Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “implementation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 955 records · Page 53

IMPLEMENTING CYBERSECURITY INTO AN EXISTING NATIONAL NUCLEAR NON-PROLIFERATION PROGRAMME – A CASE STUDY

Cyber threat profiling and risk mitigation is critical to any nuclear state organization and should be considered as part of any comprehensive nuclear security programme. Defining and evaluating the impact of the cyber threat to mission can be challenging. An existing national nuclear non-proliferation organization undertook an effort to incorporate computer security activities into its programme to address cyber risk. One of the primary goals of this endeavour was to develop a set of prioritised recommendations for organizational follow-through. The organization dedicated subject matter expert resources in the form of a cyber task force to support this goal. Opportunities were identified where computer security could be built into each programme including office-level strategies and tools. Of course, no new identified threat vector is easily considered and incorporated into existing programmes without impact. There are many obstacles to be overcome. Technically literate subject matter experts are difficult to find, management has comparatively less experience applying computer security into its programmes, and trying to change the culture to consider computer security risk at policy and programmatic levels takes time and management attention. As an outcome of this process, a roadmap for program integration was developed, including the establishment of a cyber support team. This paper will discuss the challenges and successes associated with establishing such a team.

Cyber Security, Nuclear, Non-proliferation↗

Discrete time analog front end circuit implemented in a receiver device

A device can comprise a peaked integrator circuit that generates an output signal from a continuous time signal based on a sub rate clock timing cycle. The device can further comprise a track and hold circuit coupled to the output of the peaked integrator that generates a held discrete time signal from the output of the peaked integrator based on a second sub rate clock timing cycle that is offset in time from the sub rate clock timing cycle by a single time unit interval. The device can further comprise an integrator circuit coupled to an output of the track and hold circuit that integrates the held discrete time signal, based on the second sub rate clock timing cycle that is offset in time from the sub rate clock timing cycle by a single time unit interval.

42 ENGINEERING↗

Communication device for implementing selective encryption in a software defined network

The present disclosure pertains to systems and methods for selectively encrypting data flows within a software defined network (SDN). In one embodiment, a communication device may be configured to receive a plurality of unencrypted data packets. The communication device may receive from an SDN controller a criterion used to identify at least one of the unencrypted data flows to be encrypted. Based on the criterion, an encryption subsystem may generate an encrypted data flow the unencrypted data packets based on an encryption key. In some embodiments, the encryption system may parse the packets and encrypt the data payloads without encrypting the routing information associated with the packet. In other embodiments, the encryption subsystem may be configured to encapsulate and encrypt the entire unencrypted data packet. In some embodiments, the encryption subsystem may further be configured to authenticate a sending device and/or to verify the integrity of a message.

97 MATHEMATICS AND COMPUTING↗

Implementing Zero Energy Design with the U.S. Department of Energy Solar Decathlon

The U.S. Department of Energy Solar Decathlon® Design Challenge is a collegiate competition that challenges student teams to design high performance buildings that push the boundaries of the industry. In the 2020 competition, DOE is piloting Design Partners, a low-risk opportunity for builders and building owners to harness student innovation and explore zero energy design for current or upcoming projects. Design Partners provide a student team of architects and engineers with project requirements. By the end of the Challenge, Design Partners receive a zero energy alternative and cost estimate for their project. The collaboration allows Design Partners to incorporate innovative concepts such as grid-interactivity, resilience, and low embodied carbon in a low-risk environment and provides the future generation of engineers and architects with invaluable experience designing a building for a client under real-world circumstances. Attendees will leave understanding the “perfect storm” of policy, technology, health, and economic trends that make zero energy buildings desirable and feasible and the value of the U.S. DOE Solar Decathlon to industry. They will also get a sneak peek at innovative solutions 2020 Design Partner pilot projects are bringing to the building industry and how becoming a Design Partner in 2021 could benefit their organization.

30 DIRECT ENERGY CONVERSION↗