Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “customization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 955 records · Page 53

Lunar Glovebox Balance with Wireless Technology

The most important equipment required for processing lunar samples is a high-quality mass balance for maintaining accurate weight inventory, security, and scientific study. After careful review, a Curation Office memo by Michael Duke in 1978 chose the Mettler PL200 to be used for sample weight measurements inside the gloveboxes (Fig. 3). These commercial off-the-shelf (COTS) balances did not meet the strict accepted material requirements in the Lunar lab. As a result, each balance housing, weighing pan, and wiring was custom retrofitted to meet Lunar Operating Procedure (LOP) 54 requirements [for material construction restrictions]. The original design drawings for the custom housings, readout support stands, and wiring were done by the JSC engineering directorate. The 1977- 1978 schematics, drawings, and files are now housed in the curation Data Center. Per the design specifications, the housing was fabricated from aluminum grade 6061 T6, seamless welds, and anodized per MIL-A-8625 type I, class I. The balance feet were TFE Teflon and any required joints were sealed with Viton A gaskets. The readout display and support stands outside the glovebox were fabricated from 300 series stainless steel with #4 finish and mounted to the glovebox with welded bolts. Wire harnesses that linked the balance with the outside display and power were encapsulated with TFE Teflon and transported through custom Deutsch wire bulk head pass-through systems from inside to outside the glovebox. These Deutsch connectors were custom fabricated with 316L stainless steel bodies, Viton A O-rings, aluminum 6061 with electroless nickel plating, Teflon (replacing the silicone), and gold crimp connectors (no soldering). Many of the Deutsch connectors may have been used in the Apollo program high vacuum complex in building 37 and date to about 1968 to 1970.

Zeigler, Ryan A.↗

TPSAS-NF1676L-16833-DND

Semantic Infrastructure is central to realizing the first goal of the ASDC's Strategic Plan: expanding the ASDC's customer base by improving access to ASDC data. ASDC data comprises a widely heterogeneous set of complex products which presents two significant challenges in data access: Helping customers discover, among many available options, the most suitable data products for their purpose; and Guiding customers to easily and appropriately use products. Data products differ significantly in terms of how the data was collected and processed, even with similar subject matter. Understanding differences is critical to using data effectively. To reach a broader customer range, the ASDC must provide prospective users with enough information to quickly and meaningfully compare and evaluate data products. Data formats and structures also differ among products. Applications displaying and analyzing data need access to federated and semantically disambiguated data. Semantic technologies offer functionality for addressing this issue. Ontologies can provide robust, stable domain models serving as common schema for discovering, evaluating, comparing, and integrating data from disparate products. Reasoning engines and triple stores can leverage ontologies to support intelligent search applications allowing users to discover, query, retrieve, and easily reformat data from a broad spectrum of sources.

Beth Huffer↗

Gaussian Process Regression Method for Costing SmallSat Bus Capabilities

NASA is responding to the growing interest in, andcapabilities of, small satellites for science applications with an increasingnumber and frequency of Announcements of Opportunityfor small satellite space missions. Estimating the probabilitythat these mission concepts will fit within the small cost capsof these opportunities is largely driven by the probability thatone of the burgeoning number of small satellite providers will beable to meet the payload’s accommodation requirements withinthe budget for the spacecraft. JPL has collected a databasecontaining technical specifications and cost of commerciallyavailable Smallsat buses across various vendors. The primarypurpose of the database is for use in JPL’s Team X architecturestudies to inform cost estimates of a spacecraft bus which fitsthe customer’s technical requirements for their payload andmission. Customer needs are often unique and don’t alignperfectly with an off-the-shelf commercial spacecraft bus, whichmotivates the need to develop a cost model across the continuoustechnical parameter space.Al’s Bus Cost Distribution Estimator (ABCDE) uses Gaussianprocess regression (GPR) to predict commercial Smallsat spacecraftbus cost based on a subset of a customer’s technicalrequirements (payload mass, payload power, delta V, pointingcontrol, and downlink rate). GPR is implemented in ABCDE asa Bayesian method which fits an implied multivariate regressionon the technical parameters and uses kriging to intentionally“overfit” the residuals. Overfitting the residuals allows costestimates to collapse in uncertainty closer to the data pointswhile maintaining larger uncertainty intervals in regions of parameterspace with fewer data records. The data used to fit thismodel is sensitive and represents cost estimates for off-the-shelfcommercial buses. GPR simultaneously protects the sensitivityof the database and uses the sparse nature of the database toaccount for uncertainty in cost in a useful way. For a givenset of customer technical requirements, the tool provides a costestimate distribution, the percentiles of which can be interpretedas a confidence level of finding a commercial bus under a specifiedcost cap. ABCDE dramatically pushes the boundaries ofspacecraft cost estimation models due to its Bayesian methodology(accounting for the maximum uncertainty in the underlyingregression), the mathematically advanced kriging methodology,and the novelty of its application in Team X architecture tradestudies.

Austin, Alex↗

Evaluation of evolving residential electricity tariffs

Residential customers in California's Pacific Gas and Electric (PG&E) territory have seen several electricity rate structure changes in the past decade. A relatively simple two-tiered pricing system (charges by usage under/over baseline for the home's climate zone) was replaced in the summer of 2001 by a more complicated five-tiered system (usage below baseline and up to 30percent, 100percent, 200percent, and 300percent+ over baseline). In 2009, PG&E began the process of upgrading its residential customers to Smart Meters and laying the groundwork for time of use pricing, due to start in 2011. This paper examines the history of the tiered pricing system, discusses the problems the utility encountered with its Smart Meter roll out, and evaluates the proposed dynamic pricing incentive structures. Scenario analyses of example PG&E customer bills will also be presented. What would these residential customers pay if they were still operating under a tiered structure, and/or if they participated in peak hour reductions?

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Design, implementation and migration of security systems as an extreme project.

Decision Trees, algorithms, software code, risk management, reports, plans, drawings, change control, presentations, and analysis - all useful tools and efforts but time consuming, resource intensive, and potentially costly for projects that have absolute schedule and budget constraints. What are necessary and prudent efforts when a customer calls with a major security problem that needs to be fixed with a proven, off-the-approval-list, multi-layered integrated system with high visibility and limited funding and expires at the end of the Fiscal Year? Whether driven by budget cycles, safety, or by management decree, many such projects begin with generic scopes and funding allocated based on a rapid management 'guestimate.' Then a Project Manager (PM) is assigned a project with a predefined and potentially limited scope, compressed schedule, and potentially insufficient funding. The PM is tasked to rapidly and cost effectively coordinate a requirements-based design, implementation, test, and turnover of a fully operational system to the customer, all while the customer is operating and maintaining an existing security system. Many project management manuals call this an impossible project that should not be attempted. However, security is serious business and the reality is that rapid deployment of proven systems via an 'Extreme Project' is sometimes necessary. Extreme Projects can be wildly successful but require a dedicated team of security professionals lead by an experienced project manager using a highly-tailored and agile project management process with management support at all levels, all combined with significant interface with the customer. This paper does not advocate such projects or condone eliminating the valuable analysis and project management techniques. Indeed, having worked on a well-planned project provides the basis for experienced team members to complete Extreme Projects. This paper does, however, provide insight into what it takes for projects to be successfully implemented and accepted when completed under extreme conditions.

99 GENERAL AND MISCELLANEOUS↗

Design implementation and migration of security systems as an extreme project.

Decision Trees, algorithms, software code, risk management, reports, plans, drawings, change control, presentations, and analysis - all useful tools and efforts but time consuming, resource intensive, and potentially costly for projects that have absolute schedule and budget constraints. What are necessary and prudent efforts when a customer calls with a major security problem that needs to be fixed with a proven, off-the-approval-list, multi-layered integrated system with high visibility and limited funding and expires at the end of the Fiscal Year? Whether driven by budget cycles, safety, or by management decree, many such projects begin with generic scopes and funding allocated based on a rapid management 'guestimate.' Then a Project Manager (PM) is assigned a project with a predefined and potentially limited scope, compressed schedule, and potentially insufficient funding. The PM is tasked to rapidly and cost effectively coordinate a requirements-based design, implementation, test, and turnover of a fully operational system to the customer, all while the customer is operating and maintaining an existing security system. Many project management manuals call this an impossible project that should not be attempted. However, security is serious business and the reality is that rapid deployment of proven systems via an 'Extreme Project' is sometimes necessary. Extreme Projects can be wildly successful but require a dedicated team of security professionals lead by an experienced project manager using a highly-tailored and agile project management process with management support at all levels, all combined with significant interface with the customer. This paper does not advocate such projects or condone eliminating the valuable analysis and project management techniques. Indeed, having worked on a well-planned project provides the basis for experienced team members to complete Extreme Projects. This paper does, however, provide insight into what it takes for projects to be successfully implemented and accepted when completed under extreme conditions.

99 GENERAL AND MISCELLANEOUS↗

Southwestern Power Administration Annual Report 2008

Dear Secretary Chu, I am pleased to present the financial statements and operating data for Southwestern Power Administration (Southwestern) for Fiscal Year (FY) 2008. In FY 2008, Southwestern delivered over 7.3 billion kilowatt-hours of energy to its wholesale customers – nearly 31% more than average due to numerous record rainfall amounts in the southwest region. These record amounts produced revenues which exceeded the average annual revenue requirement by nearly $20 million and resulted in over $200 million in economic benefits to the region. Yet even as Southwestern exceeded its goals of marketing and delivering Federal hydroelectric power to our customers, we stayed focused on safety, security, and reliability. For example, we maintained our nearly 1,400 miles of high-voltage transmission lines, substations, and communications sites while achieving a Recordable Accident Frequency Rate of 0.0, a record that reflects Southwestern’s safety achievement of no recordable injuries for every 200,000 hours worked. We kept our rights-of-way secure from vegetation and other obstacles, work that not only supports our mission but also promotes reliability of the regional and National grid. We exceeded all North American Electric Reliability Corporation (NERC) Control Performance Standards (CPS- 1 and CPS-2), and maintained regulation and reserve obligations and reactive reserve margins to ensure the reliability of the bulk electric system, even during extended periods of restricted hydro operations due to unusually high project inflows. Finally, we continued our partnerships with the Department of Energy, the U.S. Army Corps of Engineers, our customers, and other Federal power stakeholders, partnerships that are vital to our continued success in marketing and delivering carbon-free, renewable, and domestically produced energy to our customers and to the Nation. Sincerely, Jon Worthington Administrator

Financial statement, operating data, Southwestern ↗

Incorporating Non-energy Benefits into Energy Savings Performance Contracts

This paper evaluates the issue of non-energy benefits within the context of the U.S. energy services company (ESCO) industry?a growing industry comprised of companies that provide energy savings and other benefits to customers through the use of performance-based contracting. Recent analysis has found that ESCO projects in the public/institutional sector, especially at K-12 schools, are using performance-based contracting, at the behest of the customers, to partially -- but not fully -- offset substantial accumulated deferred maintenance needs (e.g., asbestos removal, wiring) and measures that have very long paybacks (roof replacement). This trend is affecting the traditional economic measures policymakers use to evaluate success on a benefit to cost basis. Moreover, the value of non-energy benefits which can offset some or all of the cost of the non-energy measures -- including operations and maintenance (O&M) savings, avoided capital costs, and tradable pollution emissions allowances-- are not always incorporated into a formal cost-effectiveness analysis of ESCO projects. Nonenergy benefits are clearly important to customers, but state and federal laws that govern the acceptance of these types of benefits for ESCO projects vary widely (i.e., 0-100percent of allowable savings can come from one or more non-energy categories). Clear and consistent guidance on what types of savings are recognized in Energy Savings agreements under performance contracts is necessary, particularly where customers are searching for deep energy efficiency gains in the building sector.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Incident Management Preparedness and Coordination Toolkit

As with many professions, safety planners and first responders tend to be specialists in certain areas. To be truly useful, tools should be tailored to meet their specific needs. Thus, general software suites aimed at the professional geographic information system (GIS) community might not be the best solution for a first responder with little training in GIS terminology and techniques. On the other hand, commonly used web-based map viewers may not have the capability to be customized for the planning, response, and recovery (PR&R) mission. Data formats should be open and foster easy information flow among local, state, and federal partners. Tools should be free or low-cost to address real-world budget constraints at the local level. They also need to work both with and without a network connection to be robust. The Incident Management Preparedness and Coordination Toolkit (IMPACT) can satisfy many of these needs while working in harmony with established systems at the local, state, and federal levels. The IMPACT software framework, termed the Geospatial Integrated Problem Solving Environment (GIPSE), organizes tasks, tools, and resources for the end user. It uses the concept of software wizards to both customize and extend its functionality. On the Tasks panel are a number of buttons used to initiate various operations. Similar to macros, these task buttons launch scripts that utilize the full functionality of the underlying foundational components such as the SQL spatial database and ORNL-developed map editor. The user is presented with a series of instruction pages which are implemented with HTML for interactivity. On each page are links which initiate specific actions such as creating a map showing various features. Additional tasks may be quickly programmed and added to the panel. The end user can customize the graphical interface to faciltate its use during an emergency. One of the major components of IMPACT is the ORNL Geospatial Viewer (OGV). It is used to provide various map displays for the Tasks and Maps panels. Unlike typical maps however, the OGV display is highly interactive and can be customized, automated, and animated to meet the needs of the user. It is also a means to both import and export geospatial data from or to existing GIS systems. The built-in simulation capability can be used as the basis of table-top exercises.

Koch, Daniel B.↗

OpenStudio: A Platform for Ex Ante Incentive Programs

Many utilities operate programs that provide ex ante (up front) incentives for building energy conservation measures (ECMs). A typical incentive program covers two kinds of ECMs. ECMs that deliver similar savings in different contexts are associated with pre-calculated 'deemed' savings values. ECMs that deliver different savings in different contexts are evaluated on a 'custom' per-project basis. Incentive programs often operate at less than peak efficiency because both deemed ECMs and custom projects have lengthy and effort-intensive review processes--deemed ECMs to gain confidence that they are sufficiently context insensitive, custom projects to ensure that savings are claimed appropriately. DOE's OpenStudio platform can be used to automate ex ante processes and help utilities operate programs more efficiently, consistently, and transparently, resulting in greater project throughput and energy savings. A key concept of the platform is the OpenStudio Measure, a script that queries and transforms building energy models. Measures can be simple or surgical, e.g., applying different transformations based on space-type, orientation, etc. Measures represent ECMs explicitly and are easier to review than ECMs that are represented implicitly as the difference between a with-ECM and without-ECM models. Measures can be automatically applied to large numbers of prototype models--and instantiated from uncertainty distributions--facilitating the large scale analysis required to develop deemed savings values. For custom projects, Measures can also be used to calibrate existing building models, to automatically create code baseline models, and to perform quality assurance screening.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Automated Dynamic Demand Response Implementation on a Micro-grid

In this paper, we describe a system for real-time automated Dynamic and Sustainable Demand Response with sparse data consumption prediction implemented on the University of Southern California campus microgrid. Supply side approaches to resolving energy supply-load imbalance do not work at high levels of renewable energy penetration. Dynamic Demand Response (D 2 R) is a widely used demand-side technique to dynamically adjust electricity consumption during peak load periods. Our D 2 R system consists of accurate machine learning based energy consumption forecasting models that work with sparse data coupled with fast and sustainable load curtailment optimization algorithms that provide the ability to dynamically adapt to changing supply-load imbalances in near real-time. Our Sustainable DR (SDR) algorithms attempt to distribute customer curtailment evenly across sub-intervals during a DR event and avoid expensive demand peaks during a few sub-intervals. It also ensures that each customer is penalized fairly in order to achieve the targeted curtailment. We develop near linear-time constant-factor approximation algorithms along with Polynomial Time Approximation Schemes (PTAS) for SDR curtailment that minimizes the curtailment error defined as the difference between the target and achieved curtailment values. Our SDR curtailment problem is formulated as an Integer Linear Program that optimally matches customers to curtailment strategies during a DR event while also explicitly accounting for customer strategy switching overhead as a constraint. We demonstrate the results of our D 2 R system using real data from experiments performed on the USC smartgrid and show that 1) our prediction algorithms can very accurately predict energy consumption even with noisy or missing data and 2) our curtailment algorithms deliver DR with extremely low curtailment errors in the 0.01-0.05 kWh range.

Kuppannagari, Sanmukh R.↗

Stem Inc. SunShot Incubator Program Final Technical Report

In this Energy Storage Control Algorithms project, Stem sought to develop tools and control algorithms to increase the value and reduce balance-of-system and grid integration costs associated with adding distributed solar generation to the grid. These advances fell under the headings SolarScope and SolarController. Stem sought to create initial market traction with a fully commercialized product for the solar industry to size storage systems (SolarScope) as well as a solar intermittency-mitigation framework for utilities (SolarController) in the course of the project. The company sought to align strategic growth plans and enable the rollout of the products to broader audiences in multiple geographic regions by leveraging the major solar companies in the national market as partners. Both final products were both intended to be commercialized. They are: SolarScope: Analysis tool to identify viable PV + storage projects and thereby expedite the sales and interconnection processes. SolarScope combines customer load data, PV production estimates, utility rate tariff, and simulated storage into a simple user interface for PV developers. Developers can easily identify viable solar + storage sites without the need for complex and time consuming, site-by-site spreadsheet modeling. SolarContoller: Tool to autonomously dispatch distributed storage in order to mitigate voltage fluctuation and reduce curtailment. SolarController co-optimizes, in real time, storage dispatch for circuit stability and curtailment reduction, enabling higher penetrations of PV. SolarController is automated, not requiring utility dispatch or management, as Stem hardware senses grid voltage, frequency, customer load, PV production, and power factor. In the end the two products met with different outcomes. SolarScope was tested by potential users, and continues to be used as a foundational platform for partnership with key solar industry partners. SolarController, on the other hand, was successful in lab testing but was not commercialized due to a lack of marketability and lack of interested customer base. Together the development of these two products marked a material step forward for Stem; and a new milestone along the pathway of integration for the solar and storage industries. SolarScope is leading to real, out-of-the-lab project development in storage + solar for the commercial customer sector. Meanwhile SolarController has opened the eyes of regulators and utility executives alike to the potential of distributed solar and by doing so, has moved the conversation forward for the integration of distributed energy resources more broadly on the grid.

25 ENERGY STORAGE↗

Apparatus and method for optimal phase balancing using dynamic programming with spatial consideration

Provided are an apparatus and method for load-balancing of a three-phase electric power distribution system having a multi-phase feeder, including obtaining topology information of the feeder identifying supply points for customer loads and feeder sections between the supply points, obtaining customer information that includes peak customer load at each of the points between each of the feeder sections, performing a phase balancing analysis, and recommending phase assignment at the customer load supply points.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Time-of-Use and Demand Charge Battery Controller Using Stochastic Model Predictive Control: Preprint

Stationary batteries in residential and commercial buildings are often used to smooth customer load profiles and to lower customer electricity bills. Controllers for these battery systems should account for customer energy consumption, rate structures, and high internal battery temperatures, which can lead to reduced performance over the battery lifetime. It is important to consider the uncertainty in forecasting energy consumption and temperature, especially for customers with highly variable and uncertain loads. We propose a novel battery controller using stochastic model predictive control that accounts for these uncertainties and can handle complex rate structures, including demand charges. We show that the controller performs better than standard model predictive control when there is significant uncertainty in the forecast. We also show improvements in the performance with more accurate forecasts and with a more aggressive control strategy.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Battery Control Using Stochastic Model Predictive Control

Stationary batteries in residential and commercial buildings are often used to smooth customer load profiles and to lower customer electricity bills. Controllers for these battery systems should account for customer energy consumption, rate structures, and high internal battery temperatures, which can lead to reduced performance over the battery lifetime. It is important to consider the uncertainty in forecasting energy consumption and temperature, especially for customers with highly variable and uncertain loads. We propose a novel battery controller using stochastic model predictive control that accounts for these uncertainties and can handle complex rate structures, including demand charges. We show that the controller performs better than standard model predictive control when there is significant uncertainty in the forecast. We also show improvements in the performance with more accurate forecasts and with a more aggressive control strategy.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Projecting Future Colorado River Basin Water and Hydropower Operations

Drought, variable renewable energy (VRE) resources (primarily wind and photovoltaic technologies), and power markets can all impact hydropower plant operations. We analyze how these three factors collectively may potentially change the future operation and economics of federal dams and hydropower plants located in the Colorado River Basin (CRB). Federal CRB energy and capacity resources, including 4,200 MW of hydropower capacity, are marketed by Western Area Power Administration (WAPA) and sold through long-term Firm Electric Service (FES) contracts to entities located in 15 western and central States that serve millions of electricity consumers. The parameters of FES contracts allow a wide range of scheduling flexibility for FES customers. The FES customers will adjust the timing of energy delivery according to the changing water, power market, and VRE contribution level to the power grid. We simulate and project water and hydropower operations with two models: 1) reservoir operation and 2) power system operation (production cost) with various temporal granularity. We consider two sets of grid scenarios (one representing today's infrastructure, and one representing higher VRE contributions in 2036) and two sets of water scenarios (drought and normal hydrology). We modeled scenarios to understand the power market-energy price levels and patterns, FES customer scheduling, hydropower economics, WAPA finances and hydropower operation for various hydrologic conditions, and VRE contribution level to the power grid. The detailed modeling framework includes: (1) creating ensembles of CRB hydrologic and hydropower futures, (2) selecting representative futures, (3) simulation of FES customer contracts, (4) simulating western U.S. power grid economic scheduling and dispatch under two VRE contribution levels, utilizing information from modeling steps (1)-(4), (5) assessment of reservoir water and hydropower operation, and (6) comparing scenario operations and economics. Our study team comprising WAPA, and an interdisciplinary team of national labs will gain insight into how WAPA can prepare for and adapt its practices in response to an evolving U.S. power grid.

Colorado River↗

Leaning the tank closure process at the Savannah River Site - 15515

The Savannah River Site liquid waste system consists of multiple facilities that safely receive and store legacy radioactive waste prior to treatment and disposition. The liquid radioactive waste is stored in large underground tanks. The waste inventory currently stored in these tanks is a complex mixture of insoluble metal hydroxide solids and soluble salt supernate. The high-level (radioactive) portion of the waste is vitrified into a glass waste form, while the low-level waste is immobilized into a cementitious grout waste form called salt-stone. Once the waste is retrieved and processed, the tanks are closed. The closure process includes; waste removal, characterizing residuals, isolating the tank systems, and stabilizing the tank with tailored grout formulations. The core of Lean is to eliminate waste or non-value added steps from processes to maximize customer value. From the perspective of the customer, 'value' is defined as any action or process for which a customer would willingly pay. In this case our product is to safely and efficiently remove waste from the underground storage tanks and demonstrate operational closure to the State of South Carolina. Savannah River Remediation (SRR) initiated the use of the Lean process in late 2013 and identified the Tank Closure process as one of the targeted areas to improve. The first step in the Lean process is to 'map' out the value stream and identify areas where non-value added steps are present and then prioritize Rapid Improvement Events (RIE). Based on this mapping process, there were a number of areas that SRR determined warranted further evaluation for improvements, including; standard equipment design, characterization, standard work packages, regulatory documentation, tank characterization, structural evaluations, engineering documentation and equipment re-use. This paper focuses on the application of the Lean process at SRR and more specifically, effective application to the Tank Closure Process. This paper discusses the value stream mapping process for Tank Closures, as well as, summarizes the RIEs and demonstrate the realized benefits. Benefits can come in a variety of forms, from schedule compression to decreased costs. Through the Lean process we have been able to identify close to $10 M in savings over the life cycle of the tank closure process and a 4 year schedule compression. Cost and schedule savings are used to accomplish further risk reduction efforts. In addition to hard benefits, there are also soft benefits. These soft benefits are a result of the process itself and help drive improved efficiencies through better communication with key stakeholders, such as regulators and customers. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Knowledge management information tool analytics with distributed database engine - 15737

The D and D KM-IT is a web-based knowledge management information tool custom built for the deactivation and decommissioning (D and D) user community. The system allows interested users to post information which goes through a custom work flow. To better improve the performance and user experience, the analysis of server logs is being conducted using MongoDB. MongoDB is a document database that provides high performance, high availability, and easy scalability. Objectives: - Feasibility study of Distributed Database Engine, MongoDB for web analytics; - Analyze server logs to evaluate D and D KM-IT module usage; - Generate useful information from the analysis. Method: - The server logs were loaded and stored in MongoDB for analysis; - Analysis and visualization was performed using NodeJS and Java Script library. Results: - It was possible to store log files in MongoDB; - Log files with different time stamps and groups from different servers can be aggregated; - Queries can be written to extract meaningful information from aggregated log files (e.g. users from different countries/organizations). Conclusions: - MongoDB is useful for server log analytics as the analyst can immediately access, analyze, and visualize MongoDB data based on the requirements; - The information can be extracted to develop custom reports; - Optimized queries can be run for fast data access. Path forward: - Custom queries need to be developed to extract information leading to improved user information.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗