Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “infrastructure analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 955 records · Page 53

Considerations for AMI-Based Operations for Distribution Feeders

More than $5 billion in investments in advanced metering infrastructure (AMI) technologies, AMI deployments, as pervasive secondary network voltage monitoring systems, provide opportunities for utility operations and controls. This paper focuses on the considerations for AMI-based tools and techniques as the industry moves toward operationalizing such large data sets. Phase identification is a first such tool. Numerous distribution network analysis, monitoring, and control applications - including volt/volt-ampere reactive control, state estimation, and distribution automation - require accurate phase connectivity information in the system models. The phase connectivity database maintained by utilities is inaccurate because of a significant amount of missing data, restoration activities, and network reconfiguration. Existing phase identification techniques that estimate phase connectivity work well in distribution feeders that have low or no photovoltaic (PV) generation; however, they fail to identify the phases accurately when considerable PV generation is present. This work addresses the phase identification problem in the presence of high PV generation using statistical analysis methods. Further, insights into the AMI data requirements for this application in terms of data window length and resolution are provided using sensitivity analysis performed on an actual distribution feeder model of San Diego Gas & Electric Company. The results of this study show that the phase connectivity, even in the presence of high PV generation, can be accurately identified using statistical analysis of AMI data of 1 day.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Considerations for AMI-Based Operations for Distribution Feeders: Preprint

More than $5 billion in investments in advanced metering infrastructure (AMI) technologies, AMI deployments, as pervasive secondary network voltage monitoring systems, provide opportunities for utility operations and controls. This paper focuses on the considerations for AMI-based tools and techniques as the industry moves toward operationalizing such large data sets. Phase identification is a first such tool. Numerous distribution network analysis, monitoring, and control applications - including volt/volt-ampere reactive control, state estimation, and distribution automation - require accurate phase connectivity information in the system models. The phase connectivity database maintained by utilities is inaccurate because of a significant amount of missing data, restoration activities, and network reconfiguration. Existing phase identification techniques that estimate phase connectivity work well in distribution feeders that have low or no photovoltaic (PV) generation; however, they fail to identify the phases accurately when considerable PV generation is present. This work addresses the phase identification problem in the presence of high PV generation using statistical analysis methods. Further, insights into the AMI data requirements for this application in terms of data window length and resolution are provided using sensitivity analysis performed on an actual distribution feeder model of San Diego Gas & Electric Company. The results of this study show that the phase connectivity, even in the presence of high PV generation, can be accurately identified using statistical analysis of AMI data of 1 day.

24 POWER TRANSMISSION AND DISTRIBUTION↗

EVs@Scale Deep Dive - SCM/VGI (Day 1: SCM/VGI Analysis)

The U.S. Department of Energy (DOE) Electric Vehicles at Scale Laboratory Consortium (EVs@Scale Lab Consortium) is accelerating research to support the establishment of a secure and scalable national network of charging infrastructure. Critical to this effort is an understanding of the potential grid impacts of EV charging and possible smart charge management (SCM) or vehicle-grid integration (VGI) capabilities that could mitigate these impacts. The EVs@Scale SCM/VGI Pillar is analyzing the impacts of EV charging and developing and demonstrating the capabilities of both SCM and VGI with many different vehicle use cases and grid scenarios. This Deep Dive Discussion from year 1 of the project encompasses the progress and future plans for the analysis components of the FUSE (Flexible charging to Unify the grid and transportation Sectors for Evs at scale) project.

ADVANCED PROPULSION SYSTEMS↗

Electrochemical impedance spectroscopy and finite element analysis modeling of a 4-electrode humidity sensor for natural gas transportation pipelines

Reliable corrosion monitoring of natural gas transmission lines is a major tool providing a foundation for safe management of natural gas infrastructures. Through the development of membrane-based electrochemical sensors which are able to function in low-conductivity gas environments, corrosion monitoring practices can be further strengthened by real-time monitoring of key risk factors such as relative humidity and corrosion rates of corrodible structures. In this work, we demonstrate and validate how a 4-electrode conductivity sensor can provide a means to monitor relative humidity in gases via electrochemical impedance spectroscopy through finite element analysis (FEA). For a relative humidity range of 5%–55%, the impedance response varied from 1 kΩ to 66 kΩ, showing a high sensitivity for gas humidity. To confirm that the measured impedance values reliably interpreted relative humidity, it was found that precise estimation of the sensor’s cell constant was needed. FEA was used to assess how the cell constant depended on the electrode geometry, membrane geometry, and electrode placement within the sensor. Through this approach, assumptions about the characteristic area and length were validated using electrolyte equipotential and current density vector mapping. This reduced possible cell constant uncertainties by 70%. Here, with a cell constant of 14.84 cm –1 , obtained via FEA, membrane conductivity values were in good agreement with published data.

47 OTHER INSTRUMENTATION↗

D3: A Collaborative Infrastructure for Aerospace Design

DARWIN is a NASA developed, Internet-based system for enabling aerospace researchers to securely and remotely access and collaborate on the analysis of aerospace vehicle design data, primarily the results of wind-tunnel testing and numeric (e.g., computational fluid dynamics) model executions. DARWIN captures, stores and indexes data, manages derived knowledge (such as visualizations across multiple data sets) and provides an environment for designers to collaborate in the analysis of the results of testing. DARWIN is an interesting application because it supports high volumes of data, integrates multiple modalities of data display (e.g. images and data visualizations), and provides non-trivial access control mechanisms. DARWIN enables collaboration by allowing not only sharing visualizations of data, but also commentary about and view of data.

Walton, Joan↗

Public electric vehicle charging station utilization in the United States

The utilization of electric vehicle (EV) charging equipment is a key driver of charging station economics, but current trends and factors related to the utilization of public charging infrastructure in the United States are not well understood. This study analyzes EV charging data from 3,705 nationwide public Level 2 (L2) and direct current fast charging (DCFC) stations over 2.5 years (2019-2022), observing utilization patterns over time. Regression analysis is used to assess the relationships between station utilization and several contextual and environmental factors. We conclude that local EV adoption is a strong indicator of utilization; L2 station utilization decreases with the size of the local charging network, while DCFC stations are less affected; and increased charging power has a greater effect on utilization for DCFC stations than L2. This study fills a critical research gap by reporting updated public charging station utilization statistics and analysis for the U.S. market.

33 ADVANCED PROPULSION SYSTEMS↗

Evaluation of Performance Variables to Accelerate the Deployment of Sustainable Aviation Fuels at a Regional Scale

An increase in jet fuel consumption and its associated emissions across the world have led to the need for alternative technologies to produce sustainable aviation fuels (SAF). One option to produce SAFs is to utilize waste or biomass-based feedstocks that has the potential to reduce greenhouse gas emissions by 50% or more compared to conventional jet fuel. However, there is a lack of understanding of how the synergistic effects of key performance variables could hinder or help the deployment of aviation fuels on a regional scale. Here, we assess the implications of key variables-including type and quantity of waste/biomass feedstock availability near the airport, cost of SAF production, life cycle greenhouse gas (GHG) emissions, policies, and fuel/infrastructure logistics-on the deployment of SAF at Chicago's O'Hare International Airport. We consider three ASTM International-approved SAF technologies (Hydroprocessed Esters and Fatty Acids, Fischer-Tropsch, and Alcohol to Jet) that can be blended up to 50% with petroleum-based jet fuel. Results from our analysis show that woody biomass-based Fischer-Tropsch technology has the lowest fuel production costs ($2.31-$2.81/gallon gasoline equivalent) of all pathways, and it reduces life cycle GHG emissions by 86% compared to conventional jet fuel despite the higher availability of crop residues compared to either woody biomass or fats, oils, and greases. Also, infrastructure is available at O'Hare International Airport to blend SAF with Jet A fuel through three terminals directly connected to the airport via pipelines. Our sensitivity analysis shows renewable fuel incentives and feedstock price to be key performance variables affecting the production cost and deployment of SAF.

alcohol-to-jet↗

A Data Processing Pipeline for Adversarial Socio-Technical Network Analysis

With the rapid adoption of emerging technologies, there is a need to catalog and model sociotechnical interdependencies that have been historically used to influence the operation of Critical Infrastructure networks including the impacts of mergers and acquisitions, hostile takeovers, and foreign investment. Our research intends to address this need with two primary contributions. First, we have developed a data curation and processing pipeline to generate sociotechnical networks extracted from a variety of data sources including SEC filings and infrastructure asset databases. The pipeline, implemented in Apache Airflow, extracts and normalizes the representation of entities and relations, specified within ontologies. Our intent is to provide an extensible, machine-actionable approach to quickly communicate such models, reproduce previous results, and adapt them to new, unanticipated situations. Second, networks produced by our pipeline enable the development of graph-theoretic metrics that consider the properties of network components in addition to its topology. Metadata associated with network components---whether semantic, temporal, or geospatial---affects the alignment of generated networks with assumptions underlying complexity metrics. Validation of generated networks relative to component types defined by an ontology, may allow the research community to adapt metrics to the semantics of the domains being studied. Generated networks may be processed as knowledge, dynamic, or spatial graphs and enables a variety of analyses including automated reasoning and measures of network complexity. Automated reasoning views extracted entities and relations as a knowledge graph; this enables application of inference rules that represent historically-attested adversarial business methods and applies that behavior to a specific geographic context. Measures of network complexity, including degree distribution, reachability analyses, temporal analysis, and community detection can be adapted to indicate adversarial organizational influence.

97 MATHEMATICS AND COMPUTING↗

The Mathematical Foundations of the Science of Cities

In this chapter, we describe graph-theoretic representations of infrastructure and social processes in urban environments and trace the development of these fields from the perspective of mathematics, social science, and urban planning. We follow the historical development of two different perspectives on cities and urban planning – one in which infrastructure and urban form is the primary focus and another which made people and social processes the primary focus. These perspectives can be traced through their application of concurrently developing mathematical techniques in graph theory, network science, and social network analysis. These different perspectives are now becoming integrated into a more mathematically grounded understanding of cities as coupled social and physical systems, in which the social life of a city shapes and defines the infrastructure that is built and a city’s infrastructure and physical form also shape the lives and communities of its residents.

Brelsford, Christa↗

Port of New York and New Jersey Drayage Electrification Analysis

The National Renewable Energy Laboratory (NREL) evaluated the potential for drayage electrification in the Port of New York and New Jersey (PoNYNJ), with a focus on operators: Harbor Freight Transport (HF), Safeway Trucking (SWT), and International Motor Freight Inc (IMF). This report summarizes the data collection and electrification evaluation of all three drayage operators, includes detailed operational data, and identifies the performance requirements for battery electric tractors (BETs) and corresponding infrastructure operated within the context of PoNYNJ drayage operation. This report also details a methodology to evaluate opportunities, strategies, and challenges associated with future expansions of BETs in meeting PANYNJ emissions goals. The Port Authority has established a goal of achieving Net Zero carbon emissions by 2050 across all facilities, including from tenant and stakeholder sources such as drayage trucks. NREL used real-world performance data collected on the three PoNYNJ drayage operations, along with modeling and analysis tools to compare BET to diesel trucks. From March to July 2021, NREL collected 1Hz vehicle and engine data from 46 drayage trucks at the three operators totaling nearly 121,000 miles of operation, providing enough information to assess vehicle operations for electrification potential. A Future Automotive Systems Technology Simulator (FASTSim) electric truck powertrain model was validated using PoNYNJ data and scenarios were run to evaluate drayage truck electrification requirements over the real-world cycles. The first scenario examined BET viability with minimal changes to existing operations. This assumes the trucks charge when stopped for two hours or longer, have a functional battery size of 375 kWh, and can charge at 270 kilowatts (kW) average which are the specification of the commercially available Freightliner eCascadia. The second scenario looked at what operational, charging infrastructure, and BET technology changes would be needed to fully electrify. Finally, detailed analysis was run on charging rate structure to understand operational costs to the fleets. The studied drayage trucks averaged 5.1 MPG, spent roughly 9% of their energy at idle, and drove an average of 140 miles per day with a maximum daily distance of 573 miles. The FASTSim model results indicate a comparable BET would use 417 kWh of energy per day on average accounting for cargo weight, which is close to the full usable capacity of the eCascadia currently available on the market. Based on the daily average operating data, partial fleet electrification is possible with current technology. However, some specific days of operation would require over 1,600 kWh of energy due to longer distances traveled by the trucks and more intense operation. Trucks used for long distance and intense operation cannot be readily electrified with current technology without operational changes. Full adoption of BETs could reduce CO 2 emissions from these fleets by roughly 75% today, eliminating 76 metric tons of CO 2 (MTCO 2 ) per vehicle each year, which equates to 24,100 MTCO 2 per year for all three operators. Commercially available direct current fast chargers (DCFC) have charge rates up to 350 kW. Based on the average daily modeled energy use for each operator, current industrial rate structures, and the assumption of 350 kW peak charging, full drayage electrification would increase electricity consumption. In addition, peak demand usage would increase with unmanaged charging along with cost of electricity having a direct impact on cost per mile for electric vehicles. The resulting cost per mile for BETs along with comparable cost per mile for conventional diesel trucks are also examined at $\$$4.00 per gallon of diesel. It will be important for PANYNJ and the drayage operators within the PoNYNJ to consider these load impacts to their existing electrical infrastructure and devise operational strategies that avoid coincident charging of vehicles to mitigate demand charges. Despite these electricity cost increases, savings from reductions in diesel consumption will help offset the costs of this increased electricity consumption. However, prices of both electricity and diesel are subject to change based on various factors meaning the realized savings will vary over time. This shows BETs could be cost-competitive on an energy cost per mile basis for all scenarios while diesel is above $\$$3.00/gal. Further, if diesel prices dropped to the 15-year low of $2.33/gal, it would still be cost competitive to operate the EVs with electricity costs of 16.3 ¢/kWh or less.

33 ADVANCED PROPULSION SYSTEMS↗

Paths to circularity for plastics in the United States

In 2019, the United States consumed over 57 million metric tons (MMT) of plastic with less than 7% recovered for reuse. This study provides an updated material flow analysis at national and regional scales for all durable and single-use plastics in the United States. From this material flow analysis, we develop a series of alternative future national plastic flow scenarios that envision a scale-up of recycling technologies, incorporating technical limitations and sorting infrastructure constraints. The results suggest that a maximum of 68% (24 MMT) of plastic waste could be diverted from landfills by scaling up existing commercial recycling technologies. Based on the current technological landscape, reaching near-zero waste is only possible if processes that are operating at pilot and laboratory scales can be effectively scaled and coupled with improved sorting infrastructure. Through these scenarios with increased recycling, the availability of postconsumer resin stocks could increase by 22–43 MMT.

36 MATERIALS SCIENCE↗

Transportation Deployment; NREL (National Renewable Energy Laboratory)

Automakers, commercial fleet operators, component manufacturers, and government agencies all turn to the U.S. Department of Energy’s National Renewable Energy Laboratory (NREL) to help put more green vehicles on the road. The lab’s independent analysis and evaluation pinpoint fuel-efficient and low-emission strategies to support economic and operational goals, while breaking down barriers to widespread adoption. Customized assessment of existing equipment and practices, energy-saving alternatives, operational considerations, and marketplace realities factor in the multitude of variables needed to ensure meaningful performance, financial, and environmental benefits. NREL provides integrated, unbiased, 360-degree sustainable transportation deployment expertise encompassing alternative fuels, advanced vehicles, and related infrastructure. Hands-on support comes from technical experts experienced in advanced vehicle technologies, fleet operations, and field data collection coupled with extensive modeling and analysis capabilities. The lab’s research team works closely with automakers and vehicle equipment manufacturers to test, analyze, develop, and evaluate high-performance fuel-efficient technologies that meet marketplace needs.

33 ADVANCED PROPULSION SYSTEMS↗

A hybrid computational strategy to address WGS variant analysis in >5000 samples

Abstract Background The decreasing costs of sequencing are driving the need for cost effective and real time variant calling of whole genome sequencing data. The scale of these projects are far beyond the capacity of typical computing resources available with most research labs. Other infrastructures like the cloud AWS environment and supercomputers also have limitations due to which large scale joint variant calling becomes infeasible, and infrastructure specific variant calling strategies either fail to scale up to large datasets or abandon joint calling strategies. Results We present a high throughput framework including multiple variant callers for single nucleotide variant (SNV) calling, which leverages hybrid computing infrastructure consisting of cloud AWS, supercomputers and local high performance computing infrastructures. We present a novel binning approach for large scale joint variant calling and imputation which can scale up to over 10,000 samples while producing SNV callsets with high sensitivity and specificity. As a proof of principle, we present results of analysis on Cohorts for Heart And Aging Research in Genomic Epidemiology (CHARGE) WGS freeze 3 dataset in which joint calling, imputation and phasing of over 5300 whole genome samples was produced in under 6 weeks using four state-of-the-art callers. The callers used were SNPTools, GATK-HaplotypeCaller, GATK-UnifiedGenotyper and GotCloud. We used Amazon AWS, a 4000-core in-house cluster at Baylor College of Medicine, IBM power PC Blue BioU at Rice and Rhea at Oak Ridge National Laboratory (ORNL) for the computation. AWS was used for joint calling of 180 TB of BAM files, and ORNL and Rice supercomputers were used for the imputation and phasing step. All other steps were carried out on the local compute cluster. The entire operation used 5.2 million core hours and only transferred a total of 6 TB of data across the platforms. Conclusions Even with increasing sizes of whole genome datasets, ensemble joint calling of SNVs for low coverage data can be accomplished in a scalable, cost effective and fast manner by using heterogeneous computing platforms without compromising on the quality of variants.

59 BASIC BIOLOGICAL SCIENCES↗

States of Cybersecurity: Electricity Distribution System Discussions

State and local entities that oversee the reliable, affordable provision of electricity are faced with growing and evolving threats from cybersecurity risks to our nation's electricity distribution system. All-hazards system resilience is a shared responsibility among electric utilities and their regulators or policy-setting boards of directors. Cybersecurity presents new challenges and should be a focus for states, local governments, and Native American tribes that are developing energy-assurance plans to protect critical infrastructure. This research sought to investigate the implementation of governance and policy at the distribution utility level that facilitates cybersecurity preparedness to inform the U.S. Department of Energy (DOE), Office of Energy Policy and Systems Analysis; states; local governments; and other stakeholders on the challenges, gaps, and opportunities that may exist for future analysis. The need is urgent to identify the challenges and inconsistencies in how cybersecurity practices are being applied across the United States to inform the development of best practices, mitigations, and future research and development investments in securing the electricity infrastructure. By examining the current practices and applications of cybersecurity preparedness, this report seeks to identify the challenges and persistent gaps between policy and execution and reflect the underlying motivations of distinct utility structures as they play out at the local level. This study aims to create an initial baseline of cybersecurity preparedness within the distribution electricity sector. The focus of this study is on distribution utilities not bound by the cybersecurity guidelines of the North American Electric Reliability Corporation (NERC) to examine the range of mechanisms taken by state regulators, city councils that own municipal utilities, and boards of directors of rural cooperatives.

14 SOLAR ENERGY↗

Real-Time Coupling of Geographically Distributed Research Infrastructures: Taxonomy, Overview, and Real-World Smart Grid Applications

Novel concepts enabling a resilient future power system and their subsequent experimental evaluation are experiencing a steadily growing challenge: large scale complexity and questionable scalability. The requirements on a research infrastructure (RI) to cope with the trends of such a dynamic system therefore grow in size, diversity and costs, making the feasibility of rigorous advancements questionable by a single RI. Analysis of large scale system complexity has been made possible by the real-time coupling of geographically separated RIs undertaking geographically distributed simulations (GDS), the concept of which brings the equipment, models and expertise of independent RIs, in combination, to optimally address the challenge. This article presents the outputs of IEEE PES Task Force on Interfacing Techniques for Simulation Tools towards standardization of GDS as a concept. First, the taxonomy for setups utilized for GDS is established followed by a comprehensive overview of the advancements in real-time couplings reported in literature. The overview encompasses fundamental technological design considerations for GDS. The article further presents four application oriented case studies (real-world implementations) where GDS setups have been utilized, demonstrating their practicality and potential in enabling the analysis of future complex power systems.

distributed laboratories↗

An AI-driven framework for evaluating local and state authorities’ permitting processes

The demand for new energy infrastructure is increasing across the United States, but heterogenous permitting processes and embedded requirements across different local jurisdictions can cause project delays, increase “soft costs,” and hinder developer expansion. This study analyzes the variability in local permitting requirements across the U.S. and develops a quantitative approach to describe their clarity and effectiveness in enabling infrastructure project development. By using an Energy Language Model (ELM), a large language model (LLM) for energy technologies, we systematically gathered permitting information from nearly 300 state-, county-, and city-level documents, creating a structured dataset of requirements and procedures on an unprecedented scale and speed. Our analysis revealed that local (city and county) permitting requirement documents are underrepresented compared to state-level guidance documents, which can impede timely and cost-effective installation of new electric infrastructure. Our validation process showed that the final database has an accuracy of approximately 95%. We, further, created a new quantitative method to score permitting requirements for clarity and efficiency, with electric vehicle supply equipment as an initial use case. The average local permitting document scored a 1.8 out of 5, which we interpret as meaning that half of the requirements developers face when installing electric infrastructure are ambiguous, increasing both cost and time. We also created a “Generalized Permit Process”, highlighting common procedural steps and identifying specific opportunities for municipalities to improve their documentation. This research establishes a systematic and scalable framework for evaluating the complexities of local infrastructure permitting processes by combining LLM-powered data collection and quantitative scoring. The framework enables policymakers and developers to identify and mitigate procedural bottlenecks, with the expectation that these improvements can accelerate application review and approval, reduce project costs, and expedite connection to utility distribution grids. As a foundational approach for streamlining local project development processes, this study’s methods are intended to be extended to a wide range of energy applications.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

LogPath: Log data based energy consumption analysis enabling electric vehicle path optimization

Vehicle navigation and path optimization require a more meticulous approach when it deals with EVs (electric vehicles) and SDVs (software-defined vehicles), due to lengthy charging times and the lack of charging infrastructure. Long-distance freight EV trucking needs path guidance with accurate energy consumption estimates to prevent charging-related failures. We developed a novel energy consumption estimation approach that only uses battery log data to extract major vehicle parameters to increase EV navigation accuracy without additional sensors. This is enabled by extracting multiple drive modes from the log data for analysis. The system provides 1) routes, 2) charge locations, 3) charging times, and 4) optimal vehicle speeds that guarantee the shortest travel time. Here we successfully validated the system using log data collected from an EV and Tesla's Supercharging map in the US and compared it with the commercially available navigation system, Tesla's trip planner, whose capabilities solely include charging time and routing.

EV (Electric vehicles) navigation↗

Toward Exascale Earthquake Ground Motion Simulations for Near-Fault Engineering Analysis

Modernizing SW4 for massively parallel time-domain simulations of earthquake ground motions in 3D earth models increases resolution and provides ground motion estimates for critical infrastructure risk evaluations. Simulations of ground motions from large (M ≥ 7.0) earthquakes require domains on the order of 100 to500 km and spatial granularity on the order of 1 to5 m resulting in hundreds of billions of grid points. Surface-focused structured mesh refinement (SMR) allows for more constant grid point per wavelength scaling in typical Earth models, where wavespeeds increase with depth. In fact, MR allows for simulations to double the frequency content relative to a fixed grid calculation on a given resource. The authors report improvements to the SW4 algorithm developed while porting the code to the Cori Phase 2 (Intel Xeon Phi) systems at the National Energy Research Scientific Computing Center (NERSC) at Lawrence Berkeley National Laboratory. As a result, investigations of the performance of the innermost loop of the calculations found that reorganizing the order of operations can improve performance for massive problems.

58 GEOSCIENCES↗