Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Waste Transfer”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 955 records · Page 53

Optimization of salt-cake removal flowsheet at SRS through incorporation of testing and in-tank waste experience - 15263

Salt-cake removal at SRS may be performed for several reasons: to provide space for evaporator operation (i.e., to precipitate more salt in the drop tank), to provide feed for salt processing (i.e. immobilize the waste), or to remove the salt for tank closure. Many different salt dissolution techniques have been employed in the 40 years that SRS has been performing salt removal, from a basic 'Add, Sit, Remove' method (water is added on top of the salt-cake and time is allowed for diffusion), to performing interstitial liquid removal, or using mixing devices to promote contact with the liquid. Lessons learned from previous salt-cake removal campaigns, in addition to testing and modeling, have led to opportunities for improvements to the overall salt-cake removal process. This includes better understanding of salt properties and behavior during dissolution; the primary concerns for salt dissolution are the release of radiolytic hydrogen and criticality prevention (post-dissolution). Recent developments in salt dissolution include the reuse of dilute supernate and a semi-continuous dissolution (SCD) process, where low volume mixing eductors are used to deliver water near the surface of the salt-cake at the same rate as the salt solution is removed and transferred to a receipt tank. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of the Corrosion Risks to a Double Shell Tank During the Selective Removal of a Cesium-rich Supernate Layer - 20227

The Direct Feed Low Activity Waste (DF-LAW) activity will provide the initial feed to the Waste Treatment and Immobilization Plant at the Hanford Tank Farm facility. Feed preparation for DF-LAW will be carried out in multiple double shell waste tanks (DST) utilizing the Tank Side Cesium Removal (TSCR) process. Tank AP-106 will be an integral part of the TSCR process and hence key to the DFLAW activity. Prior to being utilized for this purpose, the Cs-137 concentration levels in the AP-106 supernate must be reduced significantly. The AP-106 re-purposing process manages normal waste tank addition procedures such that waste acceptance criteria objectives for Cs-137 removal are achieved. As this process was being developed, several concerns regarding tank integrity during and after repurposing of Tank AP-106, and the associated tanks (i.e., AP-102, AN-101, and AP-108), were addressed. The potential corrosion degradation mechanisms identified based on process knowledge included: general and pitting corrosion, caustic stress corrosion cracking, concentration cell corrosion, and microbiologically induced corrosion (MIC). A systematic approach was undertaken to assess the risk of corrosion during the AP-106 re-purposing process. The assessment considered the initial and present condition of the tank, the service history of the tank, the environmental conditions created in each tank during each stage of the process, process timing, and corrosion testing and modeling that approximated tank conditions. Based on this information, recommendations were provided to minimize the exposure of the tank to corrosive conditions. These recommendations included time limits for each stage of the process, staging of corrosion inhibitor solutions should process delays occur, and waste sampling with potential chemistry adjustments at defined steps in the process. Additionally, recommendations for post-process supernate chemistry adjustments and tank inspections were put forth. The greatest risk for this process occurs during the manipulation of large quantities of Columbia River water (i.e., greater than 450,000 gallons) within AP-106, the associated tanks and the supporting infrastructure (i.e., transfer line piping). This risk becomes more pronounced if there is a process upset and the tank walls remain exposed to a corrosive condition longer than intended. As long as the river water is blended into the supernate in a timely fashion, and the waste is adjusted appropriately with corrosion inhibitors, corrosion may be minimized and the final condition of the supernate in AP-106 and the associated tanks is expected to be in compliance with corrosion chemistry requirements. Contingency plans will be made to minimize the impact of a process upset. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nuclear energy: Where do we go from here?

As Malaysia progresses towards 2020, the depleting resource of oil and gas has forced a re-look at alternatives to replace fossil fuels as energy sources. Among the viable options is nuclear energy, enabling us to meet energy needs and sustain national development in the twenty-first century. Three essential steps Malaysia must take to introduce nuclear power into its energy mix are: energy planning, infrastructure development, and deployment. Malaysia has to face a series of challenges, including public acceptance, waste management, minimizing proliferation risk, and ensuring the security of nuclear plants and materials. Timely development of qualified and competent manpower is a key limiting factor in the development and transfer of nuclear technologies — and education and training take time, effort and money. There is a need for political will. Within the Asian region, China, Korea and Japan are in the forefront in utilizing nuclear power to meet electricity demands. Countries such as UAE, Bangladesh, Vietnam and Turkey are moving ahead with the nuclear option for electricity generation and they have begun planning and construction of nuclear power plants. Against this backdrop, what are Malaysia’s moves? This paper discusses various options and challenges, obstacles and repercussions in meeting future energy demands.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Implementation of Increased Salt and Decreased Sludge Volumes in the Defense Waste Processing Facility - 19597

The Savannah River Site (SRS) Liquid Waste System (LWS) safely stores and treats high-level radioactive waste. The LWS consists of 51 waste storage tanks (eight of which are operationally closed and filled with grout), waste evaporators, treatment facilities, and solidification facilities such as the Defense Waste Processing Facility (DWPF) and Saltstone Production Facility (SPF). The disposition of high-level waste (HLW) into a glass waste form poured into canisters at the DWPF began in 1996. DWPF processed a sludge only flowsheet until 2008 when the Actinide Removal Process (ARP) and Modular Caustic Side Solvent Extraction Unit (MCU) began treating the salt waste from the underground liquid storage tanks by striking with monosodium titanate (MST) to remove actinides, when necessary to meet downstream acceptance criteria, and removing the MST and entrained sludge solids (SS) by filtration before using an organic solvent to strip the cesium from the salt, creating two new concentrated HLW streams. This change caused the DWPF to begin processing under both a sludge-only and a coupled operations flowsheet where salt streams would only be added when available. This strategy allows for continuous glass canister production at DWPF. Recently, DWPF completed a 10-month melter replacement in December 2017 and the Concentrate, Storage, and Transfer Facility (CSTF) has completed repairs to the 3H Evaporator system. These facility outages have caused delays in preparing the next batch of sludge feed for DWPF. Concurrent with these facility outages, the Salt Waste Processing Facility (SWPF) has been undergoing system testing and commissioning, working toward startup. SWPF is designed to process salt waste in the same manner as ARP/MCU, but with much higher throughput volumes produced per unit time. In order to process the SWPF salt streams efficiently, DWPF will implement a coupled operation only flowsheet. Based on the facility outages mentioned above, efforts have been made to identify strategies to minimize sludge volumes and maximize salt volumes in the DWPF until the next sludge batch is ready for processing in DWPF. Savannah River Remediation (SRR) recently performed an evaluation that examines the effects of reducing the volume of sludge and maximizing the addition of the cesium-rich concentrated salt solution in each Sludge Receipt and Adjustment Tank (SRAT) batch in order to extend the existing sludge batch as long as possible until the next sludge batch is ready. These effects include a reduction of weight percent solids in the DWPF processing vessels, an increase in cycle time, a new canister heat generation value that remains within regulatory limits, and higher gamma source that remains within bulk facility gamma shielding. Balancing the above parameters resulted in a small reduction of sludge volume per SRAT batch under SWPF operation and maximizing the salt volumes for both ARP/MCU and SWPF operation. This slight reduction in sludge volume and increase in salt volumes allows SRR to mitigate some of the schedule impact incurred by the facility outages. This strategy was evaluated for both ARP/MCU and SWPF operation. This strategy has been successfully implemented under ARP/MCU operation using small step changes in the current process. This paper provides an overview of the evaluation performed for DWPF with ARP/MCU and DWPF with SWPF operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SLUDGE TREATMENT PROJECT PHASE 1 SLUDGE STORAGE OPTIONS ASSESSMENT OF T PLANT VERSUS ALTERNATE STORAGE FACILITY

The CH2M HILL Plateau Remediation Company (CHPRC) has recommended to the U.S. Department of Energy (DOE) a two phase approach for removal and storage (Phase 1) and treatment and packaging for offsite shipment (Phase 2) of the sludge currently stored within the 105-K West Basin. This two phased strategy enables early removal of sludge from the 105-K West Basin by 2015, allowing remediation of historical unplanned releases of waste and closure of the 100-K Area. In Phase 1, the sludge currently stored in the Engineered Containers and Settler Tanks within the 105-K West Basin will be transferred into sludge transport and storage containers (STSCs). The STSCs will be transported to an interim storage facility. In Phase 2, sludge will be processed (treated) to meet shipping and disposal requirements and the sludge will be packaged for final disposal at a geologic repository. The purpose of this study is to evaluate two alternatives for interim Phase 1 storage of K Basin sludge. The cost, schedule, and risks for sludge storage at a newly-constructed Alternate Storage Facility (ASF) are compared to those at T Plant, which has been used previously for sludge storage. Based on the results of the assessment, T Plant is recommended for Phase 1 interim storage of sludge. Key elements that support this recommendation are the following: (1) T Plant has a proven process for storing sludge; (2) T Plant storage can be implemented at a lower incremental cost than the ASF; and (3) T Plant storage has a more favorable schedule profile, which provides more float, than the ASF. Underpinning the recommendation of T Plant for sludge storage is the assumption that T Plant has a durable, extended mission independent of the K Basin sludge interim storage mission. If this assumption cannot be validated and the operating costs of T Plant are borne by the Sludge Treatment Project, the conclusions and recommendations of this study would change. The following decision-making strategy, which is dependent on the confidence that DOE has in the long term mission for T Plant, is proposed: (1) If the confidence level in a durable, extended T Plant mission independent of sludge storage is high, then the Sludge Treatment Project (STP) would continue to implement the path forward previously described in the Alternatives Report (HNF-39744). Risks to the sludge project can be minimized through the establishment of an Interface Control Document (ICD) defining agreed upon responsibilities for both the STP and T Plant Operations regarding the transfer and storage of sludge and ensuring that the T Plant upgrade and operational schedule is well integrated with the sludge storage activities. (2) If the confidence level in a durable, extended T Plant mission independent of sludge storage is uncertain, then the ASF conceptual design should be pursued on a parallel path with preparation of T Plant for sludge storage until those uncertainties are resolved. (3) Finally, if the confidence level in a durable, extended T Plant mission independent of sludge storage is low, then the ASF design should be selected to provide independence from the T Plant mission risk.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning of the Chernobyl NPP: Problems, Progress, Prospects - 18485

Decommissioning of the Chernobyl NPP provides a special case due to a number of peculiarities: it is prescheduled decommissioning, the facilities undergone a major accident with off-site contamination, no previous experience of decommissioning of RBMK-type nuclear power units, unavailability of proper spent fuel and radioactive waste management infrastructure, special types of waste. The most challenging issue is the final decommissioning of the Unit 4 destroyed by the major accident on 26 April 1986. Neither of four RBMK-1000 nuclear power units was in operation till the end of the design-based lifetime, Units 1 and 3 being in operation for 19 years each, Units 2 and 4 even less. The last operating unit, Unit 3, was permanently shutdown on December 15 2000, however the main obstacle to complete a complex technological and radiological survey was spent fuel left in reactor pools and in the core due to lack of capacity in the existing interim spent fuel storage of wet type (ISF-1). So removal of spent fuel from the core and reactor pools was considered as one of the priority tasks. While construction of ISF-2 (of dry type) was delayed due to different reasons, safety reassessment and modernization of ISF-1 enabled capacity increase and transfer of all non-damaged fuel assemblies into ISF-1. Thus Chernobyl NPP Units were fully vacated from spent fuel. Since that Chernobyl NPP Units are considered as the radioactive waste facility. Dismantlement of Units 1,2 turbine hall equipment is on the way and some progress is achieved in technical solution for fragmentation of long-size equipment. All dismantled equipment after decontamination and characterization is either released from regulatory control or disposed as solid radioactive waste. The details are discussed in the paper. Eventually the comprehensive technological and radiological survey of Chernobyl NPP Units had been completed and detailed decommissioning programme had been endorsed. The decommissioning strategy chosen for the Chernobyl NPP is based on the deferred dismantlement approach, so final dismantlement of all equipment and constructions is supposed after some period of decay storage. However, the issue of the final state of the site and its further use is still open. The main reason for it is the lack of clear picture as for the destroyed Unit 4, as technical solutions concerning its highly damaged and contaminated constructions and so called fuel containing masses (FCM) are not available yet. It could be reasonably predicted also that the internal part of the so called exclusion zone will not be released into non-restricted use in near future due to characteristics of its contamination. Possible implications of these and other factors on further decommissioning activities and some approaches to find solutions are discussed in the paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sulfur oxidation to sulfate coupled with electron transfer to electrodes by Desulfuromonas strain TZ1

Microbial oxidation of elemental sulfur with an electrode serving as the electron acceptor is of interest because this may play an important role in the recovery of electrons from sulfidic wastes and for current production in marine benthic microbial fuel cells. Enrichments initiated with a marine sediment inoculum, with elemental sulfur as the electron donor and a positively poised (+300 mV versus Ag/AgCl) anode as the electron acceptor, yielded an anode biofilm with a diversity of micro-organisms, including Thiobacillus, Sulfurimonas, Pseudomonas, Clostridium and Desulfuromonas species. Further enrichment of the anode biofilm inoculum in medium with elemental sulfur as the electron donor and Fe(III) oxide as the electron acceptor, followed by isolation in solidified sulfur/Fe(III) medium yielded a strain of Desulfuromonas, designated strain TZ1. Strain TZ1 effectively oxidized elemental sulfur to sulfate with an anode serving as the sole electron acceptor, at rates faster than Desulfobulbus propionicus, the only other organism in pure culture previously shown to oxidize S with current production. The abundance of Desulfuromonas species enriched on the anodes of marine benthic fuel cells has previously been interpreted as acetate oxidation driving current production, but the results presented here suggest that sulfur-driven current production is a likely alternative.

Zhang, T↗

Investigating potential light-duty efficiency improvements through simulation of turbo-compounding and waste-heat recovery systems

Modern diesel engines used in light-duty transportation applications have peak brake thermal efficiencies in the range of 40-42% for high-load operation with substantially lower efficiencies at realistic road-load conditions. Thermodynamic energy and exergy analysis reveals that the largest losses from these engines are due to combustion irreversibility and heat loss to the coolant, through the exhaust, and by direct convection and radiation to the environment. Substantial improvement in overall engine efficiency requires reducing or recovering these losses. Unfortunately, much of the heat transfer either occurs at relatively low temperatures resulting in large entropy generation (such as in the air-charge cooler), is transferred to low-exergy flow streams (such as the oil and engine coolant), or is radiated or convected directly to the environment. While there are significant opportunities for recovery from the exhaust and EGR cooler for heavy-duty applications, achieving similar benefits for light-duty applications is complicated by transient, low-load operation at typical driving conditions and competition with the turbocharger and aftertreatment system for the limited thermal resources. We have developed an organic Rankine cycle model using GT-Suite to investigate the potential for efficiency improvement through waste-heat recovery from the exhaust and EGR cooler of a light-duty diesel engine. The model is used to examine the effects of efficiency-improvement strategies such as cylinder deactivation, use of advanced materials and improved insulation to limit ambient heat loss, and turbo-compounding on the steady-state performance of the ORC system and the availability of thermal energy for downstream aftertreatment systems. Results from transient drive-cycle simulations are also presented, and we discuss strategies to address operational difficulties associated with transient drive cycles and balancing the thermal requirements of waste-heat recovery, turbocharging or turbo-compounding, and exhaust aftertreatment.

33 ADVANCED PROPULSION SYSTEMS↗

Need Of Modelling Radionuclide Transport In Fresh Water Lake System, Subject To Indian Context

The operations of nuclear facilities results in low level radioactive effluents, which are required to be released into the environment. The effluents from nuclear installations are treated adequately and then released in a controlled manner under strict compliance of discharge criteria. The effluents released from installations into environment undergo dilution and dispersion. However, there is possibility of concentration by the biological process in the environment. Aquatic ecosystems are very complex webs of physical, chemical and biological interactions. It is generally both costly and laborious to describe their characteristics, and to predict them is even harder. Every aquatic ecosystem is unique, and yet it is impossible to study each system in the detail necessary for case-by-case assessment of ecological threats. In this situation, quantitative mathematical models are essential to predict, to guide assessment and to direct interventions.

54 ENVIRONMENTAL SCIENCES↗

The energetic coupling of scales in gyrokinetic plasma turbulence

In magnetized plasma turbulence, the couplings of perpendicular spatial scales that arise due to the nonlinear interactions are analyzed from the perspective of the free-energy exchanges. The plasmas considered here, with appropriate ion or electron adiabatic electro-neutrality responses, are described by the gyrokinetic formalism in a toroidal magnetic geometry. Turbulence develops due to the electrostatic fluctuations driven by temperature gradient instabilities, either ion temperature gradient (ITG) or electron temperature gradient (ETG). The analysis consists in decomposing the system into a series of scale structures, while accounting separately for contributions made by modes possessing special symmetries (e.g., the zonal flow modes). The interaction of these scales is analyzed using the energy transfer functions, including a forward and backward decomposition, scale fluxes, and locality functions. The comparison between the ITG and ETG cases shows that ETG turbulence has a more pronounced classical turbulent behavior, exhibiting a stronger energy cascade, with implications for gyrokinetic turbulence modeling.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Evaluation of chemical additives for glycolic destruction in the recycle collection tank

Savannah River National Laboratory (SRNL) has completed a work scope in support of the Savannah River Remediation (SRR) Nitric-Glycolic flowsheet. Glycolic acid will replace formic acid as a reducing agent in the pre-processing of High-Level Waste sludge performed at the Defense Waste Processing Facility (DWPF). Glycolic acid will perform the same function as formic acid, namely reduction of mercury and adjustment of feed rheology and melter oxidation/reduction potential, while significantly reducing the potential for hydrogen generation in DWPF processing. Development testing has demonstrated glycolic acid virtually eliminates hydrogen production in the pre-processing steps. The Nitric-Glycolic flowsheet significantly improves DWPF’s ability to address Savannah River Site’s key challenge - the incorporation of effluent received from the Salt Waste Processing Facility (SWPF). SWPF will deliver significant effluent volume to DWPF, resulting in a concurrent increase in DWPF effluent returned to the Concentration, Storage and Transfer Facilities (CSTF). This work scope demonstrates that glycolate can be destroyed under the Nitric-Glycolic flowsheet prior to returning the DWPF recycle stream to CSTF. To avoid potential flammability issues due to thermolysis of glycolate in CSTF, SRR tasked SRNL to quantify and mitigate glycolate returns via DWPF’s recycle stream. The development of a strategy for glycolic mitigation was initiated with a system’s engineering workshop. Various chemical and/or physical solutions for how and where to destroy glycolate were considered – consistent with DWPF’s operational capabilities and process requirements. The workshop identified chemical oxidation of glycolate within the DWPF Recycle Collection Tank (RCT) a as the most promising option with sodium permanganate and Fenton’s reagent (metallic ion catalyzed hydrogen peroxide) as the two most promising oxidants.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

The Viability of Selected Vacuum Furnace Quench Methods for Heat Treatment of Uranium

Recent developments in high-pressure gas-quench furnaces have allowed them, in many applications, to achieve heat transfer coefficients similar to those of oil-quench furnaces. Simultaneously, high-pressure gas quench furnaces offer many attractive qualities including a smaller footprint, limited waste generation, and a more consistent quench rate across a range of temperatures. With these benefits in mind, an experimental matrix was developed to assess the feasibility of implementing a high-pressure gas quenching furnace in the Sigma facility for processing of uranium alloys. The details of this experimental matrix, as well experimental results gathered during FY21 and FY22, will be presented.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Dissolution of Technetium(IV) Oxide by Natural and Synthetic Organic Ligands Under both Reducing and Oxidizing Conditions

Technetium-99 (Tc) in nuclear waste is a significant environmental concern due to its long half-life and high mobility in the subsurface. Reductive precipitation of Tc(IV) oxides [TcO2(s)] is an effective means of immobilizing Tc, thereby impeding its migration in groundwater. However, TcO2(s) is subject to dissolution by oxidants and/or complexing agents. In this study we ascertain the effects of a synthetic organic ligand, ethylenediaminetetraacetate (EDTA), and two natural humic isolates on the dissolution and solubility of Tc(IV) oxides. Pure synthetic TcO2(s) (0.23 mM) was used in batch experiments to determine dissolution kinetics at pH ~6 under both reducing and oxidizing conditions. All organic ligands were found to enhance the dissolution of Tc(IV) oxides, increasing their solubility from ~10-8 M (without ligands) to 4 10-7 M under strictly anoxic conditions. Reduced Tc(IV) was also found to re-oxidize rapidly under oxic conditions, with an observed oxidative dissolution rate approximately an order of magnitude higher than that of ligand-promoted dissolution under reducing conditions. Significantly, oxidative dissolution was inhibited by EDTA but enhanced by humic acid compared with experiments without any complexing agents. The redox functional properties of humics, capable of facilitating intra-molecular electron transfer, may account for this increased oxidation rate under oxic conditions. Our results highlight the importance of complex interactions for the stability and mobility of Tc, and thus for the long-term fate of Tc in contaminated environments.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Live wires: direct extracellular electron exchange for bioenergy and the bioremediation of energy-related contamination

Microorganisms that can form direct electrical connections with insoluble minerals, electrodes, or other microorganisms can play an important role in some traditional as well as novel bioenergy strategies and can be helpful in the remediation of environmental contamination resulting from the use of more traditional energy sources. The surprising discovery that microorganisms in the genus Geobacter are capable of forming highly conductive networks of filaments that transfer electrons along their length with organic metallic-like conductivity, rather than traditional molecule to molecule electron exchange, provides an explanation for the ability of Geobacter species to grow in subsurface environments with insoluble Fe(III) oxides as the electron acceptor, and effectively remediate groundwater contaminated with hydrocarbon fuels or uranium and similar contaminants associated with the mining and processing of nuclear fuel. A similar organic metallic-like conductivity may be an important mechanism for microorganisms to exchange electrons in syntrophic associations, such as those responsible for the conversion of organic wastes to methane in anaerobic digesters, a proven bioenergy technology. Biofilms with conductivities rivaling those of synthetic polymers help Geobacter species generate the high current densities in microbial fuel cells producing electric current from organic compounds. Electron transfer in the reverse direction, i.e. from electrodes to microbes, is the basis for microbial electrosynthesis, in which microorganisms reduce carbon dioxide to fuels and other useful organic compounds with solar energy in a form of artificial photosynthesis that is more efficient and avoids many of the environmental sustainability concerns associated with biomass-based bioenergy strategies. The ability of Geobacter species to produce highly conductive electronic networks that function in water opens new possibilities in the emerging field of bioelectronics.

Lovley, DR↗

Development of a multi-purpose container system for the storage, transport and disposal of PWR spent fuel in the UK - 15466

Radioactive Waste Management Limited (RWM) is a wholly owned subsidiary of UK's Nuclear Decommissioning Authority, and is responsible for implementing UK Government policy on geological disposal of higher activity radioactive waste. An aspect of the generic work programme that underpins the current generic disposal concepts includes the development of the associated disposal containers. To date RWM has focused on the development of a range of disposal container designs that fulfil the requirements for transport and disposal in a Geological Disposal Facility (GDF) for legacy high heat generating wastes, one of which includes legacy Pressurised Water Reactor (PWR) spent nuclear fuel (SF). In line with a number of European countries exploring deep geological disposal, the conceptual disposal container solution developed for this waste type has a capacity of 4 PWR fuel assemblies. Since 2013, the feasibility of developing an alternative higher capacity disposal container design based around the Multi-Purpose Container (MPC) concept has been explored. In general terms, MPCs are containers that are designed to meet requirements for safe containment of radioactive waste during storage, transport and disposal. The fundamental design philosophy of the MPC is that once the waste is packaged in an MPC, it would not need to be handled again. That is, after a period of initial cooling in a fuel pond, the SF could be packaged for long term dry storage and would not require direct handling for its eventual transport to, and disposal in, a GDF. The novel feature of the MPC system design considered is the inclusion of an additional overpack specifically for the final deep geological disposal phase. The conceptual MPC and its associated storage, transfer, transport and thick walled carbon steel disposal overpack have been developed to a conceptual level of design detail to demonstrate concept feasibility, with the final design solution confirming a MPC system with a capacity of 12 PWR SF assembles. This represents the highest capacity PWR MPC system that complies with the mass and rail gauge limits of the UK W6a rail gauge. Such a capacity realises a contents loading three times that of the standard PWR disposal container and presented technical challenges from both a structural performance and thermal perspective; necessitating the need for the inclusion of features to enhance heat transfer from the central fuel assemblies within the MPC and novel lid features on the transport container overpack to maintain structural integrity and containment during the hypothetical accident conditions of transport tests. In developing the MPC system conceptual design it is recognised that, depending upon the safety functions of the MPC disposal overpack, the choice of carbon steel material may not be suitable for all geological environments. Consequently, the MPC system design and its materials of construction will require further evaluation once detailed knowledge of the disposal concept to be implemented, its safety functions and geological environment are known. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Microchannel Reactor System Design & Demonstration For On-Site H2O2 Production by Controlled H2/O2 Reaction

We successfully demonstrated an innovative hydrogen peroxide (H2O2) production concept which involved the development of flame- and explosion-resistant microchannel reactor system for energy efficient, cost-saving, on-site H2O2 production. We designed, fabricated, evaluated, and optimized a laboratory-scale microchannel reactor system for controlled direct combination of H2 and O2 in all proportions including explosive regime, at a low pressure and a low temperature to produce about 1.5 wt% H2O2 as proposed. In the second phase of the program, as a prelude to full-scale commercialization, we demonstrated our H2O2 production approach by ‘numbering up’ the channels in a multi-channel microreactor-based pilot plant to produce 1 kg/h of H2O2 at 1.5 wt% as demanded by end-users of the developed technology. To our knowledge, we are the first group to accomplish this significant milestone. We identified the reaction pathways that comprise the process, and implemented rigorous mechanistic kinetic studies to obtain the kinetics of the three main dominant reactions. We are not aware of any such comprehensive kinetic studies for the direct combination process, either in a microreactor or any other reactor system. We showed that the mass transfer parameter in our microreactor system is several orders of magnitude higher than what obtains in the macroreactor, attesting to the superior performance of microreactor. A one-dimensional reactor model incorporating the kinetics information enabled us to clarify certain important aspects of the chemistry of the direct combination process as detailed in section 5 of this report. Also, through mathematical modeling and simulation using sophisticated and robust commercial software packages, we were able to elucidate the hydrodynamics of the complex multiphase flows that take place in the microchannel. In conjunction with the kinetics information, we were able to validate the experimental data. If fully implemented across the whole industry as a result of our technology demonstration, our production concept is expected to save >5 trillion Btu/year of steam usage and >3 trillion Btu/year in electric power consumption. Our analysis also indicates >50 % reduction in waste disposal cost and ~10% reduction in feedstock energy. These savings translate to ~30% reduction in overall production and transportation costs for the $1B annual H2O2 market.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Nuclear waste vitrification efficiency: cold cap reactions

The cost and schedule of nuclear waste treatment and immobilization are greatly affected by the rate of glass production. Various factors influence the performance of a waste-glass melter. One of the most significant, and also one of the least understood, is the process of batch melting. Studies are being conducted to gain fundamental understanding of the batch reactions, particularly those that influence the rate of melting, and models are being developed to link batch makeup and melter operation to the melting rate. Batch melting takes place within the cold cap, i.e., a batch layer floating on the surface of molten glass. The conversion of batch to glass consists of various chemical reactions, phase transitions, and diffusion-controlled processes. These include water evaporation (slurry feed contains as high as 60% water), gas evolution, the melting of salts, the formation of borate melt, reactions of borate melt with molten salts and with amorphous oxides (Fe2O3 and Al2O3), the formation of intermediate crystalline phases, the formation of a continuous glass-forming melt, the growth and collapse of primary foam, and the dissolution of residual solids. To this list we also need to add the formation of secondary foam that originates from molten glass but accumulates on the bottom of the cold cap. This study presents relevant data obtained for a high-level-waste melter feed and introduces a one-dimensional (1D) mathematical model of the cold cap as a step toward an advanced three-dimensional (3D) version for a complete model of the waste glass melter. The 1D model describes the batch-to-glass conversion within the cold cap as it progresses in a vertical direction. With constitutive equations and key parameters based on measured data, and simplified boundary conditions on the cold-cap interfaces with the glass melt and the plenum space of the melter, the model provides sensitivity analysis of the response of the cold cap to the batch makeup and melter conditions. The model demonstrates that batch foaming has a decisive influence on the rate of melting. Understanding the dynamics of the foam layer at the bottom of the cold cap and the heat transfer through it appears crucial for a reliable prediction of the rate of melting as a function of the melter-feed makeup and melter operation parameters. Although the study is focused on a batch for waste vitrification, the authors expect that the outcome will also be relevant for commercial glass melting.

Hrma, Pavel R↗

THE IMPACT OF THE MCU LIFE EXTENSION SOLVENT ON DWPF GLASS FORMULATION EFFORTS

As a part of the Actinide Removal Process (ARP)/Modular Caustic Side Solvent Extraction Unit (MCU) Life Extension Project, a next generation solvent (NG-CSSX), a new strip acid, and modified monosodium titanate (mMST) will be deployed. The strip acid will be changed from dilute nitric acid to dilute boric acid (0.01 M). Because of these changes, experimental testing with the next generation solvent and mMST is required to determine the impact of these changes in 512-S operations as well as Chemical Process Cell (CPC), Defense Waste Processing Facility (DWPF) glass formulation activities, and melter operations at DWPF. To support programmatic objectives, the downstream impacts of the boric acid strip effluent (SE) to the glass formulation activities and melter operations are considered in this study. More specifically, the impacts of boric acid additions to the projected SB7b operating windows, potential impacts to frit production temperatures, and the potential impact of boron volatility are evaluated. Although various boric acid molarities have been reported and discussed, the baseline flowsheet used to support this assessment was 0.01M boric acid. The results of the paper study assessment indicate that Frit 418 and Frit 418-7D are robust to the implementation of the 0.01M boric acid SE into the SB7b flowsheet (sludge-only or ARP-added). More specifically, the projected operating windows for the nominal SB7b projections remain essentially constant (i.e., 25-43 or 25-44% waste loading (WL)) regardless of the flowsheet options (sludge-only, ARP added, and/or the presence of the new SE). These results indicate that even if SE is not transferred to the Sludge Receipt and Adjustment Tank (SRAT), there would be no need to add boric acid (from a trim tank) to compositionally compensate for the absence of the boric acid SE in either a sludge-only or ARP-added SB7b flowsheet. With respect to boron volatility, the Measurement Acceptability Region (MAR) assessments also suggest that Slurry Mix Evaporator (SME) acceptability decisions would not be different assuming either 100% of the B{sub 2}O{sub 3} from the SE were retained or volatilized. More specifically, the 0.84 wt% B{sub 2}O{sub 3} in the SE is so minor that its presence in the SME analysis does not influence SME acceptability decisions. In fact, using the 100% retention and 100% volatilization composition projections, only minor differences in the predicted properties of the glass product occur with all of the glasses being acceptable over a WL interval of 32-42%. Based on the 0.01M boric acid flowsheet, there is very little difference between Frit 418 and Frit 418-7D (a frit that was compositionally altered to account for the 0.84 wt% B{sub 2}O{sub 3} in the SE) with respect to melt temperature. In fact, when one evaluates the composition of Frit 418-7D, it lies within the current Frit 418 vendor specifications and therefore could have been produced by the vendor targeting the nominal composition of Frit 418.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗