Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “commissioning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 955 records · Page 53

Pitka's Point/St. Mary's Wind Energy Construction Project. Final report

This is the final report for the St. Mary’s/Pitka’s Point Wind Construction Project. Under the project Alaska Village Electric Cooperative, Inc. (AVEC) constructed and commissioned one new 900 kW-capacity wind turbine at a site in Pitka’s Point about 4 miles from the diesel-fired prime power plant in St. Mary’s. The main objective of this project is to generate electric power from a renewable resource in an effort to reduce the local dependency on fuel oil as the sole source of electric power generation. The wind generator’s output augments the prime source generation provided by the diesel-powered generators.

17 WIND ENERGY↗

Bethel Wind Energy Construction Project. Final report

Final report for the Bethel (Alaska) Wind Construction project. Under this project, Alaska Village Electric Cooperative, Inc. (AVEC) constructed and commissioned one new 900 kW-capacity wind turbine at a site in Bethel about 3.3 miles NE of the diesel-fired prime power plant. The wind generator’s output will augment the prime source generation provided by the diesel-powered generators.

17 WIND ENERGY↗

Savannah River Site Composite Analysis (FY2019 Annual Review)

The Savannah River Site (SRS) is a Department of Energy (DOE) site encompassing approximately 310 square miles in South Carolina. It is bounded on the southwest by the Savannah River (SR) and is situated approximately 12 miles south of Aiken, South Carolina, and 15 miles southeast of Augusta, Georgia. Construction of and subsequent operations at the SRS began in 1951 under the direction of the Atomic Energy Commission. The primary mission of the SRS was to produce tritium and plutonium for the national nuclear weapons complex. Between 1953 and 1955, SRS brought five reactors and various support facilities into operation in support of its primary mission. Support facilities included two chemical separations plants, a heavy water extraction plant, a nuclear fuel and target fabrication facility, a tritium extraction facility and waste management facilities. With the declining need for a large nuclear weapons stockpile since the end of the Cold War, many SRS facilities no longer produce or process nuclear materials. All reactors were shut down by 1993. However, the SRS Tritium Extraction Facility continues to supply DOE with tritium. Additionally, operations at the K-Area Complex currently provide interim safe storage for much of DOE’s excess plutonium (Pu) and high enriched uranium, in a building which formerly housed K Reactor. As the SRS mission has changed, many surplus facilities are being dispositioned safely and economically. SRS has completed extensive decommissioning activities in D-Area, M-Area, P-Area, R-Area, and T-Area, with groundwater (GW) remediation ongoing. High-level waste tanks continue to be emptied and closed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Computational-experimental Study to Simulate Mixing and Thermal Stratification in SFRs

This NEUP project 16-10579 entitled “A Computational-Experimental Study to Simulate Mixing and Thermal Stratification in SFRs”, has investigated important phenomena of thermal stratification and mixing in Sodium-cooled Faster reactors (SFRs). A liquid metal experimental set-up was built at Kansas State University to generate high fidelity experimental data and validate computational models. The scope of the work involved - scaled down design of experimental facility, construction and commissioning of the new facility, conducting thermal-hydraulics experiments relevant to the physics of thermal stratification and mixing in the plena, developing 3D CFD models of the experiments, developing SAS4A/SASSYS-1 system model of the liquid metal experimental facility , survey of previous data in literature on stratification experiments and recommendations for improved models.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

An Integrated Energy Systems Prototype Human-System Interface for a Steam Extraction Loop System to Support Joint Electricity-Hydrogen Flexible Operations

Due to increasing economic competition from renewables and combined-cycle natural gas plants, nuclear power plants are looking toward flexible operations to enhance their cost competitiveness. The Integrated Energy Systems project under the Light Water Reactor Sustainability program of the U.S. Department of Energy focuses on joint electricity-hydrogen flexible operations. Joint electricity-hydrogen flexible operations entail the nuclear power plant diverting thermal energy via main steam to a hydrogen production plant located nearby. The steam serves to enhance the efficiency of the hydrogen production. Furthermore, high temperature electrolysis requires a large amount of electricity, which the plant can also provide. The plant provides steam and electricity to the hydrogen plant throughout the day, but during peak demand hours the nuclear power plant returns to solely providing electricity to meet the high demand. Through this flexible concept of operations, the plant can optimize the thermal energy it produces without having to maneuver the power of the plant. This report documents the human factors process to design and develop a prototype human-system interface for the steam extraction loop that serves as the conduit between the nuclear power plant and the adjacent hydrogen plant. The design process followed the human factors guidelines set by NUREG-0711, Human Factors Engineering Program Review Model (O’Hara, Higgins, & Fleger, 2012), and expanded upon by the Guideline for Operational Nuclear Usability and Knowledge Elicitation (GONUKE; Boring, Ulrich, Joe, & Lew, 2015; Boring, Lew, & Ulrich, 2016). The design process entailed operator interviews to determine the concept of operations for the steam extraction loop, a review and adaptation of digital interface design concepts developed by the team in prior projects, an iterative design process, and reviews conducted by both operators and human factors experts. Several versions of the prototype human-system interface were developed. Operators were interviewed to determine what design features they found useful and would like to see in the interface. The design underwent a review by human factors experts against NUREG-0700, Human Interface Design Review Guidelines (U.S. Nuclear Regulatory Commission, 2019), to ensure compliance with the latest human factors standards for digital interfaces in nuclear applications. The design was then prototyped as a functional windows-based application integrated with the Generic Pressurized Water Reactor simulator modified to include the steam extraction loop. The simulation is supported by the Human Systems Simulation Laboratory at Idaho National Laboratory, which supports operator-in-the-loop testing. This is an ongoing project and the next phase of the project entails performing an operator-in-the-loop usability study to evaluate the interface and examine the proposed concept of operations to extraction steam from the nuclear power plant for delivery to the coupled hydrogen production plant.

99 GENERAL AND MISCELLANEOUS↗

A Comparison of the Environmental Effects of Open-Loop and Closed-Loop Pumped Storage Hydropower

Pumped storage hydropower (PSH) capabilities are generally characterized as either open-loop or closed-loop. The U.S. Department of Energy (DOE) defines open-loop PSH as “continuously connected to a naturally flowing water feature,” and closed-loop PSH as “not continuously connected to a naturally flowing water feature.” All the PSH projects constructed in the United States to date are open-loop, so the potential environmental effects of closed-loop systems are not as well documented as the effects of open-loop systems. To address this knowledge gap, the DOE Water Power Technologies Office, under its HydroWIRES Initiative, has prepared this report to: (1) compare the potential environmental effects of open-loop PSH projects with those of closed-loop PSH projects; (2) describe how these effects are being avoided, minimized, or mitigated at existing projects in other countries and proposed projects in the United States; and (3) discuss the relative significance of the environmental issues. The report begins with a brief introduction on the current status of PSH development in the United States. Next, the report describes the current Federal Energy Regulatory Commission (FERC) hydropower licensing process, emphasizing some recent regulatory changes that affect closed-loop PSH development. The report then provides a summary comparison of the environmental effects of constructing and operating open-loop and closed-loop PSH systems and discusses the relative significance of those issues. This comparison and discussion are based on the results of a literature review and a review of FERC licensing records. The literature review includes journal articles, technical reports, and presentations on the environmental effects of PSH systems. It includes literature from the United States as well as countries where closed-loop PSH projects have been constructed. The FERC records review examines the FERC licensing record (e.g., National Environmental Policy Act documents and license orders) to identify the environmental effects anticipated and mitigation measures proposed for six of the closed-loop PSH projects currently licensed or permitted in the United States. For comparison, the FERC records review also discusses the environmental effects and mitigation measures for four open-loop PSH projects proposed or currently operating in the United States. The comparison of effects between open-loop and closed-loop projects is relative; that is, it characterizes the impacts of each project type as generally lower or higher than another project type. The comparison reflects general trends among project types because there are sometimes exceptions to the examples cited. The comparison is based on both spatial (location) and temporal (duration) factors and reflects both the severity and likelihood of effects. The report concludes that the environmental effects of closed-loop PSH projects are generally lower (i.e., more localized and of shorter duration) than those of open-loop PSH projects because they are located “off-stream,” minimizing aquatic and terrestrial impacts, and often have greater siting flexibility than open-loop PSH projects. For certain closed-loop project designs, however, impacts to groundwater may be higher relative to open-loop projects and should be considered in any environmental review.

13 HYDRO ENERGY↗

Ultra-Low SWaP CO 2 Sensing for Demand Control Ventilation (Final Report)

In this project PARC and Energy ETC aimed to develop an ultra-low cost, size, weight, and power (SWaP) printed CO 2 sensor system for occupancy detection to enable Demand Control Ventilation (DCV) on a per-room basis. The CO 2 sensor technology is based on the temperature variation when CO 2 reversibly physisorbs to a highly conductive and high surface area sorbent surface, and is compatible with integration with PARC innovations in printed sensors and flexible electronics, for which PARC is a globally leading research center. The printed CO 2 sensor itself is designed to be compatible with PARC’s “peel-and-stick” platform of ultra-low power, low-cost, distributed sensors, and to facilitate real-time DCV based on overall indoor air quality (IAQ). Previously, PARC has developed flexible hybrid electronics (FHE) compatible materials to measure humidity, temperature, light, strain, and gases such as carbon monoxide, methane, ammonia, and hydrogen sulfide. Through this project, PARC developed FHE-compatible materials to measure CO 2 . Thus, with one <$15 FHE “peel-and-stick” based sensor node, a building management system (BMS) will be able to capture a complete picture of the indoor environment. This includes IAQ, light, temperature, and other comfort factors that impact building operations. Combined with optimized DCV, this low-cost sensor capability can be a key enabler of annual primary energy savings of ~ 0.3-0.4 Quad in commercial buildings while ensuring healthy IAQ. Energy ETC is a leader in supplier-agnostic BMS deployments and will design the commissioning and deployment procedures to maximize system interoperability.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Harnessing the Hydroelectric Potential of Engineered Drops (Final Technical Report)

The potential for low-head hydropower in the engineered drops in both federal and private irrigation system is well known and significant. The environmental and socio/recreational impacts of harnessing this renewable energy resource in man-made conduits are much less, and often insignificant, compared with comparable hydro-electric potential in natural water features on rivers, lakes, and streams. Yet, few new plants have been commissioned in more than two decades. Over the same time period, low head hydro installations in Germany have more than doubled. The challenge is in finding economical ways to harness the hydro-electric potential in the engineered drops, and efficiently deliver the power to the grid. The objectives of Percheron Power, LLC's (Percheron Power) Project were to design, develop, permit, and operate an innovative low-head hydro-electric generation facility on an existing engineered drop of a large irrigation canal system. The hydro-electric generation facility was designed to employ a new type of turbine and technology, called an Archimedes Hydrodynamic Screw (AHS), to harness the existing potential of the engineered drop. The goal was to demonstrate the new lower cost AHS technology system to federal agencies, irrigation districts and other system owners and to support further development of new small hydropower projects at previously marginal low-head sites in the U.S. The objective of this funding opportunity of the Department of Energy Water Power Technologies Office was to reduce the Levelized Cost of Energy (LCOE) for small hydropower to less than ${$}$0.07/kWh (${$}$70/MWh) to be competitive with existing base-load power sources such as coal-powered power plants.

13 HYDRO ENERGY↗

Technical and Licensing Considerations for Micro-Reactors

The U.S. Nuclear Regulatory Commission (NRC) has interacted with vendors pursuing the commercialization of micro-reactors (i.e., reactors capable of producing about 1 MW(th) to 20 MW(th) of energy from nuclear fission). It is envisioned that micro-reactors could be assembled and fueled in a factory and shipped to a site. Many of the sites are expected to be remote locations requiring off-grid power or in some cases military bases. The objective of this effort is to explore the technical issues and the approach required to reach a finding of "reasonable assurance of public health and safety" for this new and different class of reactors. The analysis performed here leverages available micro-reactor design and testing data available from national laboratory experience as well as commercial design information to explore technical issues. Some factors considered include source term, accidents that would need to be analyzed, and the extent of the probabilistic risk assessment (PRA). The technical evaluation was performed within the framework of the Licensing Modernization Project (LMP) to identify licensing basis events, classification of structures, systems and components, and defense-in-depth needed to provide regulatory certainty. With this framework and technical evaluation in mind, the scope and content of a micro-reactor licensing application is discussed.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Determining Utility System Value of Demand Flexibility From Grid-interactive Efficient Buildings

This report focuses on ways current methods and practices that establish the value to electric utility systems of distributed energy resource (DER) investments can be enhanced to determine the value of demand flexibility in grid-interactive efficient buildings that can provide grid services. The report introduces key valuation concepts that are applicable to demand flexibility that these buildings can provide and links to other documents that describe these concepts and their implementation in more detail.The scope of this report is limited to the valuation of economic benefits to the utility system. These are the foundational values on which other benefits (and costs) can be built. Establishing the economic value to the grid of demand flexibility provides the information needed to design programs, market rules, and rates that align the economic interest of utility customers with building owners and occupants. By nature, DERs directly impact customers and provide societal benefits external to the utility system. Jurisdictions can use utility system benefits and costs as the foundation of their economic analysis but align their primary cost-effectiveness metric with all applicable policy objectives, which may include customer and societal (non-utility system) impacts.This report suggests enhancements to current methods and practices that state and local policymakers, public utility commissions, state energy offices, utilities, state utility consumer representatives, and other stakeholders might support. These enhancements can improve the consistency and robustness of economic valuation of demand flexibility for grid services. The report concludes with a discussion of considerations for prioritizing implementation of these improvements.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Workshop on Improving Holdup Monitoring in the US

The characterization and quantification of nuclear deposits, or residual nuclear material retained in process equipment, generally referred to as holdup, continues to challenge nuclear processing facilities in DOE program areas such as nuclear criticality safety, material control and accountability, environmental management. The efficiency and effectiveness of nuclear operations in these facilities depends heavily on the results from nondestructive techniques designed to measure nuclear materials in situ. The traditional methods used to measure holdup were established more than 30 years ago and assume unrealistic conditions for most measurement cases. These blind, in situ measurements present unique challenges due to the following attributes: unique, non-ideal geometries; unknown deposit thicknesses; lack of representative calibration standards; large number of holdup deposit locations; and poor accessibility for many measurement locations. These difficulties and the poor assumptions made to handle them have resulted in measurement uncertainties that are often too large for many programs to effectively utilize. In an effort to address and identify solutions to the current holdup challenges facing the US nuclear industry, Oak Ridge National Laboratory hosted the Technical Workshop on Improving Holdup Monitoring in the US. The two-day workshop held August 21–22, 2019, was attended by 35 holdup measurement practitioners, program managers, stakeholders from US Department of Energy sites, the Nuclear Regulatory Commission, and representatives from commercial industry. The primary objectives were to identify critical elements of a successful and defensible holdup measurement program; identify technical challenges, needs, and potential improvements associated with measurement of holdup; and share best practices and lessons learned from recent accumulation events. Fourteen presentations were delivered on holdup topics including necessary elements for effective program management, measurement needs, emerging technologies and other measurement solutions, and lessons learned from recent events. These presentations highlighted best practices related to accumulation monitoring, considerations and proactive steps to facilitate holdup in new facility designs, imaging solutions to improve holdup assumptions, and new software developed in support of holdup measurements. Breakout sessions were also employed to determine additional needs and identify potential solutions to common holdup challenges. The primary discussions focused on causes and prevention of material accumulations, needs for uranium and plutonium measurements, and reduction of measurement uncertainty, all of which were explicitly identified as critical needs during the 2018 Workshop on Technical and Programmatic Needs for a Sustainable NDA Program for the US DOE.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Nuclear Structure Studies. Final Report

This is the final progress report resulting from 55 consecutive years of support as a Principle Investigator supported by the Atomic Energy Commission, the Energy Research and Development Administration and the Department of Energy. Included in various accomplishments are publications issued and experiments conducted.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

ASCR@40: Highlights and Impacts of ASCR’s Programs

A report compiled by the ASCAC Subcommittee on the 40-year history of ASCR for the U.S. Department of Energy’s Office of Advanced Scientific Computing Research. The Office of Advanced Scientific Computing Research (ASCR) sits within the Office of Science in the Department of Energy (DOE). Per their web pages, “the mission of the ASCR program is to discover, develop, and deploy computational and networking capabilities to analyze, model, simulate, and predict complex phenomena important to the DOE.” This succinct statement encompasses a wide range of responsibilities for computing and networking facilities; for procuring, deploying, and operating high performance computing, networking, and storage resources; for basic research in mathematics and computer science; for developing and sustaining a large body of software; and for partnering with organizations across the Office of Science and beyond. While its mission statement may seem very contemporary, the roots of ASCR are quite deep—long predating the creation of DOE. Applied mathematics and advanced computing were both elements of the Theoretical Division of the Manhattan Project. In the early 1950s, the Manhattan Project scientist and mathematician John von Neumann, then a commissioner for the AEC (Atomic Energy Commission), advocated for the creation of a Mathematics program to support the continued development and applications of digital computing. Los Alamos National Laboratory (LANL) scientist John Pasta created such a program to fund researchers at universities and AEC laboratories. Under several organizational name changes, this program has persisted ever since, and would eventually grow to become ASCR.

97 MATHEMATICS AND COMPUTING↗

Demonstration of μCHP in Light Commercial Hot Water Applications

Internal combustion engine driven combined heat and power (CHP) systems produce power while the waste heat is recovered and used for another purpose. For µCHP systems (less than 50kWe output) overall efficiencies can reach over 90% for products currently on the market throughout the world. On a fuel basis this offers an advantage over using grid-based power and another fuel for heat. Additionally, the cost of natural gas on an energy unit basis is significantly less expensive than electric power. This difference can lead to substantial savings for the end user of a CHP system. In some parts of the world, particularly Germany and Japan, µCHP has become a common part of the heat and distributed generation equipment mix. Market analysis conducted in 2012 showed that in North America there is potential of a 5,300 units per year market for µCHP, resulting in an annual energy savings of approximately 13.5 TBtu and more than $84 million in annual customer savings. However, µCHP still has not seen much market penetration in North America. This study helps to identify some of the reasons why, address roadblocks that still need to be overcome and provide experience to established best practices. Nine commercial sites were initially identified (fitness club, surgical center, senior community, resort and spa, commercial laundry, two multi-family housing, restaurant and manufacturing facility). Systems from two different manufacturers were installed at five sites total, but due to unforeseen circumstances, only three of those sites were finally commissioned: test data were collected by Oak Ridge National Laboratory. While not all systems were installed as intended, the project resulted in the following key findings: Micro combined heat and power is an unfamiliar technology for building owners and plumbing and electrical contractors that serve the buildings most suited for µCHP. Manufacturers will need to be aggressive in providing training and providing broad support to successfully bring the technology to market.; The proper integration of µCHP into other building systems is the most critical part of a successful installation. Manufacturers will need to be able to provide the expertise to train, advise and support the mechanical contractors during the design and installation of the heat integration system.; Regulations governing µCHP varies across the country. There are a few UL standards (UL 2200 and UL 1741) that apply nationally. Emissions are governed by EPA except in California where the California Air Resources Board (CARB) has established their own standard. Requirements that dictate installation and interconnection are dependent on local building codes and local utility processes and requirements. Some out of date building codes do not offer clear guidance for these requirements, leading to confusion. This makes developing training and determining broadly applicable best practices difficult.; Installation costs of µCHP are a key factor in making an installation successful. It is critical that these costs and all national, state and local regulations be understood and accounted for by all parties involved in the installation before a project is undertaken.; A robust customer service organization is important to meet the needs of the customers. These systems require annual maintenance and service and local capability is needed to keep costs inline.

03 NATURAL GAS↗

NRC Multiphysics Analysis Capability Deployment FY2020: Part 3

This report details progress and activities of Idaho National Laboratory (INL) on the Nuclear Regulatory Commission (NRC) project “Development and Modeling Sup- port for Advanced Non-Light Water Reactors.” The tasks completed for this report are: Task2c: Explicit modeling of pebble transient temperature response. In this simulation, the 400 MWth Pebble-Bed Modular Reactor (PBMR) design, PBMR- 400, experiences a 20-second power ramp from 100% to 150% power. This is followed by a similar reduction in the power back to 100%. Several multiscale pebble coupling approaches are tested with one pebble per mesh element in the active core region. The results show good conservation behavior and the stability of the coupling.; Extended scope part 1: An assessment of the computational efficiency of the Discontinuous Finite Element Method (DFEM) heat transfer solver shows good scalability. The DFEM solver is a factor of 4 more expensive in solution time than the Finite Element Method (FEM) solver for heat transfer problems due to the increased number of degrees of freedom. Nonetheless, the DFEM approach provides the user with the flexibility to model gap heat transfer problems.; Extended scope part 2: The GapHeatTransferInterfaceMaterial was improved to give the user increased flexibility with the modeling of heat transfer through gaps with the DFEM solver. A number of gap parameters can now be coupled both through functions and variables.; Extended scope part 3: Demonstration of how the gap width between hexagonal fuel cells can be calculated during a heat-up transient and used in the GapHeatTransferInterface model. A full-domain DFEM model with gap expansion is coupled to a SubApp that models the thermal expansion of the base plate. The results show the expected physical behavior, although have not been fully bench-marked at this point in time.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Risk Importance Ranking of Fire Data Parameters to Enhance Fire PRA Model Realism

Fire is historically and analytically a significant contributor to nuclear power plant risk. The level of fire risk and the methods, tools and data for modeling this risk is highly debated by experts. One area of debate is the input data used in fire modeling and how to deal with this data’s high uncertainty. This report outlines initial work performed for determining the key parameters causing this uncertainty and how it propagates into nuclear power plant models. This research paves the way for the development of methods to reduce fire data uncertainty used in modeling. The Nuclear Regulatory Commission has mandated that nuclear power plants perform fire risk modeling. However, there are several issues with the current risk modeling implementation that affect the results. Approved modeling methods can be overly conservative and often do not match plant experience. Also, the data used in the modeling can have high uncertainties and is influenced by expert judgement. To evaluate input data uncertainty, researchers performed an initial review of several fire experiments done at Sandia National Laboratories. Uncertainties for fire data can come from many sources, such as experiment design constraints, environmental conditions, or other plant-specific aspects. There are many different significant and insignificant parameters driving the uncertainty. Additionally, the uncertainty of the different input data used in the fire modeling could have a significant or insignificant effect on the entire plant risk. A four-step methodology was developed to perform Integrated Probabilistic Risk Assessment Importance Ranking. A demonstration case using these steps was set up and three of the four steps were completed in fiscal year (FY) 2019 and the fourth step done FY 2020. These steps are: 1. The qualitative analysis of potential sources was conducted with the following items identified for the demonstration. • Maximum heat release rate • Time to maximum heat release rate • Duration of max heat release rate • Time to decay • Thermal conductivity of concrete • Specific heat of concrete • Density of concrete • Cable jacket thickness 2. A quantitative characterization of dominant sources of uncertainty was performed. A list of distributions and determined values of the dominant sources is shown in Appendix A. 3. A quantitative screening of the potential sources of uncertainty using Morris Elementary Effects Analysis was completed. An experimental model using the physics-based fire modeling tool Fire Dynamics Simulator was developed and coupled with the Risk Analysis Virtual Environment. The Morris analysis identified at least two parameters that can be eliminated as significant contributors (specific heat of concrete and cable jacket thickness). 4. Global importance measure (Global IM) analysis to generate a comprehensive ranking based on their influence on the plant risk. In this research, a moment-independent Global IM is used since it can address (a) uncertainty in the input parameters of the fire model, (b) uncertainty in the risk outputs, and (c) non-linearity and interactions among input parameters in the fire model, more accurately than the correlation-based and variance-based global methods. The observations from the research showed that, depending on the initial and boundary conditions of the fire scenarios, fire-induced damage could have a very small probability and could be dominated by the tail of the uncertainty distribution; hence, the accuracy of the correlation-based and variance-based methods is questionable. The moment-independent Global IM analysis in this research provides a better understanding of how experimental uncertainty data affects industry’s plant models and where improvements in that data will have the largest benefit for improving fire modeling accuracy in causing core damage. Among the five unscreened parameters obtained from the Morris EE analysis, the Global IM analysis results for the case study indicated that max heat release rate and fire location are the most important parameters. The report also outlines benefits of using a unified computational platform that integrates the underlying simulations (e.g., a fire progression model), quantitative screening (using the Morris EE method), and the Global IM analysis. A unified platform can (i) facilitate the ranking of input parameters considering multiple key fire scenarios simultaneously, rather than considering one scenario at a time, (ii) contribute to more explicit and accurate treatment of dependencies at multiple levels of Fire PRA, (iii) facilitate the sampling-based uncertainty quantification for Fire PRA, and (iv) help generating both “industry-wide” and "plant-specific" ranking of uncertainty sources in Fire PRA. Future research should be done to include additional parameters such as detection/suppression or cable fire spread. Adding a PRA software such as SAPHIRE to the RAVEN platform would help with plant model integration and improve treatment of fire-induced dependency. The I-PRA risk importance ranking methodology offered in this report can provide valuable information for efficiently (a) enhancing the realism of Fire PRA for existing plants and (b) supporting the development of Dynamic Fire PRA for advanced reactors and new plants.

97 MATHEMATICS AND COMPUTING↗

Control of the Plasma-Material Interface for Long Pulse Optimization in EAST and KSTAR

This is the Final Technical Report for the Grant DE-SC0016322. The major goals of the project are to use HIDRA to evaluate and optimize the FLiLi and LiMIT concepts, in preparation for the final designs of liquid Li PFCs for testing in EAST long pulse discharges. In the first year the goal is to fully commission HIDRA and begin liquid Li tests. In the second year it is to test the FLiLi and LiMIT designs in HIDRA and start the production of the first LiMIT test plate for EAST.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Groundwater and Intruder Radionuclide Screening

Solid Waste Management (SWM) operates the E-Area Low-Level Waste Facility (ELLWF) where low level on-site and off-site solid waste streams are buried. The facility has been in operation since late 1994 and is currently projected to remain in operation until 2065. This facility can accommodate a broad range of waste forms resulting from the six different types of disposal unit options (i.e., varying degrees of engineered barriers → trenches to concrete vaults). This facility is currently operating under a Performance Assessment (PA) issued back in 2008, along with several subsequent supporting Special Analyses (SA). The Savannah River National Laboratory (SRNL) developed the prior PAs and SAs and has been tasked to update the facility’s PA. For operating the E-Area facility, a Waste Inventory Tracking System (e.g., WITS) is actively employed by waste generators where every radionuclide entering the facility (to be buried in one of its many disposal units) must be either directly or indirectly accounted for. Since there is a large number of radionuclides in existence (>3,000), the International Commission on Radiological Protection (ICRP-107) has provided guidance on the subset of radionuclides requiring further assessment in landfills such as the E-Area LLWF. The ICRP-107 publication provides critical radiological information on 1,252 radionuclides of 97 elements. This database is the critical starting point for developing a consistent inventory limit system. The explicit measurement and tracking of all radionuclides are not necessary when process knowledge, burial history, and radiological aspects are factored into conservative groundwater and intruder screening processes. Across the DOE complex these screening processes have been historically performed using the methodology suggested by the National Council on Radiation Protection and Measurements (NCRP) as presented in their original report (NCRP 1984) and then refined in a later report (NCRP 1996). In the recommended screening models employed within this report the traditional NCRP models are updated to better handle progeny and better reflect the known characteristics of E-Area. This improved screening process is referred to as the “NCRP-like” method. Various upgrades to the traditional NCRP methodology have been used by others (e.g., NRC funded effort by Kennedy and Strenge 1992). The more detailed models by Kennedy and Strenge (1992) were considered in this effort and are compared to the results from the more traditional NCRP-like models. The groundwater and inadvertent intruder screening analyses presented in this report start with this 1,252 radionuclide list and reduces it down to more manageable lists that are applicable to the various disposal unit types contained within E-Area. In order to reduce this starting list, some level of exposure risk must be considered acceptable. Historically, a dose (or concentration level) has been compared with a screening criterion set to 1% of a performance measure (e.g., a beta-gamma dose not to exceed the 4 mrem/yr beta-gamma performance measure x 0.01 = 0.04 mrem/yr). Thus, if a radionuclide produced a bounding or screening-level dose (or concentrations) less than the screening criterion, it could be safely removed from further consideration. Several tiers of screening and bounding level analyses have been considered in this report.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗