Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “distributed services”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 955 records · Page 53

Non-Refrigerated Warehouse Design Guide [Slides]

Warehouses typically have a low energy use relative to their floor area. This make warehouses ideal to install solar panels and offset on-site energy use and have a surplus of energy if roof area is maximized. This surplus can be used to provide things like grid services or charge electric vehicle fleets. This document is intended to provide owners and operators of warehouse information on designing efficient/decarbonized warehouses and maximize on-site generation. The information here references outside publications to provide specific guidance, such as the ASHRAE Advanced Energy Design Guides, but tailors the information specifically to warehouses. This guide provides owners a better understanding of warehouse design as well as more specific information for themselves or outside designers to reference.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Residential Vehicle-to-Home Backup Power Capabilities: Key Findings from a ComEd Beneficial Electrification R&D Pilot

This report summarizes key findings from a collaborative technical study of residential, non-grid-tied vehicle-to-home (V2H) backup power systems in Commonwealth Edison’s (ComEd’s) service territory. The work integrates (1) a feeder-level technoeconomic analysis (TEA) using historical outage-event data and simulated electric-vehicle (EV) driving/charging profiles to estimate potential reliability and customer interruption-cost impacts under V2H and vehicle-to-grid (V2G) adoption scenarios; (2) controlled laboratory performance testing of a representative V2H backup ecosystem to characterize transfer-to-backup behavior, sustained power delivery, efficiency trends, and repeatable reliability limitations; and (3) a cybersecurity assessment aligned with NIST Cybersecurity Framework (CSF) 2.0 and ISO/SAE 21434 to evaluate interface-level risk drivers and identify program-relevant mitigations. Results indicate that V2H can provide measurable resilience value, but outcomes are strongly context dependent on outage patterns and the share of events that are “V2H-applicable.” Typical transfer-to-backup behavior clustered on the order of minutes, but rare long-delay edge cases were observed (including an event approaching 30 minutes) and should be treated as a reliability risk. High-power testing showed that peak-rated output is not necessarily continuously deliverable; stable operation may require operation below nameplate ratings and attention to thermal and installation constraints. The cybersecurity assessment highlights a broad attack surface spanning commissioning, home networks, embedded services, and cloud/OTA pathways, motivating minimum controls for secure onboarding, signed updates, patch cadence, and coordinated vulnerability response for any scaled deployment.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Quantifying the impact of climate change on erosion - 20397

The New York State Energy Research and Development Authority (NYSERDA) is the owner of the Western New York Nuclear Service Center (WNYNSC), a 1,351-ha (3,338-ac) site located approximately 48 km (30 mi) south of Buffalo, New York. In 1962, Nuclear Fuel Services, Inc. (NFS) entered into Agreements with the Atomic Energy Commission and New York State to construct the first commercial reprocessing plant of nuclear fuel in the United States. NFS, a private company, built and operated the spent fuel reprocessing plant and waste disposal facilities, processing 640 Mg (metric tons, or 705 short tons) of spent nuclear fuel from 1966 to 1972 under an Atomic Energy Commission license. Nuclear fuel reprocessing operations ended in 1972 and never reopened, leaving behind radioactive and chemical wastes. Erosion can play an important role in the fate and transport of waste at sites where disposal of long-lived waste is anticipated. The statistical characterization of key processes related to erosion is essential to the understanding of site stability through time. One of the key processes governing erosion is extreme precipitation and it is critical that trends in the distribution of extreme precipitation events through time be represented. The evidence of climate change is increasingly well documented and projected impacts on extreme precipitation events should be incorporated in performance assessment studies when relevant. Not evaluating future climate states in a performance assessment is contradictory to good modeling practice. Specifically, excluding climate change limits development of modeling information that could aid in effective decision making. The current climate literature provides both observational evidence and climate model projections of climate trends and/or climate change in the late 20. and early 21. centuries for North America and the northeast United States. In this work, this information was used to assess the impacts of potential changes in climate on erosion processes. The goal was to understand how projections of future climate relate to the performance of the WNYNSC through time. In the first stage of this work multi-temporal historical aerial images were analyzed in conjunction with orthophotography and Lidar data to develop probability distributions for variables representing important erosion processes. The information from these analyses was then used in conjunction with simulated data from the West Valley Erosion Working Group (EWG). Analysis of EWG simulations provides estimates for the change in erosion rates through time that is driven by changes in climate. The time-varying rates of erosion change were applied to the historical aerial imagery data in order to inform time-varying rates of erosion that are driven by changes in climate. Ultimately, this process resulted in the identification of locations for features like gully heads using both the Lidar dataset and projection of the estimated location from the historical aerial photo under consideration back to the Lidar dataset. The distance between the estimate of the location from the historical image and that of the Lidar dataset was the estimated distance the feature has moved. This distance was then divided by the number of years between the Lidar dataset and the year of the historical aerial image of interest to get a rate of movement through time. This was done for several dozen points on each historical aerial image. The analyses from the EWG were used to characterize the relative impact of climate change on the erosion rates. This relative impact was quantified by comparing the LEM based estimates of erosion that were derived using historical climate data with LEM based estimates of erosion that were derived using projections of future climate. The relative increase in the erosion rates was then applied to the historical estimates of erosion derived from the analysis of the historical aerial imagery. This approach was used since the LEM-based estimated of the historical erosion rates from the past century have a bias towards underestimating erosion. This underestimation is hypothesized to be a consequence of an inability of the LEMs to account for the impacts of land-use change (i.e. deforestation) which had been shown to significantly increase erosion in similar Northern hardwood forest ecosystems. In summary, gully head retreat rate and gully widening rate were characterized using statistical probability distributions from the historical aerial image analysis. Simulated data from the EWG was used to estimate the climatically-driven changes in erosion rates through time. The changes through time from the EWG were applied to the gully head retreat rate and gully widening rate characterized using the historical aerial image analysis. This information can be used to inform PPA models to project future risks from a given site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Best Practices for Renewable Energy Installations in the National Parks

The U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP) and National Park Service (NPS) have partnered to support the development and utilization of renewable energy technology at federal facilities and on federal lands. FEMP provides technical support to NPS on renewable energy projects to identify and generate significant cost savings and efficiency benefits, investigate opportunities to reduce carbon footprint and/or achieve carbon neutrality, and improve resilience to NPS-owned facilities and sites. The purpose of this report is to support NPS staff as they evaluate whether and how to use renewable energy technologies in park operations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Generator Interconnection Costs to the Transmission System in non-ISO Balancing Authorities [Slides]

Electric transmission system operators—including Independent System Operators (ISOs), Regional Transmission Organizations (RTOs), and utilities—require proposed power plants to undergo a series of interconnection studies before connecting to the grid. These studies assess what transmission upgrades or new infrastructure may be necessary and assign the associated costs to the project. Lawrence Berkeley National Laboratory has compiled, aggregated, and cleaned interconnection cost data, originally for ISOs/RTOs, and now for five non-ISO Balancing Authorities: PacifiCorp, Bonneville Power Authority, Duke Energy Progress, Duke Energy Carolinas and Duke Energy Florida. Insufficient transparency in interconnection cost data may contribute to rapidly expanding interconnection queues, with active queue capacities tripling between 2020 and 2024 in the studied BAs. Most projects withdraw after receiving high interconnection cost estimates. Interconnection costs have increased since the early 2000s, with average costs for "complete" projects reaching $194/kW between 2018 and 2024. Active queue projects and withdrawn projects incur substantially higher costs, primarily due to rising network upgrade costs. Recent interconnection costs in non-ISO balancing authorities are higher than in ISO regions, potentially due to a greater willingness to pay among developers. Utility-scale solar, wind, and storage projects have interconnection costs that exceed those for natural gas. However, when focusing on projects that do not withdraw from the queue, the interconnection costs for these technologies are more similar to natural gas projects. Other key findings include: (1) Larger generation projects benefit from lower proportional interconnection costs, (2) capacity transmission service (NRIS) often requires additional network investments, and (3) projects with high network upgrade costs are often clustered geographically. The dataset includes results from 2,104 interconnection studies conducted between 2000 and 2024, covering projects that are operational, withdrawn, or still progressing through the study process. The Excel file contains (a) the complete project-level interconnection cost dataset, and (b) seven additional tabs summarizing cost metrics across dimensions such as time, market structure, cost category (point of interconnection vs. broader network upgrades), fuel type, service type (ERIS vs. NRIS), generator size, and geography.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Comparing multi-source urban flood indicators: satellite, simulation, and citizen-reported data

Urban flooding arises from complex mechanisms, making it challenging to capture accurately with a single detection method. This study evaluates three complementary approaches to detect flooding across three Chicago neighborhoods: (i) Sentinel-1 synthetic aperture radar (SAR), offering weather-independent, high-resolution (10 m) imagery of surface inundation; (ii) the storm water management model (SWMM), simulating combined sewer overflow and drainage performance; and (iii) citizen-generated 311 service requests, capturing observed flooding impacts. By analyzing six storms ranging from severe to mild, we examine how each source uniquely contributes to identifying urban flood events. SAR imagery effectively identifies standing water but can miss brief flooding due to satellite revisit constraints. SWMM provides detailed insights into system-wide drainage behavior yet may underestimate localized street-level flooding. Meanwhile, 311 calls reflect real-world flooding impacts but are vulnerable to underreporting. Statistical overlap analysis highlights chronic flood hotspots repeatedly identified across multiple detection methods, indicating persistent infrastructure and topographic vulnerabilities. Temporal analysis further reveals that while SWMM flooding aligns closely with rainfall peaks, 311 calls typically precede or persist beyond these peaks. Our findings emphasize the value of using satellite observations, hydrological modeling, and resident-reported data in a complementary manner to better interpret patterns in flood timing, severity, and spatial distribution—providing insights that can inform targeted infrastructure improvements and contribute to urban flood resilience planning.

311↗

Transition to Online Cable Insulation Condition Monitoring

Nuclear power plant cables were originally qualified for 40 year life and generally have not required specific test verification to assure service availability through the initial plant qualification period. However, license renewals to 60 and 80 years of operation require a cable aging management program that depends on some form of test and verification to assure fitness for service. Environmental stress (temperature, radiation, chemicals, water, and mechanical) varies dramatically within a nuclear power plant and, in some cases, cables have degraded and required repair or replacement before their qualified end-of-life period. In other cases, cable conditions have been mild and dependable cable performance confirmed to extend well beyond the initial qualified life. Most offline performance-based testing requires cables to be de-coupled and de-energized for specially trained technicians to perform testing. These offline tests constitute an expensive operational burden that limits the economic viability of nuclear power plants. Although initial investment may be higher, new online test practices are emerging as options or complements to offline testing that avoid or minimize the regularly scheduled offline test burden. These online methods include electrical and fiber-optic partial discharge measurement, spread spectrum time or frequency domain reflectometry, distributed temperature profile measurements, and local interdigital capacitance measurement of insulation characteristics. Introduction of these methods must be supported by research to confirm efficacy plus either publicly financed or market driven investment to support the start-up expense of cost-effective instrumentation to monitor cable condition and assure reliable operation. This work summarizes various online cable assessment technologies plus introduces a new cable motor test bed to assess some of these technologies in a controlled test environment.

Glass, Samuel W.↗

Hamilton: Flexible, Open Source $10 Wireless Sensor System for Energy Efficient Building Operation

Sensors for improving building performance are rapidly populating the market, driven in part by the drive to reduce greenhouse gas emissions resulting from energy production as well as improve the interior environment for healthy and more productive spaces. UC Berkeley has led wireless sensor development over the past 25 years (e.g., Telos mote), with the Hamilton (named after Alexander Hamilton on the US $10 bill) as the most recent. The Hamilton sensor was designed as a low-cost high-performance sensor that is modular and interoperable. The objective of the Hamilton project was to create, evaluate and establish the technological foundations for secure and easy to deploy building energy efficiency applications utilizing pervasive, low-cost wireless sensors integrated with traditional Building Management Systems (BMS), consumer-sector building components, and powerful data analytics. The project included iterative hardware design, incorporating a high-performance database (BTrDb, http://btrdb.io/), creating and iterating the development of secure data middleware (BOSSwave, WAVE/WAVEMQ), working with and pushing the development of an open-source tiny operating system RiotOS, and implementing and improving protocols such as Thread/OpenThread and TCP/IP. The hardware benefited from careful design to drive down the cost; the design included a System-on-a-Chip (SoC), chip antenna, single crystal and five passive components. Careful design of the operating system created a low-power design to enable a long life with small batteries. The hardware included several sensors: temperature, radiant temperature, relative humidity, magnetometer, accelerometer, and light, with an optional occupancy (Passive InfraRed) sensor. The project was the basis of several applications, both internal to the research team and other researchers and professionals at other institutions. Several applications used the sensor hardware as the basis for other complex devices. Other applications used the sensors to improve building performance through interoperating with the building Heating Ventilation and Air-Conditioning (HVAC) system, such as using occupancy and/or distributed temperature sensing to reduce HVAC zone energy while still providing thermal comfort and to reduce peak loads in small commercial buildings. We demonstrated cloud-based energy analytics, implemented a schedule and a Model Predictive Controller in a small commercial building to optimize HVAC energy, occupancy and electricity price. Initial integration of these technological innovations was performed through the creation of execution containers containing the WAVE agent and various driver, proxy, or building system function logic. The research added to the understanding of efficient sensor hardware, secure middleware, time-series data management (high performance database), efficient communication protocols, and interoperating with applications and building systems. The project showed the technical effectiveness and economic feasibility of creating a low-cost, modular, and easy-to-deploy sensor. Through conversations with multiple end users, the research team discovered that many customers wanted data management and services in addition to the sensors. HamiltonIOT developed packages of sensors, border router, and data services to provide a seamless “plug-and-play” sensor deployment. Some customers were willing to pay for higher quality sensors (such as light); some customers wanted a robust enclosure (waterproof).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Social vulnerability and power loss mitigation: A case study of Puerto Rico

The increasing occurrence of extreme weather events urges us to reevaluate the resiliency and vulnerability aspects of our most critical infrastructures — such as power grids — as their failures result in both economic loss and severe human hardship. Seen through the lens of alleviating human suffering, it is crucial to be able to identify critical system components of the infrastructure for targeted hardening given resource constraints. This effort is of particular importance in islanded areas such as Puerto Rico where hurricanes are frequent and resources are limited, and where the spatially diverse effects of power loss on human suffering are all the more severe. Recent studies on evaluating infrastructure networks during extreme weather events have taken a simulation based approach that incorporates a variety of component models, such as weather realizations, topological network models, fragility models, and power flow models to estimate expected loss of service. Here, in this work, we expand such a Component Based Event Simulation (CBES) methodology proposed in the literature and integrate it with a social vulnerability modeling component. This paradigm-advancing approach of synthesizing the cutting edge capability of power network modeling and the social impacts of the power transmission network failure is demonstrated for the island of Puerto Rico. Our work exemplifies the efficacy of this integrated modeling framework in developing a decision metric for targeted transmission line hardening.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Improving the Representation of Hydropower in Production Cost Models

One of the challenges of a high-renewable, low-carbon system is that grid operators will no longer be able to count on fossil-fired generation should wind miss its forecast or modeling errors create shortage issues, and this change has operational and reliability implications that affect variable renewable energy integration. Hydropower can help in that it can provide many of the services that have been traditionally provided by fossil generation. However, getting the most from hydropower can be challenging in that its capabilities vary with time and are affected by other water users' needs, two complexities that are not well represented in most of today's production cost models (PCMs). This work is an early step in addressing these gaps and making the most of hydropower's capabilities.

cost model↗

Providing Ramping Service with Wind to Enhance Power System Operational Flexibility

This project develops an innovative, integrated, and transformative approach to mitigate the impact of wind ramping by providing flexible ramping products from wind power. The project will significantly contribute to the reduction of wind integration costs by making wind power dispatchable and allowing the efficient management of wind ramping characteristics. In addition, we collaborated with industry to test and validate the methodology, considering economic and reliability goals, by integrating the proposed methodology into the simulated market frameworks of two independent system operators: California Independent System Operator and the Electric Reliability Council of Texas.

17 WIND ENERGY↗

Investigation of Process Emissions during Thermal Cutting of Clad Metals from the Nuclear Sector - 20183

Typically, reactor pressure vessels as well as steam generators comprising low alloyed steel with a cladding of stainless steel. Recently the permissible values for Cr (VI) in the air of the working areas have been reduced in Germany from 100 μg/m{sup 3} to 1 μg/m{sup 3} air. This results in the danger that even with low-alloy steel with claddings these limit values would be exceeded when using flame cutting technologies. In order to ensure compliance with the permissible limit values, exhaust gas systems with gas cleaning measures are provided. The process emission test shall replace the assumptions required for the design of these systems with measured values. NUKEM Technologies Engineering Services GmbH (NUKEM) has chosen autogenous flame cutting as an example of a thermal cutting system for process emission testing, as there are no proven values in the literature for the Cr (VI) and NiOx emissions produced. The autogenous flame cutting can be used for a variety of cutting tasks within decommissioning projects. In order to simulate the material to be cut, mock ups were generated and cut from information about the material specification for the reactor pressure vessel from existing nuclear power plants including possible claddings. The cutting length needed for analysis in the test will be maximum 100 mm. The airborne emissions from the thermal cutting process will be captured and analyzed as follows: - Dust emission: The generated particles will be collected by a hood equipped with strong suction device and suitable filter elements. The resulting filter is gravimetrically measured before and after the tests. - Particle Size Distribution: The airborne particle size distribution measurement will result in figures for the size and number of particles arising from the thermal cutting process. - Gas Analysis: The gas analysis enables the determination of e.g. CO{sub 2}, CO, O{sub 3}, NO, NO{sub 2}. - Cr (VI) and NiOx Analysis: For the Cr (VI) and NiOx analysis, samples of the filter residue will be taken. As a result Cr (VI) in relation to total Cr as well as the Ni content will be determined by ICP-optically emission spectroscopy and put in relation to the total dust amount. The process emissions test itself as well as the necessary gas analyses and spectroscopic analyses were carried out at the Institute of Materials Science (IW) of Leibniz Universitaet Hannover (LUH). The results of the process emission tests are used to confirm the design of the gas cleaning systems. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

EAGLE-I County Customer Dataset Fall 2025

This dataset provides a combination of modeled and collected county-level electric customer counts derived from 2023 EIA-861 utility customer data, 2021 HIFLD electric retail service territory boundaries, 2021 LandScan population estimates, and 2025 EAGLE-I customer outages. The dataset details county FIPS code, number of customers, and customer type (modeled, collected, mixed). Outage data in included for all 50 U.S. states, Puerto Rico, and the District of Columbia (excluding other U.S. territories).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Large Scale Field Demonstration Evaluation Plan

This Evaluation Plan defines practical, commissioning-oriented test protocols for in-field assessment of grid-forming (GFM) inverter-based resources (IBRs) deployed under the UNIFI Consortium Field Demonstration. The demonstration’s overarching objective is to validate multi vendor GFM technologies at impactful unit/plant scale, assess interoperability and grid-service performance, and evaluate the applicability of the UNIFI Specifications for Grid-forming Inverter-based Resources in real utility environments, including integration with operational systems and protection schemes.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electricity Rate Designs for Large Loads: Evolving Practices and Opportunities 2026 Update

Electricity demand from large-load customers such as data centers is projected to grow significantly in the near term. While these large loads play an important role in advancing technology innovation and economic growth in the United States, meeting their energy needs requires utilities and regulators to consider important operational and financial risks, such as insufficient energy supply or underutilized investments, that can impact all customers. This paper builds on similar research published in January 2025, providing an overview of how utilities and regulators are managing these risks through different tariffs, including rate structures and electric service agreements. Regulators, utilities, customers, and other stakeholders can use this paper as a foundation when discussing issues and sharing perspectives on developing or reviewing large-load tariffs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Providing Levelized Cost and Waiting Time Inputs for HDV Hydrogen Refueling Station Planning: A Case Study of U.S. I-75 Corridor

Widespread use of diesel fuels in freight transportation leads to greenhouse gas (GHG) emissions that play an important role in air pollution. The air pollution, as well as the energy crisis, drives the transition from diesel fuel to cleaner and more energy-efficient fuels such as hydrogen fuels. With such a transition, the strategic planning and optimization of supporting refueling infrastructure along the national highway for heavy-duty vehicles (HDVs) become a necessity. Cost and service level are two essential factors to be considered in hydrogen refueling station location and capacity optimization. The service level in this study is assessed by the delay (waiting time) at fueling stations as well as the fueling demand fulfilled. To this end, this study presents a methodology to provide waiting time (delay) and levelized hydrogen fuel cost inputs under different station configurations (number of dispensers and fill rates) for hydrogen refueling station planning. Determining the station configurations based on the trade-off between the two inputs is further discussed. Particularly, this study points out that the levelized cost and waiting time are affected by hourly demand patterns and estimates the two inputs under different peak hour fueling demand scenarios. The results suggest that, with the same daily demand, the cost, as well as the waiting time, increases obviously with the peak hour demand. In the case study, the cost grows at least 30% when the peak hour visit frequency of the daily total visits increases from 5% (evenly distributed pattern) to 10% (the most common pattern for existing diesel fueling stations along I-75). Accounting for this peak hour effect in hydrogen refueling station planning is recommended. Overall, the waiting time model and cost analysis provide key inputs for optimizing hydrogen refueling station location and configurations based on anticipated refueling demand patterns. The paper is the second in a series that aims to build a comprehensive modeling plan and optimize hydrogen refueling infrastructure along the Interstate 75 (I-75) corridor for HDVs.

Liu, Yuandong↗

ECAR-6580 Rev 0 ASME Section III, Division 5 Analysis of the MARVEL PCS and GVS Top Corner

The purpose of this Engineering Calculations and Analysis Report (ECAR) is to document the structural evaluation for part of the Microreactor Applications Research Validation and Evaluation (MARVEL) Primary Coolant System (PCS) and Guard Vessel System (GVS). For the PCS this relates specifically to the Distribution Plenum (DP), The Intermediate Heat Exchanger (IHX), and the Upper Downcomer (UD). For the GVS, this will include only the top corner that is machined into the DP Top Plate. These components will be evaluated using the 2021 version of ASME Section III, Division 5 [1] which is a design code that governs the construction of vessels, storage tanks, piping, pumps, valves, supports, core support structures and nonmetallic core components for use in high temperature reactor systems and their supporting systems. Materials at high temperature are subject to creep and fatigue mechanisms that require additional analyses that aren’t covered in ASME Section III, Division 1 rules. Division 5 contains two approaches: elastic or inelastic, however, additional Code Cases specific to Division 5, allow for an Elastic-Perfectly Plastic (EPP) approach. The components analyzed in this ECAR will use a combination of the elastic and EPP approach. Only Design and Service Levels A and B are evaluated in this ECAR. Service Level D evaluations for the entire PCS are documented in ECAR-6564, “MARVEL Project Primary Coolant System Pressure Vessel Stress Documentation” [2] and for the entire GVS are documented in ECAR-6574, “MARVEL Guard Vessel System FEA and ASME Analysis” [3]. The Design and Service Level A and B analyses for the PCS Downcomer piping and Core Barrel are documented in ANL-24/36, "Engineering Calculations and Analysis of the Core Barrel and Downcomer Piping in the MARVEL PCS” [4], and the GVS (except for the top corner) is in ECAR-6574, “MARVEL Guard Vessel System FEA and ASME Analysis.” See Section 2.0 for more detail on the analysis boundaries.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Solar PV, Wind Generation, and Load Forecasting Dataset for ERCOT 2018: Performance-Based Energy Resource Feedback, Optimization, and Risk Management (P.E.R.F.O.R.M.)

This report describes the Advanced Research Projects Agency-Energy Performance-Based Energy Resource Feedback, Optimization, and Risk Management (PERFORM) Electric Reliability Council of Texas (ERCOT) dataset consisting of load, solar, and wind deterministic and probabilistic forecasts at three timescales. This dataset consists of 1 year of time-coincident load, wind, and solar actuals and probabilistic forecasts for a region similar to ERCOT. All the data are stored in Hierarchical Data Format 5 (HDF5) files and have been uploaded to an Amazon Web Services repository. The ERCOT data set has 2 years (2017, 2018) of actuals and 1 year (2018) of probabilistic forecasts. These data are provided at various spatial (i.e., site-level, zone-level, and system-level) and temporal scales (i.e., day-ahead, intraday, and intra-hour). Specifically, data are provided for 125 existing wind sites, 22 existing solar sites, 139 proposed wind sites, and 204 proposed solar sites.

14 SOLAR ENERGY↗