prices have fallen over time, “levelized storage adders” have recently increased somewhat to ~$\$ $7000/MW-month, ~$\$ $60/MWh-stored (assuming one full cycle per day), or ~$\$ $15/MWh-PV. Some of the recent price increase could simply reflect a trend towards higher battery:PV capacity ratios over time, which increases costs, all else being equal. The well-publicized impact of inflationary and supply chain pressures on battery prices is no doubt a contributor as well.

25 ENERGY STORAGE↗

Solar and Storage Integration in the Southeastern United States: Economics, Reliability, and Operations

Solar energy has the potential to be a core energy resource for the southeastern United States. To better understand the implications of higher levels of solar PV (27%-43% of total generation capacity) and electricity storage (13%-49% of peak load) would affect electricity system reliability, costs, and operations in the U.S. Southeast, this study sought to address two main questions. First, how would higher levels of solar PV and electricity storage impact the costs, reliability, and operations of electricity systems in the Southeast in 2035? Second, at different levels of solar PV and electricity storage, what are the benefits of operational coordination among utilities in the Southeast, through more efficient regional dispatch and sharing operating reserves? To answer these questions, the study used detailed capacity expansion and dispatch modeling to develop and examine 15 scenarios with different levels of solar PV, electricity storage, and operational coordination, focusing on the year 2035. The study also evaluates the benefits of operational coordination among utilities through more efficient regional dispatch and reserve sharing, at different levels of solar and storage. The study focuses on five balancing regions that cover Alabama, Georgia, Kentucky, North Carolina, South Carolina, Tennessee, and parts of Mississippi and Missouri.

14 SOLAR ENERGY↗

Peer-to-peer communication control for resilient operations of networked cyberphysical systems

This report includes two main accomplishments of the peer-to-peer communication control for resilient operation of networked microgrids project in FY24, which include a scheme for cyberattack-aware coordination of networked microgrids for supporting voltages of bulk power systems and a scheme for price signal-based operations of EV-rich networked microgrids with mixed ownership. First, the cyberattack-aware scheme enables networked microgrids to distributedly determine the amount of reactive power injection to support the voltage of bulk power system (BPS) in a fair manner. In this scheme, a risk-informed algorithm is presented to generate the peer-to- peer (P2P) communication graph with minimal risk of attack on communication links. To deal with cyberattacks on MG controllers, the resilient consensus algorithm (CA) is utilized for MG controllers to robustly estimate the total reactive power headroom, from which the MGs can accurately provide the needed amount of reactive power injection for supporting the voltage of BPS. The CA implementation and performance within the P2P communication framework are demonstrated on the IEEE 39-bus system with 6 microgrids contained in the distribution feeder under different cyberattack scenarios. Second, the price-based scheme enables the usage of the real-time price signal for the operations of electric vehicle (EV)-rich networked-microgrids with mixed ownership, in which not all the microgrids can communicate with the distribution system operator (DSO). In this scheme, a max consensus is introduced to enable the real-time price signal to be propagated from the DSO to all the microgrids, from which each microgrid controller will manage the DERs to balance the load demand and the power injection from the EV charging stations within its microgrid. Numerical results over one day with 288 slots of 5-minute intervals on the modified 123-node test feeder including 3 microgrids with high penetration of EV are presented to evaluate how the price signal affects the operations of networked microgrids under different charging strategies of the EV charging stations. The result indicates that our proposed EVCS (dis)charging strategy, which leverages the flexibility of EVs to support the grid through discharging during peak demand, proves to be a cost-effective solution that reduces operational costs while improving the social welfare of EV charging.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Molten Salt Loop Operational Experience and Test Campaigns in FY24

The Facility to Alleviate Salt Technology Risks (FASTR) at the US Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) was developed to demonstrate technology for high-temperature chloride salt systems (Figure 1). FASTR is primarily constructed using alloy C-276 and is designed to operate at temperatures of up to 725°C. The facility is loaded with 250 kg of NaCl-KCl-MgCl 2 salt. This salt provides a relevant test environment for de-risking technology while avoiding the costs and hazards associated with beryllium-based or uranium-bearing salts. The facility’s major components include a centrifugal pump for salt circulation, an air-based heat exchanger to reject heat, a suite of instrumentation, and trace heating to prevent salt freezing. The salt was purified in 2020 and 2022, and the pumped loop first operated in December 2022. FASTR is a unique US capability for high-temperature molten halide salt testing. FASTR’s scale, co located purification system, and relatively large power (465 kW) differentiates it from other testing systems. Furthermore, access to the DOE-supported facility and efficient communication of results— which are generally disseminated publicly—distinguish FASTR as being broadly significant throughout the molten salt reactor community. FASTR is similar to ORNL’s Liquid Salt Test Loop (LSTL), although FASTR contains chloride-based salt instead of the fluoride-based salt (LiF-NaF-KF) found in LSTL. Furthermore, FASTR is approximately 2× larger than LSTL in terms of pipe size and length, power, salt volume, flow rate, and number of thermocouples. The LSTL first operated in 2016. At the end of FY23, there was a suspected gas leak in the LSTL that halted operation. At the start of FY24, a leak in the LSTL pump’s tank gas space was confirmed. Because the gas-space leak prevented operation of LSTL, FY24 efforts were focused on operation of FASTR. This report summarizes the progress made during FY24 in support of the DOE Office of Nuclear Energy (DOE-NE) work package, AT-24OR070202 Salt Loop and Capability for Testing Sensors and Off Gas Components.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Operation of Argonne's Liquid Salt-Liquid Metal Separation Testbed for U/TRU Product Processing

Argonne National Laboratory has constructed a liquid salt-liquid metal separation testbed for use in the development and advancement of cathode processing of U/TRU co‑deposits generated by pyroprocessing of used nuclear fuel. The U/TRU product recovered from the electrorefiner contains adhered and entrained salt that must be removed prior to consolidation of the U/TRU alloy for use in advanced reactor fuel fabrication. The bottom pour operation utilizes the low melting points of U/TRU co‑deposits and higher densities of molten metals compared to molten salts to separate and consolidate the U/TRU product. Argonne’s testbed is designed to support the development and optimization of bottom-pouring configurations for batch and semi-continuous operations, integration of process monitoring and control technologies, and determination of operational requirements for implementing in an industrial setting. Scoping tests were performed to demonstrate operational aspects of the testbed, including operation using single-pour spout and dual-pour spout configurations, effectiveness of salt containment and extent of salt vaporization, and the use of sensor probes to detect the location of the interface between the metal and salt phases during pouring. Recommendations for process optimization testing for further development of bottom pour processing to separate U/TRU alloys from adhered salt were made based on the results of scoping tests. Completing the recommended activities will increase the technical readiness level (TRL) of the liquid salt-liquid metal separation operation and consolidation of U/TRU alloys to support industrialization of pyroprocessing.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Characterization of Inlet Guide Vane Performance for Discharge Compressor Operation near the Dome of an sCO 2 Pumped Heat Energy Storage

Southwest Research Institute® (SwRI®) developed and tested a Variable Inlet Guide Vane (IGV herein) assembly on an integrally-geared sCO 2 compressor (IGC) to demonstrate compressor operation at both the compressor design point and near the dome and to define the operating limits of the compressor by monitoring for two-phase flow, flow turbulence from the IGVs, and compressor choke and surge as the CO 2 inlet temperature is varied. Performance testing was conducted on an existing integrally-geared, two-stage main compressor designed for near-critical-point operation with CO 2 . This testing campaign validated the IGV design and operation, as well as improved the understanding and confidence in operating compressors and predicting performance characteristics near the critical point where fluid properties change rapidly with temperature. In addition to improving the robust operating limits of an sCO 2 compressor, the development of an IGV for the IGC system improved off-design compressor efficiency by 12%.

25 ENERGY STORAGE↗

U.S. Department of Energy-National Lab Equity Summit: Grid Planning and Operations (Workshop Report)

This report summarizes the U.S. DOE and national laboratories equity summit that was held on February 5, 2024, and focused on grid planning and operations. The objectives of the summit were to connect DOE and lab researchers working on grid-related equity issues, share information on current and planned grid-related equity projects and initiatives, and inspire and educate participants by hearing from our panelists about solutions and challenges to integrating equity in grid planning and operations. The summit included two panels of industry leaders. The first was a state and community perspectives panel that included representatives from a state public utility commission (Oregon Public Utility Commission), a state energy office (Washington Department of Commerce), a state utility consumer advocate (Connecticut Consumer Counsel), and industry consultants (Elevated Engagement and ArkSpring Consulting). Panelists shared successes they have seen, critical challenges related to equity and grid planning and operations, and other considerations. The second panel addressed utility perspectives and included representatives from two utilities (Commonwealth Edison and Tacoma Power), the National Rural Electric Cooperative (NRECA), and a former utility employee and legal consultant. Panelists discussed the role of the utility concerning equity, the most significant technical and data modeling needs and opportunities, and the role the labs could help advance equity in grid planning and operations. There was also a session on partner organization presentations. Argonne National Laboratory made a short presentation on the Grid Modernization Laboratory Consortium (GMLC) project they are leading on equity-informed power system planning. NARUC, NASEO, and the Clean Energy States Alliance, as partners of the GMLC project also shared updates on relevant activities and resources. During the summit, there were two rounds of lightning presentations by national labs and DOE highlighting research that addresses equity and grid planning and operations (Tables 5 and 6 and slides in the Appendix). The goal of the lightning rounds was to share information between participants to encourage collaboration and leverage ongoing research at labs and DOE. The summit included two interactive exercises where summit participants shared their perspectives on relevant equity projects and initiatives (Table 2), key challenges regarding equity and grid planning and operations (Table 3), and promising innovations or progress (Table 4). At the end of the session, participants were asked to share essential insights from the event (Table 7) and an action they plan to take as a result of the event. Participants agreed that the event was useful in helping them share and learn from each other. The project team plans to use the information from the summit as a starting point to help inform future research and technical assistance. In 2026, another Equity Summit will be held (virtually or in person) as part of the same project to help raise awareness and disseminate research and resources completed during the project's duration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Block-Structured Operator Inference for Coupled Multiphysics Model Reduction

This work presents a block-structured formulation of Operator Inference as a way to learn structured reduced-order models for multiphysics systems. The approach specifies the governing equation structure for each physics component and the structure of the coupling terms. Once the multiphysics structure is specified, the reduced-order model is learned from snapshot data following the nonintrusive Operator Inference methodology. In addition to preserving physical system structure, which in turn permits preservation of system properties such as stability and second-order structure, the block-structured approach has the advantages of reducing the overall dimensionality of the learning problem and admitting tailored regularization for each physics component. The numerical advantages of the block-structured formulation over a monolithic Operator Inference formulation are demonstrated for aeroelastic analysis, which couples aerodynamic and structural models. For the benchmark test case of the AGARD 445.6 wing, block-structured Operator Inference provides an average 20% online prediction speedup over monolithic Operator Inference across subsonic and supersonic flow conditions in both the stable and fluttering parameter regimes while preserving the accuracy achieved with monolithic Operator Inference.

42 ENGINEERING↗

Improving Microalgal Biomass Productivity Using Weather-Forecast-Informed Operations

The operation of microalgal cultivation systems, such as culture dilution associated with harvests, affects biomass productivity. However, the constantly changing incident light and ambient temperature in the outdoor environment make it difficult to determine the operational parameters that result in optimal biomass growth. To address this problem, we present a pond operation optimization tool that predicts biomass growth based on future weather conditions to identify the optimal dilution rate that maximizes biomass productivity. The concept was tested by comparing the biomass productivities of three dilution scenarios: standard batch cultivation (no dilution), fixed-rate dilution (harvest 60% of the culture every three days), and weather-forecast-informed dilution. In the weather-forecast-informed case, the culture was diluted daily, and the dilution ratio was optimized by the operation optimization tool according to the future 24 h weather condition. The results show that the weather-forecast-informed dilution improved the biomass productivity by 47% over the standard batch cultivation and 20% over the fixed-rate dilution case. These results demonstrate that the pond operation optimization tool could help pond operators to make decisions that maximize biomass growth in the field under ever-changing weather conditions.

59 BASIC BIOLOGICAL SCIENCES↗

Characterizing the performance of a POPS miniaturized optical particle counter when operated on a quadcopter drone

We first validate the performance of the Portable Optical Particle Spectrometer (POPS), a small light-weight and high sensitivity optical particle counter, against a reference scanning mobility particle sizer (SMPS) for a month-long deployment in an environment dominated by biomass burning aerosols. Subsequently, we examine any biases introduced by operating the POPS on a quadcopter drone, a DJI Matrice 200 V2. We report the root mean square difference (RMSD) and mean absolute difference (MAD) in particle number concentrations (PNCs) when mounted on the UAV and operating on the ground and when hovering at 10 m. When wind speeds are low (less than 2.6 m s –1 ), we find only modest differences in the RMSDs and MADs of 5 % and 3 % when operating at 10 m altitude. When wind speeds are between 2.6 and 7.7 m s –1 the RMSDs and MADs increase to 26.2 % and 19.1 %, respectively, when operating at 10m altitude. No statistical difference in PNCs was detected when operating on the UAV in either ascent or descent. We also find size distributions of aerosols in the accumulation mode (defined by diameter, d, where 0.1 ≤ d ≤ 1 µm) are relatively consistent between measurements at the surface and measurements at 10 m altitude, while differences in the coarse mode (here defined by d > 1 µm) are universally larger. Our results suggest that the impact of the UAV rotors on the POPS PNCs are small at low wind speeds, but when operating under a higher wind speed of up to 7.6 m s –1 , larger discrepancies occur. In addition, it appears that the POPS measures sub-micron aerosol particles more accurately than super-micron aerosol particles when airborne on the UAV. These measurements lay the foundations for determining the magnitude of potential errors that might be introduced into measured aerosol particle size distributions and concentrations owing to the turbulence created by the rotors on the UAV.

47 OTHER INSTRUMENTATION↗

Coordination and control – limits in standard representations of multi-reservoir operations in hydrological modeling

Abstract. Major multi-reservoir cascades represent a primary mechanism for dealing with hydrologic variability and extremes within institutionally complex river basins worldwide. These coordinated management processes fundamentally reshape water balance dynamics. Yet, multi-reservoir coordination processes have been largely ignored in the increasingly sophisticated representations of reservoir operations within large-scale hydrological models. The aim of this paper is twofold, namely (i) to provide evidence that the common modeling practice of parameterizing each reservoir in a cascade independently from the others is a significant approximation and (ii) to demonstrate potential unintended consequences of this independence approximation when simulating the dynamics of hydrological extremes in complex reservoir cascades. We explore these questions using the Water Balance Model, which features detailed representations of the human infrastructure coupled to the natural processes that shape water balance dynamics. It is applied to the Upper Snake River basin in the western US and its heavily regulated multi-reservoir cascade. We employ a time-varying sensitivity analysis that utilizes the method of Morris factor screening to explicitly track how the dominant release rule parameters evolve both along the cascade and in time according to seasonal high- and low-flow events. This enables us to address aim (i) by demonstrating how the progressive and cumulative dominance of upstream releases significantly dampens the ability of downstream reservoir rules' parameters to influence flow conditions. We address aim (ii) by comparing simulation results with observed reservoir operations during critical low-flow and high-flow events in the basin. Our time-varying parameter sensitivity analysis with the method of Morris clarifies how independent single-reservoir parameterizations and their tacit assumption of independence leads to reservoir release behaviors that generate artificial water shortages and flooding, whereas the observed coordinated cascade operations avoided these outcomes for the same events. To further explore the role of (non-)coordination in the large deviations from the observed operations, we use an offline multi-reservoir water balance model in which adding basic coordination mechanisms drawn from the observed emergency operations is sufficient to correct the deficiencies of the independently parameterized reservoir rules from the hydrological model. These results demonstrate the importance of understanding the state–space context in which reservoir releases occur and where operational coordination plays a crucial role in avoiding or mitigating water-related extremes. Understanding how major infrastructure is coordinated and controlled in major river basins is essential for properly assessing future flood and drought hazards in a changing world.

54 ENVIRONMENTAL SCIENCES↗

Experimental Operation of a Prototype 750C Advanced Chloride Molten Salt Bellows Valve

To achieve DOE 2030 SunShot targets that reduce the cost of liquid-based solar by an additional 40% to 70% beyond 2018 costs, a more reliable, highly manufacturable flow valve, capable of achieving operational temperatures of >700°C is required [1]. This paper investigates the development of an innovative high-temperature chloride molten salt valve, with operation up to 750°C. This valve is intended to be employed within Gen 3 CSP liquid-based thermal energy storage (TES) systems as well as Gen 4 modular salt reactor (MSR) technologies. This work details the general design and flow testing of a bellows-seal flow control valve (FCV). This design includes an integrated closed-loop thermal control system to ensure robust design for freeze-thaw cycles. The self-contained thermal management STM system, is unique in the salt valve industry since it is an integrated solution to provide a consistent, repeatable alternative to typical heat tracing. Additionally, the design includes the employment of a novel heat pipe valve stem to facilitate enhanced passive thermal management into the valve assembly. This valve stem heat pipe is designed to facilitate natural circulation within the bonnet to ensure robust operation, during both nominal and transient thermal operation. The valve body and trim will be designed using SS316H, consistent with Flowserve Corporation’s existing product base and is code qualified but will utilize clad material for materials corrosion, manufacturing cost reduction and compatibility to ensure design flexibility. A test campaign was performed in this investigation utilizing a novel 750°C ternary chloride (20%NaCl/40%MgCl2/40%KCl by mol. wt. %) molten salt flow loop. A discussion about the design and installation of the valves within this test bed is provided for this investigation. Valve test results from this study assessed Cv curves as well as multiple actuator cycles, under varying thermodynamic and operational mode conditions, which would be characteristic within a commercial molten salt facility. The results indicate nominal operation for the baseline design, though improved performance and reliability is expected with the full designed FCV.

Armijo, Kenneth (ORCID:0000000346832147)↗