Exceedance Probabilities and Recurrence Intervals for Extended Power Outages in the United States

Power outages cause significant economic and societal impacts. An increasing likelihood of extreme weather coupled with aging grid infrastructure is leading to a higher prevalence of extended power outages, which can leave customers without power for multiple days or even weeks. Planners at the facility, local, state, and federal levels are interested in resilience solutions to reduce the impacts of extended power outages. Resilience solutions—such as installing backup systems, integrating microgrid solutions, weatherizing buildings, and hardening distribution and transmission components—can reduce the consequences of extended power outages, but these solutions come with increased capital costs. Conducting cost-benefit analyses is important for determining which steps to take to mitigate the impact of power outages without investing in ineffective and cost-prohibitive resilience solutions. The expected benefits of resilience investments depend on the frequency of power outages of various durations, particularly extended outages lasting several hours, days, or weeks. A significant barrier to resilience planning is the lack of publicly available data on the frequency and duration of extended power outages. The absence of outage duration information severely limits the ability to conduct quantitative cost-benefit analyses of resilience investments. This report provides estimates of recurrence intervals and conditional exceedance probabilities for major power outages by U.S. region between 2015 and 2021. Additionally, we provide estimates for grid management, particularly outages caused by California’s public safety power shutoffs (PSPS), and for natural outages caused by major hurricanes. Outage recurrence intervals are the average number of years between outage events, and conditional exceedance probabilities are the likelihoods that a customer who experiences a major power outage will experience an outage exceeding a given duration. Major outage events are those that affect 10,000 or more customers, as defined by the U.S. Department of Energy’s (DOE’s) Electric Emergency Incident and Disturbance Report, called OE-417 (DOE 2020). These results can be applied to determine the likelihood of experiencing long-duration outages, which can be integrated into cost-benefit analyses of resilience solutions and broader energy resilience studies. We developed a methodology to estimate customer outage durations for extended outage events using publicly available data on customer outages. Shorter-duration power outages are relatively common, with customers experiencing on average more than one power outage each year lasting fewer than 12 hours. An outage event lasting between 1 day and 1 week is expected to occur between once every 16 years and once every 42 years, depending on the region, with an average recurrence rate of once every 32 years across the contiguous United States.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Estimating the Breakeven Cost of Delivered Electricity to Charge Class 8 Electric Tractors

As vehicle electrification expands from the light-duty sector to include larger commercial medium- and heavy-duty vehicles, businesses need to decide if electrification is appropriate for their fleets. A key factor in this decision will be the total cost of ownership for on-road electric Class 8 tractors compared to their combustion counterparts. This report examines the breakeven price of electricity for electric Class 8 tractor charging to address its importance in the total cost of ownership for the operation of an electrified fleet and to account for the inherent differences of higher-power charging. To understand the likely cost of delivered energy--in this report the breakeven price--to charge electric tractors, this study followed an analysis framework that considers a wide range of factors to estimate the breakeven price to charge at various station types. This requires an estimation of electric vehicle adoption trajectories and analysis of real-world fleet data to assess energy needs of heavy-duty electric tractors and to determine expected charging station demand over time. Station demand informs the level of electric vehicle supply equipment (EVSE) deployment that is necessary at each station type, as well as the site utilization and anticipated load profiles. Then, by accounting for a wide range of capital investments, operating costs, and other expenses, a breakeven price of energy is determined.

33 ADVANCED PROPULSION SYSTEMS↗

Appendix N: Technology Commercialization Program [Slides]

To transfer new and emerging technologies between the Laboratory and private industry to enhance the Laboratory's ability to meet mission requirements, improve the economic environment in which the Laboratory operates and further the industrial competitiveness of the United States; To develop improved mechanisms for the utilization of Laboratory technologies that stimulate new business startups, attract entrepreneurs, create alternative job opportunities, and attract businesses and capital to the region while continuing to serve the nation as a whole.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Sorbent Based Post-Combustion CO 2 Slipstream Testing

TDA Research, Inc. has developed a low-cost sorbent (alkalized alumina) based technology for post-combustion CO 2 capture. The sorbent runs in an isothermal process for adsorption and regeneration. Neither temperature swing nor pressure swing is needed. TDA designed a system which operated 10 fixed beds to simulate a moving bed process. The flow pattern was optimized to minimize the steam usage for regeneration. An excellent sorbent (Batch 1) was also developed with collaboration with our partner. The sorbent degraded after long term operation. We developed a reprocessing procedure, which can be conducted in situ, to restore the sorbent capture capacity as the fresh sorbent after running for about 1250 hours. The reprocessing extended the sorbent longevity significantly. TDA designed a pilot unit (40’ x 32’ x 11.5’), processing flue gas equivalent to 0.5 MW of power generation. It had 10 beds and each bed could hold 1.75 m 3 of sorbent. We worked with Springs Fabrication, Inc. to complete the construction of the pilot unit. It was then shipped and installed at NCCC. The pilot unit was kept running in 24-hour mode when the flue gas and steam were available. It could run automatically without operator on site. Parametric and long-term (2 months) tests were carried out successfully. The results showed that TDA’s process can achieve 90% capture and 95% CO 2 purity for both coal and NG flue gases. For coal flue gas, the system reached performance target when processing up to 0.62 MW flue gas, 24% higher than the design capacity. Thus, capital cost could be saved on the reactors and sorbent. The strip air flow was designed to be 0.25 of that of the flue gas. The test data showed the strip/flue ratio can be reduced to as little as 0.18, which saves the power consumption for the strip air blower. The pressure drop was found to be lower than what the empirical equation calculated. The sorbent still had 91.7% of original capacity after 3-month test. With the data from the pilot test, we updated the TEA. For a 550-MW e supercritical coal fired power plant with CO 2 capture, the capture cost for TDA’s process is $34.9/tonne CO 2 captured, which meets DOE’s goal of $40/tonne and is 17.1% less than the DOE baseline Case 12. Therefore, TDA’s process has a good potential for commercialization.

01 COAL, LIGNITE, AND PEAT↗

Development of Cast Valve Bodies For High Temperature Service

Gen 3 Concentrating Solar-Thermal Power (CSP) system components are required to operate at 750°C - 800°C to achieve the Sunshot target of 6 cents/kWh. Haynes ® 282 and IN ® 740H are preferred alloys for the construction of these components due to their high tensile and creep strengths for service at temperatures greater than 750°C. There is significant motivation to lower the cost of materials and components so that the capital costs can be minimized. One approach to reduce costs is to fabricate castings at the lowest possible cost. To obtain the lowest cost in castings, there is a significant need to maximize yields in castings by decreasing rejects due to casting defects and to minimize wastage in material lost in the gating systems. However, very little work has been performed to develop cast products using Haynes ® 282. Although preliminary work has established the feasibility of casting Haynes ® 282 using investment and sand casting, there are no commercial cast components available. In particular, there is significant interest in the development of casting design and process technology for the fabrication of components such as valve bodies using Haynes ® 282.

14 SOLAR ENERGY↗

Advanced Ceramic Membranes/Modules for Ultra Efficient Hydrogen (H2) Production/Carbon Dioxide (CO2) Capture for Coal-Based Polygeneration Plants: Fabrication, Testing, and CFD Modeling

Inorganic membrane-based systems are a promising technology for precombustion CO2 capture with simultaneous H2 production. State-of-the-art packages for high temperature and pressure service consist of multiple tube membrane bundles prepared in a "candle filter" configuration, in which the membrane tubes are open at one end and sealed at the other. This configuration is used for practical reasons, specifically the need to minimize problems due to thermal expansion mismatch between the ceramic tube bundle and the steel housing. However, the primary technical problem with the candle filter format for commercial-scale installations is the inability to purge the tube side (typically the permeate side), a feature that is crucial for high H2 recovery. In this study, the focus is to design and fabricate the first dual-end open full ceramic multiple tube membrane bundle that enables tube side (permeate) purge for gas separation applications. An additional key feature of this design is the simplified module layout, as the membrane bundles can be installed end-to-end with tube side (permeate) flow directly from one bundle to the next. This layout simplifies the membrane to housing seals and yields significant improvement in membrane packing density. Detailed focus areas in our studies include: (i) Materials development and preparation of the tube-to-tube sheet potting for the dual-ended bundle; (ii) the sealing and optimal module configuration design to minimize membrane stress upon module mounting; (iii) the demonstration, via the fabrication of CMS and Pd-alloy membranes supported on full-size, dual-ended ceramic support bundles, of the first example of a purgeable ceramic membrane and module; and (iv) development of a CFD model of the membrane module for calculation of feed flow distribution, and for use in scale-up, and capital cost estimating. The CFD model was validated using experimental data with the multi-tubular membrane system, employing He/N2 as a model gas mixture (surrogate for H2/CO2), and has been shown to be quite accurate. Employing the model, we are able to study the effects of operating pressure and temperature, feed and sweep gas flow rates, and the choice of membrane tube configuration on system performance.

20 FOSSIL-FUELED POWER PLANTS↗

The Status and Ambitions of the US Heavy Element Program

The aim of this whitepaper is to highlight the current capabilities and priorities of the US Heavy Element community and to provide the framework for a coordinated advancement of nuclear science from these studies. This is an organized effort to reflect on what has been achieved in the field given the recommendations and initiatives of the 2015 NSAC Long Range Plan, and on what can be realized in the next decade given current and possibly expanded investments. Current investments have positioned the US community to be among the world leaders in studies of the nuclear and chemical properties of the heaviest elements. These include studies of reaction mechanisms, moving us ever closer to the “island of stability”, in spectroscopy, allowing us to better understand nuclear structure at these extreme proton numbers, in chemical behavior, looking to determine how these elements should be placed on the Periodic Table, in performing the first measurements where isotopes are directly identified by their mass numbers, and in laying the foundation for a potential US-led new element discovery experiment. At present, the highest priority of the US Heavy Element community is to capitalize on the current investments by supporting the operations of US facilities at optimal values. These facilities include the Argonne Tandem Linac Accelerator System at Argonne National Laboratory and other Department of Energy facilities such as the 88-Inch Cyclotron at Lawrence Berkeley National Laboratory, which has a dedicated superheavy element program, as well as university laboratories, including Texas A&M University. The High Flux Isotope Reactor at Oak Ridge National Laboratory is crucial to providing the radioactive isotopes required for heavy element science targets. This facility should be supported to provide the actinide materials that are essential for US-based science. Production of stable, rare isotopes for beam material, including 48 Ca, 50 Ti, 54 Cr and 58 Fe, at the Stable Isotope Production and Research Center is critical to continued research in heavy element science and should be a priority. The continued development of targets for heavy element science and retaining US-based expertise is critical for the heavy element community. This is an area that is currently under pressure. For example, the target laboratory at Argonne National Laboratory serves a broad community and is currently under threat due to loss of critical personnel. The skills needed to make targets for nuclear science and develop new targetry methods need to be supported long term at Argonne, Oak Ridge and Lawrence Livermore National Laboratories as well as maintaining the programs at Oregon State University and San José State University as vital pipelines for training students. Advances in theory are the foundation to understand how nuclei behave and to predict those behaviors in new circumstances. Progress in these studies will necessitate continued and new investment and access to high-performance computing. The future health of the heavy element field is dependent on the continuous support of talented early-career professionals at all levels. It is critical that opportunities continue to be created for the next generation to become established in heavy element research so that we can ensure the field is attracting and retaining the best minds for continued success. It is also clear that to ensure diversity of ideas, perspectives and techniques, we need to recruit diverse personnel that are trained at the best facilities. The heavy element community is in support of continued investment to programs with initiatives in diversity, equity, and inclusion. Looking to the next decade of research, support needs to maintain and grow US leadership in heavy element science. Specifically, new investments in state-of-the-art instrumentation will be essential to scientific development of the field and in expanding scientific knowledge. Advances in the next generation of electron cyclotron resonance ion sources, multi-reflection time-of-flight devices, laser spectroscopy, trapping methods and next generation alpha and gamma spectroscopy systems should be prioritized.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Commercial-Scale Front-End Engineering Design (Feed) Study for MTR’s Membrane CO 2 Capture Process

This is the final report for a DOE sponsored project (DE-FE00031846) where MTR, Sargent & Lundy (S&L), Trimeric Corporation (Trimeric), in cooperation with Basin Electric Power Cooperative (BEPC), and Electric Power Research Institute (EPRI), completed a full-scale Front End Engineering and Design (FEED) study to evaluate the retrofit of MTR’s membrane-based post-combustion carbon dioxide (CO2) capture technology to the BEPC Dry Fork Station (DFS) Unit 1. The capture plant is designed to treat the entire flue gas flow from DFS; it is estimated that this system will capture 6,560 tonnes per day (TPD) of carbon dioxide. The overall goal of the project was to develop an AACE Level 2 Capital Cost Estimate with an accuracy of ±15% to demonstrate the economic feasibility of constructing and operating the MTR CO2 capture plant.

01 COAL, LIGNITE, AND PEAT↗

Engineering Design of a Linde-BASF Advanced Post-Combustion CO 2 Capture Technology at a Linde Steam Methane Reforming H 2 Plant

Linde carried out an initial engineering design study for a Linde-BASF advanced post combustion CO 2 capture technology to be installed at a commercial-scale steam methane reforming (SMR) hydrogen plant located in the US Gulf Coast. This pre-FEED equivalent study included following: (1) basic design, including specific project scope definition and design basis, (2) basic engineering, including development of process flow diagrams and heat & material balances, (3) inside the battery limit (ISBL) equipment and systems specification, (4) balance of plant outside the battery limit (OSBL) equipment and systems specifications, (5) technology maturation plan, (6) hazard and operability (HAZOP) review, (7) environmental, health and safety (EH&S) assessment and environmental permitting analysis, (8) constructability review, (9) ISBL and OSBL EPC cost estimation, and (10) commercial-scale techno-economic analysis including capital expenditures (CAPEX) and operating expenditures (OPEX) and CO 2 capture cost estimates.

08 HYDROGEN↗

Operations, maintenance, and cost considerations for PV+Storage in the United States

Battery storage systems are increasingly being installed at photovoltaic (PV) sites to address supply-demand balancing needs. Although there is some understanding of costs associated with PV operations and maintenance (O&M), costs associated with emerging technologies such as PV plus storage lack details about the specific systems and/or activities that contribute to the cost values. This study aims to address this gap by exploring the specific factors and drivers contributing to utility-scale PV plus storage systems (UPVS) O&M activities costs, including how technology selection, data collection, and related and ongoing challenges. Specifically, we used semi-structured interviews and questionnaires to collect information and insights from utility-scale owners and operators. Data was collected from 14 semi-structured interviews and questionnaires representing 51.1 MW with 64.1 MWh of installed battery storage capacity within the United States (U.S.). Differences in degradation rate, expected life cycle, and capital costs are observed across different storage technologies. Most O&M activities at UPVS related to correcting under-performance. Fires and venting issues are leading safety concerns, and owner operators have installed additional systems to mitigate these issues. There are ongoing O&M challenges due the lack of storage-specific performance metrics as well as poor vendor reliability and parts availability. Insights from this work will improve our understanding of O&M consideration at PV plus storage sites.

14 SOLAR ENERGY↗

Enhancing Lifetime and Reducing Costs for Fish Diversion Netting Structures (Abstract)

This effort will focus on technology transfer and commercialization of antifouling coatings with an enthusiastic and engaged industrial team. Environmental requirements and operational demands call for a nontoxic coating/paint to prevent fouling on fish passage guidance netting at hydropower facilities. For example, one netting customer estimated the capital cost for compliance at $\$12$ million to $\$15$ million. This project will build partnerships between PNNL and private companies to optimize, demonstrate, mature, and commercialize a novel PNNL-developed technology that addresses this critical coating need of the hydropower industry. This effort will support modification of existing coatings for application to flexible netting structures. Industrial partners include commercial coating development specialist (Lorama), hydrophobic material manufacturer and paint developer (Dry Surface Technologies), aquatic applications specialists (Prometheus Innovations and River Connectivity Systems), and hydropower netting producer (Pacific Netting Products). Engagement with the U.S. Army Corps of Engineers (USACE) and Bureau of Reclamation (BOR), two hydropower operators, throughout the project will provide expertise and field test sites that will provide crucial proof of real-world performance data (additional details provided in Teaming section). Taylor Shellfish Farms will provide organisms and fouling expertise as well as a perspective of potential broader impacts for the blue economy. Sample netting will demonstrate performance in a range of environments for key hydropower applications. PNNL will work with industrial partners to overcome commercialization barriers as well as resolving any manufacturing or regulatory issues. This Phase 1 effort is focused on technology optimization for application to fish passage guidance netting and technology validation as verified by independent testing (through USACE, BOR, Taylor Shellfish and Prometheus Innovations). Through this effort, SLIC will be demonstrated for netting applications at technology readiness level (TRL) 5. The field test data will allow optimization of SLIC formulation and performance which is key to enabling technology transfer of a mature proven technology to industry and production of a viable commercial product specifically focused for hydropower needs.

13 HYDRO ENERGY↗

Technoeconomic Analysis of Infrastructure Buildout Scenarios

The success of CCUS deployment in the southeast will depend on the optimized pipeline network from CO 2 point sources to geologic sinks for CO 2 storage. An optimal pipeline framework will reduce both environmental impacts and pipeline building cost. However, finding an optimal pipeline/transport infrastructure design is a non-trivial task and requires simultaneous usage of large volumes of data, computational resources, and a state-of-the-art simulator. Such a transport infrastructure model must consider point sources for CO 2 capture and associated volumes, sinks for CO 2 storage, and transportation from source to sink via pipeline networks. These considerations must be addressed simultaneously and systemically in an optimization process, in which a defined objective function (i.e., capital, variable CO 2 capture, transport, and storage cost function) is required to be minimized with the consideration of practical constraints (e.g., CO 2 flow through pipelines is less than the maximum capacity). Although optimization has been widely used in subsurface resources production and CO 2 storage, its application in large scale CCUS infrastructure design is rarely reported in the literature. SimCCS, developed by Los Alamos National Laboratory, is an open-source CCUS pipeline infrastructure design toolset that facilitates the optimization of pipeline infrastructure networks.

99 GENERAL AND MISCELLANEOUS↗

Impact of anatomical fractionation of corn stover on hammer mill throughput and energy consumption

The goal of this Case Study was to quantify the impacts of variable moisture and ash on hammer mill throughput and energy consumption and on loss of very wet stover that causes failures in the first stage grinder and that are not able to be fed to conversion, as compared to a status quo Base Case system. Also considered was convertible carbohydrate content (minimum total carbohydrate specification) and maximum ash content and the delivered feedstock cost impacts of not being able to feed stover not meeting the total carbohydrate specification to the conversion reactor. Laboratory data on the impacts of moisture content and tissue fraction on throughput and energy consumption in a stage 2 hammer mill were received from FCIC Subtask 5.1. Additional air classifier throughput, energy consumption and separation efficiency data were obtained from FCIC Subtask 5.1 for the new air classifier, which has three exit streams (lights, middle and heavies). These data were utilized to develop the necessary response surface equations to perform throughput analysis using discrete event simulation. Because the ash contents and particle sizes had not been analyzed in the laboratory at the time of the model runs, we assumed that the ash distributed proportionally with total mass into the lights and heavies in an air classifier having two exit streams (lights and heavies) and that the lights fraction from the air classifier was not removed. Key takeaways from this Case Study are that due to lower energy consumption, it is more cost effective to hammer mill fractionated corn stover tissues than whole stover. Reduction of grinding energy was significant and may possibly be connected to particle-particle interactions in the grinder that lead to increased residence time of leaves and husks, resulting in decreased throughput and higher generation of fines when milling whole stover. While we did not see significant impacts to throughput, this was due to moisture failures of the first stage grinder in each system dominating failures and downtime. The operating cost savings of reduced grinding energy savings in the second stage hammer mills alone was high enough to offset the added capital cost of the air classifier and extra grinding line.

09 BIOMASS FUELS↗

Novel Harsh Environment Materials and Fabrication Techniques for Wireless Sensor Applications (Final Report)

The overarching goal of this project is to establish a center of excellence program at the University of Maine that is focused on Harsh Environmental Materials and Fabrication Techniques for Wireless Sensor Applications. UMaine is well-positioned to build on previous successes in the areas of materials science research and sensor engineering. Since 1980, the Laboratory for Surface Science & Technology (LASST) has been a very successful interdisciplinary UMaine research center with a well-established infrastructure to investigate surfaces, interfaces, thin films, and micro/nano-fabrication. This infrastructure established through NSF, DOE, DOD, NASA, the State of Maine, and industry includes (i) a 3,500 ft2 clean room with nano/microfabrication and photolithography instrumentation, (ii) thin film synthesis, processing and characterization, (iii) surface and thin film analytical chemistry tools, and (iv) device packaging, electronic testing, wireless devices, system fabrication, and sensor test facilities. This strong foundation is the basis for a planned significant growth in R&D capacity currently underway. To that end, since the start of this project in the Fall of 2019, LASST has undergone a transition to become a new interdisciplinary center at UMaine, named the Frontier Institute for Research in Sensor Technologies (FIRST). This new focus represents a commitment and investment by UMaine that aligns with the proposed DOE-EPSCoR theme, capitalizing on the state-of-the-art instrumentation to form an energized group of faculty and students pursuing advances in sensor materials, devices, and applications.

36 MATERIALS SCIENCE↗

Improving Economics of Generation 3 CSP System Components Through Fabrication and Application of High Temperature Nickel-Based Alloys

To improve the efficiency and lower the cost of Concentrating Solar Power (CSP) plants, new Generation 3 ‘Gen 3’ CSP concepts using novel salts, solids, or gas heattransfer media envisaged to integrated with a supercritical CO 2 (sCO 2 ) power block at temperatures >715ºC are being investigated. Regardless of the specific pathway, critical components including receivers, piping, and heat-exchangers (HXs) will require the use of heat-resistant nickel-based alloys. Furthermore, the use of age-hardenable alloys, such as INCONEL® alloy 740H® (alloy 740H) may be needed to reduce capital cost. The unique challenges presented by CSP plants to material manufacture, such as small diameter thin-walled tubing in receivers, large diameter thin wall piping, and thin sheet and tubes for HXs can add to the cost to produce such alloys when compared to traditional wrought and cast processing. The goal of this project was to facilitate a reduction of plant cost by developing alternate manufacturing routes and quantifying the performance and economic benefits for alloy 740H in comparison to other candidate nickel-based alloys through fabrication trials, high-temperature mechanical property studies, and interactions with technology developers and codes and standards.

14 SOLAR ENERGY↗

Development of a Cloud-based Application to Enable a Scalable Risk-informed Predictive Maintenance Strategy at Nuclear Power Plants

Light-water reactor operations and maintenance (O&M) costs are prohibitively high, thus contributing to the premature decommissioning of nuclear power plants (NPPs). This is partly due to how the equipment is monitored. In recent years, cloud computing has emerged as a dominant technology by virtue of its low costs, computing and storage adaptability, and ability to host applications over numerous types of virtual infrastructures. Cloud computing can be a cost-effective alternative to onsite storage and diagnostics. This paper conducts a techno-economic assessment of a provisional cloud deployment architecture for a NPP predictive monitoring (PdM) system. The cloud-based monitoring system would enable maintenance and diagnostics (M&D) analysts and other authorized plant users to remotely monitor equipment functionality so as to enable PdM practices and early detection of faults. The Microsoft Azure cloud platform is included in the proposed cloud architecture to provide data processing and storage, sensor device networking, and database management; however, this analysis could be extended to other cloud computing service providers as well. For the techno-economic assessment, technical feasibility is measured in terms of network performance metrics such as response time, latency, and throughput, whereas economic feasibility is measured in terms of operational costs and capital expenditures. Finally, this report covers certain regulatory and security aspects that may concern licensees looking to implement cloud computing. The report focuses on the integration of sensor database storage, the application of cloud resources to PdM, and the identification of technological and economic hurdles associated with moving to a cloud-computing-based architecture.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

LH CO 2 MENT Colorado Project (Final Report)

The objective of Electricore’s pre-FEED project “LH CO 2 MENT COLORADO PROJECT” is to accelerate the implementation of a 1.5 million tonnes per year (TPY), and first-of-a-kind (FOAK) at world scale, Svante VeloxoTherm™ carbon capture plant. This project represents a quantum leap to a large-scale facility that will launch Svante’s carbon capture technology into the next era of accomplishments and market acceptance. By completing the Front-End Loading (FEL) Feasibility Study Report (FEL-2) for a fit-for-purpose design at the HOLCIM cement plant, located near Florence Colorado, USA, this technology can be proven as the future of large-scale deployment for carbon capture and storage. This carbon capture plant was designed with the goal of reaching a target of near Net Zero Emissions by capturing 90% of the carbon dioxide (CO 2 ) emissions from the HOLCIM cement plant and from the boiler which produces steam required to regenerate the adsorbent. Additionally, this project will be leveraging a renewable Power Purchase Agreement (PPA) using solar energy to acquire power at the target price of 0.04 $/kWh or less. In its current configuration CO 2 emissions from the HOLCIM cement plant is around 700 – 800 kg/ton of clinker produced. The proposed new carbon capture plant will allow a reduction of CO 2 emissions to about 100 kg/ton of clinker produced. The scope of work consists of the process design and capital & operating cost estimation (Class IV) for a total plant capacity of 4,750 TPD of pipeline grade CO 2 . The Svante VeloxoTherm™ technology is comprised of a Rotary Adsorption Machine (RAM) for intensified Thermal Swing Adsorption (TSA) using Structured Adsorbent Beds (SABs) and related Balance of Plant (BOP), including CO 2 compression. A business case (financial analysis) evaluation has been undertaken for the Owner’s management review. Recommendations on how best to proceed to the next stage of the project have been conveyed and are documented within this report. This analysis has relied on a detailed and comprehensive Project Financial Model, evaluating the Total Project IRR (after tax, unlevered, and including all forecast 45Q PTCs and 100% tax efficiency) – the project financial analysis (as opposed to standard TEA analysis) only considered a 12 year plant economic lifetime as a result of 45Q being the sole driver considered at this stage. The Total Project IRR was evaluated across a large number of potential scenarios. The evaluation demonstrated that if the 45Q PTD is increased to $85/MT for sequestration, there are a large number of feasible scenarios which demonstrate economic returns.

01 COAL, LIGNITE, AND PEAT↗

Large-scale Hydrogen Storage – Risk Assessment Seattle City Light and Port of Seattle [Abstract]

This CRADA presents the strategy that Pacific Northwest National Laboratory (PNNL) and Sandia National Laboratories (SNL) will take to support Seattle City Light (SCL), and the Port of Seattle (Port) in performing a risk assessment of large-scale hydrogen storage. Risk assessment is often used to ensure that adequate measures are taken to protect workers and the public, the environment, infrastructure, and assets. A detailed risk assessment can also be used to direct funding and upgrades, to specific components and sub-systems in order to mitigate risks to the larger system. In this way risk assessments are often employed as a part of a larger risk management strategy, with the goal of minimizing the occurrence of hazards and to identify means to limit their consequences. Risk assessment is often used to engage and inform regulators, and to communicate how specific regulations are being met. However, it is important to note that the proposed work is not intended for SCL and the Port to use in order to gain regulatory acceptance for their proposed activities. The work performed as a part of this effort will be a preliminary risk assessment for early-stage component and system designs and should be considered research and development (R&D). As such, the proposed work will be performed to a quality level and design maturity consistent with R&D and is not considered appropriate for final safety analysis and regulatory compliance purposes. Previous and on-going work at SCL and the Port demonstrated the utility of deploying hydrogen systems at the Port. The deployment of hydrogen at the Port is a part of a larger vision of using hydrogen to address a range of issues for SCL and the Port. These include large-scale fueling of MD/HD vehicles, cargo-handling equipment (CHE), and harbor vessels to reduce emissions; support of adjacent LD vehicles; support of critical port operations during extreme events (i.e., resiliency); deferral of more capital- and time-intensive electrical distribution system upgrades while still supporting evolving port operations and decarbonization efforts; facilitating electrification by establishing energy storage as a grid resource, starting at strategic port locations; creation of a flexible market resource that can be used by SCL to generate revenue via arbitrage; support of planned future maritime operations that involve heavy use of hydrogen for ocean-going vessels; and future end-use applications involving natural gas pipeline hydrogen injection. Ultimately, the success of these activities is underpinned by the deployed storage capacity. Large-scale deployment of hydrogen systems will require hydrogen storage at a scale that has not been demonstrated. In addition, the ideal location for such multi-use systems is near the end user which will often necessitate deploying into urban and/or industrial areas. A detailed risk assessment using the Port as a test case is necessary to ensure the deployment of large-scale hydrogen is successful. Many technologies have been proposed for hydrogen storage; however, these technologies need to be analyzed as they apply to an actual site. The physical infrastructure and hydrogen use cases for the Port will be analyzed, and a risk assessment for compressed hydrogen, liquified hydrogen, and Liquid Organic Hydrogen Carrier (LOHC) storage will be performed. These risk assessments will be useful for understanding how each of these technologies would perform in terms of facility and public safety. The operating states of the proposed hydrogen systems at the Port will be analyzed and incorporated into the storage risk assessment. Scalability will also be analyzed to understand how future port uses would affect the overall risk assessment. Finally, using the risk assessment as a tool to inform engagement and to gain stakeholder acceptance will be explored.