Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “mated”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 955 records · Page 53

STS-88 Crew Interview: Jim Newman

Jim Newman discusses the seven-day mission that will be highlighted by the mating of the U.S.-built Node 1 station element to the Functional Energy Block (FGB) which will already be in orbit, and two spacewalks to connect power and data transmission cables between the Node and the FGB. Node 1 will be the first Space Station hardware delivered by the Space Shuttle. He also discusses the assembly sequence. The crew will conduct a series of rendezvous maneuvers similar to those conducted on other Shuttle missions to reach the orbiting FGB. Once the two elements are docked, Ross and Newman will conduct two scheduled spacewalks to connect power and data cables between the Node, PMAs and the FGB. The day following the spacewalks, Endeavour will undock from the two components, completing the first Space Station assembly mission.

Source record↗

STS-88 Crew Interview: Jerry Ross

Jerry Ross discusses the seven-day mission that will be highlighted by the mating of the U.S.-built Node 1 station element to the Functional Energy Block (FGB) which will already be in orbit, and two spacewalks to connect power and data transmission cables between the Node and the FGB. Node 1 will be the first Space Station hardware delivered by the Space Shuttle. He also disscusses the assembly sequence. The crew will conduct a series of rendezvous maneuvers similar to those conducted on other Shuttle missions to reach the orbiting FGB. Once the two elements are docked, Ross and Newman will conduct two scheduled spacewalks to connect power and data cables between the Node, PMAs and the FGB. The day following the spacewalks, Endeavour will undock from the two components, completing the first Space Station assembly mission.

Source record↗

Summary Report of Mission Acceleration Measurements for STS-89: Launched January 22, 1998

Support of microgravity research on the 89th flight of the Space Transportation System (STS-89) and a continued effort to characterize the acceleration environment of the Space Shuttle Orbiter and the Mir Space Station form the basis for this report. For the STS-89 mission, the Space Shuttle Endeavour was equipped with a Space Acceleration Measurement System (SAMS) unit, which collected more than a week's worth of data. During docked operations with Mir, a second SAMS unit collected approximately a day's worth of data yielding the only set of acceleration measurements recorded simultaneously on the two spacecraft. Based on the data acquired by these SAMS units, this report serves to characterize a number of acceleration events and quantify their impact on the local nature of the accelerations experienced at the Mechanics of Granular Materials (MGM) experiment location. Crew activity was shown to nearly double the median root-mean-square (RMS) acceleration level calculated below 10 Hz, while the Enhanced Orbiter Refrigerator/Freezer operating at about 22 Hz was a strong acceleration source in the vicinity of the MGM location. The MGM science requirement that the acceleration not exceed q I mg was violated numerous times during their experiment runs; however, no correlation with sample instability has been found to this point. Synchronization between the SAMS data from Endeavour and from Mir was shown to be close much of the time, but caution with respect to exact timing should be exercised when comparing these data. When orbiting as a separate vehicle prior to docking, Endeavour had prominent structural modes above 3 Hz, while Mir exhibited a cluster of modes around 1 Hz. When mated, a transition to common modes was apparent in the two SAMS data sets. This report is not a comprehensive analysis of the acceleration data, so those interested in further details should contact the Principal Investigator Microgravity Services team at the National Aeronautics and Space Administration's John H. Glenn Research Center.

Hrovat, Kenneth↗

Experimental Analysis of a Rocket Based Combined Cycle (RBCC) Engine in a Direct-Connect Test Facility

The object of this study is to investigate the operation of a RBCC at ramjet and scramjet flight conditions using a direct-connect test facility. The apparatus being tested is a single strut-rocket within a dual-mode ram/scramjet combustor. The gaseous hydrogen/oxygen, linear strut-rocket was supplied by Aerojet Propulsion Company. The hardware is being tested in the Direct Connect Supersonic Combustion Test Facility at NASA Langley Research Center. The test facilities hydrogen/oxygen vitiated heater is capable of flight total enthalpies to Mach 8. A Mach 2.5 facility nozzle mates the heater to the combustor duct. The rocket ejector will ordinarily operate in a fuel-rich mode. Additional fuel injection is provided by a pair of parallel injectors located at the base of the strut body. Instrumentation on the test apparatus includes a unique, direct thrust measurement system. Performance predictions for the anticipated test conditions have been made using a one-dimensional, thermodynamic analysis code. Results from the code show the dependence of overall thrust and specific impulse on rocket chamber pressure, rocket fuel equivalence ratio, and overall fuel equivalence ratio. Once the experimental test series begins, the inferred combustion efficiency as a function of axial location and the thermal choke region (where applicable) can also be determined using this code. Upon completion of the experimental test series, measurements will be used to calculate thrust, specific impulse, etc. Measured and calculated values will be compared to those found analytically. If appropriate, the code will be tailored to better predict hardware operation. Conclusions will be drawn as to the fuel-rich rocket's overall effect on ramjet and scramjet performance. Also, comparisons will be made between the integrated thrust calculated from the static pressure taps located along the duct and the thrust measured by the direct thrust measurement system.

K. Nelson↗

Design Optimization and Analysis of a Composite Honeycomb Intertank

Intertanks, the structure between tanks of launch vehicles, are prime candidates for weight reduction of rockets. This paper discusses the optimization and detailed follow up analysis and testing of a 96 in. diameter, 77 in. tall intertank. The structure has composite face sheets with an aluminum honeycomb core. The ends taper to a thick built up laminate for a double lap bolted splice joint interface. It is made in 8 full length panels joined with bonded double lap joints. The nominal load is 4000 lb/in. Optimization is by Genetic Algorithm and minimizes weight by varying core thickness, number and orientation of acreage and buildup plies, and the size, number and spacing of bolts. A variety of design cases were run with populations up to 2000 and chromosomes as long as 150 bits. Constraints were buckling; face stresses (normal, shear, wrinkling and dimpling); bolt stress; and bolt hole stresses (bearing, net tension, wedge splitting, shear out and tension/shear out). Analysis is by a combination of elasticity solutions and empirical data. After optimization, a series of coupon tests were performed in conjunction with a rigorous analysis involving a variety of finite element models. This analysis and testing resulted in several small changes to the optimized design. The equation used for hole bearing strength was found to be inadequate, resulting in thicker ends. The core thickness increased 0.05", and potting compound was added in the taper to strengthen the facesheet bond. The intertank has undergone a 250,000 lb limit load test and been mated with a composite liquid hydrogen tank. The tank/intertank unit is being installed in a test stand where it will see 200 thermal/load cycles. Afterwards the intertank will be demated and loaded in compression to failure.

Finckenor, Jeff↗

STS-103 In VAB

Live footage of the fully constructed Discovery Orbiter mated to the external tank and solid rocket boosters in the VAB (Vehicle Assembly Building) high bay 1 is seen.

Source record↗

Characterization of Settled Atmospheric Dust by the DART Experiment

The DART ("Dust Accumulation and Removal Test") package is an experiment which will fly as part of the MIP experiment on the Mars-2001 Surveyor Lander. Dust deposition could be a significant problem for photovoltaic array operation for long duration emissions on the surface of Mars. Measurements made by Pathfinder showed 0.3% loss of solar array performance per day due to dust obscuration. The DART experiment is designed to quantify dust deposition from the Mars atmosphere, measure the properties of settled dust, measure the effect of dust deposition on the array performance, and test several methods of mitigating the effect of settled dust on a solar array. Although the purpose of DART (along with its sister experiment, MATE) is to gather information critical to the design of future power systems on the surface of Mars, the dust characterization instrumentation on DART will also provide significant scientific data on the properties of settled atmospheric dust.

Landis, Geoffrey A.↗

Delta FUSE Fairing Installation at Launch Complex 17A

This NASA Kennedy Space Center (KSC) video release presents footage of the June 19, 1999 installation of the fairing around the Far Ultraviolet Spectroscopic Explorer (FUSE) spacecraft. The spacecraft was previously mated to the Boeing Delta II rocket. Installation took place on Pad A of Launch Complex 17.

Source record↗

GH/IGF-I Transgene Expression on Muscle Homeostasis

We propose to test the hypothesis that the growth hormone/ insulin like growth factor-I axis through autocrine/paracrine mechanisms may provide long term muscle homeostasis under conditions of prolonged weightlessness. As a key alternative to hormone replacement therapy, ectopic production of hGH, growth hormone releasing hormone (GHRH), and IGF-I will be studied for its potential on muscle mass impact in transgenic mice under simulated microgravity. Expression of either hGH or IGF-I would provide a chronic source of a growth-promoting protein whose biosynthesis or secretion is shut down in space. Muscle expression of the IGF-I transgene has demonstrated about a 20% increase in hind limb muscle mass over control nontransgenic litter mates. These recent experiments, also establish the utility of hind-limb suspension in mice as a workable model to study atrophy in weight bearing muscles. Thus, transgenic mice will be used in hind-limb suspension models to determine the role of GH/IGF-I on maintenance of muscle mass and whether concentric exercises might act in synergy with hormone treatment. As a means to engineer and ensure long-term protein production that would be workable in humans, gene therapy technology will be used by to monitor muscle mass preservation during hind-limb suspension, after direct intramuscular injection of a genetically engineered muscle-specific vector expressing GHRH. Effects of this gene-based therapy will be assessed in both fast twitch (medial gastrocnemius) and slow twitch muscle (soleus). End-points include muscle size, ultrastructure, fiber type, and contractile function, in normal animals, hind limb suspension, and reambutation.

Schwartz, Robert J.↗

Comparison Of Human Modelling Tools For Efficiency Of Prediction Of EVA Tasks

Construction of the International Space Station (ISS) will require extensive extravehicular activity (EVA, spacewalks), and estimates of the actual time needed continue to rise. As recently as September, 1996, the amount of time to be spent in EVA was believed to be about 400 hours, excluding spacewalks on the Russian segment. This estimate has recently risen to over 1100 hours, and it could go higher before assembly begins in the summer of 1998. These activities are extremely expensive and hazardous, so any design tools which help assure mission success and improve the efficiency of the astronaut in task completion can pay off in reduced design and EVA costs and increased astronaut safety. The tasks which astronauts can accomplish in EVA are limited by spacesuit mobility. They are therefore relatively simple, from an ergonomic standpoint, requiring gross movements rather than time motor skills. The actual tasks include driving bolts, mating and demating electric and fluid connectors, and actuating levers; the important characteristics to be considered in design improvement include the ability of the astronaut to see and reach the item to be manipulated and the clearance required to accomplish the manipulation. This makes the tasks amenable to simulation in a Computer-Assisted Design (CAD) environment. For EVA, the spacesuited astronaut must have his or her feet attached on a work platform called a foot restraint to obtain a purchase against which work forces may be actuated. An important component of the design is therefore the proper placement of foot restraints.

Dischinger, H. Charles, Jr.↗

STS-34: Atlantis Stacking Activities in the VAB

The primary mission for STS-34 was the launch of the Galileo Probe to Jupiter. This videotape shows the shuttle Atlantis in the Vertical Assembly Building (VAB) being hoisted from the horizontal position to the vertical position. It also shows the shuttle being moved into position for mating with the solid rocket boosters.

Source record↗

Titan III Mars Observer Arrival and Uncrating at PHSF

Live footage of the uncrating and the arrival of the Titan III Mars Observer to the Payload Hazardous Servicing Facility (PHSF) is presented. The Mars Observer's mission is to study the surface, atmosphere, interior and magnetic field of Mars from Martian orbit. At the PHSF, fueling of the spacecraft with its orbit insertion and attitude control propellants will occur. This will be followed by mating to the Transfer Orbit Stage (TOS). This is the upper stage that will provide the final thrust to propel the spacecraft on its 11-month journey to Mars.

Source record↗

Mars Observer Spacecraft Processing

Footage shows various Mars Observer activities. Scenes include the checkout of the radar pin, the arrival of both the transfer orbit stage and the Mars Observer Spacecraft. Also shown are the mating of the spacecraft, pre-launch activities, countdown, animation of the Martian Environment, and replays of the launching of the Titan satellite.

Source record↗

STS-39 Discovery in the VAB and Columbia Tow From HB-2

The orbiter Discovery sits inside the Vehicle Assembly Building (VAB) after its rollover from the Orbiter Processing Facility (OPF). In the VAB, Discovery will be mated with an external tank and solid rocket boosters for its launch. Shown also is Columbia orbiter being towed from the High Bay 2.

Source record↗

International Space Station ECLSS Operations Status - Increment OA

This paper describes Environmental Control and Life Support Systems (ECLSS) operations to date for preflight planning, international partner coordination and mission plan execution of the International Space Station (ISS). The focus is on the activities involved with the STS-88(2A) Space Shuttle Endeavor flight, the first delivery of the US segment of the ISS, which consists of the Pressurized Mating Adapter (PMA)/and Node 1 elements, and the delivery of the first Russian segment of the ISS, the FGB, a US-financed and Russian- built module.

Lamczyk, Philip C.↗

Temperature Regulation in Crewmembers After a 115-Day Space Flight

Impaired thermoregulation, which has been observed during exercise following bed rest, may significantly impact crewmembers during space flight operations by decreasing exercise capacity and orthostatic tolerance. Impaired temperature regulation would cause higher levels of core temperature, due to an attenuated cutaneous vasodilatory reflex and sweating response, for a given oxygen consumption. Two mate crewmembers of the Mir 18 mission performed supine cycle exercise se (20 min @ 40% and 20 min @ 65% preflight VO2pk) 145 days preflight and 5 days postflight. Core temperature (Tcore) was measured by an ingestible telemetry pill, skin blood flow (SBF) by laser Doppler velocimetry, and sweat rate (SR) by dew point hygrometry. Tcore at the time of test termination was similar (37.8 C) for both subjects before and after flight despite a shorter test duration (40 vs 28-29 minutes) postflight. The slopes of the SBF/Tcore relationship (Subj 1: 396 vs 214; Subj 2: 704 vs 143 Perfusion Unit/degC) and SR/Tcore relationship (Subj 1: 4.5 vs 2.1; Subj 2: 11.0 vs 3.6mg/min/sq cm/degC) were reduced postflight. Tcore thresholds for both SR (Subj 1: 37.4 vs 37.6; Subj 2: 37.6 vs 37.6 C) and SBF (Subj 1: 37.3 vs 37.5; Subj 2: 37.6 vs 37.7 C) were similar pre- to postflight. For these 2 crewmembers, it appeared that thermoregulation during exercise was impaired as evidenced by compromised heat loss responses after long-duration space flight.

Lee, S. M. C.↗

Crew Activity Report/Flight Day 6 Highlights

On this sixth day of the STS-92 mission, the flight crew, Commander Brian Duffy, Pilot Pamela A. Melroy, and Mission Specialists Koichi Wakata, Leroy Chiao, Peter J.K. Wisoff, Michael E. Lopez-Alegria, and William S. McArthur continue working on the exterior of the International Space Station (ISS) to prepare the station for its first resident crew. Lopez-Alegria and Wisoff perform the second of four spacewalks to maneuver the third pressurized mating adapter (PMA-3) into its new location on the Unity module.

Source record↗

STS-92 Crew Activity Report/Flight Day 4 Highlights

On this fourth day of the STS-92 mission, the flight crew, Commander Brian Duffy, Pilot Pamela A. Melroy, and Mission Specialists Koichi Wakata, Leroy Chiao, Peter J.K. Wisoff, Michael E. Lopez-Alegria, and William S. McArthur give an overview of the day's accomplishments. Footage of the third pressurized mating adapter (PMA-3), the common berthing mechanism (CBM), and the installed Z1 truss are shown.

Source record↗